| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.8 LAccepted-AOC I 910 JAHANGIR PURI NEAR BY ANAND MAYA HOSPITAL NORTH WEST DELHI DELHI 110033 UDYAM DL 06 0040830 | NORTH DELHI | DELHI | 110033 | 1 | Accepted-AOC L1 | |
| 2 | 2₹17.5 L+₹66,330 (3.94%)Rejected-AOC | 2 | Rejected-AOC Other than L1 | |
| 3 | 3₹18.7 L+₹1.9 L (11.1%)Rejected-AOC | 3 | Rejected-AOC Other than L1 | |
| 4 | 4₹19.6 L+₹2.8 L (16.5%)Rejected-AOC | 4 | Rejected-AOC Other than L1 | |
| 5 | Rejected-Technical | - | Rejected-Technical NO WLR OF SISTER CONCERN FIRM M/S SURAT SINGH AND SONS |
Tender Value
Refer Docs
EMD Value
₹62,000
Closing Date
23 Jan 2021, 6:00 pmClosed
GE SATWARI
GE SATWARI
MANNING AND OPERATION THROUGH OUTSOURCING OF ELECTRICAL INSTALLATIONS OF MAIN RECEIVING STATION 33 KV, 11 KV AT NEAR SIG OFFRS MESS, 213 TRANSIT CAMP OFFRS MESS UNDER GE SATWARI
2020_MES_393718_3
GEJM-66/20-21
Open Tender
Miscellaneous Works
Item Rate
335 days
GE SATWARI
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE SATWARI
₹62,000
Yes
17 Jun 2021
9 Jan 2021
25 Jan 2021
9 Jan 2021
23 Jan 2021
11 Jan 2021
Amount
Manning and operation of HT 33 KV installation for 24 Hrs (0600 hrs to 1400 hrs, 1400 hrs to 2200 hrs & 2200 hrs to 0600 hrs) in three shifts per day (Each shift of 08 hrs) one skilled Electrician per shift contineous all as per the directions of Engr in Charge (It will be ensured that the electrician must remain on duty per shift and at the time of change of shift). The contractor shall employ qualified electrician having ITI diploma from the recognised institution with minimun 2 years experience or having 7 years experience in related field in operation of following HT 33 system:- (MRS 33 KV NEAR 26 IDSR OFFICER MESS). Details of equipment installed to be operated by electrician in three shifts are as under :- (a) 33/11 KV POWER TRANSFORMER MAKE:-CONTINETAL TRANSFORMER -01 NO (b) TRANSFORMER CR PANEL MAKE :- POWER CONTROL SYSTEMS -01 NO (c) 33 KV VCB MAKE:- ALIND SWITCH GEAR - 01 NO (d) 33 KV CURRENT TRANSFORMER MAKE :- CROMPTON GREAVES LTD - 01SET/03NOS (e) 33 KV POTENTIAL TRANSFORMER MAKE :- CROMPTON GREAVES LTD - 01SET/03NOS (f) TRANSFORMER ISOLATOR - 01 SET (g) OUTGOING STRUCTURES & 11 KV CABLES - 04 NOS (h) 33 KV LIGHTENING ARRESTOR - 01 SET (j) 11 KV SWITCHGEAR MAKE - ALIND INDUSTRIES 1+4 SET (k) AC BOARD MAKE :- POWER CONTROL SYSTEMS - 01 NOS (l) DC BOARD MAKE :- POWER CONTROL SYSTEMS - 01 NOS (m) BATTERY CHARGER MAKE :- POWER CONTROL SYSTEMS - 01 NOS (n) BATTERY BANK MAKE:- TITANIC - 18CELL 2V EACH (o) AUXILIARY TRANSFORMER MAKE :- NATIONAL CABLES (INDIA) - 01 NOS
Manning and operation of HT 33 KV installation for 24 Hrs (0600 hrs to 1400 hrs, 1400 hrs to 2200 hrs & 2200 hrs to 0600 hrs) in three shifts per day (Each shift of 08 hrs) one unskilled Helper per shift contineous all as per the directions of Engr in Charge (It will be ensured that the helper must remain on duty per shift and at the time of change of shift). Helper will assist electrician for operation of equipment mentioned at Ser Item No 1.00 (a) to (o) at (MRS 33 KV NEAR 26 IDSR OFFICER MESS).
Manning and operation of HT 11 KV installation for 24 Hrs (0600 hrs to 1400 hrs, 1400 hrs to 2200 hrs & 2200 hrs to 0600 hrs) in three shifts per day (Each shift of 08 hrs) one skilled Electrician per shift contineous all as per the directions of Engr in Charge (It will be ensured that the electrician must remain on duty per shift and at the time of change of shift). The contractor shall employ qualified electrician having ITI diploma from the recognised institution with minimun 2 years experience or having 7 years experience in related field in operation of following HT 11 KV system:- (MRS 11 KV AT 213 TRANSIT CAMP OFFRS MESS). Details of equipment installed to be operated by electrician in three shifts are as under :- (a) HT 11 KV Panel VCBSF-6 (Incommer)-01 No Make - ABB (b) HT 11 KV Panel VCBSF-6 (Outgoing)-05 No Make - ABB (c) GOD HT 60 Nos (d) LT/HT UG cable of different sizes 12 KMs (e) LT/HT OH line of different sizes - 20 kms (f) Transformers 22 Nos
Manning and operation of HT 11 KV installation for 24 Hrs (0600 hrs to 1400 hrs, 1400 hrs to 2200 hrs & 2200 hrs to 0600 hrs) in three shifts per day (Each shift of 08 hrs) one unskilled Helper per shift contineous all as per the directions of Engr in Charge (It will be ensured that the helper must remain on duty per shift and at the time of change of shift). Helper will assist electrician for operation of equipment mentioned at Ser Item No 03.00 (a) to (f) at (MRS 11 KV AT 213 TRANSIT CAMP OFFRS MESS).
Note.for Srl No 1 to 4 :- (i) The cost of maintenance of document, installation chart, daily records i.e., log sheet as clarified under relevant PS shall deemed to be included in rates quoted for the above items. (ii) Any breakdown/fault of electric supply will be attended by the tradesman employed by the contractor. All tools and T&P required by tradesman will be provided by the contractor (Such as bamboo ladder, tourch, search light, Axe, Dha, HT Gloves and other T&P required for working in HT/LT line/under ground cable) (iii) Contractor shall replace blown out fuse wire, HT Jumper and lead as and when required. The aspect shall be deemed to be included in the quoted rates and nothing extra shall be admissible on this account. (iv) All the complaints lodge in the substation of external electric supply and internal electrical supply will be attended by contractor and will keep record of complaint slip attended . (v) Electrician shall attend the telephone while on duty and will keep the record of complaints.
(vi) In case of operator/helper found absent from duty to any reason a penal recovery of double the rate quoted by the contractor pershift per person shall be made from contractor dues. Decision of acepting officer in this regard shall be final and binding. (vii) Proper shutdown will be taken by the electrician while attending fault/rewiring fuse element on DO fuse assy at MRS, Sub Station and GOD on two/Four poles structure as directed by Engineer-in-Charge. (viii) All the shifts shall also be monitored properlly by the contractor to avoid any delay in attending faults occurred at MRS. (ix) The contractor will be fully responsible for safety, security of the worker and upkeep of installations. (x) The contractor is also generally responsible for cleanliness of equipments inside the sub station complex and cleaning/cutting of grass at the surrounding areas of sub station and MRS. (xi) the contractor will also be responsible to attend complaints of internal electrification nature. (xii) Emergency light will be provided by the contractor during night hours without any extra cost.
M/S S K Electricals Regd
Azurite Engineering
M/S J N TRADERS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .