Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Fee/PreQual/Technical/Finance | -52.99% | ₹3.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.8 L+₹95,501.98 (25.0%)Admitted-Fee/PreQual/Technical/Finance | -41.22% | ₹4.8 L+₹95,501.98 (25.0%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.8 L+₹97,368.20 (25.5%)Admitted-Fee/PreQual/Technical/Finance | -40.99% | ₹4.8 L+₹97,368.20 (25.5%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹5.1 L+₹1.3 L (34.4%)Admitted-Fee/PreQual/Technical/Finance AT WARD NO 3 DAYAPALA NHC POLPS DAYAPALA 1 DIST NAYAGARH | DAYAPALA | NAYAGARH | ODISHA | -36.80% | ₹5.1 L+₹1.3 L (34.4%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹5.5 L+₹1.7 L (44.4%)Admitted-Fee/PreQual/Technical/Finance | -32.11% | ₹5.5 L+₹1.7 L (44.4%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.1 L
EMD Value
₹8,114
Closing Date
10 Aug 2026, 5:00 pmClosed
Divisional Officer
O/o the S.E, RandB Division, Nayagada
Providing Barricading and Preparation of ground in the PTS field at Nayagarh for Celebration of Independence Day 2026.Such as field levelling tree culvert and stage painting
2026_EICCL_138078_1
SE 10 OF 2026-27
Open Tender
Civil Works - Others
Percentage
3 days
Nayagarh
2 documents required · 2 mandatory
₹4,000
₹8,114
Yes
11 Aug 2026
5 Aug 2026
11 Aug 2026
5 Aug 2026
10 Aug 2026
5 Aug 2026
5 Aug 2026 - 10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying & filling foundation and plinth with sand well watered and rammed including cost, cost of all labour, carriage, royalty, taxes, T&P etc complete. | 101.31 | cum | 720.53 | ₹72,996.89 |
| 2 | Providing temporary barricading such as (0'8") dia & 1'6" deep digging holes at 5' interval in all kind of soil fixing of bullah verticaly &firmly binding horizentily three rows of bomboo to site for barricading & dismantling aftercelebration including cost of all materials,labour,sundries & t&P etc.complete. | 1,891.59 | rm | 220.83 | ₹4,17,719.82 |
| 3 | Providing & laying Granular Sub Base with Crusher Dust, spreading in uniform layers not exceeding 225 mm watering and compacting with VRR to achive the required density in OMC including cost, conveyance, royality of all materials and labour charges etc. complete. | 223.79 | cum | 1,176.57 | ₹2,63,304.6 |
| 4 | Painting two coats with any approved paint including cost of paint & labour to give an even. | 38.7 | sqm | 262.15 | ₹10,145.21 |
| 5 | Finishing wall with water proofing cement paint of two coat with any approved shade including cost of cement paint etc.complete. | 1,048.04 | sqm | 45.07 | ₹47,235.16 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 0.86 MB
Tendernotice_2.pdf
PDF • 1.75 MB
Tendernotice_1.pdf
PDF • 1.68 MB
BOQ_604877.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .