| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹88.5 LAccepted-AOC | ₹88.5 L | L1 | Accepted-AOC As directed by CWC, Contract Agreement is placed on the L1 contractor, Deepam Enterprises, Chennai, at their quoted total amount of Rs. 88,47,752.50 /- for the work. |
| 2 | L2₹90.9 L+₹2.4 L (2.71%)Rejected-Finance | ₹90.9 L+₹2.4 L (2.71%) | L2 | Rejected-Finance L2 contractor. Not accepted by CWC. |
| 3 | L3₹92.5 L+₹4.0 L (4.57%)Rejected-Finance | ₹92.5 L+₹4.0 L (4.57%) | L3 | Rejected-Finance L3 contractor. Not accepted by CWC. |
| Sl No | Description | Qty | Unit | Sri Lakshmi Industries L3 | Sri Krishna Agencies L2 | DEEPAM ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00 | Demolition of tiles/daddo with cement mortor of any description or any thickness in floors and walls. | 150 | 10 SQM | 700 ₹1,05,000 | 635 ₹95,250 | 600 ₹90,000 Lowest |
| 2.00 | Dismantling structural steel work including doors, gates & windows but exculding framed truss etc. | 5 | Quintal | 650 ₹3,250 | 630 ₹3,150 Lowest | 700 ₹3,500 |
| 3.00 | Demolition of Brick work built in Cement Mortor of any description. | 50 | CUM | 1,500 ₹75,000 | 780 ₹39,000 Lowest | 1,450 ₹72,500 |
| 4.00 | Taking down Chowkhats or frames exc 1.5 sq. m but n exc 4 sq. m each and handing over to CE (Fy) stores. | 8 | EACH | 300 ₹2,400 Lowest | 300 ₹2,400 Lowest | 300 ₹2,400 Lowest |
| 5.00 | Taking down Chowkhats or frames not exc 1.5 sq. m and handing over to CE(Fy) stores | 8 | EACH | 250 ₹2,000 Lowest | 250 ₹2,000 Lowest | 250 ₹2,000 Lowest |
| 6.00 | Taking down plastering on lathing (other than wirenetting), without removing lathing, in cement lime or cement mortar | 100 | SQM | 40 ₹4,000 | 36 ₹3,600 | 35 ₹3,500 Lowest |
| 7.00 | Demolition of Reinforced Cement Concrete structure of any description | 3 | CUM | 2,000 ₹6,000 | 1,800 ₹5,400 | 1,750 ₹5,250 Lowest |
| 8.00 | Earthwork excavation in hard/dense soil in trenches width and depth not exceeding 1.50 m and getting out in hard / dense soil. | 120 | CUM | 700 ₹84,000 Lowest | 700 ₹84,000 Lowest | 700 ₹84,000 Lowest |
| 9.00 | Material and labour for Quarry dust filling under foundation , flooring etc, including watering and consolidation. | 35 | CUM | 1,100 ₹38,500 Lowest | 1,250 ₹43,750 | 1,250 ₹43,750 |
| 10.00 | M & L for P.C.C 1:3:6, C2 type using 40mm graded aggregated in foundation, grouting of steel structures. | 35 | CUM | 6,500 ₹2,27,500 | 5,900 ₹2,06,500 Lowest | 6,000 ₹2,10,000 |
Tender Value
₹96.0 L
EMD Value
₹1.7 L
Closing Date
7 Jul 2026, 2:00 pmClosed
THE CHIEF GENERAL MANAGER
THE CGM, EO CIVIL, FMU-HVF, AVADI, CHENNAI - 600054
SPECIAL REPAIRS TO THE PROOF FIRING CONTROL ROOM, FRONT ENTRANCE, SECURITY GUARD ROOM AND FIRE HYDRANTS AT PROOF RANGE COMPLEX AT HVF, AVADI
2026_AVNL_281574_1
HVF/TE/13025/CEO/2026-27/31
Open Tender
Civil Works
Works
365 days
PROOF RANGE COMPLEX, HVF, AVADI.
DETAILS ENCLOSED
8 documents required · 8 mandatory
₹0
₹1.7 L
7 Aug 2026
22 Jun 2026
8 Jul 2026
22 Jun 2026
7 Jul 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of tiles/daddo with cement mortor of any description or any thickness in floors and walls. | 150 | 10 SQM | 708.75 | ₹1,06,312.5 |
| 2 | Dismantling structural steel work including doors, gates & windows but exculding framed truss etc. | 5 | Quintal | 717.14 | ₹3,585.7 |
| 3 | Demolition of Brick work built in Cement Mortor of any description. | 50 | CUM | 1,888.23 | ₹94,411.5 |
| 4 | Taking down Chowkhats or frames exc 1.5 sq. m but n exc 4 sq. m each and handing over to CE (Fy) stores. | 8 | EACH | 347.42 | ₹2,779.36 |
| 5 | Taking down Chowkhats or frames not exc 1.5 sq. m and handing over to CE(Fy) stores | 8 | EACH | 273.24 | ₹2,185.92 |
| 6 | Taking down plastering on lathing (other than wirenetting), without removing lathing, in cement lime or cement mortar | 100 | SQM | 33.18 | ₹3,318 |
| 7 | Demolition of Reinforced Cement Concrete structure of any description | 3 | CUM | 2,166.26 | ₹6,498.78 |
| 8 | Earthwork excavation in hard/dense soil in trenches width and depth not exceeding 1.50 m and getting out in hard / dense soil. | 120 | CUM | 776.25 | ₹93,150 |
| 9 | Material and labour for Quarry dust filling under foundation , flooring etc, including watering and consolidation. | 35 | CUM | 1,000 | ₹35,000 |
| 10 | M & L for P.C.C 1:3:6, C2 type using 40mm graded aggregated in foundation, grouting of steel structures. | 35 | CUM | 6,741.3 | ₹2,35,945.5 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_328565.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .