| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-AOC | ₹10.1 L | L1 | Accepted-AOC Accept |
| 2 | L2₹10.2 LRejected-AOC | ₹10.2 L | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | VCP Constructions L2 | CHINNAMUTHU L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils and sub soils except hard rock requiring blasting with intial lead and lift including re-filling the sides of foundation and depositing the surplus earthWithin the site area as directed by departmental officers etc., complete asper standard specification. as per SS 20 B TNDSS NO: 23 & 24 VI (s2), VII 9,10 | 108 | m3 | 21,600 ₹21,600 | 21,276 ₹21,276 |
| 2.00 | Plain Cement concrete Using 1:4:8 mix using 40mm ISS gauge HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Finishing and curing etc., complete as per standard specification. TNDSS NO: 28 V, VI (S2) V, VI (S5A) VII | 24 | m3 | 1,41,600 ₹1.4 L | 1,39,248 ₹1.4 L |
| 3.00 | Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10 stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over (silver oak joists) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all material to site etc., complete complying with standard specification. TNDSS NO: 20 & 85 (For Side wall) | 404 | m2 | 2,92,900 ₹2.9 L | 2,86,840 ₹2.9 L |
| 4.00 | Plain Cement Concrete 1:2:4 mix Using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specification. | 69 | m3 | 5,00,250 ₹5.0 L | 4,99,284 ₹5.0 L |
| 5.00 | Reinforced Cement Concrete 1:1½:3 Mix (One Part of cement, one and half Part of M- Sand and three Part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 V, VI (S3), VII-3. | 2.4 | m3 | 21,120 ₹21,120 | 21,079.2 ₹21,079.20 |
| 6.00 | Supplying, fabricating and placing in position M.S (or) R.T.S. for all Reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complying with standard specifications.TNBP No:30 | 240 | kgs | 24,000 ₹24,000 | 22,320 ₹22,320 |
| 7.00 | Finishing the top of flooring with granolithick flooring with cement concrete 1:2:4 using 10 to 12mm ISS HBG Stone Jelly of 25mm tk etc., Complete. including cost and conveyance of materials to work site & labour charges for mixing,laying,finishing and Curing etc,complete as per standard specifications . | 85 | m2 | 17,000 ₹17,000 | 15,300 ₹15,300 |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
4 Sept 2025, 3:00 pmClosed
Executive Officer
Sithayankottai Town Panchayat
Construction of Storm Water Drain With RCC Culvert at Ward No 4 John Street and Ward No 6 Kannimar Kovil Street in Sithayankottai Town Panchayat Panchayat
2025_DTP_599989_1
461/2025-2
Open Tender
Civil Works - Others
90 days
Sithayankottai Town Panchayat
Class 1
2 documents required · 2 mandatory
₹1
Yes
₹12,000
27 Jan 2026
3 Sept 2025
4 Sept 2025
3 Sept 2025
4 Sept 2025
3 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx