| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16,724.26Accepted-AOC NULL | L1 | Accepted-AOC Quoted Amount Less than Value | |
| 2 | L2₹16,998.62+₹274.36 (1.64%)Rejected-AOC KATPADI VELLORE | VELLORE | TAMIL NADU | 632001 | L2 | Rejected-AOC Quoted Amount More than Value |
| Sl No | Description | Qty | Unit | Balaji L1 | suresh babu L2 |
|---|---|---|---|---|---|
| 1.00VELLORE DISTRICT CONSTRUCTION OF COMMUNIT SOAK PIT FOR 30000 LTR OHT AT ATHIYUR IN ATHIYUR PANCHAYAT VELLORE BLOCK 15 CFC 2025-26 PACKAGE NO 12 | |||||
| 2.00 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 4.25 | cum | 263.65 ₹1,120.51 Lowest | 267.97 ₹1,138.87 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 0.27 | cum | 5,370.88 ₹1,450.14 Lowest | 5,459.01 ₹1,473.93 |
| 4.00 | Supplying and Filling of 225mm Boulders into the soak pit including cost and conveyanceof all materials to work site and all labour charges etc. | 1.01 | cum | 707 ₹714.07 Lowest | 718.6 ₹725.79 |
| 5.00 | Solid Block in cement mortar 1:5 mix using solid blocks 40x10x20cm and conveyance of all materials to site and all labour charges etc complete | 0.21 | cum | 5,930.63 ₹1,245.43 Lowest | 6,027.94 ₹1,265.87 |
| 6.00 | Supplying and Filling of 40mm Metal into the soak pit including cost and conveyanceof all materials to work site and all labour charges etc. | 1.01 | cum | 1,421.14 ₹1,435.35 Lowest | 1,444.46 ₹1,458.9 |
| 7.00 | Supplying and Erection of 0.60m dia RCC Prcast water tab with Cover Slab into the soak pit including cost and conveyanceof all materials to work site and all labour charges etc. | 1 | Nos | 749.63 ₹749.63 Lowest | 761.93 ₹761.93 |
| 8.00 | Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm | 5.71 | sqm | 284.16 ₹1,622.55 Lowest | 288.82 ₹1,649.16 |
| 9.00 | Supplying and Filling of 20mm Metal into the soak pit including cost and conveyanceof all materials to work site and all labour charges etc. | 1.78 | cum | 1,955.37 ₹3,480.56 Lowest | 1,987.46 ₹3,537.68 |
| 10.00 | Supply and Fixing of 90mm PVC Pipe from Chamber to Soak pit inculding all Charges etc., | 2 | mtr | 142.23 ₹284.46 Lowest | 144.56 ₹289.12 |
Tender Value
Refer Docs
Closing Date
12 Nov 2025, 3:00 pmClosed
The Block Developement Officer Vellore
The Block Developement Office Vellore
VELLORE DISTRICT CONSTRUCTION OF COMMUNIT SOAK PIT FOR 30000 LTR OHT AT ATHIYUR IN ATHIYUR PANCHAYAT VELLORE BLOCK 15 CFC 2025-26 PACKAGE NO 12
2025_RDTN_619160_1
A2/629/2025 VLR OCT 25-25
Open Tender
Civil Works
Item Rate
180 days
The Block Developement Office Vellore
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
25 Nov 2025
31 Oct 2025
12 Nov 2025
31 Oct 2025
12 Nov 2025
31 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_740158.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
Tendernotice_2.pdf
PDF • 0.37 MB
BOQ_740158.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .