Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Qualified |
| 2 | Accepted-Technical AT PO PATASUNDARPUR KAKATPUR DIST PURI 752108 | KAKATPUR | PURI | ODISHA | 752108 | Accepted-Technical Qualified |
| 3 | Accepted-Technical AT ARPATA KHUNTA DIST MAYURBHANJ PIN 757083 | KHUNTA | MAYURBHANJ | ODISHA | 757083 | Accepted-Technical Qualified |
| 4 | Accepted-Technical | Accepted-Technical Qualified |
| 5 | Accepted-Technical | Accepted-Technical Qualified |
Tender Value
₹6.5 Cr
EMD Value
₹6.5 L
Closing Date
13 Aug 2026, 5:00 pmClosed
Circle Officer
RURAL WORKS CIRCLE, BARIPADA
Construction of H.L. Bridge over Gudia river at 2nd Km on Brahmanbose to Dandbose _Rairangpur Block Boundry_ Road
2026_CERWI_137722_1
NCB 423
National Competitive Bid
Civil Works - Bridges
Percentage
455 days
SERW Division, Rairangpur
4 documents required · 4 mandatory
₹10,000
₹6.5 L
Yes
9 Sept 2026
1 Aug 2026
14 Aug 2026
1 Aug 2026
13 Aug 2026
1 Aug 2026
1 Aug 2026 - 12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation in all kinds of soil within initial lead of 50m. and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth etc complete as per the direction of the Enngineer in Charge. | 906.3 | cum | 311.55 | ₹2,82,358.08 |
| 2 | Supplying & fitting fixing in position steel cutting edge as per approved design & drawing weighing not less than 40kg. per meter including steel cladding using M.S.Angles/ rods, plates bolts & nuts, rivets complete wherever necessary including bending to size & shape drilling holes riveting welding bolting etc. complete in all respects confirming to relevant IRC codes & ISI specification including cost conveyance & all taxes of all materials, labour & T&P & all machineries etc. required for the work with all leads & lifts complete in position in all respects (cutting edge to be placed at the level of the bottom of well cap indicated in Drg. or 150 mm. above L.W.L. as specified in the Drg. or as per written order of the Engineer-in-Charge. | 200.92 | qtl | 12,047.43 | ₹24,20,569.64 |
| 3 | Labour of sinking single circular well casion / cribwell of specfied diameter in all kinds of soil to line levels & plumb by scoping out from inside the well & bellow the steining by chiseling grabbing blasting ( if required ) etc. including cost of dredging chiseling, hammering, cutting with pick axes & crow bars, jack hammers oor using any other divices for removing the rock strata other than rock in lines plumb etc.complete as per specification and direction of the Engineer-in-charge.
Upto 10.00 mtr depth
For 7.50 mtr dia Well (Abutment Left ) | 3 | rm | 28,422.79 | ₹85,268.37 |
| 4 | Labour of sinking single circular well casion / cribwell of specfied diameter in all kinds of soil to line levels & plumb by scoping out from inside the well & bellow the steining by chiseling grabbing blasting ( if required ) etc. including cost of dredging chiseling, hammering, cutting with pick axes & crow bars, jack hammers oor using any other divices for removing the rock strata other than rock in lines plumb etc.complete as per specification and direction of the Engineer-in-charge.
For 7.50 mtr dia Well (Abutment Right ) | 2 | rm | 28,422.79 | ₹56,845.58 |
| 5 | Sinking of R.C.C well sinking in soft rock (Non coring)/ Boulder/ Hard Soil )(wherein SPT>100) to lines levels & plum by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-charges.
For 7.50 mtr dia Well (Abutment Left ) | 2 | rm | 1,25,849.05 | ₹2,51,698.1 |
| 6 | Sinking of R.C.C well sinking in soft rock (Non coring)/ Boulder/ Hard Soil )(wherein SPT>100) to lines levels & plum by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-charges.
For 7.50 mtr dia Well (Abutment Right ) | 2 | rm | 1,25,849.05 | ₹2,51,698.1 |
| 7 | Construction of R.C.C well sinking in soft rock to lines levels & plumb by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-charges.
For 7.50 mtr dia Well (Abutment Left ) | 2.26 | rm | 3,43,804.89 | ₹7,76,999.05 |
| 8 | Construction of R.C.C well sinking in soft rock to lines levels & plumb by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-charges.
For 7.50 mtr dia Well (Abutment Right ) | 2.71 | rm | 3,43,804.89 | ₹9,31,711.25 |
| 9 | Construction of R.C.C well sinking in Hard rock to lines levels & plumb by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-charges.
For 7.50 mtr dia Well (Abutment Left ) | 0.6 | rm | 6,86,618.59 | ₹4,11,971.15 |
| 10 | Construction of R.C.C well sinking in Hard rock to lines levels & plumb by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-charges.
For 7.50 mtr dia Well (Abutment Right ) | 0.6 | rm | 6,86,618.59 | ₹4,11,971.15 |
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.14 MB
Tendernotice_1.pdf
PDF • 1.82 MB
BOQ_604257.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .