| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.1 LAccepted-AOC | ₹12.1 L | L1 | Accepted-AOC Lowest rate of tender |
| 2 | L2₹12.2 L+₹16,523 (1.37%)Rejected-Finance | ₹12.2 L+₹16,523 (1.37%) | L2 | Rejected-Finance Higher rate |
| 3 | L2₹12.2 L+₹16,523 (1.37%)Rejected-Finance | ₹12.2 L+₹16,523 (1.37%) | L2 | Rejected-Finance Higher rate |
| 4 | L2₹12.2 L+₹16,523 (1.37%)Rejected-Finance 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 UDYAM WB 23 0013338 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | ₹12.2 L+₹16,523 (1.37%) | L2 | Rejected-Finance Higher rate |
| 5 | L2₹12.2 L+₹16,523 (1.37%)Rejected-Finance | ₹12.2 L+₹16,523 (1.37%) | L2 | Rejected-Finance Higher rate |
Tender Value
₹12.2 L
EMD Value
₹24,479
Closing Date
9 Jun 2026, 3:00 pmClosed
Executive Engineer, PWD, KNHD
P16 INDIA EXCHANGE PLACE EXTENSION 2ND FLOORKIT BUILDING Kolkata 700 073
R.G.Kar Medical College and Hospital - Urgent repair of damaged false ceiling, wall panelling of the different Lecture Theatre of Platinum Jubilee Building, Anatomy building and New Academic building
2026_WBPWD_5014327_1
WBPWD/EE/KNHD/NIT-08e/2026-27
Open Tender
CIVIL WORKS
Percentage
60 days
R.G. Kar Medical College and Hospital
Please refer Tender documents.
5 documents required · 5 mandatory
₹24,479
Yes
21 Sept 2026
22 May 2026
12 Jun 2026
22 May 2026
9 Jun 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out existing partition/ceiling of particle board, masonite board, ply board,soft board etc. of any thickness and refixing same in new position with necessaryclamps making holes in walls, floor, roof and mending damages if any. [concrete plaster will be paid separately] | 332.96 | M2 | 55 | ₹18,312.8 |
| 2 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars
In ground floor including roof | 1.05 | M3 | 1,956 | ₹2,053.8 |
| 3 | Spot application for insecticides using Aqua base spray for pest (for bugs, cockroaches, silverfish, spider, termites, mosquitoes) to walls and ceiling etc. with chemical emulsion by admixing chloropyrofos emulsifiable concentrates (1% concentration) with water by weight including spraying the emulsified chemical @ 0.5 litres per sq.m. by a hand operated pressure pump on wall surfaces, ceiling, electrical fixture, electrical lines including drilling holes in places where source of termite is detected squirting chemical solution into the holes and sealing the holes with cement grout. (Rate is per sq.m. of the floor area while actual work will be all walls ceiling, rack, partition and furniture). | 1,744.2 | Mtr | 49 | ₹85,465.8 |
| 4 | M.S. works in brackets made from flats, angles, tees etc. to sizes specialy bent, twisted, forged; making holes drilled and fitted to rafter of trusses with necessary bolts, nuts, washer or screws etc. (length of straight not less than 230 mm). (To be used for repair works only). | 1 | Qntl | 9,984 | ₹9,974.02 |
| 5 | Wall panelling / partition with Melamine faced 3 layered flat pressed wood particle board of approved make and brand as per direction of Engineer - in -
Charge of requisite grade bonded with phenol formaldehyde synthetic resin conforming to IS: 848 - 1974 (excluding the cost of supporting frame work and teak wood battens / lipping)
Prelaminated particle board conforming to IS: 3087 - 1985 and IS 12823 -1990.
One side decorative laminated
Interior Grade
12mm thick | 95.95 | M2 | 1,038 | ₹99,596.1 |
| 6 | Supplying and fitting in all places of wall panelling to all heights and fixing on pre- framed existing frame work grid with glass wool of 50mm thick having density of 48 Kg per cum. to be inserted into the pre - fabricated slot covered the glass wool by marking cloths treated with Naptha @ 0.07 Ltr.per Sq.m. of cloths. Finally 12.5mm thick gypsum Fulton board having size 595mmX595mm fitted & fixed into the pre-fabricated grid and covered the all perifirial gaps of fulton board by self-additive fibre tape with necessary filler if required, complete in all respect as per direction of the Engineer-in-charge. | 77.65 | M2 | 1,182 | ₹91,782.3 |
| 7 | Supplying solid flush type doors of commercial quality, the timber frame consisting of top and bottom rails and side styles of well-seasoned timber 65mm wide each and the entire frame fitted with 37.5mm wide battens places both ways in order to make the door of solid core and internal lipping with Garjan or similar wood veneers using phenol formaldehyde as glue etc. complete, including fitting, fixing shutters in position but excluding the cost of hinges and other fittings in ground floor.
32 mm thick shutters (single leaf)
Double leaf shutters [Note: Mode of measurement-Measurement shall be made on the basis of area of shutter] | 8.32 | M2 | 2,389 | ₹19,876.48 |
| 8 | Cleaning the concrete surface by removing dirt and debris, marking defective locations and removing loose concrete by careful stripping untill hard surface is exposed, cutting the concrete to regular shape, wire brushing the exposed surface and removing debris from site complete as per direction of the Engineer - in - Charge. | 21 | M2 | 90 | ₹1,890 |
| 9 | Cleaning the exposed reinforcement preferably upto full diameter by wirebrush, applying two coats of polymer based rust removing compound left for 24 hours, removing the coating and then applying two (2) coats of polymermodified anti corrosive protective coating formulated to inhibit the corrosionof reinforcement as per manufacturer's specification] [Mode ofmeasurement: The affected surface area of reinforcement shall be considered for payment] | 6.3 | M2 | 782 | ₹4,926.6 |
| 10 | Removing corroded worn out portion of reinforcement (when the area of bar is damaged by more than 25%) by cutting and replacing the same by a new plain round bar of requisite diameter by binding with required lap / welding with old bar, including cost of reinforcement, complete in all respect including removing unserviceable materials from site as per direction of the Engineer - in - charge. Note : Payment on weight (Kg.) of new reinforcement. | 63 | kg | 87 | ₹5,481 |
stage.html
html • 0.18 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
2911_NRe_6th5696FY011019_M3_ChangeOK.pdf
Tender Documents • 0.99 MB
BOQ_5082359.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .