| 1 | L1₹20.3 LAccepted-AOC | L1 | Accepted-AOC Award of contract | |
| 2 | L2₹35.3 L+₹11.3 L (47.0%)Rejected-Finance NO 01 ARCOT ROAD REMI COMPOUND AZHWARTHIRUNAGAR CHENNAI 600087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹29,500
Closing Date
20 Jun 2025, 2:00 pmClosed
The Superintending Engineer, GCC,Madurai
The Superintending Engineer, General construction circle,TANTRANSCO, K.Pudur,Madurai-625 007
Labour charges for dismantling of failed 315MVA ICT and Erection ,Hot oil circulation, cable laying, wiring, earthing,painting, co-ordinate for testing and commissioning of allotted 315MVA ,400/230KV ICT at 400/230-110KV Kayathar SS
2025_EB_568612_1
SE/GCC/MDU/ELEC SPEC NO-02/2025-26
Open Tender
Electrical Works
Works
60 days
Madurai
As per BQR
2 documents required · 2 mandatory
₹0
₹29,500
2 Jul 2025
13 Jun 2025
21 Jun 2025
13 Jun 2025
20 Jun 2025
14 Jun 2025
Amount
Labour charges for Dismantling of busbar and Jumper connection of Failed ICT including disconnection of necessary wiring as directed by the Field Engineer in Kayathar 400KV SS
Dismantling of 315 MVA, ICT such as header pipes,Cooler Bank radiators,H.V. & L.V. bushings, conservator tanks, bucholz relays, equalizing pipes,Cooler fans, Pumps etc. and Draining the oil to the required level as directed by Field Engineer.,
Labour charges for draining of oil from main tank (To Barrel) as directed by the Field Engineer
Labour charges for Pulling of Existing ICT from plinth to safer side as directed by the Field Engineer (249MTx60Mts)
Labour Charges for loading /unloading of power transformer oil barrel with new/ released oil from store to site or vice versa as directed by the Field Engineer.
Labour charges for erection of ICT with out using Board crane wherever applicable including gasket changing for H.V. & L.V. Bushings ,Radiator valve, Conservator Valve, equalizer Pipe Valve, Bucholz Valve, etc. as directed by Field Engineer ( Gasket to be supplied by board)
Labour charges for Applying vacuum in the Auto transformer including vaccum kit etc. at SS and filling of Nitrogen upto required pressure for Transporting Purpose as directed by the Field Engineer.(N2 gas to be supplied by contractor.)
Labour charges for filling of the transformer oil from oil barrel to Spare tank for Hot oil circulation
Labour charges for initial hot oil circulation in seprate tank (separate tank will be not less than 10 KL) upto satisfied
Labour charges for filling of the transformer oil from Spare tank to Main tank for Hot oil circulation
Labour charges for Hot oil Circulation of oil of Transformer and OLTC under vacuum drying when ever applicable/ necessary to the required level and circulation of oil till satisfactory results are obtained before commissioning as directed by Field Engineer. The fillter will be provided by contractor.upto 5000 Ltrs
Labour charges for Hot oil Circulation of oil of Transformer and OLTC under vacuum drying when ever applicable/ necessary to the required level and circulation of oil till satisfactory results are obtained before commissioning as directed by Field Engineer. The fillter will be provided by contractor. above 5000 Ltrs
Labour for the erection of required control cable in duct from power transformer to control room and in the transformer body as directed by the Field Engineer.(Labour for erection of cable in duct/trench/clamping on structures - neat laying in the ducts with identification Tags,Plastic token in all duct corners for easy identification of cables. including fabrication of clamps and fixing at uniform intervals as directed by the field engineer) Above 8 Core
Labour for the erection of required control cable in duct from power transformer to control room and in the transformer body as directed by the Field Engineer.(Labour for erection of cable in duct/trench/clamping on structures - neat laying in the ducts with identification Tags,Plastic token in all duct corners for easy identification of cables. including fabrication of clamps and fixing at uniform intervals as directed by the field engineer) upto 8 Core
Supply and glanding of all the control cable in transformer to RTCC, DM.Box,MBox,etc including removing of insulation of the control cable and providing suitable holes in the gland plateas directed by the field engineer. 32mm Gland
Supply and glanding of all the control cable in transformer to RTCC, DM.Box,MBox,etc including removing of insulation of the control cable and providing suitable holes in the gland plateas directed by the field engineer. 28mm Gland
Supply and glanding of all the control cable in transformer to RTCC, DM.Box,MBox,etc including removing of insulation of the control cable and providing suitable holes in the gland plateas directed by the field engineer. 25mm Gland
Supply and glanding of all the control cable in transformer to RTCC, DM.Box,MBox,etc including removing of insulation of the control cable and providing suitable holes in the gland plateas directed by the field engineer. 19 mm Gland
Termination of cable core end dressed neatly including the cost of cable socket (lug) ferrules, sleeves, tags, ties, stropes, etc., as directed by the field engineer.(No.of core ends in unit of 1000)
Supply of various steel materials and Labour machinery consumables for the double earthing of neutral , main tank and other panel etc.as directed by the field engineer
Labour charges for one finish coating of aluminium painting works with spray gun for transformer complete including T&P etc. and painting of valves, bushings with red, yellow, blue and black paint including cost of paint of reputed make company viz Asian, Berger etc., and Consumables as directed by the field engineer
Labour charges for rewinding of cooling fan motors including cost of bearings, terminal blocks, terminal cover including testing of fan motors for healthyness and refixing the repaired motors in its place (ie) on radiators (if necessary) as directed by the Field Engineer.
Labour charges for rewinding of cooling pump motors including cost of bearings, terminal blocks, terminal cover including testing of pump motors for healthyness and re-erection the repaired motors in its place ie) on headers (if necessary) as directed by the Field Engineer.
Supply and erection of various sizes of GI bolts &Nuts and washers of required sizes to be used for erection of Turret, Radiator, wheel bolts, Conservator, Foundation bolts for A frame etc. as per the requirement during erection
Supply and erection of various sizes of Gasket 900×900×10mm
Supply and erection of various sizes of Gasket 900×900×8 mm
Supply and erection of various sizes of Gasket 900×900×6mm
Supply and erection of various sizes of Gasket 900×900×3mm
Supply and erection of silica gel breather flange type including the cost of 4-6 mm blue mesh silica gel. 5Kg
Supply and Erection of HV side Power connectors including the cost of bolts, Nuts and Electrical connections as per drawing directed by the field engineer 75mm
Supply and Erection of LV side Power connectors including the cost of bolts, Nuts and Electrical connections as per drawing directed by the field engineer 75mm
Labour for erection of LV Jumper including modification of clamps providing holes wherever necessary as directed by the field engineer
Supply and erection of Neutral omega copper with copper M-42 Nut & washer of suitable length and diameter as per drawing and as directed by the field engineer.
Labour for dismantling of Top Cover with gaskets including OLTC cover and Replacement of Top cover gaskets, OLTC gaskets, Radiator, Butterfly valve inner Gaskets and all other gaskets, which are not normally covered under dismantling and re-erection, gaskets changing and refitting of top cover and OLTC cover plate & all other dismantled accessories and complete tightening works as directed by the Field Engineer. All the required Gaskets of RC 70C grade and governed by IS 4253 to be supplied by Contractor.
Labour Charges for Overhauling of Transformer OLTC mechanism including cleaning and replacing of defective spares and gaskets etc. as directed by the Field Engineer.(Gasket & Spares will be supplied by TANTRANSCO)
Supply & erection of 1 no. Oil Temperature indicator
Supply & erection of 1 no. Winding temperature indicator with four control switch
Supply and Erection of Magetic Oil Gauage dial with minimum,maximum and normal (at 30C) marking and pointer and low oil level contact of 0.5 Amps , 110/30 V DC rating.
Supply and Erection of Butterfly valve as per required size
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
SHRI MEENATCHI ENGINEERING (BID ID -1371238)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .