Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAccepted-Finance ALIGARH | UTTAR PRADESH | 202001 | ₹16.8 L | L1 | Accepted-Finance Lowest Rate |
| 2 | L2₹16.8 L+₹2,707.70 (0.16%)Rejected-Finance | ₹16.8 L+₹2,707.70 (0.16%) | L2 | Rejected-Finance Above to Lowest Rate |
| 3 | Rejected-Technical | - | - | Rejected-Technical Documents not Completed |
Tender Value
₹16.8 L
EMD Value
₹1.7 L
Closing Date
16 Jun 2026, 1:00 pmClosed
EXECUTIVE OFFICER
NPP MAU
WARD NO 35 MUNSHIPURA PURVI ME SRI RAM SADAN SE CHAPPAN BHOG HOTE HUYE MAKHAN JWELLERS TAK R.C.C NALA NIRMAD KARYA
2026_DOLBU_1131388_2
68-295
Open Tender
Civil Works
Percentage
120 days
WORK
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,560
EXECUTIVE OFFICER
₹1.7 L
18 Jul 2026
4 Jun 2026
16 Jun 2026
4 Jun 2026
16 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site Clerance including labour and matrials
and including grass cutting /Dressing and
carrage of matrials by Head load | 1 | JOB | 10,000 | ₹10,000 |
| 2 | Dismenteling of Brick Work including
Stacking of materials as directed by the
Engineer-in-Charge with the distance of
60.00m. Work SI No. 692 | 35.35 | CUM | 435 | ₹15,377.25 |
| 3 | E/W in Excavation in ordenery soil in
foudation including labour and matrials
and T/P with all com. Work SI No. 251 | 180.6 | CUM | 115 | ₹20,769 |
| 4 | C.C. Work in 1:6:12 in cement, fine sand
and 40 mm Gauge Brick Ballast including
labour and matrials , T/P with all com.
Work SI No. 273 | 27.09 | CUM | 3,250 | ₹88,042.5 |
| 5 | R.C.C. Work in 1:1.5:3 in cement coarse
sand and 20mm gauge including labour
and matrials, T/P with all com. Work SI
No.285 deduction of old brick bats 13263 | 83.73 | CUM | 9,430 | ₹7,89,573.9 |
| 6 | MS work in R.C.C. work including
labour and matrials , T/P with all com.
Work SI. No.504 | 83.54 | QTL | 5,650 | ₹4,72,001 |
| 7 | Shifting of all material ,add to item 251-253
for every additional 30m .lead or part of
30m.or for every additional 1.50m lift or
part of 1.50m .Work SI No-254.
150 m distance | 195.77 | CUM | 95 | ₹18,598.15 |
| 8 | S/F of Granite Sign Board including labour
and matrials T/P with all com. Work. | 1 | JOB | 10,000 | ₹10,000 |
| 9 | Add 18% GST | 1 | GST | 2,56,391 | ₹2,56,391 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.43 MB
tech6801.pdf
Tender Documents • 6.53 MB
BOQ_2166543.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .