| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAccepted-AOC NEW KALIMATI ROAD SAKCHI 831001 JAMSHEDPUR | JAMSHEDPUR | EAST SINGHBHUM | JHARKHAND | 831001 | ₹16.8 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical as per committee decision |
| 3 | Rejected-Technical SACHCHAK JAMSHEDPUR | JAMSHEDPUR | EAST SINGHBHUM | JHARKHAND | - | - | Rejected-Technical as per committee decision |
| 4 | Rejected-Technical | - | - | Rejected-Technical as per committee decision |
Tender Value
₹24.7 L
EMD Value
₹49,306
Closing Date
19 Feb 2026, 5:00 pmClosed
Deputy Municipal Commissioner, JNAC, Sakchi
JNAC, SAKCHI, JAMSHEDPUR, EAST SINGHBHUM
Construction of covered main drain from Augusti Kalidis house to Sant Ravidas Bhawan in Bagunahatu River Road Kalidi Basti and from Sadanand Kalidis house via Neem Bhatta Mukesh Mundaris house to Vihari Basti under JNAC Jamshedpur in East Singhbhum
2026_UDD_110241_3
Jnac/Epro-38/2025-26
Open Tender
Civil Works
Percentage
180 days
JAMSHEDPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹49,306
16 Jun 2026
12 Feb 2026
20 Feb 2026
12 Feb 2026
19 Feb 2026
12 Feb 2026
Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15M. lead and disposal of unserviceable materials with all leads all complete as per direction of E/l.
Earthwork in excavation/levelling in foundation trenches in hard soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling, ramming the foudation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/l.
Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including' cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/l (Mode of measurement complacted volume).
Providing designation 75 B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/l.
Providing and laying in position specified grade of reinforced cement concrete ,excluding the cost of centering ,shuttering, finishing and reinforcement - All work up plinth level. 1:1½.3 (1 cement : 1½ coarse sand (zone-lll) : 3 graded stone aggregate 20mmnominal size)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landing, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral stair cases above plinth level up to floor five level , excluding the cost of centering , shuttering, finishing and reinforcement, with 1:1:5:3 (1 cement :1.5 coarse sand (zone-lll) : 3 graded stone aggregate 20 mm nominal size )
Providing Tor steel reinforcement of 10mm. ,12mm & 16mm dia. bars as per approved design and drawing excluding carriage of M.S. bars to work site , cutting, bending and binding with annealed wire with cost of wire, removal of rust placing the rods in position all complete as per building specification and direction of E/l.
Supplying, fitting and fixing M.S. grill gate with M.S. grills made of 20x6mm M.S. flats or 16mm square bars fitted on 25x25x6mm M.S Angle frame including cost of fabrication , providing necessary locking arrangement with haskal and domny duly fixed in P.C.C. (1:2:4) blocks of required size, applying a priming red lead paint over steel work, taxes all complete as per drawing specification and direction of E/l. (where steel is not supplied by the deptt.)
Providing Centering & Shuttering including Strutting, Propping etc & Removal of Form of Foundation, Footing, Bases of Column (Mass Concereting) all complete job.
Centering and shuttering including strutting, propping etc. and removal of form for edges of slab and breaks in floors and walls under 20cm wide.
Centering and shuttering including strutting, propping etc. and removal of form for edges of slab and breaks in floors and walls above 20cm wide.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-lll) :4 gradde stone aggregate 20 mm nominal size)
Supply 300 mm dia NP2 Hume Pipe with collors
Labour for Laying and fixing 300 mm dia NP2 Hume Pipe with collors
Supply 250 mm dia NP2 Hume Pipe with collors
Labour for Laying and fixing 250 mm dia NP2 Hume Pipe with collors
Loading and unloading of stone boulder / stone / aggrigate / sand / kanker / moorum / earth. Placing tipper at loading point,laoding with front end loader,dumping,turning for return trip,excluding time for haulage and return trip.
Earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume)
Carriage cost of Cement (Lead 5km (P)km)
Carriage cost of Sand (Lead (1K+9P)km )
Carriage cost of Chips (Lead (1K+25P)km)
Carriage cost of Bricks (Lead (1K+7P)km )
Carriage cost of Steel (Lead 5km (P)km)
Cost of Sign Board
Goods & Service Tax (G.S.T.) -
Labour Cess -
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_149060.xls
BOQ • 0.29 MB
document3738.pdf
Tender Documents • 1.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].