Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹27.3 LAdmitted-Finance | -33.34% | ₹27.3 L | L1 | Admitted-Finance |
| 2 | L2₹28.9 L+₹1.6 L (5.90%)Admitted-Finance | -29.41% | ₹28.9 L+₹1.6 L (5.90%) | L2 | Admitted-Finance |
| 3 | L3₹29.7 L+₹2.4 L (8.76%)Admitted-Finance | -27.50% | ₹29.7 L+₹2.4 L (8.76%) | L3 | Admitted-Finance |
| 4 | L4₹30.6 L+₹3.3 L (12.2%)Admitted-Finance | -25.23% | ₹30.6 L+₹3.3 L (12.2%) | L4 | Admitted-Finance |
| 5 | L5₹31.5 L+₹4.2 L (15.3%)Admitted-Finance | -23.11% | ₹31.5 L+₹4.2 L (15.3%) | L5 | Admitted-Finance |
Tender Value
₹41.0 L
EMD Value
₹81,920
Closing Date
4 Sept 2026, 5:00 pmClosed
PEK
Sanat Ghar Bemina
Construction of Deep Drain at Industrial Estate Bijbehara
2026_SICOP_320804_1
45-PEK of 2026-27 dated 13- 08-2026
Open Tender
Civil Works
Percentage
60 days
Bijbehara
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
PEK
₹81,920
21 Sept 2026
13 Aug 2026
5 Sept 2026
13 Aug 2026
4 Sept 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in trenches foundation including disposal of same. All kind of soil by mechanical means. | 850 | Cum | 256.85 | ₹2,18,322.5 |
| 2 | Providing and laying of sand bed 300mm thick including including leveling complete job. | 290.4 | Cum | 850 | ₹2,46,840 |
| 3 | Providing and laying of RCC Spun pipes 600mm dia including all necessary fittings, levelling including carriages complete job. | 508 | Rm | 5,500 | ₹27,94,000 |
| 4 | Cast in situ concrete work of nominal mix M-20 grade(1:1.5:3 mix) size 20mm and curing complete excluding cost of form work. | 80.53 | Cum | 7,275.25 | ₹5,85,875.88 |
| 5 | Centering and shuttering incl. strutting, propping etc. and removal of form work. Of kit ply | 430 | Sqm | 286.35 | ₹1,23,130.5 |
| 6 | Refilling of excavated material by way of mechanical means including consolidation | 850 | Cum | 150 | ₹1,27,500 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_1067792.xls
BOQ • 0.33 MB
SBD45.pdf
Tender Documents • 0.85 MB
Cor45C.pdf
PDF • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .