| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-Finance | ₹8.3 L | L1 | Accepted-Finance LESS |
| 2 | L2₹8.4 LRejected-Finance | ₹8.4 L | L2 | Rejected-Finance MORE |
| Sl No | Description | Qty | Unit | S V Constructions L1 | Mahesh Constructions L2 |
|---|---|---|---|---|---|
| 1.00 | Picking of existing B.T road complete direction as per the departmental officers | 785 | M3 | 24 ₹18,840 | 24.5 ₹19,232.50 |
| 2.00 | Providing and laying WBM 75MM Compacted thicness with Grade III metal Using1M3 of 53mm to 26.50mm IRC METAL as Top layers with 0.24 cum of gravel for blindage per 10 sqm including cost and conveyance of all materials and stocking them at the site to departmental gauge for premeasurement including labour charges for spreading metal and hand packing to camber watering with all leads for water and compacting by 80-100 KN Power roller including hire & fuel charges for water sprinkler and full other tools and plants etc., complete as per MOST Specifications.II nd layer.. | 123 | M3 | 2,350 ₹2.9 L | 2,355 ₹2.9 L |
| 3.00 | Tack Coat using bulk bitumen of grade 80/100 with 4Kg includind all labour and material charges completed as per standard specifications | 1,638 | m2 | 78 ₹1.3 L | 79 ₹1.3 L |
| 4.00 | Tack Coat using bulk bitumen of grade 80/100 with 2Kg over BT includind all labour and material charges completed as per standard specifications | 19 | m2 | 32 ₹608 | 32 ₹608 |
| 5.00 | SDBC Providing and laying of 25mm compacted thick Semidence Bituminous Concrete using 0.10m3 of 11.2mm IRC metal/ 0.16m3 of 6.7mm IRC metal and 0.11 m3 of 2.8mm and below with24.00 kgs of bitumen of grade 60/70 for premixing per 10 m2 including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tonnes capacity conveying the mix by tipper trucks to power site spreading the mix in required temperature for uniform thickness of 25mm with mechancial paver to the specified grades and cross section and compaction by 80-100 KN power roller to the required density etc., including labour for loading bitumen into bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire chrages and fuel charges for 20-30 T CMP with bitumen boiler, tipper trucks, power finisher power rollers and all another tools and plant required including all other incidental charges etc., completed as per specification using cmp clause 511 of MOST specification | 1,657 | m2 | 239.5 ₹4.0 L | 240 ₹4.0 L |
| 6.00Add :- GST @ 18% | |||||
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
13 May 2025, 3:00 pmClosed
The Assistant Commissioner , East Zone
The Assistant Commissioner, East Zone, Coimbatore Corporation, Singanallur, Coimbatore.
Restoration of Bt surface at From sakthi nagar to Powerhouse road in ward no 8, East Zone.
2025_MAWS_554589_4
E4/2025/Eastzone
Open Tender
Civil Works - Others
90 days
East Zone, Coimbatore Corporation, Singanallur
As per Tender Conditions
4 documents required · 4 mandatory
₹0
₹10,000
29 Apr 2026
8 May 2025
14 May 2025
8 May 2025
13 May 2025
8 May 2025
Amount
Picking of existing B.T road complete direction as per the departmental officers
Providing and laying WBM 75MM Compacted thicness with Grade III metal Using1M3 of 53mm to 26.50mm IRC METAL as Top layers with 0.24 cum of gravel for blindage per 10 sqm including cost and conveyance of all materials and stocking them at the site to departmental gauge for premeasurement including labour charges for spreading metal and hand packing to camber watering with all leads for water and compacting by 80-100 KN Power roller including hire & fuel charges for water sprinkler and full other tools and plants etc., complete as per MOST Specifications.II nd layer..
Tack Coat using bulk bitumen of grade 80/100 with 4Kg includind all labour and material charges completed as per standard specifications
Tack Coat using bulk bitumen of grade 80/100 with 2Kg over BT includind all labour and material charges completed as per standard specifications
SDBC Providing and laying of 25mm compacted thick Semidence Bituminous Concrete using 0.10m3 of 11.2mm IRC metal/ 0.16m3 of 6.7mm IRC metal and 0.11 m3 of 2.8mm and below with24.00 kgs of bitumen of grade 60/70 for premixing per 10 m2 including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tonnes capacity conveying the mix by tipper trucks to power site spreading the mix in required temperature for uniform thickness of 25mm with mechancial paver to the specified grades and cross section and compaction by 80-100 KN power roller to the required density etc., including labour for loading bitumen into bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire chrages and fuel charges for 20-30 T CMP with bitumen boiler, tipper trucks, power finisher power rollers and all another tools and plant required including all other incidental charges etc., completed as per specification using cmp clause 511 of MOST specification
Add :- GST @ 18%
Mahesh Constructions (BID ID -1331811)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
EZ-E4-2025-Roads.pdf
Tender Documents • 0.91 MB
BOQ_662808.xls
BOQ • 0.27 MB
EZ-E4-2025-ITB.pdf
Additional Documents • 0.19 MB