Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.9 LAccepted-AOC 7TH MILE P O NONGLYER UPPER SHILLONG 793002 | SHILLONG | EAST KHASI HILLS | MEGHALAYA | 793002 | ₹32.9 L Quoted ₹33.0 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹37.4 L+₹4.4 L (13.2%)Rejected-Finance 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | ₹37.4 L+₹4.4 L (13.2%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹37.8 L+₹4.7 L (14.4%)Rejected-Finance | ₹37.8 L+₹4.7 L (14.4%) | L3 | Rejected-Finance Being L3 |
| Sl No | Description | Qty | Unit | madan enterprise L1 | M/S R.D. Electricals L3 | M/S DEEDAR ENTERPRISE L2 |
|---|---|---|---|---|---|---|
| 1.00 | Material and labour for cleaning of sewage line of any bore and description by rodding with green bamboo stick/cane stick/steel wire or any other method as directed and well flushing with water for easy flow and removal of sludge/silt, foreign materials and other deposits and disposing off the accumulated sludge/mud, foreign materials and other deposits to a distance not exceeding 50m, buried in ground to maintain hygine complete all as directed. | 600 | Running Meter | 220 ₹1,32,000 Lowest | 250 ₹1,50,000 | 220 ₹1,32,000 Lowest |
| 2.00 | Material and labour for cleaning of blocked pipe between floor/nahani trap and Gully trap by removing accumulated sludge/mud including cleaning and clearing of floor/nahani trap and Gully trap on either side and disposing off the accumulated sludge/mud to a distance not exceeding 100m, buried in ground to maintain hygine complete all as directed. | 100 | Each Job | 200 ₹20,000 Lowest | 300 ₹30,000 | 201 ₹20,100 |
| 3.00 | Material and labour for Cleaning of sewage line blockages from WCs/ Urinal//bathroom/kitchen trap to 1st Man hole or from1st floor/ 2nd floor to 1st man hole including removal of sludge by rodding or by another method etc by day to day basis as per complaint slip recceived from concerned AGE B/R-1 ( Complaint cell) located at HQ EAC(U) Area on all working days 0900 hrs to 1700 hrs only by deploying adequate person each day including all necessary T&P all as specfied and directed by Engineer in Charge. | 600 | Each Job | 200 ₹1,20,000 Lowest | 300 ₹1,80,000 | 201 ₹1,20,600 |
| 4.00 | Material and labour for cleaning of Manholes (as existing shape & size) of depth n.exc 1.0 Meter by pumping out the sewage water complete removing the sluge and other materials from Manholes by Mechanical means , rodding or any other suitable means removing the accumulated Night Soil, Sludge and other materials obtained from sewage lines and disinfacted the sludge within 50 metres distance including necessary excavation of Pits & returning, filing in sprinkling of Bleaching powder @ 0.50 kg/Sqm and dressing of surplus Soil, ground to slope if required and well flushing the manholes with water complete all as specified and directed by Engr-in-Charge | 120 | Each | 700 ₹84,000 Lowest | 700 ₹84,000 Lowest | 1,099 ₹1,31,880 |
| 5.00 | Material and labour for cleaning of Manholes (as existing shape & size) of depth exc 1.0 Meter but n.exc 2.00 Meter by pumping out the sewage water complete removing the sluge and other materials from Manholes by Mechanical means , rodding or any other suitable means removing the accumulated Night Soil, Sludge and other materials obtained from sewage lines and disinfacted the sludge within 50 metres distance including necessary excavation of Pits & returning, filing in sprinkling of Bleaching powder @ 0.50 kg/Sqm and dressing of surplus Soil, ground to slope if required and well flushing the manholes with water complete all as specified and directed by Engr-in-Charge | 20 | Each | 1,100 ₹22,000 Lowest | 1,300 ₹26,000 | 2,499 ₹49,980 |
| 6.00 | Dewatering /Desludging of septic tank/soak well /soak pit and Manhole by manually or mechanically and removing muddy soil sludge etc . The removal of silt/sludge & other deposits are transporting the same in covered van/trolley to a distance not exceeding 100m, excavating pit and safely buried the same in pit, top portion of pit covered with soil and excess soil spreaded evenly or removed to a distance not exceeding 50m, applying bleaching powder @ 1Kg / Sqm of covered area to maintain hygine of sludge to a distance not exceeding 250 metre and burried in the same pit. | 60 | Cubic Meter | 2,500 ₹1,50,000 Lowest | 3,000 ₹1,80,000 | 5,999 ₹3,59,940 |
| 7.00 | Material and labour for cleaning and clearing of existing septic tanks any size/depth by bailing out effluent, removing the silt/sludge & other deposits mechanically with combined high pressure water jetting cum suction (Vaccum/honey sucker) type machine mounted on LCV/HCV and having facilities of high pressure water thermoplastic fibre braided water jetting hose and through conical/ round shape nozzle pipe and flushing after cleaning and removing the silt/sludge & other deposits and transporting the same in covered van/trolley at a place as directed ,excavating pit and safely buried the same in pit, top portion of pit covered with soil and excess soil spreaded evenly or removed to a distance not exceeding 50m, appllying bleaching powder @ 1Kg / Sqm of bcovered area to maintain hygine and writing particulars of cleaning date with synthetic enamel paint on septic tanks complete all as directed. | 120 | Cubic Meter | 6,000 ₹7,20,000 Lowest | 6,500 ₹7,80,000 | 6,000 ₹7,20,000 Lowest |
| 7.01Notes against Item No 01 to 07: Irrespective of whatever mentioned in the description of the items and elsewhere in the tender document, it is mandatory condition of the contract that the provision of " The Prohibition of Employment as Manual Scavangers and their Rehabilitation Act 2013" (Revised upto date till the Performance period of the contract) shall be strictly adhered to in execution of the contract failing which the contractor shall be liable for action(s) as provided under the act and as per laws governing the contract. The contractor shall be deemed to have taken cognigence thereof while quoting their rates and no claim whatsoever shall be entertained at a later date on this account. | ||||||
| 8.00 | Demolition of Precast concrete block/ Brickwork or stone/boulder masonry, laid with cement morter complete all as directed. | 5 | Cubic Meter | 3,000 ₹15,000 | 3,500 ₹17,500 | 2,999 ₹14,995 Lowest |
| 9.00 | Demolition of plain cement Concrete (unreinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as directed. | 2 | Cubic Meter | 2,000 ₹4,000 Lowest | 3,000 ₹6,000 | 2,000 ₹4,000 Lowest |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
15 Jun 2026, 6:00 pmClosed
GE (I) (AF) Shillong
GE (I) (AF) Shillong Elephant Falls Camp PO Nonglyer Shillong-793009
REPAIR TO DRAIN, SUNKEN FLOOR AND CLEANING OF SEPTIC TANK, MANHOLES, SEWAGE LINES ETC. AT HQ EAC (U) AF UNDER GE (I) (AF) SHILLONG
2026_MES_767705_1
8028/26/E8
Open Tender
Civil Works - Water Works
Item Rate
180 days
GE (I) (AF) Shillong
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE (I) (AF) Shillong
₹60,000
Yes
7 Jul 2026
25 May 2026
17 Jun 2026
25 May 2026
15 Jun 2026
8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material and labour for cleaning of sewage line of any bore and description by rodding with green bamboo stick/cane stick/steel wire or any other method as directed and well flushing with water for easy flow and removal of sludge/silt, foreign materials and other deposits and disposing off the accumulated sludge/mud, foreign materials and other deposits to a distance not exceeding 50m, buried in ground to maintain hygine complete all as directed. | 600 | Running Meter | - | - |
| 2 | Material and labour for cleaning of blocked pipe between floor/nahani trap and Gully trap by removing accumulated sludge/mud including cleaning and clearing of floor/nahani trap and Gully trap on either side and disposing off the accumulated sludge/mud to a distance not exceeding 100m, buried in ground to maintain hygine complete all as directed. | 100 | Each Job | - | - |
| 3 | Material and labour for Cleaning of sewage line blockages from WCs/ Urinal//bathroom/kitchen trap to 1st Man hole or from1st floor/ 2nd floor to 1st man hole including removal of sludge by rodding or by another method etc by day to day basis as per complaint slip recceived from concerned AGE B/R-1 ( Complaint cell) located at HQ EAC(U) Area on all working days 0900 hrs to 1700 hrs only by deploying adequate person each day including all necessary T&P all as specfied and directed by Engineer in Charge. | 600 | Each Job | - | - |
| 4 | Material and labour for cleaning of Manholes (as existing shape & size) of depth n.exc 1.0 Meter by pumping out the sewage water complete removing the sluge and other materials from Manholes by Mechanical means , rodding or any other suitable means removing the accumulated Night Soil, Sludge and other materials obtained from sewage lines and disinfacted the sludge within 50 metres distance including necessary excavation of Pits & returning, filing in sprinkling of Bleaching powder @ 0.50 kg/Sqm and dressing of surplus Soil, ground to slope if required and well flushing the manholes with water complete all as specified and directed by Engr-in-Charge | 120 | Each | - | - |
| 5 | Material and labour for cleaning of Manholes (as existing shape & size) of depth exc 1.0 Meter but n.exc 2.00 Meter by pumping out the sewage water complete removing the sluge and other materials from Manholes by Mechanical means , rodding or any other suitable means removing the accumulated Night Soil, Sludge and other materials obtained from sewage lines and disinfacted the sludge within 50 metres distance including necessary excavation of Pits & returning, filing in sprinkling of Bleaching powder @ 0.50 kg/Sqm and dressing of surplus Soil, ground to slope if required and well flushing the manholes with water complete all as specified and directed by Engr-in-Charge | 20 | Each | - | - |
| 6 | Dewatering /Desludging of septic tank/soak well /soak pit and Manhole by manually or mechanically and removing muddy soil sludge etc . The removal of silt/sludge & other deposits are transporting the same in covered van/trolley to a distance not exceeding 100m, excavating pit and safely buried the same in pit, top portion of pit covered with soil and excess soil spreaded evenly or removed to a distance not exceeding 50m, applying bleaching powder @ 1Kg / Sqm of covered area to maintain hygine of sludge to a distance not exceeding 250 metre and burried in the same pit. | 60 | Cubic Meter | - | - |
| 7 | Material and labour for cleaning and clearing of existing septic tanks any size/depth by bailing out effluent, removing the silt/sludge & other deposits mechanically with combined high pressure water jetting cum suction (Vaccum/honey sucker) type machine mounted on LCV/HCV and having facilities of high pressure water thermoplastic fibre braided water jetting hose and through conical/ round shape nozzle pipe and flushing after cleaning and removing the silt/sludge & other deposits and transporting the same in covered van/trolley at a place as directed ,excavating pit and safely buried the same in pit, top portion of pit covered with soil and excess soil spreaded evenly or removed to a distance not exceeding 50m, appllying bleaching powder @ 1Kg / Sqm of bcovered area to maintain hygine and writing particulars of cleaning date with synthetic enamel paint on septic tanks complete all as directed. | 120 | Cubic Meter | - | - |
| 8 | Demolition of Precast concrete block/ Brickwork or stone/boulder masonry, laid with cement morter complete all as directed. | 5 | Cubic Meter | - | - |
| 9 | Demolition of plain cement Concrete (unreinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as directed. | 2 | Cubic Meter | - | - |
| 10 | Demolition of unreinforced cement concrete of any description and in any position complete all as specified. | 0.5 | Cubic Meter | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Tender8028.pdf
Tender Documents • 0.95 MB
BOQ_859754.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .