Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC WARD 30 136K NEAR KUMHAR HOUSE ROOM NO 743 KACHANI DIST SINGRAULI MP 486887 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486887 | ₹6.6 L Quoted ₹5.6 L | L1 | Accepted-AOC Accepted on L1 basis |
| 2 | L2₹6.8 L+₹1.3 L (22.6%)Rejected-Finance OLD BUS STAND JAYANT DISTT SINGRAULI MADHYA PRADESH 486890 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486890 | ₹6.8 L+₹1.3 L (22.6%) | L2 | Rejected-Finance Rejected on L2 Basis |
| 3 | L3₹7.8 L+₹2.2 L (39.7%)Rejected-Finance | ₹7.8 L+₹2.2 L (39.7%) | L3 | Rejected-Finance Rejected on L3 Basis |
| 4 | L4₹8.0 L+₹2.4 L (43.8%)Rejected-Finance | ₹8.0 L+₹2.4 L (43.8%) | L4 | Rejected-Finance Rejected on L4 Basis |
Tender Value
₹13.1 L
EMD Value
₹16,500
Closing Date
19 May 2023, 11:00 amClosed
GM(Excv), Jayant Project
GM office, Jayant project, Singrauli, M.P-486890
Carrying of scrape material from FWS to Store, Collection of store material from regional stores, BWS, CWS, CMC, FWS, Stores and loading, unloading and staging and Collection, return of burnt oil for a period of 360 days (Excluding Sunday/Holidays)
2023_NCL_278632_1
JNT/GM(Excv)/E-tender/23-24/04
Open Tender
Excavation Department Work
Item Rate
360 days
Jayant Project
As per NIT
3 documents required · 3 mandatory
₹16,500
4 Jul 2023
8 May 2023
20 May 2023
8 May 2023
19 May 2023
9 May 2023
8 May 2023 - 12 May 2023
Amount
Carrying of scrape material from FWS to Store, Collection of store material from regional stores, BWS, CWS, CMC, FWS, Stores and loading, unloading and staging and Collection & return of burnt oil for a period of 360 days (Excluding Sunday/Holidays) FWS Jayant.
Cost of1. Collection / filling fresh oil and grease for maintenance/ repair of dumper. 2. Collection of burnt oil and fill the burnt oil in empty drums for returning to store. 3. Collection of store material such as spares, oil, grease, N₂, O₂ and DA from R/store, BWS, CWS, FWS store and loading, unloading and staging. 4. Carrying of scrap material from FWS to store. 5. Blowing/cabin cleaning at FWS during schedule maintenance per day. 6. Approx 05 (five) nos unskilled manpower required for above said work under the technical supervision and guidance of NCL at FWS on daily basis. 7. All tools & tackles and transportation of manpower engaged for work will be provided by department from FWS to different sites. 8. The work shall be carried out at Jayant project( R/store, BWS, FWS, CWS etc). 9. All the safety norms should be taken care by the contractor as per safety practices of NCL. . Note -[ Rate to be quoted on per day basis including labour charges, contractor's profit ,CMPF,CMPS and any other cost]
Total impact of GST for the purpose of CTC
Shaba Engineering
SHARAD MOTORS AND ENGINEERING WORKS
MOTIKSHA ASSOCIATES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .