Tender Value
₹39.8 L
EMD Value
₹79,596
Closing Date
19 Mar 2020, 3:30 pmClosed
The Executive Engineer, ID,PWD., Puducherry
O/o The Executive Engineer, ID,PWD., Puducherry
Main Work Improvements of Primary storm water Drainage system in ABD area and Uppar Catchment area in Puducherry Region under Smart City Project in Union Territory of Puducherry Phase II. Package 6 Improvements and linking various urban storm drain
2020_PWDC2_6053_1
11/PW/IRRN/2020
Open Tender
Civil Works - Canal
Item Rate
180 days
Puducherry
Please refer Tender Documents
3 documents required · 3 mandatory
₹525
The Executive Engineer, ID,PWD., Puducherry
₹79,596
20 Mar 2020
10 Mar 2020
19 Mar 2020
10 Mar 2020
19 Mar 2020
10 Mar 2020
Amount
Earth work in excavation for foundation of structures as per drawings and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material - Ordinary Soil - Manual Means - Depth upto 3 metres including the cost of labour and overhead charges.
Providing, driving and installing driven cast -in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified , excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap) - 400 mm dia piles
Supplying and Filling in plinth with quarry rubbish under floors including watering, ramming consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40mm nominal size)
Centering and shuttering including strutting , propping etc and removal of form for - Lintels , beams , plinth beams , girders , bressumers and catilevers
Centering and shuttering including strutting , propping etc and removal of form for - Walls (any thickness ) including attached pilasters , butteresses , plinth and string courses etc.
Steel reinforcement for R.C.C.work including straightening , cutting , bending , placing in position and binding all complete upto plinth level - Thermo -Mechanically treated bars (ISI BRAND OF APPROVED MAKE) Fe - 415 or more
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size)
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (measurements to be taken of the face area timbered) . Depth not exceeding 1.5m
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (measurements to be taken of the face area timbered) . Depth exceeding 1.5m but not exceeding 3m
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work , using cement content as per approved design mix , manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads , having continuous agitated mixer , manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering , shuttering , finishing and reinforcement including cost of admixtures in recommended proportions as per IS : 9103 to accelerate / retard setting of concrete , improve workability without impairing strenghth and durability - Note :- Cement content considered in this item is @ 330 kg / cum. Excess / less cement used as per design mix is payable / recoverable separately - All work upto plinth level
Extra providing and laying Ready mix concrete - in all grade of concrete in PCC works / RCC works
MUTHUKUMARAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .