Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC SCRPI BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | L1 | Accepted-AOC AS PER TCR | |
| 2 | L2₹4.3 L+₹20,331.29 (5.00%)Rejected-Finance S O PO PADAVESWAR PADAVESWAR PASCHIM BARDHAMAN WEST BENGAL INDIA 713346 | PADAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L2 | Rejected-Finance AS PER TCR |
Tender Value
₹4.1 L
EMD Value
₹5,100
Closing Date
12 Jul 2022, 4:00 pmClosed
GM, BANKOLA AREA
OFFICE OF THE GM, BANKOLA AREA, UKHRA, PIN-713363
Transportation of gathering head of CM ( Weight 6.5Tonne) from surface to CM section and lifting and lifting of damaged gatering head to surface at Shymsundarpur colliery under Bankola Area
2022_ECL_248084_1
ECL/GM/BA/E TENDER/22-23/Enm/28 23.06.2022
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
BANKOLA
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,100
2 Nov 2022
27 Jun 2022
13 Jul 2022
27 Jun 2022
12 Jul 2022
28 Jun 2022
27 Jun 2022 - 1 Jul 2022
Amount
Item Description/ Heading
Dismentling of gathering head on surface in 4 parts I,e (i) gathering conveyor (ii) Gathering gear casing -2 nos and (iii) Gathering nose
Loading of all fours part (i) Gathering conveyor (ii) Gathering gear g -2 nos (iii) Gathering nose in trolley and transportation up to pit top of pit no 3 and then lowering of all four parts to pit bottom of pit no 3 after dismentling the cage
Transportation of all four parts (i) Gathering conveyor (ii) Gathering gear cashing -2 nos and (iii) Gathering gear casing -2 nos and (iii) gathering nose from pit bottom to 9D /19L through trackline total distance =1.5KM approx and then to 11R/19L manual transport total 2 pillars ( 70 meters approx)
Unloading and asembling of all four parts I, e (i) Gathering conveyor ( ii) Gathering gear casing -2 nos and (iii) Gathering nose at CM section
Dismentling of damaged Gathering head at CM Section in four parts I, e (i) Gathering conveyor (ii) Gathering Gear casing -2 nos and (iii) Gathering nose
Loading of all parts (i) Gathering conveyor (ii) Gathering Gear casing -2 nos and (iii) Gathering nose in trolley and manually transportation from 10R/20L to 9R/19L .
Transportation of all Parts (i) Gathering conveyor (ii) Gathering gear casing -2 nosand (iii) Gathering nose from 9R/19L to pit bottom through trackline ( Total distance =1.5KM)
Lifting of all four parts (i) Gathering conveyor (ii) Gathering gear casing -2 nos and (iii) Gthering nose from [pit bottom to suface after dismentling of cage of pit no 3
Total impact of GST for the purpose of CTC
PRASHANTA KABIRAJ
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .