Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.9 LAccepted-AOC 06 DUDHI SONBHADRA 231208 | DUDHI | SONBHADRA | UTTAR PRADESH | 231208 | ₹41.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹42.2 LRejected-Finance | ₹42.2 L | L2 | Rejected-Finance L2 |
Tender Value
₹42.9 L
EMD Value
₹4.2 L
Closing Date
15 Dec 2025, 12:00 pmClosed
SE
SE MZP Circle PWD Mirzapur
Varansi shaktinagar marg SH-5A (chainage 166.130 to 184.417) ke patch marammat ka karya
2025_CEMRZ_1094979_2
5152/53M mzp circle/2025
Open Tender
Civil Works
60 days
Sonebhadra
As per NIT
3 documents required · 3 mandatory
₹2,720
Yes
₹4.2 L
Yes
21 Jan 2026
8 Dec 2025
15 Dec 2025
8 Dec 2025
15 Dec 2025
8 Dec 2025
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom.
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
Tendernotice_2.pdf
PDF • 2.61 MB
BOQ_2019056.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid