Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.5 LAccepted-AOC 138 CANNING STREET GROUND FLOOR KOLKATA | KOLKATA | WEST BENGAL | L1 | Accepted-AOC Accepted | |
| 2 | L2₹21.5 L+₹4,613.88 (0.22%)Rejected-Finance 01 BALIA BALIA SAGARDIGHI MURSHIDABAD WEST BENGAL 742237 | MURSHIDABAD | WEST BENGAL | 742237 | L2 | Rejected-Finance Rejected | |
| 3 | L3₹21.6 L+₹9,607.63 (0.45%)Rejected-Finance 344 1 SB GORAI ROAD HILL VIEW PARK NORTH ASANSOL | ASANSOL | WEST BENGAL | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | EASTERN INDIA SALES AND SERVICE L3 | WEST BENGAL ENGINEERING CO. L1 | DAS ENTERPRISE L2 |
|---|---|---|---|---|---|---|
| 1.00 | INTAKE: -
Labour charges for 3 (three) nos. operating personnel for operation and guarding of 2 x 630KVA Substation equipment’s at Intake with all accessories | 366 | /day | 1,566 ₹5,73,156 | 1,560 ₹5,70,960 Lowest | 1,563 ₹5,72,058 |
| 2.00 | Testing and calibrationand different relays, breakers, for smooth operation of x 630 KVA Sub-Station by any testing Agency approved by WBSEDCL or Directorate of Electricity Board as per direction of E.I.C. ( preferable in the internalval of 6 months) | 2 | L.S | 49,500 ₹99,000 | 49,000 ₹98,000 Lowest | 49,200 ₹98,400 |
| 3.00 | WTP: -
Labour charges for 4 (Four) nos. operating personnel for operation and guarding of pump / valve / disinfection arrangement with all accessories for above period | 366 | /Day | 2,088 ₹7,64,208 | 2,080 ₹7,61,280 Lowest | 2,084 ₹7,62,744 |
| 4.00 | Testing and calibrationand different relays, breakers, for smooth operation of x 800 KVA Sub-Station by any testing Agency approved by WBSEDCL or Directorate of Electricity Board as per direction of E.I.C. ( preferable in the internalval of 6 months) | 2 | L.S | 49,500 ₹99,000 | 49,000 ₹98,000 Lowest | 49,200 ₹98,400 |
| 5.00 | ESIC Contribution of Employers for SL NO-(1&3) | 366 | /day | 92.15 ₹33,726.9 | 91.9 ₹33,635.4 Lowest | 92.1 ₹33,708.6 |
| 6.00 | EPF Contribution of Empleyers for SL NO-(1&3) | 366 | /day | 368.4 ₹1,34,834.4 | 367.63 ₹1,34,552.58 Lowest | 368.1 ₹1,34,724.6 |
| 7.00 | Supervision charges for electrical installation by licensed electrician having requisite parts as per IE rules 1956 with latest amendments and overhead expenditures for the above period. | 12 | /month | 8,725 ₹1,04,700 | 8,678 ₹1,04,136 Lowest | 8,700 ₹1,04,400 |
| 112.00 | Add: 18% GST | 1 | Item | 3,25,552.55 ₹3,25,552.55 | 3,24,101.52 ₹3,24,101.52 Lowest | 3,24,798.34 ₹3,24,798.34 |
| 113.00 | Add: 1% Cess | 1 | Item | 21,341.78 ₹21,341.78 | 21,246.66 ₹21,246.66 Lowest | 21,292.34 ₹21,292.34 |
Tender Value
Refer Docs
EMD Value
₹55,500
Closing Date
1 Sept 2023, 5:00 pmClosed
Executive Engineer, BMD, PHE, Dte
Office of the Executive Engineer. Bankura Mechanical Division. P.H.E. Dte. Ailakundi, PO Kenduadihi, Bankura 722102.
Operation and Guarding of pumping machineries, 2 x 630 KVA, 2 x 800KVA sub-station and other Electro mechanical installation at Plasto Industrial park Water Supply Scheme under Bankura Mechanical Division, P.H.E. Dte
2023_PHED_552399_10
WBPHED/EE/BMD/NIeT- 16 OF 2023-2024
Open Tender
MECHANICAL
Item Rate
366 days
Bankura
Please refer Tender documents.
5 documents required · 5 mandatory
₹55,500
Yes
18 Nov 2025
8 Aug 2023
4 Sept 2023
8 Aug 2023
1 Sept 2023
8 Aug 2023
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .