Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹17.7 LAccepted-AOC BEGONIA GHOSH PARA BARAKAR BARDHAMAN 713324 WEST BENGAL INDIA | BARAKAR | BARDHAMAN | WEST BENGAL | 713324 | ₹17.7 L | L-1 | Accepted-AOC PO AWARDED |
| 2 | L-2₹19.1 L+₹1.4 L (7.87%)Rejected-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹19.1 L+₹1.4 L (7.87%) | L-2 | Rejected-Finance QUOTED HIGHER THAN L-1 |
| 3 | L-3₹19.2 L+₹1.5 L (8.24%)Rejected-Finance BEGUNIA MORALPARA BARAKAR BARDHAMAN WEST BENGAL 713324 | BARDHAMAN | PASCHIM WEST BURDWAN BARDHAMAN | WEST BENGAL | 713324 | ₹19.2 L+₹1.5 L (8.24%) | L-3 | Rejected-Finance QUOTED HIGHER THAN L-1 |
Tender Value
₹16.2 L
EMD Value
₹20,300
Closing Date
18 Jul 2026, 5:00 pmClosed
GM CV AREA
OFFICE OF THE GENERAL MANAGER CV AREA XII
Upgradation of Filter Plant at Laikdih under CV Area.
2026_BCCL_361662_1
BCCL/XII/ACE/ e-Tender-20/2026-27/20 Date-03.07.2026
Open Tender
Civil Works - Buildings
Percentage
60 days
CV AREA
Please refer to the tender document.
3 documents required · 3 mandatory
₹20,300
20 Aug 2026
7 Jul 2026
20 Jul 2026
7 Jul 2026
18 Jul 2026
8 Jul 2026
7 Jul 2026 - 11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | FINISHING Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : Water thinnable cement primer | 236.05 | SQM | 53.3 | ₹12,581.57 |
| 2 | FINISHING Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete | 165.24 | SQM | 12.05 | ₹1,991.09 |
| 3 | Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 in Foundation and upto plinth level | 5.65 | CUM | 5,107.75 | ₹28,869 |
| 4 | Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 in superstructure above plinth level up to floor two level in : | 2.37 | CUM | 5,574.88 | ₹13,234.77 |
| 5 | FINISHING 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) | 273.99 | SQM | 222 | ₹60,825.78 |
| 6 | FINISHING Finishing walls with water proofing cement paint of required shade : Old work (one or more coats applied @ 2.20 kg/10 sqm) over priming coat of primer applied @ 0.80 litrs/10 sqm complete including cost of Priming coat. | 684.22 | SQM | 70.8 | ₹48,442.78 |
| 7 | STEEL WORK Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 216 | KG | 115.05 | ₹24,850.8 |
| 8 | CONCRETE WORK Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 47.09 | CUM | 5,120.95 | ₹2,41,166.02 |
| 9 | CONCRETE WORK Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources). | 28.14 | CUM | 5,892.7 | ₹1,65,814.69 |
| 10 | EARTH WORK Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 86.18 | CUM | 214.15 | ₹18,456.3 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.26 MB
BOQ_374551.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .