| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.5 LAccepted-AOC 26 26 S F ROAD BARDHAMAN WEST BENGAL 713303 | PASCHIM BARDHAMAN | WEST BENGAL | 713303 | ₹4.5 L | 1 | Accepted-AOC AS PER TCM |
| 2 | 2₹4.6 L+₹1,698.02 (0.37%)Rejected-Finance 88 SILICATE FACTORY ROAD ASANSOL 88 SILICATE FACTORY ROAD BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | ₹4.6 L+₹1,698.02 (0.37%) | 2 | Rejected-Finance AS PER TCM |
| 3 | 3₹4.6 L+₹2,274.45 (0.50%)Rejected-Finance | ₹4.6 L+₹2,274.45 (0.50%) | 3 | Rejected-Finance AS PER TCM |
| Sl No | Description | Qty | Unit | MACLEC ENGINEERING CORPORATION L1 | SUSHMA ELECTRICALS L2 | G S PARTHA & CO L3 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 2.00 | Dismantling the coil for weighment | 1 | Nos | 2,500 ₹2,500 Lowest | 2,505 ₹2,505 | 2,507 ₹2,507 |
| 3.00 | Detanking and assembling of transformer | 1 | Nos | 2,200 ₹2,200 Lowest | 2,205 ₹2,205 | 2,208 ₹2,208 |
| 4.00 | Wooden forma for coil making | 1 | Nos | 1,400 ₹1,400 Lowest | 1,405 ₹1,405 | 1,407 ₹1,407 |
| 5.00 | Fitting of reformed coils for limbs | 1 | Nos | 1,200 ₹1,200 Lowest | 1,205 ₹1,205 | 1,206 ₹1,206 |
| 6.00 | Gaskets, nut bolts and other materials | 1 | Nos | 2,500 ₹2,500 Lowest | 2,504 ₹2,504 | 2,505 ₹2,505 |
| 7.00 | Copper jumper required for connection | 4 | Nos | 750 ₹3,000 Lowest | 751.25 ₹3,005 | 751.5 ₹3,006 |
| 8.00 | Drying of transformer at recommended temperature | 1 | Nos | 1,400 ₹1,400 Lowest | 1,500 ₹1,500 | 1,410 ₹1,410 |
| 9.00 | Replacement of damaged conductor | 235 | kg | 376.51 ₹88,479.85 Lowest | 377.05 ₹88,606.75 | 377.54 ₹88,721.9 |
| 10.00 | Reinsulation of primary conductor | 235 | kg | 38 ₹8,930 Lowest | 38 ₹8,930 Lowest | 38.25 ₹8,988.75 |
Tender Value
₹4.5 L
EMD Value
₹5,700
Closing Date
5 Aug 2026, 5:00 pmClosed
Area Engineer (EnM)
Office of the General Manager, Kajora Area
Repairing of 15hp, 415V 3 phase submersible pump, 50KVA, 550V/415V 3 phase lighting cable, 400amp, 11KV CPmake OCB and 667KVA, 11KV/3.3KV transformer of Jambad UG
2026_ECL_362514_1
GM/Kaj/AEEnM/etender/26-27/05
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Kajora Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,700
18 Sept 2026
25 Jul 2026
6 Aug 2026
25 Jul 2026
5 Aug 2026
25 Jul 2026
25 Jul 2026 - 1 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item Description/ Heading | - | - | - | - |
| 2 | Dismantling the coil for weighment | 1 | Nos | - | - |
| 3 | Detanking and assembling of transformer | 1 | Nos | - | - |
| 4 | Wooden forma for coil making | 1 | Nos | - | - |
| 5 | Fitting of reformed coils for limbs | 1 | Nos | - | - |
| 6 | Gaskets, nut bolts and other materials | 1 | Nos | - | - |
| 7 | Copper jumper required for connection | 4 | Nos | - | - |
| 8 | Drying of transformer at recommended temperature | 1 | Nos | - | - |
| 9 | Replacement of damaged conductor | 235 | kg | - | - |
| 10 | Reinsulation of primary conductor | 235 | kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Tendernotice_2.pdf
PDF • 1.04 MB
ScopeofWork.pdf
Other Document • 0.28 MB
BOQ_375424.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .