| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAdmitted-Finance | ₹2.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.3 CrAdmitted-Finance | ₹2.3 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.4 CrAdmitted-Finance | ₹2.4 Cr | L3 | Admitted-Finance |
| 4 | L4₹2.4 CrAdmitted-Finance 2ND AND 3RD FLOOR WZ92C RAJA GARDEN RING ROAD NEW DELHI 110015 | WEST | DELHI | 110015 | ₹2.4 Cr | L4 | Admitted-Finance |
| 5 | L5₹2.5 CrAdmitted-Finance C 91 GROUND FLOOR SHIVALIK MALVIYA NAGAR NEW DELHI PIN 110017 | NEW DELHI | NEW DELHI | DELHI | 110017 | ₹2.5 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Spar Geo Infra Pvt Ltd L4 | Techpro Engineers Pvt Ltd L1 | SPACE ENGINEERS CONSORTIUM PRIVATE LIMITED L2 | Sood & Company L3 | IGS GEOTECHNICAL SERVICES LLP L5 | Pureways Infra Private limited L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Transportation cost of Drilling equipment like Machines, Pumps and accessories by 10 T capacity motor vehicles including loading, unloading and security complete. (a) up to 100Km | 4 | Each Trip | 2,50,000 ₹10 L | 2,00,000 ₹8 L | 75,000 ₹3 L | 25,000 ₹1 L | 88,500 ₹3.5 L | 15,842 ₹63,368 |
| 2.00 | Transportation cost of Drilling equipment like Machines, Pumps and accessories by 10 T capacity motor vehicles including loading, unloading and security complete. (b) add extra for every 50Km | 32 | Each Trip | 40,000 ₹12.8 L | 5,000 ₹1.6 L | 10,000 ₹3.2 L | 10,000 ₹3.2 L | 21,240 ₹6.8 L | 2,112 ₹67,584 |
| 3.00 | Making Approach Path and Cutting of Steps in hilley terrain including cost of labour and T&P complete for 3.0 m wide path | 13.65 | per 100 m length | 25,000 ₹3.4 L | 10,000 ₹1.4 L | 25,000 ₹3.4 L | 10,000 ₹1.4 L | 11,800 ₹1.6 L | 2,640 ₹36,036 |
| 4.00 | Dismantling, transportation and assembling of Drilling Machines of different capacity complete by head load including cost of labour, T&P, etc as per directions of engineer-in-charge. (b) up to 500 m lead | 2 | Each machine | 1,00,000 ₹2 L | 2,00,000 ₹4 L | 2,00,000 ₹4 L | 40,000 ₹80,000 | 1,47,500 ₹3.0 L | 14,785 ₹29,570 |
| 5.00 | Laying of Temporary Water Supply pipelines (25 mm diameter and above) of varying lengths from the nearest water source and construction of Temporary Water Retaining Pit of size 2 m x 1 m x 0.5 m complete with cost of all labour, material, T&P and transport as per directions of engineer-in-charge. Including the cost of GI pipes and fittings: upto 200m | 2 | Each | 2,00,000 ₹4 L | 75,000 ₹1.5 L | 25,000 ₹50,000 | 25,000 ₹50,000 | 29,500 ₹59,000 | 5,281 ₹10,562 |
| 6.00 | Construction of Platform with locally available material of size 6 m x 6 m x 1 m for housing the Drilling Machine complete with cost of labour, material, T&P and transport as per directions of engineer-in-charge. | 2 | Each | 1,00,000 ₹2 L | 60,000 ₹1.2 L | 40,000 ₹80,000 | 40,000 ₹80,000 | 29,500 ₹59,000 | 16,898 ₹33,796 |
| 7.00 | Carrying out of Diamond Core Drilling in NX size in different formations and at locations other than under water not involving construction of floating platform including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS standards, their marking and taking colour photographs of the preserved cores etc complete with cost of all labour, T&P and POL as per directions of engineer-in-Charge.In overburden soil and sandy strata mixed with boulders upto 100m depth | 200 | meter | 11,000 ₹22 L | 10,000 ₹20 L | 8,500 ₹17 L | 13,000 ₹26 L | 12,980 ₹26.0 L | 14,257 ₹28.5 L |
| 8.00 | Carrying out of Diamond Core Drilling in NX size in different formations and at locations other than under water not involving construction of floating platform including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS standards, their marking and taking colour photographs of the preserved cores etc complete with cost of all labour, T&P and POL as per directions of engineer-in-Charge. In hard rock formation up to 100 m depth | 600 | meter | 12,000 ₹72 L | 10,500 ₹63 L | 9,500 ₹57 L | 13,000 ₹78 L | 14,160 ₹85.0 L | 16,370 ₹98.2 L |
| 9.00 | Carrying out of Diamond Core Drilling in NX size in different formations and at locations other than under water not involving construction of floating platform including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS standards, their marking and taking colour photographs of the preserved cores etc complete with cost of all labour, T&P and POL as per directions of engineer-in-Charge. In hard rock formation beyond 100 m and up to 300 m depth | 676 | meter | 13,500 ₹91.3 L | 12,500 ₹84.5 L | 10,000 ₹67.6 L | 13,000 ₹87.9 L | 14,750 ₹99.7 L | 17,426 ₹1.2 Cr |
| 10.00 | Consolidation Grouting Operation for Corner holes including placing of Grout material (cement) with admixture | 369 | per nos | 5,500 ₹20.3 L | 2,000 ₹7.4 L | 17,000 ₹62.7 L | 8,730 ₹32.2 L | 2,360 ₹8.7 L | 5,281 ₹19.5 L |
Tender Value
₹2.6 Cr
EMD Value
₹5.3 L
Closing Date
29 Sept 2025, 5:00 pmClosed
DGM(Civil)
PnC Division, Kamala HE Project, Tamen, Arunachal Pradesh
Exploratory Drilling works of 04 Nos holes at Right Bank (181m each) and 04 Nos holes at Left Bank (188m each) of Kamala River at Dam Axis of Kamala HE Project, Arunachal Pradesh
2025_NHPC_875441_1
NH/KHEP/PNC/NIT/2025/663
Open Tender
Civil Works
Kamala HE Project, Tamen
As per NIT
8 documents required · 8 mandatory
₹1,770
NHPC Limited
₹5.3 L
6 Jan 2026
2 Sept 2025
6 Oct 2025
2 Sept 2025
29 Sept 2025
2 Sept 2025
Amount
Transportation cost of Drilling equipment like Machines, Pumps and accessories by 10 T capacity motor vehicles including loading, unloading and security complete. (a) up to 100Km
Transportation cost of Drilling equipment like Machines, Pumps and accessories by 10 T capacity motor vehicles including loading, unloading and security complete. (b) add extra for every 50Km
Making Approach Path and Cutting of Steps in hilley terrain including cost of labour and T&P complete for 3.0 m wide path
Dismantling, transportation and assembling of Drilling Machines of different capacity complete by head load including cost of labour, T&P, etc as per directions of engineer-in-charge. (b) up to 500 m lead
Laying of Temporary Water Supply pipelines (25 mm diameter and above) of varying lengths from the nearest water source and construction of Temporary Water Retaining Pit of size 2 m x 1 m x 0.5 m complete with cost of all labour, material, T&P and transport as per directions of engineer-in-charge. Including the cost of GI pipes and fittings: upto 200m
Construction of Platform with locally available material of size 6 m x 6 m x 1 m for housing the Drilling Machine complete with cost of labour, material, T&P and transport as per directions of engineer-in-charge.
Carrying out of Diamond Core Drilling in NX size in different formations and at locations other than under water not involving construction of floating platform including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS standards, their marking and taking colour photographs of the preserved cores etc complete with cost of all labour, T&P and POL as per directions of engineer-in-Charge.In overburden soil and sandy strata mixed with boulders upto 100m depth
Carrying out of Diamond Core Drilling in NX size in different formations and at locations other than under water not involving construction of floating platform including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS standards, their marking and taking colour photographs of the preserved cores etc complete with cost of all labour, T&P and POL as per directions of engineer-in-Charge. In hard rock formation up to 100 m depth
Carrying out of Diamond Core Drilling in NX size in different formations and at locations other than under water not involving construction of floating platform including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS standards, their marking and taking colour photographs of the preserved cores etc complete with cost of all labour, T&P and POL as per directions of engineer-in-Charge. In hard rock formation beyond 100 m and up to 300 m depth
Consolidation Grouting Operation for Corner holes including placing of Grout material (cement) with admixture
Water permeability tests at different depth:upto 100m.
Water permeability tests at different depth: from 100m -300m.
Fabrication and supply of seasoned wooden Core Box of size 1.5 m x 0.3 m x 0.1 m with wooden separators, hinges, handles etc. complete in all respect as per directions of engineer-in-charge.
Providing and laying cement concrete 1:2:4(1cement:2 Coarse sand:4 stone aggregate 20mm nominal size) excluding the cost of centring and shuttering in: (a) Foundation & Plinth.
Centring and shuttering including struting proping etc. and removal of form work for:(a) Foundation and plinth.
Loading and Unloading of Stone Boulder / Stone aggregates / Sand /Kanker/Moorum / Lime / Shingle /Surki/ Earth / Excavated Rock and Kerb Stones by Manual Means for hill roads.
Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe /Wooden Logs / Bricks / Bitumen and Timber etc by Manual Means and Stacking for hill roads.
Cost of haulage excluding loading and unloading(i)Surfaced Road.
Cost of haulage excluding loading and unloading on hill roads. Haulage of materials by Tipper excluding cost of loading, unloading and stacking. (ii) Unsurfaced Gravel road.
SPACE ENGINEERS CONSORTIUM PRIVATE LIMITED (BID ID -3290760)
Sood & Company (BID ID -3280530)
Spar Geo Infra Pvt Ltd (BID ID -3290538)
IGS GEOTECHNICAL SERVICES LLP (BID ID -3286383)
Pureways Infra Private limited (BID ID -3286705)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid