| 1 | L1₹15.9 LAccepted-AOC SAROJA CONTRACTOR SENJI TAMIL NADU TN | L1 | Accepted-AOC l1 | |
| 2 | L2₹15.9 L+₹780 (0.05%)Rejected-AOC KRISHNAGIRI | TAMIL NADU | 635001 | L2 | Rejected-AOC l2 |
| Sl No | Description | Qty | Unit | R RAJENDIRAN L2 | Saroja L1 |
|---|---|---|---|---|---|
| 1.01Providing Reneval BT to Singavaram balapiran Kottagai road 0/0-1/360 | |||||
| 1.02 | Clearing the scrub jungles including all labour charges for all labour charges etc complete. | 1,786 | sqm | 6.36 ₹11,358.96 Lowest | 6.36 ₹11,358.96 Lowest |
| 1.03 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br | 234 | Cum | 140.35 ₹32,841.9 Lowest | 140.35 ₹32,841.9 Lowest |
| 1.04Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal | |||||
| 1.05 | Km 0/0-1/0 | 9.38 | Cum | 4,153.76 ₹38,962.27 Lowest | 4,153.76 ₹38,962.27 Lowest |
| 1.06 | Km 1/0-1/300 | 1.48 | Cum | 4,162.43 ₹6,160.4 Lowest | 4,162.43 ₹6,160.4 Lowest |
| 1.07 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 3,900 | m2 | 33.4 ₹1,30,260 Lowest | 33.4 ₹1,30,260 Lowest |
| 1.08 | BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 97.5 | Cum | 11,490 ₹11,20,275 | 11,482 ₹11,19,495 Lowest |
| 1.09 | Provision for KM stone | 1 | no | 2,197 ₹2,197 Lowest | 2,197 ₹2,197 Lowest |
| 1.10 | Provision for HM stone of size 73x23x10cm | 5 | no | 574.65 ₹2,873.25 Lowest | 574.65 ₹2,873.25 Lowest |
Tender Value
₹16.1 L
EMD Value
₹16,070
Closing Date
28 Nov 2025, 3:00 pmClosed
BDO BP
Block Development Office, Gingee
Singavaram - Balbiraman Kottai Road 0/0-1/331 (1300M) ( Pothole Repairs Only)
2025_RDTN_625299_2
Gingee RRM SFC GRANT 202526 (Pack1)
Open Tender
Civil Works
Works
Gingee
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹16,070
Yes
16 Dec 2025
21 Nov 2025
28 Nov 2025
21 Nov 2025
28 Nov 2025
21 Nov 2025
Amount
Providing Reneval BT to Singavaram balapiran Kottagai road 0/0-1/360
Clearing the scrub jungles including all labour charges for all labour charges etc complete.
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for KM stone
Provision for HM stone of size 73x23x10cm
Provision for Citizen board cum name board charges
Provision for photographic charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R RAJENDIRAN (BID ID -1520376)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
BOQ_747755.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .