Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 LAccepted-AOC AMRAIYAPARA KORBA CG 495447 | KORBA | KORBA | CHHATTISGARH | 495447 | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹11.6 L+₹3,996.57 (0.35%)Rejected-Finance BANKI MONGRA KORBA CHHATTISGARH PIN 495447 | KORBA | KORBA | CHHATTISGARH | 495447 | L2 | Rejected-Finance Not L1 bidder | |
| 3 | L3₹12.5 L+₹91,406.95 (7.89%)Rejected-Finance | L3 | Rejected-Finance Not L1 bidder |
Tender Value
₹22.9 L
EMD Value
₹28,700
Closing Date
25 Mar 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer Mining SECL Korba Area
Office of the General Manager Korba Area Post and District Korba Chhattisgarh
Construction of 04 numbers air crossing from 32LE/10D, 32LE/11D, 66LE/10R, 66LE/11R and 06 numbers ventilation stoppings from near 31D panel at Singhali UG Mine.
2023_SECL_274963_1
SECL/KB/GM/SO(M)/eNIT/22-23/28
Open Tender
Civil Works - Buildings
Item Rate
120 days
Korba
As per NIT
3 documents required · 3 mandatory
₹28,700
25 Apr 2023
14 Mar 2023
27 Mar 2023
14 Mar 2023
25 Mar 2023
15 Mar 2023
14 Mar 2023 - 18 Mar 2023
Amount
Drilling (Hand Drill) /blasting in roof /sides in stone / drifting and removal of excavated materials manually upto 30m lead in UG. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management.
Roof bolting (1.5m Length, 29mm dia) by machenical drilling of holes, jamming tightening the roof bolts with bearing plates /w- straps including carriage of material from nearest district store to working faces within a lead of 500 m. (i). Material Like drill Rod , Drill bit will be provided by the department.(ii). Material like mechanical drill machine /UDM , drill cable , etc. will be provided by the colliery management. (iii). Arrangement of water & power will be provided by the management . (for underground).
Groove cutting in roof/ floor (Hard Stone) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground)
Groove cutting in roof/ floor (Coal) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground)
Loading of material (Bricks) into tub on surface within a lead of 50m.
Loading of material (Cement) into tub on surface within a lead of 50m.
Loading of material (Sand) into tub on surface within a lead of 50m.
Loading of material (Stone Chips) into tub on surface within a lead of 50m.
Loading of material (Steel) into tub on surface within a lead of 50m.
Unloading of material (Bricks) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate), Lead 100m
Unloading of material (Cement) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate), Lead 100m
Unloading of material (Sand) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate), Lead 100m
Unloading of material (Stone Chips) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate), Lead 100m
Unloading of material (Steel) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate), Lead 100m
Manual pushing of (Bricks) tubs in underground for every 30m. or part thereof in excess of first 30m. Lead 56.67
Manual pushing of (Cement) tubs in underground for every 30m. or part thereof in excess of first 30m. Lead 56.67
Manual pushing of (Sand) tubs in underground for every 30m. or part thereof in excess of first 30m. Lead 56.67
Manual pushing of (Stone Chips) tubs in underground for every 30m. or part thereof in excess of first 30m. Lead 56.67
Manual pushing of (Steel) tubs in underground for every 30m. or part thereof in excess of first 30m. Lead 56.67
Malma Cleaning/removal of silt, muck, debris etc deposited in underground galleries, sump,drain and stacking/loading the same into mine tub or into belt conveyor as per the site requirement within a lead of 30 m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground)
Brick work with flyash F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in : Cement mortar 1:6 (1 cement : 6 coarse sand) DSR Item No. 6.1.2
Brick workwith flyash F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor five level in : Cement mortar 1:6 (1 cement : 6 coarse sand) DSR Item No. 6.32.2
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). DSR Item No. 5.2.2
12 mm cement plaster of mix: 1:6 (1 cement : 6 coarse sand). DSR Item No. 13.4.2
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. DSR Item No. 5.9.2
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level for Cold twisted bars. DSR Item No. 5.22.3
Total impact of GST for the purpose of CTC
SARITA AGRAWAL
RAMESH PRASAD SINGH
stage.html
html • 0.04 MB
techsummary_284591.pdf
PDF • 0.72 MB
finsummary_284591.pdf
PDF • 0.47 MB
LOA.pdf
PDF • 4.30 MB
finance_284591.pdf
PDF • 0.72 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .