| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹11.1 L+₹1.6 L (16.6%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical Document Incomplete |
| Sl No | Description | Qty | Unit | ANUSKA ASSOCIATE L2 | NIRANJAN SINGH CONTRACTOR L1 |
|---|---|---|---|---|---|
| 0.00The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. | |||||
| 1.00 | E/w excavation in foundation of MKR mixed soil including initial lead and lift etc. all complete. But excluding GST. | 785.32 | Cum | 107.55 ₹84,461.17 | 70 ₹54,972.4 Lowest |
| 2.00 | Supply and laying of coarse sand in foundation/floor including all cost of material labour T&P etc . All complete. But excluding GST. | 24.6 | Cum | 1,657.16 ₹40,766.14 | 1,100 ₹27,060 Lowest |
| 3.00 | Laying C.C. work 1:3:6 with cement course sand and stone grit 25 to 50 mm including all cost of material, labour, T&P and proper completion of work.But excluding GST. | 51.18 | Cum | 3,813.49 ₹1,95,174.42 | 3,500 ₹1,79,130 Lowest |
| 4.00 | R.C.R. Stone masonry with 1:4 cement course sand including all cost of material, labour: T&P and proper completion of work.But excluding GST. | 124.79 | Cum | 4,340.97 ₹5,41,709.65 | 3,800 ₹4,74,202 Lowest |
| 5.00 | Laying C.C. work 1:2:4 with cement course sand and stone grit 10 to 20 mm including all cost of material, labour, T&P and proper completion of work.But excluding GST. | 6.16 | Cum | 4,583.38 ₹28,233.62 | 4,200 ₹25,872 Lowest |
| 6.00 | Dry stone pitching with all cost of labour material T&P etc. required for completion of work. | 7.6 | Cum | 2,363.85 ₹17,965.26 | 1,800 ₹13,680 Lowest |
| 7.00 | Supply and laying 1000 mm dia RCC Hume pipe including all cost of loading unloading carriage, all material, collor joint with cement jute labour etc. All complete. But excluding GST. | 17.5 | RM | 7,548.12 ₹1,32,092.1 | 6,650 ₹1,16,375 Lowest |
| 8.00 | Centering and Shuttering of C.C. Work including all material, labour T&P etc. all complete. But excluding GST. | 47.96 | Sqm | 735.3 ₹35,264.99 | 650 ₹31,174 Lowest |
| 9.00 | Raised struck cement pointing in 1:2 CM including all cost of material, labour, T&P and proper completion of work.But excluding GST. | 95.44 | Sqm | 112.36 ₹10,723.64 | 80 ₹7,635.2 Lowest |
Tender Value
₹12.3 L
EMD Value
₹24,600
Closing Date
25 Aug 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EE ICD KARWI CHITRAKOOT
Construction of drainage syphon at km 4.05 of Ichauli minor Ist. (Lot-10)
2026_UPIDC_1175409_10
02/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
120 days
Distt Mahoba
AS PER NIT
2 documents required · 2 mandatory
₹854
₹24,600
14 Oct 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. | - | - | - | - |
| 1 | E/w excavation in foundation of MKR mixed soil including initial lead and lift etc. all complete. But excluding GST. | 785.32 | Cum | 119.5 | ₹93,845.74 |
| 2 | Supply and laying of coarse sand in foundation/floor including all cost of material labour T&P etc . All complete. But excluding GST. | 24.6 | Cum | 1,841.29 | ₹45,295.73 |
| 3 | Laying C.C. work 1:3:6 with cement course sand and stone grit 25 to 50 mm including all cost of material, labour, T&P and proper completion of work.But excluding GST. | 51.18 | Cum | 4,237.22 | ₹2,16,860.92 |
| 4 | R.C.R. Stone masonry with 1:4 cement course sand including all cost of material, labour: T&P and proper completion of work.But excluding GST. | 124.79 | Cum | 4,823.3 | ₹6,01,899.61 |
| 5 | Laying C.C. work 1:2:4 with cement course sand and stone grit 10 to 20 mm including all cost of material, labour, T&P and proper completion of work.But excluding GST. | 6.16 | Cum | 5,092.64 | ₹31,370.66 |
| 6 | Dry stone pitching with all cost of labour material T&P etc. required for completion of work. | 7.6 | Cum | 2,626.5 | ₹19,961.4 |
| 7 | Supply and laying 1000 mm dia RCC Hume pipe including all cost of loading unloading carriage, all material, collor joint with cement jute labour etc. All complete. But excluding GST. | 17.5 | RM | 8,386.8 | ₹1,46,769 |
| 8 | Centering and Shuttering of C.C. Work including all material, labour T&P etc. all complete. But excluding GST. | 47.96 | Sqm | 817 | ₹39,183.32 |
| 9 | Raised struck cement pointing in 1:2 CM including all cost of material, labour, T&P and proper completion of work.But excluding GST. | 95.44 | Sqm | 124.83 | ₹11,913.78 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.61 MB
NIT02.pdf
Tender Documents • 3.60 MB
BOQ_2208970.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .