| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC Awarded |
| 2 | L1₹1.1 CrRejected-AOC VILL DARRANGIRI P O DARRANGIRI DIST GOALPARA ASSAM | ₹1.1 Cr | L1 | Rejected-AOC Not awarded |
| 3 | L2₹1.3 CrRejected-AOC VILL BOKO RAY PARA P O P S BOKO DIST KAMRUP ASSAM PIN 781123 | BOKO | KAMRUP | ASSAM | 781123 | ₹1.3 Cr | L2 | Rejected-AOC Not awarded |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Pranjal Boro L3 | TRIMURTY ENTERPRISE L1 | DSK CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting wild vegatation ,grass, bushes,shrubs,saplins and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned upto lead of 1000 m etc. as per technical specification cl 201 (i) By Manual means ( B ) In area of non thorny jungle | 1.64 | Hect. | 52,264.78 ₹85,452.92 | 47,038.3 ₹76,907.62 | 50,228.08 ₹82,122.91 |
| 2.00 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pitrs with all lifts and leads, transporting to site,spreading,grading to required slope and compacted to meet requirement of table 300.2 with a lead upto 1000 m. as per technical specification clause 303.1 (a)From Private land | 1,629.05 | Cum | 300 ₹4.9 L | 270 ₹4.4 L | 321.94 ₹5.2 L |
| 3.00 | WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means. Using stone sceening Type- B 11.2mm for Gr. III | 554.06 | Cum | 4,853.9 ₹26.9 L | 4,368.51 ₹24.2 L | 4,344.06 ₹24.1 L |
| 4.00 | Interlocking concrete block pavement Providing and laying interlocking concrete block pavement (M40) having thickness 80mm as per technical specification clause 1504. A) Including Edge block/ Edge restraints | 7,387.5 | Sq.m | 1,232 ₹91.0 L | 1,108.8 ₹81.9 L | 1,100.45 ₹81.3 L |
| 5.00 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
I. Ordinary soil
Upto 3 m depth | 32.68 | Cum | 130 ₹4,248.40 | 117 ₹3,823.56 | 121.02 ₹3,955.03 |
| 6.00 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803,1202 & 1203
A. With crushed stone.
(II) P.C.C grade M 10
Nominal mix 1:3:6 | 1.81 | Cum | 6,500 ₹11,765 | 5,850 ₹10,588.50 | 5,721.4 ₹10,355.73 |
| 7.00 | Bedding for pipe (ii) Type B (First Class) Laying 1st class bedding on well compacted sand, moorum brick soling layer as per clause 115(ii) Granular bedding. | 3.45 | Cum | 1,800 ₹6,210 | 1,620 ₹5,589 | 1,476.7 ₹5,094.62 |
| 8.00 | Brick msonry work in cement mortar in foundation of wall complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 ii) In 1:4 cement mortar | 16.76 | Cum | 8,500 ₹1.4 L | 7,650 ₹1.3 L | 7,061.75 ₹1.2 L |
| 9.00 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of grannular material in single row including fixing collar with cement mortar 1;2 but excluding excavatiuon, protection works, backfilling, concrete and masonary works, in head walls and parapets Clause 1106. B) 1000 MM Dia | 7.5 | Rm | 8,907.5 ₹66,806.25 | 8,016.75 ₹60,125.62 | 7,381.23 ₹55,359.25 |
| 10.00 | Plastering with cement morter(1:6) 15mm thick on brick work in sub structure as per technical specification. | 27.62 | Sqm | 130 ₹3,590.60 | 117 ₹3,231.54 | 138.79 ₹3,833.35 |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
5 Jan 2026, 2:00 pmClosed
Chief Engineer,PWRD
O/o the Chief Engineer PWRD,Assam,Guwahati-03
Recovery and Reconstruction of Road from Mandira Nichlamari to Malibari Puran Bazar under NDRF( PDNA-2022) for the year 2025-26
2025_PWD_49573_53
CE/Commn/192/PDNA/2025-26/02
Open Tender
Civil Works – Roads
60 days
Boko
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,520
₹2.5 L
Yes
O/o the Chief Engineer PWRD,Assam,Guwahati-03
17 Mar 2026
24 Dec 2025
5 Jan 2026
24 Dec 2025
5 Jan 2026
24 Dec 2025
24 Dec 2025 - 5 Jan 2026
26 Dec 2025
Clearing and grubbing road land including uprooting wild vegatation ,grass, bushes,shrubs,saplins and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned upto lead of 1000 m etc. as per technical specification cl 201 (i) By Manual means ( B ) In area of non thorny jungle
Construction of subgrade and earthen shoulders with approved material obtained from borrow pitrs with all lifts and leads, transporting to site,spreading,grading to required slope and compacted to meet requirement of table 300.2 with a lead upto 1000 m. as per technical specification clause 303.1 (a)From Private land
WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means. Using stone sceening Type- B 11.2mm for Gr. III
Interlocking concrete block pavement Providing and laying interlocking concrete block pavement (M40) having thickness 80mm as per technical specification clause 1504. A) Including Edge block/ Edge restraints
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil Upto 3 m depth
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803,1202 & 1203 A. With crushed stone. (II) P.C.C grade M 10 Nominal mix 1:3:6
Bedding for pipe (ii) Type B (First Class) Laying 1st class bedding on well compacted sand, moorum brick soling layer as per clause 115(ii) Granular bedding.
Brick msonry work in cement mortar in foundation of wall complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 ii) In 1:4 cement mortar
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of grannular material in single row including fixing collar with cement mortar 1;2 but excluding excavatiuon, protection works, backfilling, concrete and masonary works, in head walls and parapets Clause 1106. B) 1000 MM Dia
Plastering with cement morter(1:6) 15mm thick on brick work in sub structure as per technical specification.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.04 MB