Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24.8 LAdmitted-Fee/PreQual/Technical/Finance | -0.50% | ₹24.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
1 Jul 2026, 3:00 pmClosed
Chief Engineer
Lucknow Municipal Corporation
Construction and covering of an RCC drain from Chikwan Tola locality in Bhawaniganj Ward, passing through Peepal Wala Maidan, up to the Mazar-wala drain.
2026_DOLBU_1162434_1
78/CE/26-27
Open Tender
Civil Works
Lucknow Municipal Corporation
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,939
Lucknow Municipal Corporation
₹2.5 L
2 Jul 2026
20 Jun 2026
1 Jul 2026
20 Jun 2026
1 Jul 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentaling brick work or stone work in lime of cement mortar and including stacking of materials as directed by the Engineer-in-charge with in a distance of 60 metres (200ft.) | 18.01 | m3 | 1,627.46 | ₹29,310.55 |
| 2 | Earth work excavated earth (excluding rock) in trenches, plinth, sides of foundations etc in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 1.5 m. | 275.5 | m3 | 156.33 | ₹43,068.92 |
| 3 | Cartage of ballast, kankar, coal, grit or sand etc including loading and unloading but excluding stacking on pucca roads. | 234.18 | m3 | 237.49 | ₹55,615.41 |
| 4 | Making bandh in Nala etc all comp. | 45 | No | 45 | ₹2,025 |
| 5 | Dewatering for making Nala etc all comp. | 225 | Hur | 85 | ₹19,125 |
| 6 | Shuttering for Nala etc all comp. | 696 | m2 | 665.54 | ₹4,63,215.84 |
| 7 | providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level1:5:10 (1 cement : 5 coarse sand (zone-III) 10 graded brick aggregate 40 mm (norminal size) | 27.55 | m3 | 5,149 | ₹1,41,854.95 |
| 8 | providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering and shuttering finishing and reinforcement all work upto plinth level 1:2:4 (1 cement : 2 coarse sand :4 graded stone aggregate 20mm nominal size | 120.35 | m3 | 6,780.45 | ₹8,16,027.16 |
| 9 | Structural steel work in single section fixed with of without connecting plate including cuting hoisting fixing in position and applying a priming coat of approved steel primer all complete | 94.47 | Qtl | 8,519 | ₹8,04,789.93 |
| 10 | Granular sub-base with Graded material (table-400-1) by mix in place method construction of granular sub-base by providing close grader on prepared surface, mixing by mix in place method with vibratory roller to achieve the desired density, comp. as per clause 40 1. | 10.29 | m3 | 3,866.86 | ₹39,789.99 |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_2178750.xls
BOQ • 0.30 MB
RFP-78CE.pdf
Tender Documents • 1.38 MB
Download all tender documents and submit your bid