Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹23.5 L
Closing Date
2 Sept 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer, National Highway Division, PWD Compound Tumkur
Widening and Improvement to Existing CD works at Km 595.660 of NH150A of Jevargi-Chamarajanagar Section in the state of Karnataka under MandR Central for the year 2021-22
2021_MoRTH_644368_1
EE/NHD/TMK/NIT2/2021-22
Open Tender
Civil Works - Roads
Item Rate
60 days
Bellurcross
as per KW2
4 documents required · 4 mandatory
₹5,900
PAO MoRTH Bangalore
Exempted
3 Sept 2021
19 Aug 2021
3 Sept 2021
19 Aug 2021
2 Sept 2021
19 Aug 2021
135 days
Amount
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness including all labour, hire charges of all machineries etc., complete. By Mechanical Means, In area of thorny jungle. Complete as directed by Engineer in charge of work
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres including all labour, hire charges of all machineries etc., complete.-By Mechanical Means-Cement Concrete Grade M-15 & M-20 Complete as directed by Engineer in charge of work
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres including all labour, hire charges of all machineries etc., complete. Rubble stone masonry in cement mortar. Complete as directed by Engineer in charge of work
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work including all lead, lifts, labour etc., complete. Complete as directed by Engineer in charge of work
Providing and laying Plain cement concrete 1:3:6 mix with Granite / Basalt / Trap crushed stone aggregate 40 mm nominal size, clean seived approved sand, mechanically mixed in concrete mixer, placed in foundation and compacted by vibrator, curing for 14 days, including cost of all materials, labour, hire charges of machinery, loading, unloading, lead, lift, transporting etc., complete except lead for cement . Complete as directed by Engineer in charge of work
Providing & laying Plain / Reinforced Cement Concrete M 20 in substructure for Abutment / Pier Cap using granite/trap/basalt aggregates using 20mm and downsize and clean sieved approved sand including mixing mechanically in Concrete Mixer laid in layers not exceeding 15cms thick layers, as per Drawing including cost of all materials, formwork, centring, vibrating , compacting, hire charges of machinery, lead, lift, loading, unloading, transporting, stacking, curing, finishing the exposed faces etc., complete except lead for cement. (excluding cost of steel and fabrication charges) Complete as directed by Engineer in charge of work
Providing & laying PCC / RCC mix in substructure as per drawing using granite/trap/basalt aggregates of 20 mm and down size and clean sieved approved sand, form work, scaffolding, mixing mechanically, laid in layers of 15cms thick in each layer,well compacted, centering, vibrating, including cost of all materials, labour, hire charges of machinery, lead, lifts, loading, unloading, curing, finishing the exposed faces etc.,RCC M25 Height upto 5m Using concrete Mixer complete except lead for Complete as directed by Engineer in charge of work
Providing, furnishing and Placing Reinforced/ Prestressed cement concrete in superstructure using 20mm and downsize granite/trap/basalt coarse aggregates and clean seived approved sand, mixing mechanically, laid in layers not exceeding 15cms thick layers, compacting, formwork, centring,finishing exposed faces nicely, curing as per drawing including cost of all materials, labour, hire charge of machineries, transporting, loading, unloading, lead, lifts etc., complete.except lead for cement (Excluding the cost of steel and fabrication charges) RCC/PSC M30 Using Concrete Mixer. For solid slab super-structure Height upto 5m Complete as directed by Engineer in charge of work
Providing T.M.T. Steel bar reinforcement conforming to FE-500 Grade designation as per table 1000-3 including straightening bars, cutting, bending, hooking, binding with approved quality binding wire after placing in position, tying, lapping and or welding wherever required and anchoring to the adjoining members wherever necessary as per drawing (laps, hooks and wastages shall not be measured and paid) including cost of all materials, bar bending charges, labour, lifts etc., complete.except lead for steel. Complete as directed by Engineer in charge of work
Back filling behind abutment, wing wall, return wall and foundation trenches as per drawing in layers not exceeding 20cms in depth, compacting deposited material by plate compactor/power rammer after duly watering to achieve the desired degree of compaction, including cost of materials, labour, hire charge of machineries, transportation, lead, lift, loading, unloading etc complete. Granular material with all lead Complete as directed by Engineer in charge of work
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces, including cost of all materials, labour, loading, unloading, lead, lift, transporting etc., complete. Complete as directed by Engineer in charge of work
Providing Weep Holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 110 mm outer dia PVC pipe, at 2Kg / Sqm , fixing in position with collar and clamp extending through the full width of the structure with slope of 1V :20H towards drawing force as per drawing including cost of all materials, labour, transporation,lead, lift, loading, unloading etc., Complete as directed by Engineer in charge of work
Providing and laying boulders laid dry without wire crates for Apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing, including cost of all materials, labour, loading, unloading, lead and lift, transporting etc., complete. Complete as directed by Engineer in charge of work
Providing and fixing Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25-1967, excavation and fixing in position in M-15 concrete plastering the expsoed faces with CM 1:2, painting and printing letters, necessary reinforcement etc., including cost of all materials, labour, loading, unloading, lead , lift, transporting etc., complete. Complete as directed by Engineer in charge of work
V N Madegowda
Bidder Name
V N Madegowda
Rache gowda
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .