| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.3 CrAccepted-AOC COLLAGE ROAD JASHPURNAGAR JASHPURNAGAR JASHPUR CHHATTISGARH 496331 | JASHPUR | CHHATTISGARH | 496331 | L1 | Accepted-AOC L1 Letter No. 3190(S)WE Date-03.07.2023 | |
| 2 | L2₹64.2 Cr+₹89.3 L (1.41%)Rejected-Finance | L2 | Rejected-Finance L2 Letter No. 3190(S)WE Date-03.07.2023 | |
| 3 | L3₹65.0 Cr+₹1.7 Cr (2.72%)Rejected-Finance FLAT NO 207 LUMBINI ENCLAVE OPP NIMS PANJAGUTTA HYDERABAD 500082 | HYDERABAD | HYDERABAD | TELANGANA | 500082 | L3 | Rejected-Finance L3 Letter No. 3190(S)WE Date-03.07.2023 | |
| 4 | L4₹65.8 Cr+₹2.6 Cr (4.05%)Rejected-Finance 104 L I C COLONY VAISHALI NAGAR AJMER RAJASTHAN 305001 | AJMER | RAJASTHAN | 305001 | L4 | Rejected-Finance L4 Letter No. 3190(S)WE Date-03.07.2023 | |
| 5 | L5₹71.4 Cr+₹8.1 Cr (12.8%)Rejected-Finance 201 ROYAL ARCADE DR B BARUAH ROAD ULUBARI GUWAHATI 781007 | GUWAHATI | KAMRUP METRO | ASSAM | 781007 | L5 | Rejected-Finance L5 Letter No. 3190(S)WE Date-03.07.2023 |
Tender Value
₹74.0 Cr
EMD Value
₹74.1 L
Closing Date
1 Mar 2023, 12:00 pmClosed
EXECUTIVE ENGINEER RCD ROAD DIVISION SIMDEGA
EXECUTIVE ENGINEER RCD ROAD DIVISION SIMDEGA
Widening and Strengthening work of Biru (on NH - 143 ) - Tamra - Sikariyatanr - Ramrekhadham (on Kochedega - Ramrekha Road ) Road (Total Length -22.351 KM) under Road Division Simdega for the year 2022-23.
2023_CECOM_65725_1
RCD/SIMDEGA/15/2022-23
Open Tender
Civil Works
Item Wise
570 days
Biru (on NH - 143 ) - Tamra - Sikariyatanr - Ramre
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
EXECUTIVE ENGINEER RCD ROAD DIVISION SIMDEGA
₹74.1 L
Chief Engineer (Comm),RCD,Jharkhand,Ranchi
11 Jul 2023
2 Feb 2023
3 Mar 2023
2 Feb 2023
1 Mar 2023
8 Feb 2023
7 Feb 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land. Clearing and Grubbing Road Land .Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Manual means In area of light jungle | 16.05 | Hec. | - | - |
| 2 | Cutting of Trees, including cutting of Trunks, Branches and Removal of stumps and roots including backfillinbg with suitable material to required compaction. Cutting of trees stacking of serviceble material with all lifts and Removal of stumps, roots, staking of serviceable material with all lifts up to a lead of 1000 metres and earth filling in the depression/ pit. Girth 0.3m to 0.6 m | 129 | Each | - | - |
| 3 | Cutting of Trees, including cutting of Trunks, Branches and Removal of stumps and roots including backfillinbg with suitable material to required compaction. Cutting of trees stacking of serviceble material with all lifts and Removal of stumps, roots, staking of serviceable material with all lifts up to a lead of 1000 metres and earth filling in the depression/ pit. Girth 0.6m to 0.9m | 52 | Each | - | - |
| 4 | Cutting of Trees, including cutting of Trunks, Branches and Removal of stumps and roots including backfillinbg with suitable material to required compaction. Cutting of trees stacking of serviceble material with all lifts and Removal of stumps, roots, staking of serviceable material with all lifts up to a lead of 1000 metres and earth filling in the depression/ pit. Girth 0.9m to 1.8 m | 59 | Each | - | - |
| 5 | Cutting of Trees, including cutting of Trunks, Branches and Removal of stumps and roots including backfillinbg with suitable material to required compaction. Cutting of trees stacking of serviceble material with all lifts and Removal of stumps, roots, staking of serviceable material with all lifts up to a lead of 1000 metres and earth filling in the depression/ pit. Girth >1.8 m | 90 | Each | - | - |
| 6 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres. Cement concrete-M10 By Manual | 541.75 | Cum | - | - |
| 7 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement concrete- M15 & M20 By Manual | 1,399.17 | Cum | - | - |
| 8 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Brick work in cement Mortar by mechanical means | 506.14 | Cum | - | - |
| 9 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Rubble Masonary work in cement | 4,869.85 | Cum | - | - |
| 10 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Removal of Hume Pipe Upto 600mm dia | 152 | M | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_88261.xls
BOQ Document • 0.32 MB
113883308.pdf
Tender Document • 0.06 MB
SBD.pdf
Tender Document • 2.64 MB
113883310.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .