| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAccepted-AOC | ₹10.3 L | L1 | Accepted-AOC Accept |
| 2 | L2₹10.4 LRejected-AOC NEW NO 3 19 CHANDRAGIRI ARASANATHAM POST VALAYAPATTI NAMAKKAL 637020 | NAMAKKAL | TAMIL NADU | 637020 | ₹10.4 L | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | MMR CONSTRUCTION L2 | s janaki L1 |
|---|---|---|---|---|---|
| 1.00Strengthening Road From KPJV Road to Minor Veerappampillai Nagar km 0/0-0/325 H/O Koppanampalayam in Kabilarmalai Block of Namakkal District under MLACDS 2025-26 KBM-1 | |||||
| 2.00 | Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers. | 390 | Sqm | 16 ₹6,240 | 5.7 ₹2,223 |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning including all labourcharges.etc. complete. | 337.83 | Sqm | 23.36 ₹7,891.71 | 23.36 ₹7,891.71 |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2 | 152.02 | Cum | 2,831.32 ₹4.3 L | 2,831.32 ₹4.3 L |
| 5.00 | Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 1,013.5 | Sqm | 86.31 ₹87,475.19 | 86.31 ₹87,475.19 |
| 6.00 | Providing and laying Tack coat over primed WMM surface using 2.5 Kg of bituminous binder for 10 Sq.m. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous | 1,013.5 | Sqm | 20.13 ₹20,401.76 | 20.13 ₹20,401.76 |
| 7.00 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying | 1,013.5 | Sqm | 303 ₹3.1 L | 303 ₹3.1 L |
| 8.00 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content | 51.19 | Cum | 341.13 ₹17,462.44 | 341.13 ₹17,462.44 |
| 9.00 | Provision for HM Stone | 1 | Nos | 574.65 ₹574.65 | 574.65 ₹574.65 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 1,57,960 ₹1.6 L | 1,57,237 ₹1.6 L |
Tender Value
Refer Docs
EMD Value
₹10,500
Closing Date
5 Jan 2026, 3:00 pmClosed
Block Development Officer (BP) Kabilarmalai
Block Development Office (BP) Kabilarmalai
Strengthening Road From KPJV Road to Minor Veerappampillai Nagar km 0/0-0/325 H/O Koppanampalayam in Kabilarmalai Block of Namakkal District under MLACDS 2025-26 KBM-1
2025_RDTN_635691_1
1727/2025/A2
Open Tender
Civil Works - Roads
120 days
Kabilarmalai
Required Documents as per Schedule
2 documents required · 2 mandatory
₹0
₹10,500
Yes
Block Development Office (BP) Kabilarmalai
5 Jan 2026
23 Dec 2025
5 Jan 2026
23 Dec 2025
5 Jan 2026
23 Dec 2025
29 Dec 2025
Amount
Strengthening Road From KPJV Road to Minor Veerappampillai Nagar km 0/0-0/325 H/O Koppanampalayam in Kabilarmalai Block of Namakkal District under MLACDS 2025-26 KBM-1
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Picking 5 cm to 10 cm old metalled surface and sectioning including all labourcharges.etc. complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Tack coat over primed WMM surface using 2.5 Kg of bituminous binder for 10 Sq.m. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content
Provision for HM Stone
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
MMR CONSTRUCTION (BID ID -1553610)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_760764.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
1.pdf
Tender Documents • 0.85 MB
BOQ_760764.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid