Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹8.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹8.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹8.4 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹8.9 LAdmitted-Fee/PreQual/Technical/Finance | ₹8.9 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | A Thirumurthy L1 | Abi Constructions L3 | Jeeva Construction L2 |
|---|---|---|---|---|---|---|
| 1.00Providing Boundry Demarcation Cement Concrete Post for Formation of Road From Nadukuppam to Vilankuppam at Pudhurnadu HO Pudhurnadu Panchayat | ||||||
| 2.00 | Earth work excavation and depositing on bank with intial lead and lift in hard gravelly soil as per SS20 B. | 50.7 | m3 | 350 ₹17,745 Lowest | 371 ₹18,809.7 | 350 ₹17,745 Lowest |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyence of all materials and labour charges etc. completed | 8.45 | m3 | 9,144 ₹77,266.8 | 7,150 ₹60,417.5 Lowest | 9,144 ₹77,266.8 |
| 4.00 | Supply and erection of centering charges,including cost and conveyence of all materials and labour charges etc. completed | 187.59 | m2 | 370 ₹69,408.3 Lowest | 380 ₹71,284.2 | 370 ₹69,408.3 Lowest |
| 5.00 | Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyence of all materials and labour charges etc. completed | 38.45 | m3 | 7,856 ₹3,02,063.2 | 7,920 ₹3,04,524 | 7,704 ₹2,96,218.8 Lowest |
| 6.00 | Supply and Fabrication of steel ,including cost and conveyence of all materials and labour charges etc., complete | 1.4 | NO | 76,450 ₹1,07,030 | 1,06,424 ₹1,48,993.6 | 74,740 ₹1,04,636 Lowest |
| 7.00 | Reinforced Cement Concrete 1:1 1.5:3 mix using 20mm HBG metal including cost and conveyence of all materials and labour charges etc., complete | 12.55 | m3 | 9,550 ₹1,19,852.5 Lowest | 11,669 ₹1,46,445.95 | 11,870 ₹1,48,968.5 |
| 8.00 | Providing Name Board charges | 1 | No | 3,000 ₹3,000 | 1,000 ₹1,000 Lowest | 1,000 ₹1,000 Lowest |
| 9.00 | Providing Photo charges | 1 | No | 500 ₹500 | 500 ₹500 | 400 ₹400 Lowest |
| 10.00 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount ( in Rupees) | 1,25,435.84 ₹1,25,435.84 Lowest | 1,35,355.49 ₹1,35,355.49 | 1,28,815.81 ₹1,28,815.81 |
Tender Value
Refer Docs
EMD Value
₹17,840
Closing Date
30 Jul 2026, 3:00 pmClosed
The Block Development officer (BP) Tirupathur
The Block Development officer (BP) Tirupathur
Tirupathur District General Fund - 2025-26 Providing Boundry Demarcation Cement Concrete Post for Formation of Road From Nadukuppam to Vilankuppam at Pudhurnadu HO Pudhurnadu Panchayat Tirupattur Block Package No.02
2026_RDTN_685702_1
A3/5634/2025
Open Tender
Civil Works
Item Wise
180 days
Tirupathur Block
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹17,840
30 Jul 2026
14 Jul 2026
30 Jul 2026
14 Jul 2026
30 Jul 2026
14 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing Boundry Demarcation Cement Concrete Post for Formation of Road From Nadukuppam to Vilankuppam at Pudhurnadu HO Pudhurnadu Panchayat | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with intial lead and lift in hard gravelly soil as per SS20 B. | 50.7 | m3 | - | - |
| 3 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyence of all materials and labour charges etc. completed | 8.45 | m3 | - | - |
| 4 | Supply and erection of centering charges,including cost and conveyence of all materials and labour charges etc. completed | 187.59 | m2 | - | - |
| 5 | Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyence of all materials and labour charges etc. completed | 38.45 | m3 | - | - |
| 6 | Supply and Fabrication of steel ,including cost and conveyence of all materials and labour charges etc., complete | 1.4 | NO | - | - |
| 7 | Reinforced Cement Concrete 1:1 1.5:3 mix using 20mm HBG metal including cost and conveyence of all materials and labour charges etc., complete | 12.55 | m3 | - | - |
| 8 | Providing Name Board charges | 1 | No | - | - |
| 9 | Providing Photo charges | 1 | No | - | - |
| 10 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package} | - | GST Amount ( in Rupees) | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Tendernotice_2.pdf
PDF • 5.94 MB
BOQ_824232.xls
BOQ • 0.26 MB
ROADWORK.pdf
PDF • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].