Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.1 LAccepted-AOC 2 222 B 10 PONMAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹2.1 L Quoted ₹1.9 L | 1 | Accepted-AOC L1 |
| 2 | 2₹1.9 LRejected-AOC 3 140 H 1 PERIYAR STREET AMMAN NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹1.9 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SS ENGINEERING CONTRACTOR L2 | PREETHI ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for dismantling the existing hub hood, fan blades and hub with arm sleeves assembly from the gearbox and lead outside the fan stack. | 1 | Set | 13,680 ₹13,680 | 13,420 ₹13,420 |
| 2.00 | Charges for leading the hub with the respective arm sleeves, fan blades assembly & hub hood inside the fan stack and assembling the hub, arm sleeves, fan blades assembly and hub hood over the gearbox one by one. | 1 | Set | 13,680 ₹13,680 | 13,420 ₹13,420 |
| 3.00 | Charges for complete dismantling of gear box internals one by one, cleaning, inspection & renewal of gear box internals if necessary, reassembling, aligning of drive shaft assembly and re-commissioning of I.D fan gearboxes. | 1 | No | 75,800 ₹75,800 | 74,400 ₹74,400 |
| 4.00 | Charges for renewal of worm shaft bearing after dismantling the existing worn-out / damaged worm shaft bearing. | 2 | Nos | 2,200 ₹4,400 | 2,180 ₹4,360 |
| 5.00 | Charges for renewal of wheel shaft bearing after dismantling the existing worn-out / damaged wheel shaft bearing. | 2 | Nos | 2,800 ₹5,600 | 2,700 ₹5,400 |
| 6.00 | Assembling the blades with the respective arm sleeves (after Weighing the individual blades and respective arm sleeves) separately and fixing the hub assembly with blades to the balancing kit mounted in the Cooling Tower. | 1 | set | 17,900 ₹17,900 | 17,900 ₹17,900 |
| 7.00 | Static balancing of the fan blade assembly. | 1 | set | 16,250 ₹16,250 | 16,250 ₹16,250 |
| 8.00 | Dismantling of fan blades and hub assembly from the balancing kit one by one after marking proper identification. | 1 | set | 17,900 ₹17,900 | 17,900 ₹17,900 |
| 9.00 | Charges for transporting of hub, arm sleeves and fan blades (8 Nos./ Set) from cooling tower-top to ground floor and lifting the same to 12 m elevation of fan stack floor.(Necessary Transport Vehicle will be provided by TANGEDCO). | 1 | set | 8,400 ₹8,400 | 8,100 ₹8,100 |
| 10.00 | Charges for cleaning and painting of I.D fan gearbox outer surfaces, hub & arm sleeves, Tie bars and FRP fan blades with one coat of Epoxy red oxide primer and Two coats of first quality epoxy grey paint. | 51.04 | m2 | 98 ₹5,001.92 | 96 ₹4,899.84 |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
28 Oct 2024, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I CA CWS II Overhauling of existing I.D fan Gearbox for 1 No including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in Cooling Tower IV
2024_EB_495843_1
SE/P And A / SE / M-I / CA /OT. 237 / 2024-25
Open Tender
Power/Energy Projects/Products
15 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹2,000
Yes
21 May 2026
22 Oct 2024
29 Oct 2024
22 Oct 2024
28 Oct 2024
22 Oct 2024
Amount
Charges for dismantling the existing hub hood, fan blades and hub with arm sleeves assembly from the gearbox and lead outside the fan stack.
Charges for leading the hub with the respective arm sleeves, fan blades assembly & hub hood inside the fan stack and assembling the hub, arm sleeves, fan blades assembly and hub hood over the gearbox one by one.
Charges for complete dismantling of gear box internals one by one, cleaning, inspection & renewal of gear box internals if necessary, reassembling, aligning of drive shaft assembly and re-commissioning of I.D fan gearboxes.
Charges for renewal of worm shaft bearing after dismantling the existing worn-out / damaged worm shaft bearing.
Charges for renewal of wheel shaft bearing after dismantling the existing worn-out / damaged wheel shaft bearing.
Assembling the blades with the respective arm sleeves (after Weighing the individual blades and respective arm sleeves) separately and fixing the hub assembly with blades to the balancing kit mounted in the Cooling Tower.
Static balancing of the fan blade assembly.
Dismantling of fan blades and hub assembly from the balancing kit one by one after marking proper identification.
Charges for transporting of hub, arm sleeves and fan blades (8 Nos./ Set) from cooling tower-top to ground floor and lifting the same to 12 m elevation of fan stack floor.(Necessary Transport Vehicle will be provided by TANGEDCO).
Charges for cleaning and painting of I.D fan gearbox outer surfaces, hub & arm sleeves, Tie bars and FRP fan blades with one coat of Epoxy red oxide primer and Two coats of first quality epoxy grey paint.
Cost of Epoxy red oxide primer for Sl.No.10
Cost of Epoxy grey paint for Sl.No.10
Cost of Epoxy Thinner for Sl.No.10
Consumable and T&P Cost for Sl.No.1 to 10
SS ENGINEERING CONTRACTOR (BID ID -1172361)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_589150.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid