| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.5 LAccepted-AOC 125 126 14 AZAD NAGAR OFFICERS COLONY HISAR | L1 | Accepted-AOC Work allotted | |
| 2 | L2₹21.9 L+₹5.4 L (33.0%)Rejected-AOC H NO 196 LAJPAT NAGAR FATEHABAD HARYANA 125050 | HISAR | HARYANA | 125050 | L2 | Rejected-AOC L2 | |
| 3 | L3₹22.0 L+₹5.5 L (33.6%)Rejected-Finance 443 V P O LIWAN 132001 | KARNAL | HARYANA | 132001 | L3 | Rejected-Finance EMD released | |
| 4 | L4₹22.1 L+₹5.6 L (34.0%)Rejected-Finance FATEHABAD | L4 | Rejected-Finance EMD released | |
| 5 | L5₹22.8 L+₹6.3 L (38.1%)Rejected-Finance | L5 | Rejected-Finance EMD released |
Tender Value
₹18.5 L
EMD Value
₹36,000
Closing Date
3 May 2021, 5:00 pmClosed
Executive Engineer, Provincial Division, PWD B and
Executive Engineer, Provincial Division, PWD B and R Br. Fatehabad
Special Repair of Shamshan Bhumi Bhattu to Mehuwala Km 0 to 0.35 (Road ID 10194) in Fatehabad Distt.
2021_HRY_168451_1
Special Repair of Shamshan Bhumi Bhattu to Mehuwal
Open Tender
Civil Works
Item Wise
90 days
Fatehabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹36,000
Yes
23 Jun 2021
12 Apr 2021
4 May 2021
12 Apr 2021
3 May 2021
12 Apr 2021
Amount
Dismantling Brick Work, Tile Masonry or Tile Lining and Tile Terracing (HSR 8.5 (i) dry brick work
Preparation of berms including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift, but including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. As per X-section attached at DNIT at Section -5. Note:-No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer.
Earth work in excavation in ordinary soil exclusive of compensation of earth. Kassi work undressed involving an average horizontal throw upto 2 meters, and an average vertical lift upto 0.5 meter including breaking of clods. (HSR 6.2 a)
Milling of distress bituminous layer upto 20 mm depth in a single pass with suitable milling machine (capable of milling @ 200-300 sqm area per Hr.) fitted with loading conveyor for loading the milled material directly on the trucks i/c hauling and stock piling the reclaimed material near the central recycling plant or reclaiming to bring to required specification to reuse with the approval of Engineer-in-Charge for safe disposal with all leads and lifts complete in all respects. Note I:- The unutilized quantity of reclaimed bituminous mix material shall be a recovery item as mention in BOQ item No. ____.
Preparation of sub grade including trenching, rough dressing of soil, final dressing of earth, to given levels and camber, watering, rolling with road roller, and compacting the bed (HSR 24.1) Note: - In widening portion sub grade will be prepared with the use of Baby roller (HSR 24.1) or width of excavation should be made sufficient wide to accommodate road roller. Extra width required for compaction of sub grade shall not be paid and its expenditure shall be in incidental to the work.
Providing and laying 150 mm thick granular sub base consisting of drainage cum drainage cum filter layer confirming to Table 400.1 Grading –III & VI of MoRT&H 5th edition, mixing in a mechanical mix plant at OMC, carriage of mix material to the site of work, spreading in uniform layer with motor grader on prepared surface and compacting with vibratory power roller to achieve desired density complete as per clause No. 401 of MoRT&H specifications. Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing & laying 150 mm thick (Compacted) stone metal (G-I) 63 mm to 45 mm gauge wearing coat to water bound macadam in layer of 75mm each using screening type ‘B’ compacting with 3 wheeled steel roller/vibratory roller to achieve the desire density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects.(N.S.) Note: - 1.Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing & laying 150 mm thick (Compacted) stone metal (G-II) 53mm to 22.4mm gauge wearing coat to water bound macadam in layer of 75mm each using screening type ‘B’ compacting with 3 wheeled steel roller/vibratory roller to achieve the desire density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects.(N.S.) Note: - 1.Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Manufacturing, supplying and laying of precast cement concrete rectangular block (0.45 M x 0.30 M x 0.15 M ) M-30 grade using minimum cement concrete 320 Kg/ per cum with digital batching plant duly compacted with table vibration including setting in position over bed prepared with 25mm thick fine sand and filling up the joints with fine sand (NS)
Providing and laying 80mm thick ISI marked interlocking paver blocks confirming to IS: 15658:2006/IRC SP 63-2004 of all shapes and colours in design mix cement M-40 over a bed of 30 mm thick fine sand complete in all respects. [HSR 10.159]
Providing & fixing public information board consisting of 75 mm GI Pipe of size 2.45 m x 1.15 m with 900 mm x 900 mm GI sheet 16 gauge connected/ welded with 5 mm thick steel plate of 50 mm duly painted as per column mentioned in the Drawing and fixing at site in 60 x 60 x 75 cm cement concrete 1:2:4 block complete in all respect
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- i) Good Bricks @ Rs. 4.50/ each
ii) Bricks Bats @ Rs. 500/- P. Cum
iii) Bituminous Mix Material @ Rs. 1424/- P. Cum Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price.
Kamal Kumar Gera
Krishan Kumar
M/S Pritam Kumar Contractor
M/S SHERSINGHANDCOMPANY
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .