| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.8 LAccepted-AOC | ₹42.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹45.0 L+₹2.2 L (5.10%)Rejected-Finance | ₹45.0 L+₹2.2 L (5.10%) | L2 | Rejected-Finance L2 |
| 3 | L3₹50.3 L+₹7.5 L (17.5%)Rejected-Finance | ₹50.3 L+₹7.5 L (17.5%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically disqualified |
Tender Value
Refer Docs
EMD Value
₹99,000
Closing Date
4 Aug 2023, 3:00 pmClosed
The Project Director
DRDA Ramanathapuram
Renewal of the road from L026-Bogalur - Veeravanur to Thenjiyendal road Package no.TN14-56R
2023_RDTN_126738_2
DIPR/3802/Tender/2023 dt.20.07.2023
Open Tender
Civil Works - Roads
Item Rate
120 days
DRDA Ramanathapuram
Please refer Tender Document
4 documents required · 4 mandatory
₹0
₹99,000
6 Jan 2024
26 Jul 2023
4 Aug 2023
26 Jul 2023
4 Aug 2023
26 Jul 2023
Amount
Part-I Renewal Of the road from Bogalur-Veeravanur raod to Thenjiyanenthal Road Km 0/0-2/280
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44kg of Bitumen for 1cum of metal mixed in hot mix plant laying at site
Providing and applying tack coat with bitumen emulsion (RS1) using emulsion distributor at the rate of 0.2 to 0.25 kg per sqm on the prepared granuler surface treated with primer cleaned with Hydraulic broom as per Technical Specification Clause 503
BITUMINOUS CONCRETE 25MM THICK USING cmp (Grade-11Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 23.232 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete..
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.km 0/0-1/0
RoadMarking with Hot applied thermo Plastic compound with reflectorising glass beads on Bituminous Surface
Supply and fixing of KM stone SI No. 43 A.
Supply and fixing of HM stone SI No. 44 A
Provision for MS Name Board.
Provision for MS Sign Board.
Maintenance of the road
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
GANESAN SELVAM
G SIVAKUMAR
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .