| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.3 LAccepted-AOC | ₹15.3 L | 1 | Accepted-AOC l1 |
| 2 | 2₹18.7 LRejected-Finance | ₹18.7 L | 2 | Rejected-Finance 2 |
Tender Value
Refer Docs
EMD Value
₹1.8 L
Closing Date
30 Apr 2026, 12:00 pmClosed
EE PD PWD HAPUR
EE PD PWD HAPUR
Wire fencing work for Achchheja Type-4 residential quarters in District Hapur
2026_CEMRT_1141740_6
698/3A Date 21.04.2026
Open Tender
Civil Works - Canal
60 days
HAUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹1.8 L
Yes
8 Jun 2026
25 Apr 2026
30 Apr 2026
25 Apr 2026
30 Apr 2026
25 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in charge Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR 2023.6.2.1 | - | cum | - | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR 2023.2.25 | - | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) excluding the cost of centering and shuttering - All work up to plinth level :Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR 2023.4.1.8 | - | cum | - | - |
| 4 | Providing and laying in position specified grade of reinforced cement concrete,1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR 2023.5.1.2 | - | cum | - | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR 2023.5.9.1 | - | Sqm | - | - |
| 6 | Reinforced cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR 2023.5.2.2 | - | cum | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and StrutsIncluding cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR 2023.5.9.6 | - | Sqm | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR 2023.5.9.5 | - | Sqm | - | - |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR 2023.5.3 | - | cum | - | - |
| 10 | Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth .Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST.DSR 2023.6.2.1 | - | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
Tendernotice_2.pdf
PDF • 2.16 MB
BOQ_2132234.xls
BOQ • 1.25 MB
Download all tender documents and submit your bid