Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹1.3 Cr+₹24.7 L (23.5%)Rejected-Finance ROMA BANJARA TANDA CHS BUILDING NO 1 ROOM NO 506 MANKHURD W MUMBAI 400 043 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400043 | ₹1.3 Cr+₹24.7 L (23.5%) | L2 | Rejected-Finance Not being L1 |
| 3 | L3₹1.4 Cr+₹37.4 L (35.6%)Rejected-Finance | ₹1.4 Cr+₹37.4 L (35.6%) | L3 | Rejected-Finance Not being L1 |
| 4 | Rejected-Technical ROOM NO 608 BLDG NO 06 R B T CO OP HSG SOC NEW CHIKUWADI MANKHURD W MUMBAI 400043 | MUMBAI SUBURBAN | MAHARASHTRA | 400043 | - | - | Rejected-Technical Not Meeting NIT stipulations |
| 5 | Rejected-Technical | - | - | Rejected-Technical Solvency submitted is not authentic |
| Sl No | Description | Qty | Unit | M/s. Shiv Langeshwar Enterprises L3 | OM NILKANTHA CONSTRUCTION L1 | SUNIL CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling plain cement concrete manually / by mechanical means carefully without damaging adjacent structures including disposal of debris within 200 m lead as per direction of Engineer-in-Charge. | 3 | CuM | 2,010 ₹6,030 | 3,000 ₹9,000 | 2,000 ₹6,000 Lowest |
| 2.00 | Dismantling of RCC works carefully manually without damaging adjacent structures excluding cuttingof reinforcement including stacking of steel reinforcement bars and disposal of unserviceable materials within 200 m lead as per direction of Engineer-in-charge. | 3 | CuM | 3,500 ₹10,500 | 4,000 ₹12,000 | 3,000 ₹9,000 Lowest |
| 3.00 | Dismantling barbed wire / flexible wire rope in fencing including making rolls and stacking within 100 m lead. | 50 | Kg | 42 ₹2,100 | 100 ₹5,000 | 20 ₹1,000 Lowest |
| 4.00 | Providing and applying one coat of cement primer of approved brand on wall surface to receive specified paint including scaffolding complete all as per specifications and as directed by Engineer-in-charge. | 1,000 | SqM | 65 ₹65,000 Lowest | 75 ₹75,000 | 100 ₹1,00,000 |
| 5.00 | Providing and applying wall painting two coats on new work with premium plastic emulsion paint of approved brand to give an even shade, including a coat of approved cement primer, including preparation of the surfaces, scaffolding complete. as per specifications and as directed by the Engineer-in-charge. | 8,000 | SqM | 125 ₹10,00,000 Lowest | 150 ₹12,00,000 | 200 ₹16,00,000 |
| 6.00 | Providing and applying white cement based wall putty of approved make over concrete or Plastered surface up to 3 mm thick to get uniform surface free from undulation including cleaning complete all as directed by the Engineer-in-charge. | 5,000 | SqM | 195 ₹9,75,000 | 85 ₹4,25,000 Lowest | 120 ₹6,00,000 |
| 7.00 | Providing and painting walls with (Two coats) of approved shade of high build protective, elastomeric water proof exterior grade paint of approved make of required shade, minimum dry film thickness of 250 microns achieved in two or more coats / as per manufacturer's specifications including preparation of the surfaces by scrapping / wire brush, scaffolding complete. Primer coat will be with approved make with water in ratio of 1:2 and 2 coats of finishing coat without water all as directed by Engineer-in-charge. | 12,000 | SqM | 470 ₹56,40,000 | 240 ₹28,80,000 Lowest | 350 ₹42,00,000 |
| 8.00 | Providing and fixing double tubular scaffolding system using H- frames with cup lock type on the exterior side upto seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S clamps and M.S staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and as approved by the Engineer -in - charge. The elevation area of the scaffolding shall be measured for payment purposes. The payment shall be made once irrespective of duration of scaffolding. | 12,000 | SqM | 232 ₹27,84,000 | 90 ₹10,80,000 Lowest | 180 ₹21,60,000 |
| 9.00 | Dismantling old plaster / skirting carefully, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 100 m lead. | 1,500 | SqM | 156 ₹2,34,000 | 90 ₹1,35,000 Lowest | 100 ₹1,50,000 |
| 10.00 | Providing 15 mm thick plastering using Ready mix internal plastering compound of approved make for internal faces of brickwork / concrete surfaces including preparation of the surface, curing, cleaning, scaffolding complete all as per specifications and as directed at site by the Engineer-in-charge. | 500 | SqM | 650 ₹3,25,000 | 600 ₹3,00,000 Lowest | 825 ₹4,12,500 |
Tender Value
₹1.2 Cr
EMD Value
₹2.9 L
Closing Date
3 Jul 2026, 3:00 pmClosed
Chief Engineer, CED
CED, BARC, Trombay, Mumbai.
Structural Repair, External and Internal Painting, and Chain-Link Fencing of CC, CSU, 22 KV Sub-Station, and Other Hill side Buildings, including other miscellaneous works at the North site, BARC, Trombay, Mumbai, for the years 2026-2028.
2026_BARC_912384_1
BARC/CED/ET/21/2026-2027 DATE 09/06/2026
Open Tender
Civil Works
Works
540 days
CC, CSU, 22 KV Sub-StationBARC, Trombay, Mumbai.
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹2.9 L
17 Sept 2026
10 Jun 2026
8 Jul 2026
10 Jun 2026
3 Jul 2026
19 Jun 2026
10 Jun 2026 - 17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling plain cement concrete manually / by mechanical means carefully without damaging adjacent structures including disposal of debris within 200 m lead as per direction of Engineer-in-Charge. | 3 | CuM | - | - |
| 2 | Dismantling of RCC works carefully manually without damaging adjacent structures excluding cuttingof reinforcement including stacking of steel reinforcement bars and disposal of unserviceable materials within 200 m lead as per direction of Engineer-in-charge. | 3 | CuM | - | - |
| 3 | Dismantling barbed wire / flexible wire rope in fencing including making rolls and stacking within 100 m lead. | 50 | Kg | - | - |
| 4 | Providing and applying one coat of cement primer of approved brand on wall surface to receive specified paint including scaffolding complete all as per specifications and as directed by Engineer-in-charge. | 1,000 | SqM | - | - |
| 5 | Providing and applying wall painting two coats on new work with premium plastic emulsion paint of approved brand to give an even shade, including a coat of approved cement primer, including preparation of the surfaces, scaffolding complete. as per specifications and as directed by the Engineer-in-charge. | 8,000 | SqM | - | - |
| 6 | Providing and applying white cement based wall putty of approved make over concrete or Plastered surface up to 3 mm thick to get uniform surface free from undulation including cleaning complete all as directed by the Engineer-in-charge. | 5,000 | SqM | - | - |
| 7 | Providing and painting walls with (Two coats) of approved shade of high build protective, elastomeric water proof exterior grade paint of approved make of required shade, minimum dry film thickness of 250 microns achieved in two or more coats / as per manufacturer's specifications including preparation of the surfaces by scrapping / wire brush, scaffolding complete. Primer coat will be with approved make with water in ratio of 1:2 and 2 coats of finishing coat without water all as directed by Engineer-in-charge. | 12,000 | SqM | - | - |
| 8 | Providing and fixing double tubular scaffolding system using H- frames with cup lock type on the exterior side upto seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S clamps and M.S staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and as approved by the Engineer -in - charge. The elevation area of the scaffolding shall be measured for payment purposes. The payment shall be made once irrespective of duration of scaffolding. | 12,000 | SqM | - | - |
| 9 | Dismantling old plaster / skirting carefully, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 100 m lead. | 1,500 | SqM | - | - |
| 10 | Providing 15 mm thick plastering using Ready mix internal plastering compound of approved make for internal faces of brickwork / concrete surfaces including preparation of the surface, curing, cleaning, scaffolding complete all as per specifications and as directed at site by the Engineer-in-charge. | 500 | SqM | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 14.36 MB
Tendernotice_2.pdf
PDF • 1.71 MB
BOQ_958860.xls
BOQ • 0.29 MB
TechnicalbidET21.xls
Tender Documents • 0.07 MB
ScheduleAET21.pdf
Tender Documents • 0.67 MB
ProformaofScheduleAtoFET21.pdf
Tender Documents • 2.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .