| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H-1₹10,434Accepted-AOC | H-1 | Accepted-AOC Accept | |
| 2 | H-2₹10,434Same as H-1Accepted-AOC | H-2 | Accepted-AOC Accept | |
| 3 | H-3₹10,434Same as H-1Accepted-AOC | H-3 | Accepted-AOC Accept | |
| 4 | H-4₹10,434Same as H-1Accepted-AOC | H-4 | Accepted-AOC Accept | |
| 5 | H-5₹10,234−₹75 (0.72%)Accepted-AOC | H-5 | Accepted-AOC Accept |
Tender Value
₹7.3 L
EMD Value
₹15,000
Closing Date
12 Mar 2019, 3:00 pmClosed
Chief Executive Officer Z P Jalna
Chief Executive Officer Z P Jalna
Drilling of 150 mm and 115 mm dia New Borewell Installation of IM-II Hand Pump Set and Construction of Platform as per UNICEF Design in Verious Schemes in Jalna Dist
2019_JALNA_435358_1
No.ZPJ/RWS/e-Ten-03/2018-19
Open Tender
Miscellaneous Works
Item Rate
365 days
Jalna Dist
Terms and Condition as per NIT and Tender Document
3 documents required · 3 mandatory
₹1,000
₹15,000
12 Jul 2021
6 Mar 2019
13 Mar 2019
6 Mar 2019
12 Mar 2019
6 Mar 2019
Amount
Drilling of 150 mm dia borewell. (Drilling of 200 mm dia. In soft strata & 150 mm dia drilling in hard rocks including Transportation & Labour charges. on site of borewell to be drill.)
180 mm dia PVC casing pipe for drilling 150 mm dia borewell has presure 6kg / cm2 as per IS : 4985-1988 standard, (Including lowering, laying handling grouting etc)
PVC bore cap for 180 mm dia pvc casing pipe for 150 mm dia borewell.
Yeild testing of borewell using 90 degree V' notch by Air lift method for 150 mm dia. Borewell work.
Drilling of 115 mm dia, borewell work, (Drilling of 150 mm dia. In soft rock & 115 mm dia drilling work in hard rocks , including Transportation charges of rig, labour charges on site of borewell to be drill.
140 mm dia, PVC casing pipe for 115 mm dia, borewell has 4kg/ cm2 pressure and as per IS: 4985-1988 standard. Including lowering, Handling, Grouting etc.
For unconventional work. 140 mm dia, pvc casing pipe of 4 kg/cm2 for 115 mm dia. Drilling work as per IS 4985-1988 Without grouting, Including lowering laying handing etc.
After completion of 115 mm dia. Borewell drilling yield testing of borewell by 90 degree V notch [By Air lift method].
Excavation work for preparing H.P. platform [Total excavation= 2.6 M3]
Construction of platform as per UNICEF design PCC .[M-150] Work should be in 1:2:4 Total p.c.c. work =1.143 M3
Installation of India mark -lI handpump set on borewell.
Dry rubble stone filling work before the construction of platform. Total dry rubble stone filling work (2.328 M 3)
UPASNA BOREWELLS AURANGABAD
YESH BOREWELL AURANGABAD
Om Sai Services
Sun Brigth Solar
Mahalaxmi Borewells and Servises Ambad
Raj Machinery
STAR HANDPUMP
RELIABLE MULTISERVICES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .