| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.0 LAdmitted-Finance | +0.00% | ₹11.0 L | L1 | Admitted-Finance |
| 2 | L2₹11.1 LAdmitted-Finance | +1.00% | ₹11.1 L | L2 | Admitted-Finance |
| 3 | L3₹11.2 LAdmitted-Finance | +2.00% | ₹11.2 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical REJECTED |
Tender Value
₹11.0 L
Closing Date
7 May 2026, 5:00 pmClosed
SARPANCH AND GRAMPANCHAYAT ADHIKARI BHOSARE
GRAMPANCHAYAT BHOSARE TAL-MADHA
CONSTRUCTING CEMENT CONCRETE ROAD IN WARD NO. 3 FROM NAVNATH CHOBE HOUSE TO GANESH MADANE HOUSE AT BHOSARE TAL- MADHA DIST-SOLAPUR
2026_SOLAP_1299578_1
02/2026-27
Open Tender
Civil Works
90 days
GRAMPANCHAYAT BHOSARE TAL-MADHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Exempted
25 Jun 2026
30 Apr 2026
8 May 2026
30 Apr 2026
7 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation in hard murum and boulders including shoring and strutting as necessary and disposing off excavated stuff as directed, excetra complete. (Lift up to 1.50 metre)
Item / Page No : 6 / 84
Specification No : BR.3
Spec. Page No : 102 | 190.5 | Cubic Metre | 139 | ₹26,479.5 |
| 2 | Clearing grass and removal of rubbish upto a distance of 50 metres outside the periphery of the area.
Item / Page No : 7 / 23
Specification No : MoRTH 201
Spec. Page No : ---
Additional Specifications : Where only grass is met with, the area cleared will be measured and paid for under this item. | 635 | Square Metre | 4 | ₹2,540 |
| 3 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening / binding material to fill the interstices of coarse aggregate, watering and compacting with Vibratory roller to the required density. - By Mechanical Means - Grading II Using Screening type-B (11.2 milimetre Aggregate)
Item / Page No : 20 / 29
Specification No : MORTH-401, 402, 404, 902, 112
Spec. Page No : 109-111, 112-116, 121-129, 417-421, 19-21 | 44.11 | Cubic Metre | 2,880.3 | ₹1,27,052.91 |
| 4 | Supplying hard murum / kankar at the road site, including conveying and stacking, excetra complete.
Item / Page No : 29a / 25
Specification No : MORTH-408
Spec. Page No : 139-142 | 11.76 | Cubic Metre | 638.3 | ₹7,508.32 |
| 5 | Spreading hard murum / soft murrum / gravel or kankar for side width, excetra complete.
Item / Page No : 30 / 25
Specification No : MORTH-408
Spec. Page No : 139-142 | 11.76 | Cubic Metre | 79 | ₹929.28 |
| 6 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20 metre X 0.90 metre size made out 18 gauge (1.25 milimetre) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols excetra with approved colour shade paint complete, on M.S.angle of size 35 milimetre X 35 milimetre X 3 milimetre frame with properly cross braced mild steel angles of size 35 milimetre X 35 milimetre X 3 milimetre duly painted including two mild steel angle iron posts of size 65 milimetre X 65 milimetre X 6 milimetre, 3.65 metre long painted with alternate black and white bands of 25 centimetre width including all fixtures excetraand fixing the boards in 1:4:8 concrete block of size 60 centimetre X 60 centimetre X 75 centimetre including, excavation, refilling, transportation, and labour etc complete. Spec. number As directed by Engineer in Charge
Item / Page No : 36 / 60
Specification No : MoRTH-801
Spec. Page No : ---
Additional Specifications : The work shall be carried out as per instructions of Engineer in charge. | 1 | Number | 3,759 | ₹3,759 |
| 7 | Royalty charges for various building construction bonafied materials which are used for government bonafied works and for which Royalty charges are to be paid by the contractor. (This Item is to be paid to the contractor only after he pays the Royalty amount to Revenue department and produces the required voucher.)
Item / Page No : 3 / 0
Additional Specifications : 1. Government of Maharashtra, Revenue and Forest Department Gazette Number 146 Dated 04/06/2021 and Government of Maharashtra Public Works Department State Schedule of Rates 2021-22 General Note Number A(v), Page 5. 2. The amount of royalty charges will be paid only after submission of the receipt in original from Revenue authority for payment of royalty to Government, stating the name of work. 3. Above / below percentage quoted by the contractor will not be applicable for this item. | 15.29 | Cubic Metre | 216.18 | ₹3,305.39 |
| 8 | Royalty charges for natural sand which is used for government bonafied works and for which Royalty charges are to be paid by the contractor. (This Item is to be paid to the contractor only after he pays the Royalty amount to Revenue department and produces the required voucher.)
Item / Page No : 3b / 0
Additional Specifications : 1. Government of Maharashtra, Revenue and Forest Department Gazette Number 146 Dated 04/06/2021 and Government of Maharashtra Public Works Department State Schedule of Rates 2021-22 General Note Number A(v), Page 5. 2. The amount of royalty charges will be paid only after submission of the receipt in original from Revenue authority for payment of royalty to Government, stating the name of work. 3. Above / below percentage quoted by the contractor will not be applicable for this item. | 43.74 | Cubic Metre | 237.37 | ₹10,382.56 |
| 9.01 | Laboratory testing charges for various materials required for items of work, on the basis of testing frequency and charges fixed by Vigilence and Quality Control Circle, Pune.
Item / Page No : 4 / 0
Additional Specifications : 1. The amount of laboratory testing charges will be paid to contractor only after submission of the original receipt from the Vigillence and Quality Control Office with the name of work mensioned on it. 2. Above / below percentage quoted by the contractor will not be applicable for this item.Sieve Analysis Test for Metal below 40 milimetre
1 Test per 100.00 Cubic Metre | 1 | Number | 690 | ₹690 |
| 9.02 | Flekiness Index / Elongation Index Test for Metal below 40 milimetre
1 Test per Source | 1 | Number | 850 | ₹850 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_2231636.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid