Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹4.8 Cr
EMD Value
₹9.6 L
Closing Date
28 Nov 2026, 3:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SUSHIL PRAKASH
SE,BIHARSHARIF
IRRIGATION CIRCLE BIHARSHARIF
Manoj Kumar
CE, Biharsharif
Restoration of Left Bundh of Uderasthan Barrage and other Important Work.
144202
01SBD/2026-27/ID UDERASTHAN
Open Tender
CIVIL
Nalanda
• EMD
• Bid Validity
• Bid Security
• (i) Legal Status of Bidder.
(ii) Place of Registration.
(iii) Principal place of Business
(iv) Power of attorney of signatory Bid
• Total value of civil engineering construction work performed in last five years.
2021 - 2022
2022 - 2023
2023 - 2024
2024- 2025
2025- 2026
• Work Experience of Similar nature work of value not less than 10% of estimated value of contract
• Minimum Quantities of work done as prime contractor in any one year during last five years.
Earth Work (Excavation, Filling , Back Filling etc.
in combined quantities in M3)-21266.50 CUM
Cement Concrete (P.C.C., R.C.C., P.S.C, etc. in combined quantities in M3 )-62.00Cum
Protection works (Pitching/ Crating/ Soling with Boulder/Brick/Geobag/E.C.bag/Nylon crates/Gabians etc.-1967.00cum
Masonary works (Boulder, Brick, etc.)-297.17 CUM
• Bidding Capacity:More than the total Bid value of present work = A*N*3-B=Rs. ____.Where A = Maxm. Value of work executed in any one yr during last 5 yrs. N= Nos of years for completion of works. B=Value of existing commitments & ongoing works to be completed in period
• (a) Existing commitments and ongoing works
(b) Work for which Bid already submitted
• Availability of key items of Contractor's Equipment
Type of Equipment/Maximum age No. Required Max. Age in years Nos. Required
Concrete mixes with integral weigh batching facility 5 1
Poclain/ Excavator / Front End Loader or any other loading machine 8 3
Tractor/Tipper/Dumper 5/6/6 10
Dozer 8 1
Vibrator/roller/smooth/wheeled/sheep foot roller 6 1
• Key Personnel
Site Engineer-B.E. Civil+ 07 years exp. (3 years in Irrigation work) or retired A.E-1
Site Supervisor - Fresh Graduate in Civil or Diploma Civil + 03 years Exp. Or retired ITI Holder 1
• Evidence of access to or availability of creadit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old).
• Proposed methodology and programme of construction.
• Litigation History
• Affidavit
• Undertaking
• Time of Completion
• Registration No.
• Character Chertificate (As per letter no. 124 dated 04.02.2021 of WRD.)
• I.T. & GST Registration Certificate
• NOC for Debar (If required)
• Labour License
• Any other Document as per NIT
CIVIL
PERCENTAGE
L1
1
23 documents required · 23 mandatory
₹10,000
Processing Fee: 11800
₹9.6 L
CE,IC,WRD,NALANDA BIHARSHARIF OFFICE
25 Nov 2026
25 Nov 2026
30 Nov 2026
25 Nov 2026
28 Nov 2026
25 Nov 2026
27 Nov 2026
120 days
Technical Sheet
Name of Work Restoration of Left Bundh of Uderasthan Barrage and other Important Work Cost of Work as per BOQ(Rs in Lakhs) 479.35979 Time of Completion in months 3 ALL COLOURED CELL TO BE FILLED ACCORDINGLY
Sactioned Amount 47935979 Date of Sanction 24.11.2026 Date of Tender 22.10.2026
Sl No. Items Requirement Requirement Cl. No. Name of the contractor
Address of the contractor
1 Bid Validity Bids shall remain valid for a period not less than 120 days after the deadline date. A Bid valid for a shorter period shall be rejected by the Employer as non-responsive 120 Days Bid validity periods In days
2 Bid Security (A) Unconditional bank guarantee from any scheduled Indian bank issued within the state in the format given (If issued from any bank outside state will be converted to any bank within the state before executing the agreement. Amount To be entered (Rs in Lakhs)
(B) Earnest Money can be paid through Internet Payment Gateway (Credit/Debit Card), Net Banking, NEFT/RTGS in online mode. Amount To be entered (Rs in Lakhs)
Bid Security Amount - (Rs. In Lakhs) Bid Security Amount - Rs.
3 (i) Legal Status of Bidder.
(ii) Place of Registration.
(iii) Principal place of Business
(iv) Power of attorney of signatory Bid Attached (If any) or Not
4 Total value of civil engineering construction work performed in last five years. 1. Annual Financial Turn Over usually not less than 50% of the estimated cost of the work (Rs in Lakhs)
2021 - 2022 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.47
2022- 2023 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.36
2023- 2024 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.26
2024- 2025 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.17
2025- 2026 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.08
5 Work Experience of Similar nature Satisfactory completed atleast one similar work of value not less than 10% of estimated value of contract (Rs in Lakhs) Amount To be entered (Rs in Lakhs)
6 Minimum Quantities of work done as prime contractor in any one year during last five years. Items Unit Quantity
Earth Work (Excavation, Filling , Back Filling etc. in combined quantities in M3) M3 21266.5 Value to be entered in unit Cum.
Cement Concrete (P.C.C., R.C.C., P.S.C., etc. in M3) M3 62 Value to be entered in unit Cum.
Protection Work (Pitching/ Crating/ Soling with Boulder/ Brick/ Geo Bag/ E.C. Bag/ Nylon Crates/ Gabians etc.) M3 1967 Value to be entered in unit Cum.
Masonary Work (Boulder, Brick etc.) M3 297.17 Value to be entered in unit Cum.
7 Bidding Capacity: More than the total Bid value of present work = A*N*3-B=Rs. ____.Where A = Maxm. Value of work executed in any one yr during last 5 yrs. N= Nos of years for completion of works. B=Value of existing commitments & ongoing works to be completed in period
(a) Existing commitments and ongoing works Amount To be entered (Rs in Lakhs)
(b) Work for which Bid already submitted Amount To be entered (Rs in Lakhs)
8 Availability of key items of Contractor's Equipment Type of Equipment/Maximum age No. Required Max. Age in years Nos. Required Nos./ Max. Age
Concrete mixes with integral weigh batching facility 5 1
Tractor/Tipper/Dumper 5 10
Poclain/ Excavator / Front End Loader or any other loading machine 8 3
Vibrator/roller/smooth/wheeled/sheep foot roller 6 1
9 Key Personnel Key Personnel/Qualification Nos. Required Name of the Personnel and Experince in years
Site Engineer-B.E. Civil+ 07 years exp. (3 years in Irrigation work) or retired A.E. 1
Site Supervisor - Fresh Graduate in Civil or Diploma Civil + 03 years Exp. Or retired ITI Holder 1
10 Evidence of accesses to Financial Resources Evidence of access to or availability of creadit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old). (Rs in Lakhs). Amount To be entered (Rs in Lakhs)
11 Proposed methodology and programme of construction. Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not)
12 Litigation History Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not)
13 Affidavit Affidavit should be submitted in the format as per the Annexure-3 of the Water Resources Department letter no. 536 dated 13.06.2013 .
14 Undertaking Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract.
15 Time of Completion To be entered in months
16 Registration No.
17 Character Chertificate (As per letter no. 124 dated 04.02.2021 of WRD.)
18 I.T. & GST Registration
19 Labour License
20 NOC for Debar (If required)
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for purposes of post qualification as provided for in Clause 4 of the Instructions to Bidders. This information will not be incorporated in the Contract.
NAME OF THE CONTRACTOR
1 For Individual Bidders
1.1 Constitution or legal status of Bidder (Attach copy)
Place of registration :
Principal place of business :
Power of attorney of signatory of Bid (Attach)
1.2 Total value of Civil Engineering construction work performed in the last five years** (in Rs. Million)
1.3.1 Work performed as prime contractor, work performed in the past as a nominated sub- contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further that all oth
NAME OF THE CONTRACTOR
Project Name Name of the Employer* Description of work Contract No. Value of Contract (Rs. In Crore) Date of issue of work order Stipulated period of completion Actual date of completion* Remarks explaining reasons for delay & work completed)
* Attach certificate(s) from the Engineer(s)-in-Charge
** Upto last day of the month Immediately preceding the last date of bids received. (PWD letter no. 2863(E) dt. 7.6.2017
Attach certificate from Chartered Accountant.
1.3.2 Quantities of work executed as prime contractor, work performed in the past as a nominated sub-contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further
NAME OF THE CONTRACTOR
Year Name of the work Name of the Employer* Quantity of work performed (cum) @ Remarks
Earth Work (Excavation, Filling , Back Filling etc. in combined quantities in M3) Cement Concrete (P.C.C., R.C.C., P.S.C, etc. in combined quantities in M3 ) Protection works (Pitching/ Crating/ Soling with Boulder/Brick/Geobag/ E.C.bag/Nylon crates/Gabians etc. Masonary works (Boulder, Brick etc. Masonary works (Boulder, Brick, etc.) Sheet Pile /Steel pile/ 1 m Dia or above bore Pile Remarks* (indicate contract Ref)
1.4 Information on Bid Capacity (works for which bids have been submitted and works which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
NAME OF THE CONTRACTOR
Description of works Place & State Contract No. Name & Address of Employer Value of Contract (Rs Cr) Stipulated Period of Completion Value of works* remaining to be completed (Rs Cr) Anticipated date of completion
* Attach certificate(s) from the Engineer(s)-in-Charge
The item of work for which data is requested should tally with that specified in ITB clause 4.5A ©
** Immediately preceding the financial year in which bids are received.
# Delete, if prequalification has been carried out.
(B) Works for which bids already submitted :
Description of works Place & State Name & Address of Employer Estimated value of works (Rs Cr) Stipulated period of completion Date when decision is expected Remarks, if any
1.5 Availability of key items of Contractor’s Equipment essential for carrying out the Works [Ref. Clause 4.5(B)(a)]. The Bidder should list all the information requested below. Refer also to Sub Clause 4.3 (d) of the Instruction to Bidders.
NAME OF THE CONTRACTOR
Description of works Requirement Availability proposals Remarks (from whom to be purchased)
No. Capacity Owned/Leased to be procured Nos./Capacity Age/ Condition
1.6 Qualifications and experience of key personnel required for administration and execution of the Contract [Ref. Clause 4.5(B)(b)]. Attach biographical data. Refer also to Sub Clause 4.3 (e) of instructions to Bidders and Sub Clause 9.1 of the Condition
NAME OF THE CONTRACTOR
Position Name Qualification Year of Experience (General) Years of experience in the proposed position
1.7 Proposed sub-contracts and firms involved. [Refer ITB Clause 4.3(k)]
NAME OF THE CONTRACTOR
Sanction of the works Value of Sub-contract Sub-contractor (Name & Address) Experience in similar work
Attach copies of certificates on possession of valid license for executing water supply/ sanitary work/ building electrification works [Reference Clause 4.5(d) & Clause 4.5(e)]
*1.8 Financial reports for the last five years: balance sheets, profit and loss statements, auditors' reports (in case of companies/corporation), etc. List them below and attach copies.
1.9 Evidence of access to financial resources to meet the qualification requirements: cash in hand, lines of credit, etc. List them below and attach copies of support documents.
1.10 Name, address and telephone, telex and fax numbers of the Bidders' bankers who may provide references if contacted by the Employer.
1.11Information on litigation history in which the Bidder is involved.
NAME OF THE CONTRACTOR
Other Party(ies) Employer Cause of Dispute Amount involved Remarks showing Present Status
1.12 Statement of compliance under the requirements of Sub Clause 3.2 of the instructions to Bidders. (Name of Consultant engaged for project preparation is ** ........................ …………….............................)
Proposed work method and schedule. The Bidder should attach descriptions, drawings and charts as necessary to comply with the requirements of the Bidding documents. [Refer ITB Clause 4.1 & 4.3(1)]
1.15 Quality Assurance Programme
2 Additional Requirements
2.1 Bidders should provide any additional information required to fulfill the requirements of Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
*** (iii) Update of original prequalification application
*** (iv) Copy of original prequalification application
*** (v) Copy of prequalification letter
* Delete, if prequalification has been carried out.
** Fill the Name of Consultant.
*** Delete, if prequalification has not been carried out.
Check List for Submission Of Tender
Evaluation will be done as per the information provided in the document attached with tender. Bidder may disqualified, if documents are not attached properly.
Name of the Bidder
Sl. No. Checklist Items (Attach Documents in Link Name As Given in Adjacent coloumn in Edit Attachment Folder) Link Name in Edit Attachment Document attached
1 BIDSECURITY PHOTO COPY BID SECURITY PC
2 LAST 5 YEARS ANNUAL TURN OVER ANNUAL TURN OVER
3 EXPERIENCE Of SIMILAR NATURE Of W0RKS EXP SIM NAT
4 QUANTITY OF WORK (E/W, GSB, WMM, BITUMINOUS WORK, PCCetc) EXECUTED DURING LAST 5 YEARS) WORK EXE QTY
5 BALANCE VALUE OF ON GOING WORKS BAL VAL WORKS
6 EXISTING COMMITMENTS EXIST COMT
7 BANKER'S CERTIFICATE FOR ACCESS OF FINACIAL RESOURCES BANK CER
8 AFFIDAVIT AFFIDAVIT
9 UNDERTAKING FOR BID VALIDITY, INVESTMENT ABILITY, NON ASSOCIATION WITH OFFICIALS. UNDERTAKING
10 LITIGATION HISTORY LIT HIS
11 PLANT and MACHINARIES PT & MAC
12 KEY PERSONNEL KEY PER
13 Registration REGISTRATION
14 Power of Attoney POW AT
15 Legal Status Of Bidder LEGAL
16 PROGRAMME Of CONSTRUCTION PROG CONS
17 LABOUR LICENSE LAB LIC
18 IT & ST REGISTRATION and CLEARANCE CERTIFICATE IT ST CLEARANCE
19 NOC FOR DEBAR DEBAR
20 Proposal of sub-Contract SUB-CONTRACT
21 Joint Venture JV
22 Character Chertificate CC
IF YOU HAVE NOT BEEN DEBARED WRITE "NOT APPLICABLE" IN YOUR LETTER HEAD SCAN AND UPLOAD IN THE IN NOC FOR DEBAR LINK
Note:-Attachment should be self attested and should be attached as per above instruction, otherwise it may be rejected.
I, the undersigned, do hereby certify that all the statements made in the required attachments are true and correct.
Signature & Seal of the Bidder
CHAPTER ---V CHAPTER--X
CANAL EMBANKMENT AND STRUCTURE
S.No. Description Quantity Unit Rate Amount Ref
5.1.1 Preparation of seat of embankment or canals by 75 mm ploughing and removing the grass roots etc.as per specifications and direction of E/I.
Unit :- Per Sqm.
Taking Out put:- 92.94 Sqm
Unskilled mazdoor for leveling and ploughing 0.50 nos 428.00 214.00
Unskilled mazdoor for removing grass roots and leveling 0.75 nos 428.00 321.00
Add Overhead charge & C.P @ 15% 80.25
Add cess @ 1% 0.00
Rate per Sqm. 6.62
say,Rs 6.60 Per M2
5.1.2 Preparation of borrow areas of embankment or canals by removing the grass and the jungle, bushes from the top including weeding out shrubs including roots and leveling all complete as per specifications and direction of E/I. 5
Unit :- Per Sqm.
Taking Out put:-92.94 Sqm
Unskilled mazdoor for leveling and ploughing 0.75 nos 428.00 321.00
Add Overhead charge & C.P @ 15% 48.15
Add cess @ 1% 0.00
Rate per Sqm Rs 3.97
say,Rs. 4.00 Per M2
5.1.3 Jungle clearance and weeding out shrubs including small tree up to 0.50M girth and removal as per specifications and direction of E/I.
Unit :- Per Sqm
Taking Out put:- 92.94 Sqm
Unskilled mazdoor for cutting shrubs and trees 1.50 nos 428.00 642.00
Unskilled mazdoor for collecting and removing shrubs, weeds and trees. 0.75 nos 428.00 321.00
Add Overhead charge & C.P @ 15% 144.45
Add cess @ 1% 0.00
Rate per Sqm 11.92
say, Rs 11.90 Per M2
5.1.11 Extra for earth work in marshy, slushy and daldal soil (vide classification of soil item F) all complete as per specifications and direction of E/I.
Unit :- Per Cum
Taking Out put=28.32 Cum 28.32 Cum
Unskilled mazdoor for cutting 1.5 nos 428.00 642.00
Unskilled mazdoor for carrying 1.5 nos 428.00 642.00
Add Overhead charge & C.P @15% 192.60
Add cess @1% 0.00
Rate Per Cum say,Rs 52.10 Per M3
5.1.22 Extra for wet earth all complete as per specifications and direction of E/I.
Taking Out put:- 28.32 Cum
Unskilled mazdoor 1 nos 428.00 428.00
Add Overhead charge & C.P 15 % 64.20
Add Labour Cess0 % 0.00
Say Rs 17.40 Per M3
5.1.27 Earth work in excavation of foundation trenches in ordinary soil (vide classification of soil item A ) and disposal of excavated earth so obtained to a distance up to 50 M and average lift of 1.5 M including leveling , ramming the foundation trenches, removing the roots of shrubs etc. all complete as per specifications and direction of E/I.
Unit :- Per Cum
Taking Out put =28.32 Cum
Unskilled mazdoor for cutting and carrying etc. 11 nos 428.00 4708.00
Head mason 0.25 nos 660.00 165.00
Add Overhead charge & C.P@15% 730.95
Add cess@1% 0.00
Say Rs 197.90 Per M3
5.1.31 Earth work in filling in foundation trenches and back filling of structures in layers not exceeding 150 mm thick well watered, rammed and fully compacted and finally dressed with suitable earth obtained from excavation of foundation trenches and placed in a suitable profile within a lead of 30 M and lift of 1.5 M, all complete job as per specifications and direction of E/I.
Taking Out put=28.32 Cum
Unskilled mazdoor for cutting . 4.5 nos 428.00 1926.00
Unskilled mazdoor for carrying . 4 nos 428.00 1712.00
Head mason 0.125 nos 660.00 82.50
Add Overhead charge & C.P@15% 558.08
Add cess@1% 0.00
Say Rs 151.10 Per M3
5.1.34.1 Extra for earth work for ordinary or hard soil ( vide classification of soil item-A and B) for each subsequent lift up to 1 M over the initial lift of 1.5 M as per specification and direction of E/I.
Taking Out put = 28.32 Cum
Unskilled mazdoor for cutting 1 nos 428.00 428.00
Add Overhead charge & C.P@15% 64.20
Add cess@1% 0.00
Say Rs 17.40 Per M3
5.1.37 Providing coarse clean local sand in filling in foundation trenches including ramming, watering, royalty and all other taxes complete job as per specifications and direction of E/I.
Taking Out put =2.832 Cum
Unskilled mazdoor for cutting 1 nos 428.00 428.00
Local Sand 2.832 Cum 143.32 405.88 M-006
Add Overhead charge & C.P@15% 125.08
Add cess@1% 0.00
Say Rs 338.60 Per M3
5.1.38 Watering and consolidation of earth laid in 150 mm to 225 mm layers by manual labour with C.I hammer to achieve minimum 85 % of dry density including cost and carriage of water and necessary tools and plants with all leads and lifts all complete as per specifications and direction of E/I.
Taking Out put =28.32 Cum
Unskilled mazdoor 3 nos 428.00 1284.00
Bhisti for carriage of water and sprinkling 3 nos 417.00 1251.00
Cost of water 15.00
Add Overhead charge & C.P@15% 382.50
Add cess@1% 0.00
Say Rs 103.50 Per M3
5.1.42.1 Fine dressing of the canals banks or embankment and turfing with 75 mm thick grass sode obtained within a lead of 150 M including the cost of watering the grass surface till it acquires greenness as per specifications and direction of E/I.
Taking Out put =100Sqm
Unskilled mazdoor for cutting 1.5 nos 428.00 642.00
Unskilled mazdoor for carrying 1.5 nose 428.00 642.00
Unskilled mazdoor for dressing, placing turf and ramming 1 nos 428.00 428.00
Bhisti for carriage of water and sprinkling 3 nos 417.00 1251.00
Cost of watering till the growth 15.00
Add Overhead charge & C.P@15% 446.70
Add cess@1% 0.00
Say Rs 3424.70 Per % M2
5.1.42.2 Extra for each lead of 150 M over initial lead of 150 M including the cost of watering the grass surface till it acquires greenness as per specifications and direction of E/I.
Taking Out put=100 Sqm
Unskilled mazdoor for carrying 1.50 nos 428.00 642.00
Add Overhead charge & C.P@15% 96.30
Add cess@1% 0.00
Say Rs 738.30 Per % M2
5.1.43 Jungle clearance in borrow area, building premises; flanks, slope of existing road and canal etc,embankment by removing the jungle , bushes from top including weeding out shrubs including roots and leveling complete job as per specifications and direction of E/I.
Taking Out put =92.94 Sqm
Unskilled mazdoor for carrying 0.75 nos 428.00 321.00
Add Overhead charge & C.P@15% 48.15
Add cess@1% 0.00
Say Rs 4.00 Per M2
5.1.44. Earth work by tractor ( Rajashani) with bucket (Doli) with spreader ( Tractor leveller or Tractor Dozer) in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in odinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers and construction & removal of dhalas properly with lead of ............... metre (lead will be considered as perpendicular distance from C.G. of Pit to C.G. of banks or embankment ) and with all lifts all complete as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth )(Lead should be taken C.G to C.G.perpendicular to the bank Maximum Lead Upto -150 mtr. Note:- Track Path may not be taken as lead )
For C.G to C.G Lead in K.M ( L ) Speed (km/hr) ( V ) Time for loading, Unloading etc (hr) ( t )=1 min. Spacing of Dhalas (km) (S) Capacity Per Trip Cum (e ) Haulage Path (Distance travelled in one cycle) = 2(L+S)
Time of run per trip = 2(L+S)/ V Time per cycle (hr) =2(L+S) / V +t No of trips , N =8V/ (2L+2S+Vt) Output per day with 80% efficiency = 0.80xNxe Use Rate of Tractor Per Day (Tr ) Cost per Cubic Metre = Tr/Ne
Proportional Cost of Dhala (10% only) Cost of Dhala Per cubic metre Add for cutting (Use rate of tractor / Capacity of cutting 324 cum per day ) =Tr/324 Add for spreading cost =( Use rate of D-80 Dozer Per hr / Capacity of D-80 Dozer per hr 300 cum) Add for finishing and dressing =one mazdoor/100M3 Total cost (12+14+15+16+17 )
Add Overhead charge & C.P 15% Rate Per M3 Add 1% karmkar cess Total Total+Rs 33 for Royality
NOTE :- Add Royality of Earth Rs 22.00 Where needed without overhead charge & C.P
5.1.46 Earth work by Mechanical means with help of Excavator, Tipper and Spreader in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead of ............... metre (lead will be considered as track path i.e. half of distance travelled in one cycle i.e. half of haulage path from pit to bank or embankment. Pit will be beyond 150 meter from centre of bank i.e. perpendicular distance from centre of bank to nearest boundary of pit will be more than 150 meter) and with all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth )
Lead in K.M ( L ) Cost of cutting & Loading by Excavator one M3 capacity= Use rate of Excavator / Capacity of Excavator ( 60M3) Average Speed on Kucha track Km / hr = (V) Average haulage path ( Distance ) in one cycle ( D) in Km Haulage Time in minute ( Time taken in one cycle of run ) = 60D/V Loading Time one minute Per M3 For 5.5 M3
Unloading & Turning Time in minute Total Time Per trip in minute Col (5+6+7) =( T) No. of Trip per hour taken as 50 minute N =50/T Output per hour with 80 % efficiency Q = 0.8 X N X 5.5 Use Rate per hour of Tipper 5.5 M3 capacity = (Tr )
Carriage Cost per M3 = Tr/ Q Add for spreading cost =( Use rate of D-80 Dozer Per hr / Capacity of D-80 Dozer per hr 300 cum) =3000/300 Add 5 % for haul road maintenance, 5 % for processing and 2 % for extra labour for finishing = 12 % of column ( 2+12+13) Total Cost per M3 col (2+12+13+14 ) Add Overhead charge & C.P 15%
Rate Per M3 Add 1% cess Total Rate per Cum Total+Rs 33 for Royality
NOTE :- Add Royality of Earth Rs 75.00 Where needed without overhead charge & C.P
5.1.47 Earth work by excavator and spreader or tractor- leveler in lower level canal or flood embankment or dhar ( Like Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not needed ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth )
(A) Cost of cutting, loading , unloading & placing by excavator 1 M3 capacity
Use rate of Excavator(Rupees per hour) 2202.00 PM3005
Output of Excavator =60 Cum per hour
(B) Cost of spreading by D-80 Dozer
Use rate of D-80 Dozer(Rupees per hour) 2930.00 PM1003
Output of D-80 Dozer =300 Cum per Hour
( C) For dressing & finishing one labour for 100 M3
Unskilled labour 0.01 no 428.00 4.28
Add Overhead charge & C.P@15% 7.61
Add 1% Cess 0.00
Say Rs 58.40 Per M3
NOTE :- Add Royality of Earth Rs 22.00 Where needed without overhead charge & C.P
5.2 CANAL LINING
Sl.No. Description Quantity Unit Rate Amount Ref.
5.2.2 Providing filter of stone chips 20 mm and down well graded as per design for lined canal, rains including hand packing etc . all complete as per specification and direction of E/I 30%
Taking Out put =2.832 Cum
Skilled mazdoor for screening and grading filter 2 nos 541.00 1082.00
Unskilled mazdoor for laying and hand packing 1.5 nos 428.00 642.00
Add Overhead charge & C.P@15% 571.25
Add 1% Cess 0.00
Say Rs 1546.50 Per M3
5.2.7 Supplying and laying stone metal graded filter of size 90 mm to 45 mm size in slope and bed of canal below lining including royalty, all taxes etc. . all complete as per specification and direction of E/I (where depth of cutting is more than 6 M ) 50%
Taking Out put =2.832 Cum
Stone metal 2.832 cum 975.00 2761.20 M-039
Unskilled mazdoor for carrying metal 3.5 nos 428.00 1498.00
Unskilled mazdoor for spreading 1.5 nos 428.00 642.00
Add Overhead charge & C.P@15% 751.83
Add 1% Cess 0.00
Say Rs 2035.30 Per M3
5.2.8 Supplying and laying sand filter free from clay and other organic materials ( F.M 2.5 to 3.0 ) in slope and bed of the canal, below lining including the cost of watering, compaction, including royalty, all taxes etc. . all complete as per specification and direction of E/I (where depth of cutting is more than 6M) 20%
Taking Out put =2.832 Cum
Unskilled mazdoor for carrying and placing 3.5 nos 428.00 1498.00
Unskilled mazdoor for spreading 1.5 nos 428.00 642.00
Unskilled mazdoor for loading and ramming 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 675.90
Add 1% Cess 0.00
Say Rs 1829.80 Per M3
5.3. CONCRETE WORK
Sr.No. Description Quantity Unit Rate Amount
5.3.3 Providing and laying P.C.C. M-100 with nominal mix of (1:3:6 ) in foundation of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing, royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I.
Taking Out put=2.832 Cum
Coarse aggregates Gr IV (Rate of approved quality of aggregate as per Design) 2.66 M3 1080.50 2874.13 M-048
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 283.00 404.69 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 325.00 464.75 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
Add Overhead charge & C.P@15% 2242.07
Add 1% Cess 0.00
Say Rs 6069.60 Per M3
5.3.4 Providing and laying P.C.C. M-150 with nominal mix of (1:2:4 ) in foundation of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing., royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I.
Unit :- Per Cum
Taking Out put= 2.832 Cum
Coarse aggregates (20 mm To 10 mm) (Taking Rate of approved quality of aggregate as per Design) 2.548 M3 886.00 2257.53 M-045
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 283.00 404.69 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 325.00 464.75 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
Add Overhead charge & C.P@15% 2416.23
Add 1% Cess 0.00
Say Rs 6541.10 Per M3
5.3.5 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5:3 ) in foundation of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing., royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I.
Taking Out put=2.832 Cum
Coarse aggregates (20 mm To 10 mm) (Rate of approved quality of aggregate as per Design) 2.436 M3 886.00 2158.30
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 283.00 404.69 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 325.00 464.75 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
Add Overhead charge & C.P@15% 2641.47
Add 1% Cess 0.00
Say Rs 7150.90 Per M3
5.3.9 Providing and laying P.C.C. M-150 with nominal mix of (1:2.:4 ) in superstructure of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing., royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I.
Taking Out put=2.832 Cum
Coarse aggregates ( 20 mm to 10 mm ) (Cost of coarse aggregate as per Design) 2.548 M3 886.00 2257.528
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1.25 nos 541.00 676.25
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 283.00 404.69 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 325.00 464.75 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
Total 16243.4323
Add Overhead charge & C.P@15% 2436.51
Add 1% Cess 0.00
Say Rs 6596.00 Per M3
5.3.10 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5:3 ) in superstructure of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing., royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I.
Taking Out put=2.832 Cum
Coarse aggregates ( 20 mm to 10 mm ) (Cost of coarse aggregate as per Design) 2.436 M3 886.00 2158.30
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1.25 nos 541.00 676.25
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 283.00 404.69 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 325.00 464.75 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
Add Overhead charge & C.P@15% 2661.76
Add 1% Cess 0.00
Say Rs 7205.80 Per M3
5.3.13 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5:3 ) in deck slab with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing, royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I.
Taking Out put=2.832 Cum
Coarse aggregates ( 20 mm to 10 mm ) (Cost of coarse aggregate as per Design) 2.436 M3 886.00 2158.30
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1.25 nos 541.00 676.25
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 283.00 404.69 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 325.00 464.75 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
Add Overhead charge & C.P@15% 2661.76
Add 1% Cess 0.00
Say Rs 7205.80 Per M3
5.3.16 Providing and laying dry pitching with precast cement concrete blocks of size 600 mm x 600 mm x 300 mm in M-75 with nominal mix of (1:4:8) in floor and flank wall with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality of sand of requisite F.M washed and screened including necessary form work, tools and plants, vibrating, curing as well royalty and all taxes complete job as per specifications and direction of E/I.
Taking Out put =2.832 Cum
Coarse aggregates Gr III (Cost of coarse aggregate as per Design) 2.720 M3 752.36 2046.42
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
Unskilled mazdoor for placing blocks in position 4 nos 428.00 1712.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 283.00 404.69 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 325.00 464.75 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
D SHUTTERING CHARGES
Shuttering 25 blocks 25 mm thick mango planks
Add 1 % for cost of nails and spikes 132.93
Carpenter Gr II 3 Rs 541.00 1623.00
Unskilled mazdoor 8 Rs 428.00 3424.00
Assuming 4 uses to calculate 18472.43 a
Cost of shuttering for 2.832 cum = a/4 4618.11 D
TOTAL(A+B+C+D) 19505.81
Add Overhead charge & C.P@15% 2925.87
Add 1% Cess 0.00
Say Rs 7920.80 Per M3
5.3.17 Providing and laying dry pitching with precast cement concrete blocks of size 600 mm x 600 mm x 300 mm in M-100 with nominal mix of (1:3:6) in floor and flank wall with approved quality of graded coarse aggregate of required grade( as per design ) and approved quality of sand of requisite F.M washed and screened including necessary form work, tools and plants, vibrating, curing as well royalty and all taxes complete job as per specifications and direction of E/I.
Taking Out put =2.832 Cum
Coarse aggregates Gr IV (Cost of coarse aggregate as per Design) 2.66 M3 1080.50 2874.13
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
Unskilled mazdoor for placing blocks in position 4 nos 428.00 1712.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 283.00 404.69 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 325.00 464.75 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
D SHUTTERING CHARGES
Shuttering 25 blocks 25 mm thick mango planks
Add 1 % for cost of nails and spikes 132.93
Carpenter Gr II 3 Rs 541.00 1623.00
Unskilled mazdoor 8 Rs 428.00 3424.00
Assuming 4 uses to calculate 18472.43 a
Cost of shuttering for 2.832 cum = a/4 4618.11 D
TOTAL=A+B+C+D 21342.35
Add Overhead charge & C.P@15% 3201.35
Add 1% Cess 0.00
Say Rs 8666.60 Per M3
5.3.17 Based Providing and laying dry pitching with precast cement concrete blocks of size 900 mm x900 mm x 600 mm in M-100 with nominal mix of (1:3:6) in floor and flank wall with approved quality of graded coarse aggregate of required grade( as per design ) and approved quality of sand of requisite F.M washed and screened including necessary form work, tools and plants, vibrating, curing as well royalty and all taxes complete job as per specifications and direction of E/I.
Taking Out put =2.832 Cum
Coarse aggregates Gr IV (Cost of coarse aggregate as per Design) 2.66 M3 1080.50 2874.13
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
Unskilled mazdoor for placing blocks in position 4 nos 428.00 1712.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 283.00 404.69 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 325.00 464.75 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
D SHUTTERING CHARGES (600mmx600mmx300mm)
Shuttering 25 blocks 25 mm thick mango planks
Add 1 % for cost of nails and spikes 132.93
Carpenter Gr II 3 Rs 541.00 1623.00
Unskilled mazdoor 8 Rs 428.00 3424.00
Assuming 4 uses to calculate 18472.43 a
Cost of shuttering for 2.832 cum = a/4 4618.11
TOTAL=A+B+C+D 19531.33
Add Overhead charge & C.P@15% 2929.70
Add 1% Cess 0.00
Say Rs 7931.20 Per M3
5.3.17 Based Providing and laying dry pitching with precast cement concrete blocks of size 1200 mm x1200 mm x 900 mm in M-100 with nominal mix of (1:3:6) in floor and flank wall with approved quality of graded coarse aggregate of required grade( as per design ) and approved quality of sand of requisite F.M washed and screened including necessary form work, tools and plants, vibrating, curing as well royalty and all taxes complete job as per specifications and direction of E/I.
Taking Out put =2.832 Cum
Coarse aggregates Gr IV (Cost of coarse aggregate as per Design) 2.66 M3 1080.50 2874.13
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
Unskilled mazdoor for placing blocks in position 4 nos 428.00 1712.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 283.00 404.69 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 325.00 464.75 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
D SHUTTERING CHARGES (600mmx600mmx300mm)
Shuttering 25 blocks 25 mm thick mango planks
Add 1 % for cost of nails and spikes 132.93
Carpenter Gr II 3 Rs 541.00 1623.00
Unskilled mazdoor 8 Rs 428.00 3424.00
Assuming 4 uses to calculate 18472.43 a
Cost of shuttering for 2.832 cum = a/4 4618.11
TOTAL=A+B+C+D 18806.92
Add Overhead charge & C.P@15% 2821.04
Add 1% Cess 0.00
Say Rs 7637.00 Per M3
5.3.18 Providing shuttering including strutting, propping etc. and its removal after use in foundation as per specifications and direction of E/I.
Taking Out put=9.30 Sqm
Local wood planks 38 mm thick =9.3 x 38 / 1000 0.353 cum
Add 5 % wastage 0.017 cum
Cost of 0.37 cum lock wood planks 0.37 cum 26000.00 9620.00
Add cost for strutting and propping @ 10 % of above 962.00
Total cost of wood 10582.00
Assuming 4 uses to calculate 4 use
Cost of shuttering for 2.832 cum total cost/4 2645.50
Add 1 % for cost of nails and spikes on total cost of wood 105.82
Carpenter Gr II 1.5 nos 541.00 811.50
Unskilled mazdoor 2.5 nos 428.00 1070.00
C Carriage of materials
Cost of the carriage of materials from Godown and back to godown after use including loading unloading and stacking @ 1 % of Total cost of wooden materials 105.82 C
TOTAL cost per 9.3 sqm =A+B+C 4738.64
Add Overhead charge & C.P@15% 710.80
Add 1% Cess 0.00
Say Rs 586.00 Per M2
5.3.19 Providing shuttering including strutting, propping etc. and its removal after use in various components of canal structure or embankment structure as per specifications and direction of E/I.
Taking Out put=9.30 Sqm
Local wood planks 38 mm thick 9.3 x 38 / 1000 =0.353 cum 0.353 cum
Add 5 % wastage 0.017 cum
Cost of 0.37 cum lock wood planks 0.37 cum 26000.00 9620.00
Add cost for strutting and propping @ 10 % of above 962.00
Total cost of wood 10582.00
Assuming 4 uses to calculate 4 use
Cost of shuttering for 2.832 cum total cost/4 2645.50
Add 1 % for cost of nails and spikes on total cost of wood 105.82
Carpenter Gr II 1.5 nos 541.00 811.50
Unskilled mazdoor 2.5 nos 428.00 1070.00
C Carriage of materials
Cost of the carriage of materials from Godown and back to godown after use including loading unloading and stacking @ 1 % of Total cost of wooden materals 105.82 C
TOTAL cost per 9.3 sqm =A+B+C 4738.64
Add Overhead charge & C.P@15% 710.80
Add 1% Cess 0.00
Say Rs 586.00 Per M2
5.3.20 Providing centering including strutting,propping etc. and removing after use in deck slab as per specifications and direction of E/I.
Taking Out put =22.326 Sqm
(Assuming size in slab 7.32 x 3.05 =22.326 sqm )
a. 40 mm thick local wood planks 22.326 x40 / 1000
Add 5 % for wastages =0.045
Assuming 4 uses to calculate
Cost of planks per use =0.89 x rate of local wood /4 6110.00
b. Assuming av. Height of slab from G.L=3.66 M
150 mm sal bullah required =78 nos
Length of sal bullah =78 x3.66 =285.48 Mtr 285.48 M 70.57 20146.32 M-223
(Assuming sal bullah to be used 10 times for centerins
=285.48 x Rate per Mtr / 10 2014.63
c. Salwood scanting required (75 mm x 63 mm size) =0.311 cum 0.311 cum 60000.00 18660.00 BCD1199
( Assuming 10 uses )
Cost per use =0.311 x Rate per Mtr/10 1866.00
Add 1 % for cost of nails and spikes 99.91
Carpenter Gr II 4 nos 541.00 2164.00
Unskilled mazdoor 7 nos 428.00 2996.00
C. Carrage of matterials 5160.00 ( B )
Cost of the carriage of materials from Godowm and back to godown after use including loading unloading and stacking @ 1 % of Total cost of wooden materals ( A ) 99.91 ( C )
TOTAL cost per 22.326 sqm =A+B+C 15350.45
Add Overhead charge & C.P@15% 2302.57
Add 1% Cess 0.00
Say Rs 790.70 Per M2
5.3.21 Providing M.S reinforcement( Plain steel ) as per approved design , drawing, removal of rust, cutting, bending, binding, including supplying annealed wire, placing M.S rods in position complete job as per specifications and direction of E/I.
Assumng 1.00M.T
(a).Dia of bar 6mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 58600.00 61530.00 A M-126
(B). i. Annealed wire 14 Kg 49.12 687.68 M-072
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Totalof A+B 72930.68
Add Overhead charge & C.P@15% 10939.60
Add 1% Cess 0.00
Say Rs 83870.30 Per M.T
5.3.22 Providing M.S reinforcement ( Tor steel ) as per approved design , drawing, removal of rust, cutting, bending, binding, including supplying annealed wire, placing M.S rods in position complete job as per specifications and direction of E/I.
Assuming 1.00 M.T
(i). T.M.T Fe -500 8 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 73983.00 77682.15
(B). i. Annealed wire 14 Kg 75.04 1050.56 M-072
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 13416.86
Add 1% Cess 0.00
Say Rs 102862.60 Per M.T
(j). T.M.T Fe -500 10 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 72627.00 76258.35
(B). i. Annealed wire 14 Kg 75.04 1050.56 M-072
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 13203.29
Add 1% Cess 0.00
Say Rs 101225.20 Per M.T
(k). T.M.T Fe -500 12 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 72034.00 75635.70
(B). i. Annealed wire 14 Kg 75.04 1050.56
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 13109.89
Add 1% Cess 0.00
Say Rs 100509.10 Per M.T
(l). T.M.T Fe -500 16 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 72034.00 75635.70
(B). i. Annealed wire 14 Kg 75.04 1050.56
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 13109.89
Add 1% Cess 0.00
Say Rs 100509.10 Per M.T
(m). T.M.T Fe -500 20 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 72034.00 75635.70
(B). i. Annealed wire 14 Kg 75.04 1050.56 M-072
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 13109.89
Add 1% Cess 0.00
Say Rs 100509.10 Per M.T
(n). T.M.T Fe -500 25 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 72034.00 75635.70
(B). i. Annealed wire 14 Kg 75.04 1050.56
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 13109.89
Add 1% Cess 0.00
Say Rs 100509.10 Per M.T
(o). T.M.T Fe -500- 28 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 72034.00 75635.70
(B). i. Annealed wire 14 Kg 75.04 1050.56
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 13109.89
Add 1% Cess 0.00
Say Rs 100509.10 Per M.T
(p). T.M.T Fe -500 32 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 72034.00 75635.70
(B). i. Annealed wire 14 Kg 75.04 1050.56
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 13109.89
Add 1% Cess 0.00
Say Rs 100509.10 Per M.T
5.4 MASONARY WORK
Sl.No. Description Quantity Unit Rate Amount Ref.
5.4.2 Brick work in designation 100 A Brick with cement mortar (1 : 4 ) in foundation with approved quality of coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curing, scaffolding and its removal wherever required including royaliy and all taxes etc. complete job as per specification and direction of E / I.
Taking Out put=2.832 Cum
Head mason 0.125 nos 660.00 82.50
Mason Gr II 2.5 nos 541.00 1352.50
Unskilled mazdoor 5 nos 428.00 2140.00
Bhisti 1 nos 417.00 417.00
Add Overhead charge & C.P@15% 1871.74
Add 1% Cess 0.00
Say Rs 5067.10 Per M3
5.4.6 Brick work in designation 100 A Brick with cement mortar (1 : 4 ) in superstructure with approved quality of coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curing, scaffolding and its removal wherever required including royaliy and all taxes etc. complete job as per specification and direction of E / I.
Taking Out put =2.832 Cum
Head mason 0.125 nos 660.00 82.50
Mason Gr II 2.5 nos 541.00 1352.50
Unskilled mazdoor 6 nos 428.00 2568.00
Bhisti 1 nos 417.00 417.00
Add Overhead charge & C.P@15% 1935.94
Add 1% Cess 0.00
Say Rs 5240.90 Per M3
5.5. PLASTER WORK
Sl.No. Description Quantity Unit Rate Amount
5.5.2 Providing 12 mm thick cement plaster (1: 4) with approved quality sand of requisite F.M . washed and screened including curing, scaffolding wherever required and its removal, royalty and all taxes etc. complete job as per specification and direction of E / I.
Taking Out put =9.30 Sqm
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 1.5 nos 428.00 642.00
Bhisti 0.5 nos 417.00 208.50
Add Overhead charge & C.P@15% 266.26
Add 1% Cess 0.00
Say Rs 219.50 Per M2
5.7 PITCHING AND PILING
Sl.no Description Quantity Unit Rate Amount
5.7.1 Labour for making 150 mm to 200 mm dia Sal ballah piles including cutting to size and dressing, making shoes for driving etc.all complete as per specification and direction of E/I.
Unit :-Per Pile
Taking Out put =10 Piles
Carpenter Gr II 0.5 nos 541.00 270.50
Add Overhead charge & C.P@15% 40.58
Add 1% Cess 0.00
Say Rs 31.10 Per pile
5.7.2 Providing two coats of coal tar painting over 150 mm to 200 mm dia Sal ballah piles and labour for driving it below ground level up to 5 metre including cost of all tools and plants required for the job all complete as per specification and direction of E / I.
Taking Out put =30.5 M
Coal tar 9 Kg 30.00 270.00 BCD324
Unskilled mazdoor 18 nos 428.00 7704.00
Add Overhead charge & C.P@15% 1262.70
Add 1% Cess 0.00
Say Rs 317.40 Per M
5.7.3 Labour for fitting and fixing 100 mm to 150 mm dia sal ballah cross pieces 1350 mm length in position with 16 mm dia bolts, nuts and washers at each joints including the cost of bolts nuts and washers complete job as per specification and direction of E / I.
Taking Out put =13.7 M
(Assuming 10 nos. of piles)
Total nos. of joints 2x10 =20 nos
Length of one cross pipe = 1.37 mtr
Hence total length 10 x 1.37 metre =13.7 mtr
Nuts and bolts 16 mm dia 375 mm long with washer etc. 20 nos 36.35 727.00 M-265
Carpenter Gr II 0.5 nos 541.00 270.50
Unskilled mazdoor 0.5 nos 428.00 214.00
Add Overhead charge & C.P@15% 181.73
Add 1% Cess 0.00
Say Rs 101.70 Per M
5.7.4 Labour for fitting and fixing 150 mm dia sal ballah in position as back stay with 16 mm dia bolts, nuts and washers at each joints including the cost of bolts nuts and washers complete job as per specification and direction of E / I.
Taking Out put =48.80 M
(Assuming 10 nos. of back stay each of 4.88 mt )
Total nos. of joints 3x10 =30 nos
Length of back stay including 2 % wastage =49.8 m
Nuts and bolts 16 mm dia 375 mm long with washer etc. 30 nos 36.35 1090.5 M-265
Carpenter Gr II 1 nos 541.00 541.00
Unskilled mazdoor 1 nos 428.00 428.00
Add Overhead charge & C.P@15% 308.93
Add 1% Cess 0.00
Say Rs 48.50 Per M
5.7.5 Labour for fitting and fixing 100 mm to 150 mm dia sal ballah walling pieces with 16 mm dia bolts, nuts and washers at each joints including the cost of bolts nuts and washers complete job as per specification and direction of E / I.
Taking Out put:- 6.10 Mtr
(Assuming 6.10 mtr long walling pieces)
Total nos. of joints with vertical pile at 1.22 mtr = 6 nos.
Nuts and bolts 16 mm dia 375 mm long with washer etc. 6 nos 36.35 218.10 M-265
Carpenter Gr II 0.125 nos 541.00 67.63
Unskilled mazdoor 0.125 nos 428.00 53.5
Add Overhead charge & C.P 15 % 50.88
Add Labour Cess 0 % 0.00
Say Rs 64.00 Per M
5.7.6 Labour for fitting and fixing 150 mm to 200 mm dia sal ballah piles with two nos 16 mm dia 225 mm long nuts and washers including the cost of bolts nuts and washers complete job as per specification and direction of E / I.
Taking Out put:- 10.00 Joints
(Assuming 10 joints )
Nuts and bolts 16 mm dia 225 mm long with washer etc. 20 nos 36.35 727.00 M-265
Carpenter Gr II 0.5 nos 541.00 270.50
Unskilled mazdoor 0.25 nos 428.00 107.00
Add Overhead charge & C.P 15 % 165.68
Add Labour Cess 0 % 0.00
Say Rs 127.00 Per M
5.7.7 Labour for cutting 62 mm to 75 mm dia bamboo piles to size and making shoes and driving etc. complete job as per specification and direction of E / I.
Taking Out put =30.50M
(Assuming 20 nos. pile sunk 1.525 mtr deep )
Total depth sunk 30.50 meter
Carpenter Gr II 0.25 nos 541.00 135.25
Unskilled mazdoor for pilling 2.5 nos 428.00 1070.00
Add Overhead charge & C.P@15% 180.79
Add 1% Cess 0.00
Say Rs 45.40 Per M
5.7.9 Labour for fitting and fixing 62mm to 75 mm dia bamboo runners in position at every vertical pile with 150 mm long nails or 38 swg G.I. wire including cost of G.I. wire or nails complete job as per specification and direction of E / I.
Taking Out put =30.50M
Cost of 150 mm long nails 0.5 Kg 58.00 29.00
Carpenter Gr II 0.125 nos 541.00 67.63
Unskilled mazdoor 0.25 nos 428.00 107
Add Overhead charge & C.P@15% 30.54
Add 1% Cess 0.00
Say Rs 7.70 Per M
5.7.10 Providing two coats of coal tar painting over 150 mm to 200 mm dia Sal ballah piles and labour for driving it below ground level in running water upto complete job as per specification and direction of E/I. (Assuming 30.5 meter of piles)
Taking Out put=30.50 M
Coal tar 9 Kg 30.00 270.00 BCD324
Unskilled mazdoor 28 nos 428.00 11984.00
Hire charge of 2 nos of boat of 40 quintal 2 nos 714.00 1428.00 PM66001
Add Overhead charge & C.P@15% 2118.90
Add 1% Cess 0.00
Say Rs 532.60 Per M
5.7.11 Labour for fitting and fixing 75 mm dia sal ballah runners on sal ballah verticals including cost of nails or spikes for fixing the same complete job as per specification and direction of E / I.
Taking Out put =30.50M
Cost of nails or spikes 2 Kg 58.00 116.00
Carpenter Gr II 0.75 nos 541.00 405.75
Unskilled mazdoor 0.75 nos 428.00 321.00
Add Overhead charge & C.P@15% 126.41
Add 1% Cess 0.00
Say Rs 31.80 Per M
5.7.12 Labour for fitting and fixing 75 mm but upto 150 mm dia sal ballah runners on sal ballah verticals including cost of nails or spikes for fixing the same complete job as per specification and direction of E / I.
Taking Out put =30.50M
Cost of nails or spikes 4 Kg 58.00 232.00
Carpenter Gr II 1 nos 541.00 541.00
Unskilled mazdoor 1 nos 428.00 428.00
Add Overhead charge & C.P@15% 180.15
Add 1% Cess 0.00
Say Rs 45.30 Per M
5.7.13(b) Labour for laying River bed Material (30 % sand and 70% Quarry spall) including light ramming etc.all complete job as per specification and direction of E / I.
Taking Out put =1 Cum
Unskilled mazdoor 0.75 nos 428.00 321.00
Add Overhead charge & C.P@15% 48.15
Add 1% Cess 0.00
Say Rs 369.20 Per M3
5.7.14 Providing brick flat soling with designation 100A bricks joints filled with coarse sand of approved quality including royalty and all taxes, all complete as per approved design, specifications and direction of E/I
Taking Out put =9.30 Sqm
Bricks 300 per%0nos 5123.00 1536.90
Local Sand 0.142 M3 143.32 20.35
Mason Gr II 0.50 nos 541.00 270.50
Unskilled mazdoor 1.00 nos 428.00 428.00
Add Overhead charge & C.P15% 338.36
Add 1% Cess 0.00
Say Rs 278.90 Per M2
5.7.14 Based B/S By Salvage Bricks Providing brick flat soling with designation 100A bricks joints filled with coarse sand of approved quality including royalty and all taxes, all complete as per approved design, specifications and direction of E/I
Taking Out put =9.30 Sqm
Bricks 300 per%0nos 0.00 0.00
Local Sand 0.142 M3 143.32 20.35
Mason Gr II 0.50 nos 541.00 270.50
Unskilled mazdoor 1.00 nos 428.00 428.00
Add Overhead charge & C.P15% 107.83
Add 1% Cess 0.00
Say Rs 88.90 Per M2
5.7.15 Providing brick on edge soling with designation 100A bricks joints filled with coarse sand of approved quality including royalty and all taxes, all complete as per approved design, specifications and direction of E/I
Taking Out put = 9.30 Sqm
Bricks 500 per%0nos 5123.00 2561.50
Local Sand 0.283 M3 143.32 40.56
Mason Gr II 0.625 nos 541.00 338.13
Unskilled mazdoor 1.25 nos 428.00 535.00
Add Overhead charge & C.P@15% 521.28
Add 1% Cess 0.00
Say Rs 429.70 Per M2
5.7.15 Based B/S By Salvage Bricks Providing brick on edge soling with designation 100A bricks joints filled with coarse sand of approved quality including royalty and all taxes, all complete as per approved design, specifications and direction of E/I
Taking Out put = 9.30 Sqm
Bricks 500 per%0nos 0.00 0.00
Local Sand 0.283 M3 143.32 40.56
Mason Gr II 0.625 nos 541.00 338.13
Unskilled mazdoor 1.25 nos 428.00 535.00
Add Overhead charge & C.P@15% 137.05
Add 1% Cess 0.00
Say Rs 113.00 Per M2
5.7.16 Providing pitching work with designation 100A bricks in panel and in herring bond pattern one brick on edge over a brick flat soling joints filled with local sand free from clay contents including royalty and all taxes, all complete as per approved design, specifications and direction of E/I
Taking Out put =9.30 Sqm
Bricks 800 per%0nos 5123.00 4098.40
Local Sand 0.425 M3 143.32 60.91
Mason Gr II 1.125 nos 541.00 608.63
Unskilled mazdoor 2.25 nos 428.00 963.00
Add Overhead charge & C.P@15% 859.64
Add 1% Cess 0.00
Say Rs 708.70 Per M2
5.7.16 Based B/S By Salvage Bricks Providing pitching work with designation 100A bricks in panel and in herring bond pattern one brick on edge over a brick flat soling joints filled with local sand free from clay contents including royalty and all taxes, all complete as per approved design, specifications and direction of E/I
Taking Out put =9.30 Sqm
Bricks 800 per%0nos 0.00 0.00
Local Sand 0.425 M3 143.32 60.91
Mason Gr II 1.125 nos 541.00 608.63
Unskilled mazdoor 2.25 nos 428.00 963.00
Add Overhead charge & C.P@15% 244.88
Add 1% Cess 0.00
Say Rs 201.90 Per M2
5.7.17 Providing pitching work with designation 100A Bricks in panel two brick on edge over a brick flat soling joints filled with local sand free from clay contents including royalty and all taxes, all complete as per approved design, specifications and direction of E/I
Taking Out put =9.30 Sqm
Bricks 1300 per%0nos 5123.00 6659.90
Local Sand 0.556 M3 143.32 79.69
Mason Gr II 2.00 nos 541.00 1082.00
Unskilled mazdoor 4.50 nos 428.00 1926.00
Add Overhead charge & C.P@15% 1462.14
Add 1% Cess 0.00
Say Rs 1205.30 Per M2
5.7.18.2 Labour charge for pitching work on apron slope of bank with stone boulder duly packed (Uncreated complete job ) materials within 50 m lead with all lifts, all complete as per approved design, specifications and direction of E/I
Taking Out put = 2.832 Cum
Unskilled mazdoor for carrying and laying boulder 2 nos 428.00 856.00
Mason Gr II 0.50 nos 541.00 270.50
Stone dresser 0.25 nos 541.00 135.25
Add Overhead charge & C.P@15% 205.91
Add 1% Cess 0.00
Say Rs 557.40 Per M3
5.7.24.2 Labour charge for pitching above water in apron and slope of bank with bricks packed in crates of specified size ( material within 50 M lead and all lifts ) including boxing and tying the crates with 12 to 14 gauge G.I wire including cost of G.I wire all complete as per approved design, specifications and direction of E/I
Taking Out put = 2.832 Cum
Skilled mazdoor 1.00 nos 541.00 541.00
Unskilled mazdoor 2.00 nos 428.00 856.00
Black smith Gr II 0.25 nos 541.00 135.25
Cost of 12 to 14 gauge binding wire for binding crate 0.30 Kg 75.04 22.51
Add Overhead charge & C.P@15% 249.86
Add 1% Cess 0.00
Say Rs 676.40 Per M3
5.7.29.1 Supplying fitting and packing jhawa bush wood ,Kans grass or local wood brush in bundle of 600 mm die tied with coir string as per specification including loading, unloading, stacking and carriage up to 1 K.M. lead etc.all complete job as per approved design, specifications and direction of E/I
Taking Out put =2.832 Cum
1. Cost of 2.832 cum of Jhankhi
Carriage for 1 K .M lead
Hire charge of bullock cart per day 136.60
Taking lead of 1 km and speed 2 km per hour
Nos. of trips per day =8/(2/S(L+3/4) )= 4.56 trip
Cost per trip= Hire charges/4.56=136.6/4.56= 29.96
Assuming bullock cart capacity as jhawa bush wood 1.70 cum
Carriage cost per 2.832 cum =Cost per trip x 2.832 /1.70 49.90
2. Cost of coir string 0.5 Kg 31.25 15.63 M-229
Unskilled mazdoor for loading, unloading
and placing 0.5 nos 428.00 214.00
Unskilled mazdoor for cutting jhankhi 0.33 nos 428.00 141.24
Add Overhead charge & C.P@15% 63.12
Add 1% Cess 0.00
Say Rs 170.90 Per M3
5.7.29.2 Extra for carriage of jhankhi for subsequent K.M. beyond initial 1st K.M.by bullock cart.
Unit :-Per Km per Cum
Taking Out put =2.832 Cum
Assuming 5 K.M lead
Nos of trips per day=8/(2/S(L+3/4) )= 1.4 trip
Hire charge of bullock cart per day 136.60 Rs
Cost per trip= Hire charges/1.4=136.6/1.4= 97.57 Rs
Assuming bullock cart capacity as jhawa bush wood 1.7 cum
Carriage cost for 5 K.M lead = Cost per trip x 2.832 /1.70 162.54 162.54
Hence rate for each subsequent K.M. beyond 1 k.m
(Carriage cost for 5 k.m-Carriage cost for 1 k.m)/4*2.832 9.94
Add Overhead charge & C.P@15% 1.49
Add 1% Cess 0.00
Say Rs 11.40 Per K.M Per M3
5.7.32.A (a).Labour charge for making crates box of size 3m x 1.5m x 0.6m including cutting of G.I wire or B.A wire, weaving of wire to make it taranga wire having 150 mm square mesh with double knot with 8 & 10 S.W.G. wire as per approved design, specifications and direction of E/I
As per T.E.C.letter no 33 dated 8.4.06 )
Taking Out put =10 nos.
Black smith Gr II for weaving the wire roll for cutting the taragana wire to size 2 nos 541.00 1082.00
Unskilled mazdoor for weaving the wire, as helper in making creates & tying joints 3 nos 428.00 1284.00
Add Overhead charge & C.P@15% 354.90
Add 1% Cess 0.00
Say Rs 272.10 Each
5.7.36.2 Supplying wire mesh crates of size 3 M x 1.5 M x 0.60 M and 150 mm square mesh made out of G.I wire 10 S.W.G. double knot at each joints in box type etc. all complete as per approved design, specifications and direction of E/I
As per T.E.C.letter no 37 dated 30.4.06 )
Cost of one M.T. of G.I Wire of 10 S.W.G
including carriage 1 M.T 78770.00 M-224 (i)
Av nos of crate manufactured 58 nos 58 nos
Materials cost of one box=Cost of 1 M.T G.I wire/58 1358.10
Labour charge as item 5.7.32.A 236.60
Add Overhead charge & C.P@15% 239.21
Add 1% Cess 0.00
Say Rs 1833.90 Each
5.7.38.2 Supplying wire mesh crates of size 3 M x 1.5 M x 0.60 M and 150 mm square mesh made out of Black annealed wire 10 S.W.G. double knot at each joints in box type etc. all complete as per approved design, specifications and direction of E/I
As per T.E.C.letter no 37 dated 30.4.06 )
Cost of one M.T. of B.A Wire of 10 S.W.G
including carriage 1 M.T 78770.00
Average nos of crate manufactured= 58nos 58 nos
Materials cost of one box=Cost of 1 M.T G.I wire/58 1358.10
Labour charge as item 5.7.32.A 236.60
Add Overhead charge & C.P@15% 239.21
Add 1% Cess 0.00
Say Rs 1833.90 Each
5.7.44 Earth work in cutting and making slope in all kinds of soil with all leads and lifts as per specifications and direction of E/I
Taking Out put =28.32 Cum
Unskilled mazdoor for cutting earth 4 nos 428.00 1712.00
Unskilled mazdoor for carrying earth and clod breaking and rough dressing of slope 3 nos 428.00 1284.00
Add Overhead charge & C.P@15% 457.73
Add 1% Cess 0.00
Say Rs 123.90 Per M3
5.7.45.1 Providing and Laying of a Geo-textile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment materials through the voids of the stone pitching/cement concrete block as well as to allow free movement of water without creating any uplift head on the pitching as per specifications and direction of E/I
Vide T.E.C. letter no 48 (e) dated 10.05.04
Taking Out put =10.0 Sqm
Permeable synthetic Geotextile including 5 % for overlap and wastage 10.50 Sqm 84.55 887.78 M-109
Unskilled mazdoor 0.30 nos 428.00 128.40
Skilled mazdoor 0.10 nos 541.00 54.10
Add Overhead charge & C.P@15% 161.87
Add 1% Cess 0.00
Say Rs 124.10 Per M2
5.7.48 Based Providing , laying and filling Geo bags of size 1mx0.7m (Type A 300 GSM nonwoven) weight of bag 420 gm,volume of filled bag 0.07 cum, weight of filled Geo bag 126 kg with local sand including stiching in four lines by approved nylon thred with stiching machine and generator, stacking and placing in gabion of size 1.8mx1.8mx0.5m (18nos. Geo bags per gabion) after loading,unloading and carriage with the help of trolley within 150m lead including cess all complete as per specification and direction of E/I
A . Assuming out put of filling and stiching of 40 nos. of Geo Bags per day
Stiching Roll(Nylon) 2 nos 30.00 60.00
Unskilled labour for filling,stacking 2 nos 428.00 856.00
Skilled labour for stacking 0.33 nos 541.00 178.53
Unskilled labour for carrying and placing 4 nos 428.00 1712.00
Hire charge of Stiching Machine 0.33 day 50.00 16.50
Hire Charge of manual Trolley 1 day 50.00 50.00
Hire charge of 3 KVA Generator 2.67 hrs 74.00 197.58
Add Overhead charge & C.P@15% 477.24
Add 1% Cess 0.00
Rate per bag=Total/40 91.47
Cost of filling & stiching of 18 nos of Geo bags 18 nos 91.47 1646.48 A
Add Overhead charge & C.P@15% 519.10
Add 1% cess 0.00
Total(A+B) 5626.27
Rate Say,Rs 5626.00 Each
Cariage of Local Sand by Tractor
Formula Ls Lus Lk Rate Per m3 Rate Per M3 with royality
Finished Rate Unit Basic Rate of Gabion Carriage of Local Sand for 18 Nos Geo Bag Say
1 Including Local Sand Carriage Lead 1/2 Km(K) Per Gabion 5626.27 368.27 5994.50
2 Including Local Sand Carriage Lead 1 Km(K) Per Gabion 5626.27 405.52 6031.80
3 Including Local Sand Carriage Lead 1.00km (s)+1.00 Km(K) Per Gabion 5626.27 453.18 6079.40
4 Including Local Sand Carriage Lead 2.00km (s)+1.00 Km(K) Per Gabion 5626.27 500.85 6127.10
5.7.48 Based Providing , laying and filling Geo bags of size 1mx0.7m (Type A 300 GSM nonwoven) weight of bag 420 gm,volume of filled bag 0.07 cum, weight of filled Geo bag 126 kg with local sand including stiching in four lines by approved nylon thred with stiching machine and generator, stacking and placing in gabion of size 1.8mx1.2mx0.5m (12nos. Geo bags per gabion) after loading,unloading and carriage with the help of trolley within 150m lead including cess all complete as per specification and direction of E/I
A . Assuming out put of filling and stiching of 40 nos. of Geo Bags per day
Stiching Roll(Nylon) 2 nos 30.00 60.00
Unskilled labour for filling,stacking 2 nos 428.00 856.00
Skilled labour for stacking 0.33 nos 541.00 178.53
Unskilled labour for carrying and placing 4 nos 428.00 1712.00
Hire charge of Stiching Machine 0.33 day 50.00 16.50
Hire Charge of manual Trolley 1 day 50.00 50.00
Hire charge of 3 KVA Generator 2.67 hrs 74.00 197.58
Add Overhead charge & C.P@15% 477.24
Add 1% Cess 0.00
Rate per bag=Total/40 91.47
Cost of filling & stiching of 12 nos of Geo bags 12 nos 91.47 1097.66 A
Geo Bag 12 nos 83.06 996.72
Gabion 1.8mx1.2mx0.5m 1 nos 1427.60 1427.60 M-280
Add Overhead charge & C.P@15% 363.65
Add 1% cess 0.00
Total(A+B) 3885.62
Rate Say,Rs 3885.60 Each
Cariage of Local Sand by Tractor
Formula Ls Lus Lk Rate Per m3 Rate Per M3 with royality
Finished Rate Unit Basic Rate of Gabion Carriage of Local Sand for 12 Nos Geo Bag Say
1 Including Local Sand Carriage Lead 1/2 Km(K) Per Gabion 3885.60 245.51 4131.10
2 Including Local Sand Carriage Lead 1 Km(K) Per Gabion 3885.60 270.34 4155.90
3 Including Local Sand Carriage Lead 1.00km (s)+1.00 Km(K) Per Gabion 3885.60 302.12 4187.70
4 Including Local Sand Carriage Lead 2.00km (s)+1.00 Km(K) Per Gabion 3885.60 333.90 4219.50
5.7.52 Based Supply of New bag and N.C with labour for filling New E.C bag with local sand (volume of filled bag 1.2 cft and weight 50kg),stiching on two lines by approved nylon thread with stiching machine & generator,Stacking the bags and placing in Nylon crate of size (1mx1mx1m) with a lead of 150m including supply of nylon threads etc , placing the filled crates in dry portion within a lead of 30m,all complete as per approved design,specification and direction of E/I.
Unit - Each bag
Taking output of 100 nos filled new bags in 4 nos N.C
New E.C bag 100 nos 11.24 1124.00 M-291
Nylon Crate(N.C) 4 nos 41.00 164.00 M-276
Add Overhead charge &C.P @15% 193.20
Add 1% cess 0.00
Rate of material for each N.C(Totalx25/100) 370.30 A
Unskilled labour for filling,stiching & stacking 1.67 nos 428.00 714.76
Unskilled labour for crrying &placing at work site 3 nos 428.00 1284.00
Skilled labour for stiching 0.33 nos 541.00 178.53
Stiching Roll(Nylon) 2 nos 30.00 60.00
Hire Charge of Stiching Machine 0.33 day 50.00 16.50
Hire charge of Generator 3KVA 2.67 hrs 74.00 197.58
Add Overhead charge &C.P @15% 367.71
Add 1% cess 0.00
Rate for each N.C(Totalx25/100) 704.77 B
Rate for each N.C in dry portion (A+B) 1075.07
Cariage of Local Sand by Tractor
Formula Ls Lus Lk Rate Per m3 Rate Per M3 with royality
Finished Rate Unit Basic Rate of NC Carriage of Local Sand for 25 Nos EC Bag Say total
1 Including Local Sand Carriage Lead 1/2 Km(K) Per NC 1075.10 248.44 1323.50
2 Including Local Sand Carriage Lead 1 Km(K) Per NC 1075.10 273.56 1348.70
3 Including Local Sand Carriage Lead 1.00km (s)+1.00 Km(K) Per NC 1075.10 305.72 1380.80
4 Including Local Sand Carriage Lead 2.00km (s)+1.00 Km(K) Per NC 1075.10 337.88 1413.00
5.7.53 Based Supply of New bag with labour for filling New E.C bag with local sand (volume of filled bag 1.2 cft and weight 50kg),stiching on two lines by approved nylon thread with stiching machine & generator,Stacking the bags and placing with a lead of 150m including supply of nylon threads etc ,all complete as per approved design,specification and direction of E/I.
Taking output 100nos filled new bags
New E.C.Bag 100 nos 11.24 1124.00
Stiching Roll(Nylon) 2 nos 30.00 60.00
Unskilled labour for filling,stacking 1.67 nos 428.00 714.76
Unskilled labour for crrying &placing at work site 3 nos 428.00 1284.00
Skilled labour for stiching 0.33 nos 541.00 178.53
Hire Charge of Machine
Hire Charge of Stiching Machine 0.33 day 50.00 16.50
Hire charge of Generator 3KVA 2.67 hrs 74.00 197.58
Total (A+B+C) 3575.37
Add Overhead charge &C.P @15% 536.31
Add 1% cess 0.00
Rate for 100 nos. E.C (A+B+C) 4111.68
Cariage of Local Sand by Tractor
Formula Ls Lus Lk Rate Per m3 Rate Per M3 with royality
Finished Rate Unit Basic Rate of % Nos EC Carriage of Local Sand for 100 Nos EC Bag Say total
1 Including Local Sand Carriage Lead 1/2 Km(K) % Nos 4111.68 993.75 5105.40
2 Including Local Sand Carriage Lead 1 Km(K) % Nos 4111.68 1094.25 5205.90
3 Including Local Sand Carriage Lead 1.00km (s)+1.00 Km(K) % Nos 4111.68 1222.88 5334.60
4 Including Local Sand Carriage Lead 2.00km (s)+1.00 Km(K) % Nos 4111.68 1351.50 5463.20
5.7.54 Based Providing,laying & filling Geo bags of size 1mX0.7m (Type A 300GSM nonwoven) Weight 420gm,volume of filled bag 0.07 cum,weight of filledf Geo bag 126kg with local sand including stiching in four lines by approved Nylon thread with stiching machine and generator,stacking and placing after loading,unloading and carriage with the help of Trolly within 150m lead ,including cess, all complete as per specification and direction of E/I.
Taking output of 40 nos Geo bags
Stiching roll(nylon) 2 nos 30.00 60.00
Unskilled labour for filling,stacking 2 nos 428.00 856.00
Unskilled labour for crrying &placing at work site 4 nos 428.00 1712.00
Skilled labour for stiching 0.33 nos 541.00 178.53
Hire Charge of Machine
Hire Charge of Stiching Machine 0.33 nos 50.00 16.50
Hire Charge of manual Trolley 1 day 50.00 50.00
Hire charge of Generator 3KVA 2.67 hrs 74.00 197.58
Add Overhead charge &C.P @15% 975.60
Add 1% cess 0.00
Rate per geo Bag 186.99
say,Rs 187.00 Each
Cariage of Local Sand by Tractor
Formula Ls Lus Lk Rate Per m3 Rate Per M3 with royality
Finished Rate Unit Basic Rate of Each Geo Bag Carriage of Local Sand for Each Bag Say total
1 Including Local Sand Carriage Lead 1/2 Km(K) Each 187.00 20.46 207.50
2 Including Local Sand Carriage Lead 1 Km(K) Each 187.00 22.53 209.50
3 Including Local Sand Carriage Lead 1.00km (s)+1.00 Km(K) Each 187.00 25.18 212.20
4 Including Local Sand Carriage Lead 2.00km (s)+1.00 Km(K) Each 187.00 27.83 214.80
5.8 MISCELLANEOUS
Sl.No Description Quantity Unit Rate Amount Ref.
5.8.1 Supplying, fitting and fixing copper strip of 16 gauge of approved quality ( with 99 % purity ) in expansion joints complete job as per drawing, specifications and direction of E/I.
Furnishing and installing seal
A. Cost of copper seal and acessries
Size of copper seal 250 mm x 1.6 mm
weight per sq metre= 14.70 kg 14.7 kg
Weight of strips per linear metre Allowing 2.5 % for wastage and incidental to work )=0.25 x1x14.70 x1.025=3.77 kg.
i.Cost per linear metre.Including furnishing, storing, handling and cutting etc. 3.77 kg 896.80 3378.13 M-087
ii. Cost of bracing, washers and nails etc. per running metre @ 3 % of item (i) 101.34
Sub-Total 3479.48
B.Labour charge
Taking that 1/4 mason and 1 helper can place seal in one lift of 15 mtr in one shift.
Head mason. 0.25 nos 660.00 165.00
Helper 1 nos 444.00 444.00
Total labour charge 609.00
Total charge per mtr= total labour charge / 15 40.60
Total A+B 3520.08
Hence rate per kg =Total (A+B)/ wt. Of seal per mtr 934.48
Add Overhead charge & C.P@15% 140.17
Add 1% Cess 0.00
Hence rate per kg of copper seal 1074.70 Per kg
5.8.2 Supplying, fitting and fixing rubber seal of ( water stop ) of approved quality for construction joints expansion joints complete job as per drawing, specifications and direction of E/I.
Taking Out put =1 M
Cost of rubber seal 1 m 85.00 85.00
Add for overlapping and valcanizing 10 % of the materials cost 8.50
+ Add Overhead charge & C.P@15% 14.03
Add 1% Cess 0.00
Hence rate per mtr of rubber seal 107.50 Per mtr
5.8.5.1 Providing and driving steel sheet piles on specified alignment and upto designed levels including painting the sheet piles with two coats of anti- corrosive bitumen paint ( portion of sheet pile inside concrete shell not be painted ) including cost of sheet piles and hire charges of sheet pile driving plant etc. all complete as per specifications and direction of E/I . ( For the purpose of payment of sheet pile driving, measurement of sheet pile duly driven shall be taken only )
Assuming pilling that can be expected to be driven per hour= 48.25 x 6.70= 323.275 Kg
(Assuming I.S.P.S. 1625 U& pilling section vide I.S. 2314, 1963 )
Hourly use rate of sheet pile
Cost of Sheet Pile with 10 % wastage 1.1 M.T 60300.00 66330.00
Sheet pile Driving plant (x) 4504.00
B. (i). Cost of driving pile per M.T =(x)x1000 / 323.275 13932.41 Rs 13932.41
(ii). Shifting of 3 to 4 nos of pile per M.T at the place ready for driving @ 1.5 % of Sub item (i) Rs 208.99
(iii). Erecting pilling machines and dismantling @ 0.5 % of sub item (i) Rs 69.66
(iv). Depreciation charges for track fand wooden sleeper, fish plates, bolts dog spikes @ 0.5 % of sub item (i) Rs 69.66
(v). Depreciation charges forsupply of rails @ 1 % of sub item (i) Rs 139.32
(vi). Welding piles 3 to 4 nos @ 8 % of sub item b(i) Rs 1114.59
(vii). Cutting piles 2 to 4 nos @ 2 % of sub item (i) Rs 278.65
(viii). Driving hole 3 to 4 nos @ 0.5 % of sub item (i) Rs 69.66
(ix).Carriage of sheet piles 1 M.T. @ 2 % of sub item (i) Rs 278.65
C. Surface area of 1 M.T. sheet piles to be painted both side with anti-corrasive bitumen, paint
Length of sheet pile per M.T=1 x 1000 /48.25= 11.56 m
Area of both side of sheet piles=11.56 x 1.71 =20.72 sqm
Surface of sheet piles to be painted with two coats of bitumen ( Assuming 0.5 Kg / M2 =20.72x 0.5 = 10.36 Kg 47.80 495.16
D. Unskilled mazdoor 2 nos 428.00 856.00
Total (A+B+C+D) 83842.75
Add Overhead charge & C.P@15% 12576.41
Add 1% Cess 0.00
Say Rs 96419.20 Per M.T
5.8.6(a) Providing weep holes with dry graded Stone metal filter of 20 mm to 40 mm siz in abutment and wing wall as per specification and direction of E/I
Stone metal filter 20 mm to 40 mm 0.113 M3 678.14 76.63 M-011
Fitting and cost of Wire netting @ 20% of above 15.33
Add Overhead charge & C.P@15% 13.79
Add 1% Cess 0.00
Say Rs 105.70 Each
5.8.7 Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15 Metre lead and disposal of unserviceable materials with all leads. as per building specifications and direction of E/I.
Taking Out put =2.832 Cum
Semi skilled mazdoor 1 nos 444.00 444.00
Unskilled mazdoor 3 nos 428.00 1284.00
Add Overhead charge & C.P@15% 259.20
Add 1% Cess 0.00
Say Rs 701.70 Per M3
5.8.8 Dismantling plain cement or lime concrete work including stacking serviceable materials in stacks within 15 Metre lead and disposal of unserviceable materials with all leads. as per building specifications and direction of E/I.
Unit :-Per Cum Per M3
Taking Out put =2.832 Cum 2.832 Cum
Semi skilled mazdoor 3 nos 444.00 1332.00
Unskilled mazdoor 4 nos 428.00 1712.00
Add Overhead charge & C.P@15% 456.60
Add 1% Cess 0.00
Say Rs 1236.10 Per M3
5.8.9 Dismantling R.C.C work including stacking serviceable materials in stacks within 15 Metre lead and disposal of unserviceable materials with all leads. as per building specifications and direction of E/I.
Taking Out put =2.832 Cum
Hammer man 2.25 nos 444.00 999.00
Skilled mazdoor 2.25 nos 541.00 1217.25
Unskilled mazdoor 7 nos 428.00 2996.00
Blacksmith Gr II 1 nos 541.00 541.00
Add Overhead charge & C.P@15% 929.59
Add 1% Cess 0.00
Say Rs 2516.50 Per M3
5.8.10 Dismantling old plaster and pointing in cement or lime and raking out joints to 15 mm. depth, watering and disposal of unserviceable materials with all leads. as per building specifications and direction of E/I.
Taking Out put =9.30 Sqm
Semi skilled mazdoor 0.35 nos 444.00 155.40
Unskilled mazdoor 0.10 nos 428.00 42.80
Bhisti 0.06 nos 417.00 25.02
Add Overhead charge & C.P@15% 33.48
Add 1% Cess 0.00
Say Rs 27.60 Per M2
5.7.21.2* Based Labour charge for pitching above water in appron and slope of bank with boulder in crates of specified size ( material within 50 mtr lead and all lifts ) including boxing and tying the crates with 12 to 14 gauge G.I wire including cost of G.I wire all complete as per approved design,specifications and direction of E/I
Taking Out put:- 2.832 cum
Skilled mazdoor 1.00 nos 541.00 541.00
Unskilled mazdoor 2.00 nos 428.00 856.00
Black smith Gr II 0.25 nos 541.00 135.25
Stone dresser 0.25 nos 541.00 135.25
Cost of 12 to 14 gauge binding wire for binding crate 0.30 Kg 75.04 22.51
Add Overhead charge & C.P 15 % 270.15
Add Labour Cess0% 0.00
Say Rs 731.34 Per M3 (a)
Supply of Boulder
Cost of material Rs 675.00
Add 10% CP 67.5
Add Labour Cess 0 % 0.00
Total (a+b) 1473.80 Per M3
(b) Supply of mechanically woven double hexaganal Crate 3.00mx1.50mx0.60m)
Cost of material Rs 2070.000
Add Labour Cess 0 % 0.000
5.5.2 Providing 12 mm thick cement plaster (1: 4) with approved quality sand of requisite F.M . washed and screened including curing, scaffolding wherever required and its removal, royalty etc. complete job as per specification and direction of E / I.
Taking Out put =9.30 Sqm
Mason Gr II 1 nos 541.00 541.00 {S II- 4}
Unskilled mazdoor 1.5 nos 428.00 642.00 {SI-1}
Bhisti 0.5 nos 417.00 208.50 S II-13
Add Overhead charge & C.P@15% 261.83
Rate per sqm Say Rs 215.80 Per M2
5.5.10 Providing 1.5 mm thick cement punning including curing, royalty etc. complete job as per specification and direction of E / I.
Taking Out put =9.30 Sqm
Head Mason 0.0625 nos 660.00 41.25 {S II -3}
Mason Gr II 0.5 nos 541.00 270.50 {S II- 4}
Unskilled mazdoor 0.25 nos 428.00 107.00 {SI-1}
Add Overhead charge & C.P@15% 79.66
Rate per sqm Say Rs 65.70 Per M2
5.7.14 Providing brick flat soling with designation 100A bricks joints filled with coarse sand of approved quality including royalty etc. all complete as per approved design, specifications and direction of E/I
Taking Out put =9.30 Sqm
Bricks 300 nos 6.343 1902.90 M-11
Mason Gr II 0.50 nos 541.00 270.50 {S II- 4}
Unskilled mazdoor 1.00 nos 428.00 428.00 {SI-1}
Add Overhead charge & C.P15% 393.36
Rate per sqm Say Rs 324.30 Per M2
Analysis of Rate
S.No. Description Quantity Unit Rate Amount Ref
5.1.3 Jungle clearance and weeding out shrubs including small tree up to 0.50M girth and removal as per specifications and direction of E/I.
Unit :- Per Sqm
Taking Out put:- 92.94 Sqm
Unskilled mazdoor for cutting shrubs and trees 1.50 nos 428.00 642.00
Unskilled mazdoor for collecting and removing shrubs, weeds and trees. 0.75 nos 428.00 321.00
Add Overhead charge & C.P @ 15% 144.45
Add cess @ 1% 0.00
Rate per Sqm 11.92
say, Rs 11.90 Per M2
5.1.27 Earth work in excavation of foundation trenches in ordinary soil (vide classification of soil item A ) and disposal of excavated earth so obtained to a distance up to 50 M and average lift of 1.5 M including leveling , ramming the foundation trenches, removing the roots of shrubs etc. all complete as per specifications and direction of E/I.
Unit :- Per Cum
Taking Out put =28.32 Cum
Unskilled mazdoor for cutting and carrying etc. 11 nos 428.00 4708.00
Head mason 0.25 nos 660.00 165.00
Add Overhead charge & C.P@15% 730.95
Add cess@1% 0.00
Say Rs 197.90 Per M3
5.1.31 Earth work in filling in foundation trenches and back filling of structures in layers not exceeding 150 mm thick well watered, rammed and fully compacted and finally dressed with suitable earth obtained from excavation of foundation trenches and placed in a suitable profile within a lead of 30 M and lift of 1.5 M, all complete job as per specifications and direction of E/I.
Taking Out put=28.32 Cum
Unskilled mazdoor for cutting . 4.5 nos 428.00 1926.00
Unskilled mazdoor for carrying . 4 nos 428.00 1712.00
Head mason 0.125 nos 660.00 82.50
Add Overhead charge & C.P@15% 558.08
Add cess@1% 0.00
Say Rs 151.10 Per M3
5.1.44. Earth work by tractor ( Rajashani) with bucket (Doli) with spreader ( Tractor leveller or Tractor Dozer) in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in odinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers and construction & removal of dhalas properly with lead of ............... metre (lead will be considered as perpendicular distance from C.G. of Pit to C.G. of banks or embankment ) and with all lifts all complete as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth )(Lead should be taken C.G to C.G.perpendicular to the bank Maximum Lead Upto -150 mtr. Note:- Track Path may not be taken as lead )
For C.G to C.G Lead in K.M ( L ) Speed (km/hr) ( V ) Time for loading, Unloading etc (hr) ( t )=1 min. Spacing of Dhalas (km) (S) Capacity Per Trip Cum (e ) Haulage Path (Distance travelled in one cycle) = 2(L+S)
Time of run per trip = 2(L+S)/ V Time per cycle (hr) =2(L+S) / V +t No of trips , N =8V/ (2L+2S+Vt) Output per day with 80% efficiency = 0.80xNxe Use Rate of Tractor Per Day (Tr ) Cost per Cubic Metre = Tr/Ne
Proportional Cost of Dhala (10% only) Cost of Dhala Per cubic metre Add for cutting (Use rate of tractor / Capacity of cutting 324 cum per day ) =Tr/324 Add for spreading cost =( Use rate of D-80 Dozer Per hr / Capacity of D-80 Dozer per hr 300 cum) Add for finishing and dressing =one mazdoor/100M3 Total cost (12+14+15+16+17 )
Add Overhead charge & C.P 15% Rate Per M3 Add 1% karmkar cess Total Total+Rs 33 for Royality
NOTE :- Add Royality of Earth Rs 22.00 Where needed without overhead charge & C.P
5.1.46 Earth work by Mechanical means with help of Excavator, Tipper and Spreader in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead of ............... metre (lead will be considered as track path i.e. half of distance travelled in one cycle i.e. half of haulage path from pit to bank or embankment. Pit will be beyond 150 meter from centre of bank i.e. perpendicular distance from centre of bank to nearest boundary of pit will be more than 150 meter) and with all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth )
Lead in K.M ( L ) Cost of cutting & Loading by Excavator one M3 capacity= Use rate of Excavator / Capacity of Excavator ( 60M3) Average Speed on Kucha track Km / hr = (V) Average haulage path ( Distance ) in one cycle ( D) in Km Haulage Time in minute ( Time taken in one cycle of run ) = 60D/V Loading Time one minute Per M3 For 5.5 M3
Unloading & Turning Time in minute Total Time Per trip in minute Col (5+6+7) =( T) No. of Trip per hour taken as 50 minute N =50/T Output per hour with 80 % efficiency Q = 0.8 X N X 5.5 Use Rate per hour of Tipper 5.5 M3 capacity = (Tr )
Carriage Cost per M3 = Tr/ Q Add for spreading cost =( Use rate of D-80 Dozer Per hr / Capacity of D-80 Dozer per hr 300 cum) =3000/300 Add 5 % for haul road maintenance, 5 % for processing and 2 % for extra labour for finishing = 12 % of column ( 2+12+13) Total Cost per M3 col (2+12+13+14 ) Add Overhead charge & C.P 15%
Rate Per M3 Add 1% cess Total Rate per Cum Total+Rs 33 for Royality
NOTE :- Add Royality of Earth Rs 33.00 Where needed without overhead charge & C.P
Sr.No. Description Quantity Unit Rate Amount
5.3.3 Providing and laying P.C.C. M-100 with nominal mix of (1:3:6 ) in foundation of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing, royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I.
Taking Out put=2.832 Cum
Coarse aggregates Gr IV (Rate of approved quality of aggregate as per Design) 2.66 M3 1145.16 3046.13 M-048
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 362.00 517.66 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 419.00 599.17 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
Add Overhead charge & C.P@15% 2256.56
Add 1% Cess 0.00
Say Rs 6108.80 Per M3
5.3.4 Providing and laying P.C.C. M-150 with nominal mix of (1:2:4 ) in foundation of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing., royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I.
Unit :- Per Cum
Taking Out put= 2.832 Cum
A. MATERIALS 8264.705882
Coarse aggregates (20 mm To 10 mm) (Taking Rate of approved quality of aggregate as per Design) 2.548 M3 937.15 2387.86 M-045
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 362.00 517.66 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 419.00 599.17 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
Add Overhead charge & C.P@15% 2393.29
Add 1% Cess 0.00
Say Rs 6479.00 Per M3
5.3.5 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5:3 ) in foundation of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing., royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I.
Taking Out put=2.832 Cum
Coarse aggregates (20 mm To 10 mm) (Rate of approved quality of aggregate as per Design) 2.436 M3 937.15 2282.90
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 362.00 517.66 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 419.00 599.17 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
Add Overhead charge & C.P@15% 2559.74
Add 1% Cess 0.00
Say Rs 6929.60 Per M3
5.3.10 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5:3 ) in superstructure of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing., royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I.
Taking Out put=2.832 Cum
Coarse aggregates ( 20 mm to 10 mm ) (Cost of coarse aggregate as per Design) 2.436 M4 937.15 2282.90
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 362.00 517.66 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 419.00 599.17 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
Add Overhead charge & C.P@15% 2559.74
Add 1% Cess 0.00
Say Rs 6929.60 Per M3
5.3.13 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5:3 ) in deck slab with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing, royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I.
Taking Out put=2.832 Cum
Coarse aggregates ( 20 mm to 10 mm ) (Cost of coarse aggregate as per Design) 2.436 M3 937.15 2282.90
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1.25 nos 541.00 676.25
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 362.00 517.66 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 419.00 599.17 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
Add Overhead charge & C.P@15% 2580.03
Add 1% Cess 0.00
Say Rs 6984.50 Per M3
5.3.16 Providing and laying dry pitching with precast cement concrete blocks of size 600 mm x 600 mm x 300 mm in M-75 with nominal mix of (1:4:8) in floor and flank wall with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality of sand of requisite F.M washed and screened including necessary form work, tools and plants, vibrating, curing as well royalty and all taxes complete job as per specifications and direction of E/I.
Taking Out put =2.832 Cum
Coarse aggregates Gr III (Cost of coarse aggregate as per Design) 2.720 M3 1145.16 3114.84
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
Unskilled mazdoor for placing blocks in position 4 nos 428.00 1712.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 362.00 517.66 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 419.00 599.17 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
D SHUTTERING CHARGES
Shuttering 25 blocks 25 mm thick mango planks
Add 1 % for cost of nails and spikes 132.93
Carpenter Gr II 3 Rs 541.00 1623.00
Unskilled mazdoor 8 Rs 428.00 3424.00
Assuming 4 uses to calculate 18472.43 a
Cost of shuttering for 2.832 cum = a/4 4618.11 D
TOTAL(A+B+C+D) 20609.20
Add Overhead charge & C.P@15% 3091.38
Add 1% Cess 0.00
Say Rs 8368.80 Per M3
5.3.17 Providing and laying dry pitching with precast cement concrete blocks of size 600 mm x 600 mm x 300 mm in M-100 with nominal mix of (1:3:6) in floor and flank wall with approved quality of graded coarse aggregate of required grade( as per design ) and approved quality of sand of requisite F.M washed and screened including necessary form work, tools and plants, vibrating, curing as well royalty and all taxes complete job as per specifications and direction of E/I.
Taking Out put =2.832 Cum
Coarse aggregates Gr IV (Cost of coarse aggregate as per Design) 2.66 M3 1145.16 3046.13
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
Unskilled mazdoor for placing blocks in position 4 nos 428.00 1712.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 362.00 517.66 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 419.00 599.17 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
D SHUTTERING CHARGES
Shuttering 25 blocks 25 mm thick mango planks
Add 1 % for cost of nails and spikes 132.60
Carpenter Gr II 3 Rs 541.00 1623.00
Unskilled mazdoor 8 Rs 428.00 3424.00
Assuming 4 uses to calculate 18439.60 a
Cost of shuttering for 2.832 cum = a/4 4609.90 D
TOTAL=A+B+C+D 21423.46
Add Overhead charge & C.P@15% 3213.52
Add 1% Cess 0.00
Say Rs 8699.50 Per M3
5.3.18 Providing shuttering including strutting, propping etc. and its removal after use in foundation as per specifications and direction of E/I.
Taking Out put=9.30 Sqm
Local wood planks 38 mm thick =9.3 x 38 / 1000 0.353 cum
Add 5 % wastage 0.017 cum
Cost of 0.37 cum lock wood planks 0.37 cum 26000.00 9620.00
Add cost for strutting and propping @ 10 % of above 962.00
Total cost of wood 10582.00
Assuming 4 uses to calculate 4 use
Cost of shuttering for 2.832 cum total cost/4 2645.50
Add 1 % for cost of nails and spikes on total cost of wood 105.82
Carpenter Gr II 1.5 nos 541.00 811.50
Unskilled mazdoor 2.5 nos 428.00 1070.00
C Carriage of materials
Cost of the carriage of materials from Godown and back to godown after use including loading unloading and stacking @ 1 % of Total cost of wooden materials 105.82 C
TOTAL cost per 9.3 sqm =A+B+C 4738.64
Add Overhead charge & C.P@15% 710.80
Add 1% Cess 0.00
Say Rs 586.00 Per M2
5.3.19 Providing shuttering including strutting, propping etc. and its removal after use in various components of canal structure or embankment structure as per specifications and direction of E/I.
Taking Out put=9.30 Sqm
Local wood planks 38 mm thick 9.3 x 38 / 1000 =0.353 cum 0.353 cum
Add 5 % wastage 0.017 cum
Cost of 0.37 cum lock wood planks 0.37 cum 26000.00 9620.00
Add cost for strutting and propping @ 10 % of above 962.00
Total cost of wood 10582.00
Assuming 4 uses to calculate 4 use
Cost of shuttering for 2.832 cum total cost/4 2645.50
Add 1 % for cost of nails and spikes on total cost of wood 105.82
Carpenter Gr II 1.5 nos 541.00 811.50
Unskilled mazdoor 2.5 nos 428.00 1070.00
C Carriage of materials
Cost of the carriage of materials from Godown and back to godown after use including loading unloading and stacking @ 1 % of Total cost of wooden materals 105.82 C
TOTAL cost per 9.3 sqm =A+B+C 4738.64
Add Overhead charge & C.P@15% 710.80
Add 1% Cess 0.00
Say Rs 586.00 Per M2
5.3.20 Providing centering including strutting,propping etc. and removing after use in deck slab as per specifications and direction of E/I.
Taking Out put =22.326 Sqm
(Assuming size in slab 7.32 x 3.05 =22.326 sqm )
a. 40 mm thick local wood planks 22.326 x40 / 1000
Add 5 % for wastages =0.045
Assuming 4 uses to calculate
Cost of planks per use =0.89 x rate of local wood /4 6110.00
b. Assuming av. Height of slab from G.L=3.66 M
150 mm sal bullah required =78 nos
Length of sal bullah =78 x3.66 =285.48 Mtr 285.48 M 70.57 20146.32 M-223
(Assuming sal bullah to be used 10 times for centerins
=285.48 x Rate per Mtr / 10 2014.63
c. Salwood scanting required (75 mm x 63 mm size) =0.311 cum 0.311 cum 60000.00 18660.00 BCD1199
( Assuming 10 uses )
Cost per use =0.311 x Rate per Mtr/10 1866.00
Add 1 % for cost of nails and spikes 99.91
Carpenter Gr II 4 nos 541.00 2164.00
Unskilled mazdoor 7 nos 428.00 2996.00
C. Carrage of matterials 5160.00 ( B )
Cost of the carriage of materials from Godowm and back to godown after use including loading unloading and stacking @ 1 % of Total cost of wooden materals ( A ) 99.91 ( C )
TOTAL cost per 22.326 sqm =A+B+C 15350.45
Add Overhead charge & C.P@15% 2302.57
Add 1% Cess 0.00
Say Rs 790.70 Per M2
5.3.22 Providing M.S reinforcement ( Tor steel ) as per approved design , drawing, removal of rust, cutting, bending, binding, including supplying annealed wire, placing M.S rods in position complete job as per specifications and direction of E/I.
Assuming 1.00 M.T
(i). T.M.T Fe -500 8 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 52450.00 55072.50
(B). i. Annealed wire 14 Kg 49.12 687.68 M-072
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 9970.98
Add 1% Cess 0.00
Say Rs 76444.20 Per M.T
(j). T.M.T Fe -500 10 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 51094.00 53648.70
(B). i. Annealed wire 14 Kg 49.12 687.68 M-072
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 9757.41
Add 1% Cess 0.00
Say Rs 74806.80 Per M.T
(k). T.M.T Fe -500 12 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 50500.00 53025.00
(B). i. Annealed wire 14 Kg 49.12 687.68
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 9663.85
Add 1% Cess 0.00
Say Rs 74089.50 Per M.T
(l). T.M.T Fe -500 16 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 50500.00 53025.00
(B). i. Annealed wire 14 Kg 49.12 687.68
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 9663.85
Add 1% Cess 0.00
Say Rs 74089.50 Per M.T
(m). T.M.T Fe -500 20 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 50500.00 53025.00
(B). i. Annealed wire 14 Kg 49.12 687.68 M-072
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 9663.85
Add 1% Cess 0.00
Say Rs 74089.50 Per M.T
(n). T.M.T Fe -500 25 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 50500.00 53025.00
(B). i. Annealed wire 14 Kg 49.12 687.68
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 9663.85
Add 1% Cess 0.00
Say Rs 74089.50 Per M.T
(o). T.M.T Fe -500- 28 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 50500.00 53025.00
(B). i. Annealed wire 14 Kg 49.12 687.68
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 9663.85
Add 1% Cess 0.00
Say Rs 74089.50 Per M.T
(p). T.M.T Fe -500 32 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 50500.00 53025.00
(B). i. Annealed wire 14 Kg 49.12 687.68
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 9663.85
Add 1% Cess 0.00
Say Rs 74089.50 Per M.T
5.8.6(a) Providing weep holes with dry graded Stone metal filter of 20 mm to 40 mm siz in abutment and wing wall as per specification and direction of E/I
Stone metal filter 20 mm to 40 mm 0.113 M3 714.84 80.78 M-011
Fitting and cost of Wire netting @ 20% of above 16.16
Add Overhead charge & C.P@15% 14.54
Add 1% Cess 0.00
Say Rs 111.50 Each
5.4.2 Brick work in designation 100 A Brick with cement mortar (1 : 4 ) in foundation with approved quality of coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curing, scaffolding and its removal wherever required including royaliy and all taxes etc. complete job as per specification and direction of E / I.
Taking Out put=2.832 Cum
Head mason 0.125 nos #REF! #REF!
Mason Gr II 2.5 nos #REF! #REF!
Unskilled mazdoor 5 nos #REF! #REF!
Bhisti 1 nos #REF! #REF!
Add Overhead charge & C.P@15% #REF!
Add 1% Cess 0.00
Say Rs #REF! Per M3
JE AE Executive Engineer
Irrigation Division, Uderasthan
5.4 MASONARY WORK
Sl.No. Description Quantity Unit Rate Amount Ref.
5.4.2 Brick work in designation 100 A Brick with cement mortar (1 : 4 ) in foundation with approved quality of coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curing, scaffolding and its removal wherever required including royaliy and all taxes etc. complete job as per specification and direction of E / I.
Taking Out put=2.832 Cum
Head mason 0.125 nos 660.00 82.50
Mason Gr II 2.5 nos 541.00 1352.50
Unskilled mazdoor 5 nos 428.00 2140.00
Bhisti 1 nos 417.00 417.00
Add Overhead charge & C.P@15% 1871.74
Add 1% Cess 0.00
Say Rs 5067.10 Per M3
5.4.6 Brick work in designation 100 A Brick with cement mortar (1 : 4 ) in superstructure with approved quality of coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curing, scaffolding and its removal wherever required including royaliy and all taxes etc. complete job as per specification and direction of E / I.
Taking Out put =2.832 Cum
Head mason 0.125 nos 660.00 82.50
Mason Gr II 2.5 nos 541.00 1352.50
Unskilled mazdoor 6 nos 428.00 2568.00
Bhisti 1 nos 417.00 417.00
Add Overhead charge & C.P@15% 1935.94
Add 1% Cess 0.00
Say Rs 5240.90 Per M3
5.5. PLASTER WORK
Sl.No. Description Quantity Unit Rate Amount
5.5.2 Providing 12 mm thick cement plaster (1: 4) with approved quality sand of requisite F.M . washed and screened including curing, scaffolding wherever required and its removal, royalty and all taxes etc. complete job as per specification and direction of E / I.
Taking Out put =9.30 Sqm
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 1.5 nos 428.00 642.00
Bhisti 0.5 nos 417.00 208.50
Add Overhead charge & C.P@15% 266.26
Add 1% Cess 0.00
Say Rs 219.50 Per M2
5.7 PITCHING AND PILING
Sl.no Description Quantity Unit Rate Amount
5.7.1 Labour for making 150 mm to 200 mm dia Sal ballah piles including cutting to size and dressing, making shoes for driving etc.all complete as per specification and direction of E/I.
Unit :-Per Pile
Taking Out put =10 Piles
Carpenter Gr II 0.5 nos 541.00 270.50
Add Overhead charge & C.P@15% 40.58
Add 1% Cess 0.00
Say Rs 31.10 Per pile
5.7.2 Providing two coats of coal tar painting over 150 mm to 200 mm dia Sal ballah piles and labour for driving it below ground level up to 5 metre including cost of all tools and plants required for the job all complete as per specification and direction of E / I.
Taking Out put =30.5 M
Coal tar 9 Kg 30.00 270.00 BCD324
Unskilled mazdoor 18 nos 428.00 7704.00
Add Overhead charge & C.P@15% 1262.70
Add 1% Cess 0.00
Say Rs 317.40 Per M
5.7.3 Labour for fitting and fixing 100 mm to 150 mm dia sal ballah cross pieces 1350 mm length in position with 16 mm dia bolts, nuts and washers at each joints including the cost of bolts nuts and washers complete job as per specification and direction of E / I.
Taking Out put =13.7 M
(Assuming 10 nos. of piles)
Total nos. of joints 2x10 =20 nos
Length of one cross pipe = 1.37 mtr
Hence total length 10 x 1.37 metre =13.7 mtr
Nuts and bolts 16 mm dia 375 mm long with washer etc. 20 nos 36.35 727.00 M-265
Carpenter Gr II 0.5 nos 541.00 270.50
Unskilled mazdoor 0.5 nos 428.00 214.00
Add Overhead charge & C.P@15% 181.73
Add 1% Cess 0.00
Say Rs 101.70 Per M
5.7.4 Labour for fitting and fixing 150 mm dia sal ballah in position as back stay with 16 mm dia bolts, nuts and washers at each joints including the cost of bolts nuts and washers complete job as per specification and direction of E / I.
Taking Out put =48.80 M
(Assuming 10 nos. of back stay each of 4.88 mt )
Total nos. of joints 3x10 =30 nos
Length of back stay including 2 % wastage =49.8 m
Nuts and bolts 16 mm dia 375 mm long with washer etc. 30 nos 36.35 1090.5 M-265
Carpenter Gr II 1 nos 541.00 541.00
Unskilled mazdoor 1 nos 428.00 428.00
Add Overhead charge & C.P@15% 308.93
Add 1% Cess 0.00
Say Rs 48.50 Per M
5.7.5 Labour for fitting and fixing 100 mm to 150 mm dia sal ballah walling pieces with 16 mm dia bolts, nuts and washers at each joints including the cost of bolts nuts and washers complete job as per specification and direction of E / I.
Taking Out put:- 6.10 Mtr
(Assuming 6.10 mtr long walling pieces)
Total nos. of joints with vertical pile at 1.22 mtr = 6 nos.
Nuts and bolts 16 mm dia 375 mm long with washer etc. 6 nos 36.35 218.10 M-265
Carpenter Gr II 0.125 nos 541.00 67.63
Unskilled mazdoor 0.125 nos 428.00 53.5
Add Overhead charge & C.P 15 % 50.88
Add Labour Cess 0 % 0.00
Say Rs 64.00 Per M
5.7.6 Labour for fitting and fixing 150 mm to 200 mm dia sal ballah piles with two nos 16 mm dia 225 mm long nuts and washers including the cost of bolts nuts and washers complete job as per specification and direction of E / I.
Taking Out put:- 10.00 Joints
(Assuming 10 joints )
Nuts and bolts 16 mm dia 225 mm long with washer etc. 20 nos 36.35 727.00 M-265
Carpenter Gr II 0.5 nos 541.00 270.50
Unskilled mazdoor 0.25 nos 428.00 107.00
Add Overhead charge & C.P 15 % 165.68
Add Labour Cess 0 % 0.00
Say Rs 127.00 Per M
5.7.7 Labour for cutting 62 mm to 75 mm dia bamboo piles to size and making shoes and driving etc. complete job as per specification and direction of E / I.
Taking Out put =30.50M
(Assuming 20 nos. pile sunk 1.525 mtr deep )
Total depth sunk 30.50 meter
Carpenter Gr II 0.25 nos 541.00 135.25
Unskilled mazdoor for pilling 2.5 nos 428.00 1070.00
Add Overhead charge & C.P@15% 180.79
Add 1% Cess 0.00
Say Rs 45.40 Per M
5.7.9 Labour for fitting and fixing 62mm to 75 mm dia bamboo runners in position at every vertical pile with 150 mm long nails or 38 swg G.I. wire including cost of G.I. wire or nails complete job as per specification and direction of E / I.
Taking Out put =30.50M
Cost of 150 mm long nails 0.5 Kg 58.00 29.00
Carpenter Gr II 0.125 nos 541.00 67.63
Unskilled mazdoor 0.25 nos 428.00 107
Add Overhead charge & C.P@15% 30.54
Add 1% Cess 0.00
Say Rs 7.70 Per M
5.7.10 Providing two coats of coal tar painting over 150 mm to 200 mm dia Sal ballah piles and labour for driving it below ground level in running water upto complete job as per specification and direction of E/I. (Assuming 30.5 meter of piles)
Taking Out put=30.50 M
Coal tar 9 Kg 30.00 270.00 BCD324
Unskilled mazdoor 28 nos 428.00 11984.00
Hire charge of 2 nos of boat of 40 quintal 2 nos 714.00 1428.00 PM66001
Add Overhead charge & C.P@15% 2118.90
Add 1% Cess 0.00
Say Rs 532.60 Per M
5.7.11 Labour for fitting and fixing 75 mm dia sal ballah runners on sal ballah verticals including cost of nails or spikes for fixing the same complete job as per specification and direction of E / I.
Taking Out put =30.50M
Cost of nails or spikes 2 Kg 58.00 116.00
Carpenter Gr II 0.75 nos 541.00 405.75
Unskilled mazdoor 0.75 nos 428.00 321.00
Add Overhead charge & C.P@15% 126.41
Add 1% Cess 0.00
Say Rs 31.80 Per M
5.7.12 Labour for fitting and fixing 75 mm but upto 150 mm dia sal ballah runners on sal ballah verticals including cost of nails or spikes for fixing the same complete job as per specification and direction of E / I.
Taking Out put =30.50M
Cost of nails or spikes 4 Kg 58.00 232.00
Carpenter Gr II 1 nos 541.00 541.00
Unskilled mazdoor 1 nos 428.00 428.00
Add Overhead charge & C.P@15% 180.15
Add 1% Cess 0.00
Say Rs 45.30 Per M
5.7.13(b) Labour for laying River bed Material (30 % sand and 70% Quarry spall) including light ramming etc.all complete job as per specification and direction of E / I.
Taking Out put =1 Cum
Unskilled mazdoor 0.75 nos 428.00 321.00
Add Overhead charge & C.P@15% 48.15
Add 1% Cess 0.00
Say Rs 369.20 Per M3
5.7.14 Providing brick flat soling with designation 100A bricks joints filled with coarse sand of approved quality including royalty and all taxes, all complete as per approved design, specifications and direction of E/I
Taking Out put =9.30 Sqm
Bricks 300 per%0nos 5123.00 1536.90
Local Sand 0.142 M3 143.32 20.35
Mason Gr II 0.50 nos 541.00 270.50
Unskilled mazdoor 1.00 nos 428.00 428.00
Add Overhead charge & C.P15% 338.36
Add 1% Cess 0.00
Say Rs 278.90 Per M2
5.7.14 Based B/S By Salvage Bricks Providing brick flat soling with designation 100A bricks joints filled with coarse sand of approved quality including royalty and all taxes, all complete as per approved design, specifications and direction of E/I
Taking Out put =9.30 Sqm
Bricks 300 per%0nos 0.00 0.00
Local Sand 0.142 M3 143.32 20.35
Mason Gr II 0.50 nos 541.00 270.50
Unskilled mazdoor 1.00 nos 428.00 428.00
Add Overhead charge & C.P15% 107.83
Add 1% Cess 0.00
Say Rs 88.90 Per M2
5.7.15 Providing brick on edge soling with designation 100A bricks joints filled with coarse sand of approved quality including royalty and all taxes, all complete as per approved design, specifications and direction of E/I
Taking Out put = 9.30 Sqm
Bricks 500 per%0nos 5123.00 2561.50
Local Sand 0.283 M3 143.32 40.56
Mason Gr II 0.625 nos 541.00 338.13
Unskilled mazdoor 1.25 nos 428.00 535.00
Add Overhead charge & C.P@15% 521.28
Add 1% Cess 0.00
Say Rs 429.70 Per M2
5.7.15 Based B/S By Salvage Bricks Providing brick on edge soling with designation 100A bricks joints filled with coarse sand of approved quality including royalty and all taxes, all complete as per approved design, specifications and direction of E/I
Taking Out put = 9.30 Sqm
Bricks 500 per%0nos 0.00 0.00
Local Sand 0.283 M3 143.32 40.56
Mason Gr II 0.625 nos 541.00 338.13
Unskilled mazdoor 1.25 nos 428.00 535.00
Add Overhead charge & C.P@15% 137.05
Add 1% Cess 0.00
Say Rs 113.00 Per M2
5.7.16 Providing pitching work with designation 100A bricks in panel and in herring bond pattern one brick on edge over a brick flat soling joints filled with local sand free from clay contents including royalty and all taxes, all complete as per approved design, specifications and direction of E/I
Taking Out put =9.30 Sqm
Bricks 800 per%0nos 5123.00 4098.40
Local Sand 0.425 M3 143.32 60.91
Mason Gr II 1.125 nos 541.00 608.63
Unskilled mazdoor 2.25 nos 428.00 963.00
Add Overhead charge & C.P@15% 859.64
Add 1% Cess 0.00
Say Rs 708.70 Per M2
5.7.16 Based B/S By Salvage Bricks Providing pitching work with designation 100A bricks in panel and in herring bond pattern one brick on edge over a brick flat soling joints filled with local sand free from clay contents including royalty and all taxes, all complete as per approved design, specifications and direction of E/I
Taking Out put =9.30 Sqm
Bricks 800 per%0nos 0.00 0.00
Local Sand 0.425 M3 143.32 60.91
Mason Gr II 1.125 nos 541.00 608.63
Unskilled mazdoor 2.25 nos 428.00 963.00
Add Overhead charge & C.P@15% 244.88
Add 1% Cess 0.00
Say Rs 201.90 Per M2
5.7.17 Providing pitching work with designation 100A Bricks in panel two brick on edge over a brick flat soling joints filled with local sand free from clay contents including royalty and all taxes, all complete as per approved design, specifications and direction of E/I
Taking Out put =9.30 Sqm
Bricks 1300 per%0nos 5123.00 6659.90
Local Sand 0.556 M3 143.32 79.69
Mason Gr II 2.00 nos 541.00 1082.00
Unskilled mazdoor 4.50 nos 428.00 1926.00
Add Overhead charge & C.P@15% 1462.14
Add 1% Cess 0.00
Say Rs 1205.30 Per M2
5.7.18.2 Labour charge for pitching work on apron slope of bank with stone boulder duly packed (Uncreated complete job ) materials within 50 m lead with all lifts, all complete as per approved design, specifications and direction of E/I
Taking Out put = 2.832 Cum
Unskilled mazdoor for carrying and laying boulder 2 nos 428.00 856.00
Mason Gr II 0.50 nos 541.00 270.50
Stone dresser 0.25 nos 541.00 135.25
Add Overhead charge & C.P@15% 205.91
Add 1% Cess 0.00
Say Rs 557.40 Per M3
5.7.24.2 Labour charge for pitching above water in apron and slope of bank with bricks packed in crates of specified size ( material within 50 M lead and all lifts ) including boxing and tying the crates with 12 to 14 gauge G.I wire including cost of G.I wire all complete as per approved design, specifications and direction of E/I
Taking Out put = 2.832 Cum
Skilled mazdoor 1.00 nos 541.00 541.00
Unskilled mazdoor 2.00 nos 428.00 856.00
Black smith Gr II 0.25 nos 541.00 135.25
Cost of 12 to 14 gauge binding wire for binding crate 0.30 Kg 75.04 22.51
Add Overhead charge & C.P@15% 249.86
Add 1% Cess 0.00
Say Rs 676.40 Per M3
5.7.29.1 Supplying fitting and packing jhawa bush wood ,Kans grass or local wood brush in bundle of 600 mm die tied with coir string as per specification including loading, unloading, stacking and carriage up to 1 K.M. lead etc.all complete job as per approved design, specifications and direction of E/I
Taking Out put =2.832 Cum
1. Cost of 2.832 cum of Jhankhi
Carriage for 1 K .M lead
Hire charge of bullock cart per day 136.60
Taking lead of 1 km and speed 2 km per hour
Nos. of trips per day =8/(2/S(L+3/4) )= 4.56 trip
Cost per trip= Hire charges/4.56=136.6/4.56= 29.96
Assuming bullock cart capacity as jhawa bush wood 1.70 cum
Carriage cost per 2.832 cum =Cost per trip x 2.832 /1.70 49.90
2. Cost of coir string 0.5 Kg 31.25 15.63 M-229
Unskilled mazdoor for loading, unloading
and placing 0.5 nos 428.00 214.00
Unskilled mazdoor for cutting jhankhi 0.33 nos 428.00 141.24
Add Overhead charge & C.P@15% 63.12
Add 1% Cess 0.00
Say Rs 170.90 Per M3
5.7.29.2 Extra for carriage of jhankhi for subsequent K.M. beyond initial 1st K.M.by bullock cart.
Unit :-Per Km per Cum
Taking Out put =2.832 Cum
Assuming 5 K.M lead
Nos of trips per day=8/(2/S(L+3/4) )= 1.4 trip
Hire charge of bullock cart per day 136.60 Rs
Cost per trip= Hire charges/1.4=136.6/1.4= 97.57 Rs
Assuming bullock cart capacity as jhawa bush wood 1.7 cum
Carriage cost for 5 K.M lead = Cost per trip x 2.832 /1.70 162.54 162.54
Hence rate for each subsequent K.M. beyond 1 k.m
(Carriage cost for 5 k.m-Carriage cost for 1 k.m)/4*2.832 9.94
Add Overhead charge & C.P@15% 1.49
Add 1% Cess 0.00
Say Rs 11.40 Per K.M Per M3
5.7.32.A (a).Labour charge for making crates box of size 3m x 1.5m x 0.6m including cutting of G.I wire or B.A wire, weaving of wire to make it taranga wire having 150 mm square mesh with double knot with 8 & 10 S.W.G. wire as per approved design, specifications and direction of E/I
As per T.E.C.letter no 33 dated 8.4.06 )
Taking Out put =10 nos.
Black smith Gr II for weaving the wire roll for cutting the taragana wire to size 2 nos 541.00 1082.00
Unskilled mazdoor for weaving the wire, as helper in making creates & tying joints 3 nos 428.00 1284.00
Add Overhead charge & C.P@15% 354.90
Add 1% Cess 0.00
Say Rs 272.10 Each
5.7.36.2 Supplying wire mesh crates of size 3 M x 1.5 M x 0.60 M and 150 mm square mesh made out of G.I wire 10 S.W.G. double knot at each joints in box type etc. all complete as per approved design, specifications and direction of E/I
As per T.E.C.letter no 37 dated 30.4.06 )
Cost of one M.T. of G.I Wire of 10 S.W.G
including carriage 1 M.T 78770.00 M-224 (i)
Av nos of crate manufactured 58 nos 58 nos
Materials cost of one box=Cost of 1 M.T G.I wire/58 1358.10
Labour charge as item 5.7.32.A 236.60
Add Overhead charge & C.P@15% 239.21
Add 1% Cess 0.00
Say Rs 1833.90 Each
5.7.38.2 Supplying wire mesh crates of size 3 M x 1.5 M x 0.60 M and 150 mm square mesh made out of Black annealed wire 10 S.W.G. double knot at each joints in box type etc. all complete as per approved design, specifications and direction of E/I
As per T.E.C.letter no 37 dated 30.4.06 )
Cost of one M.T. of B.A Wire of 10 S.W.G
including carriage 1 M.T 78770.00
Average nos of crate manufactured= 58nos 58 nos
Materials cost of one box=Cost of 1 M.T G.I wire/58 1358.10
Labour charge as item 5.7.32.A 236.60
Add Overhead charge & C.P@15% 239.21
Add 1% Cess 0.00
Say Rs 1833.90 Each
5.7.44 Earth work in cutting and making slope in all kinds of soil with all leads and lifts as per specifications and direction of E/I
Taking Out put =28.32 Cum
Unskilled mazdoor for cutting earth 4 nos 428.00 1712.00
Unskilled mazdoor for carrying earth and clod breaking and rough dressing of slope 3 nos 428.00 1284.00
Add Overhead charge & C.P@15% 457.73
Add 1% Cess 0.00
Say Rs 123.90 Per M3
5.7.45.1 Providing and Laying of a Geo-textile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment materials through the voids of the stone pitching/cement concrete block as well as to allow free movement of water without creating any uplift head on the pitching as per specifications and direction of E/I
Vide T.E.C. letter no 48 (e) dated 10.05.04
Taking Out put =10.0 Sqm
Permeable synthetic Geotextile including 5 % for overlap and wastage 10.50 Sqm 84.55 887.78 M-109
Unskilled mazdoor 0.30 nos 428.00 128.40
Skilled mazdoor 0.10 nos 541.00 54.10
Add Overhead charge & C.P@15% 161.87
Add 1% Cess 0.00
Say Rs 124.10 Per M2
5.7.48 Based Providing , laying and filling Geo bags of size 1mx0.7m (Type A 300 GSM nonwoven) weight of bag 420 gm,volume of filled bag 0.07 cum, weight of filled Geo bag 126 kg with local sand including stiching in four lines by approved nylon thred with stiching machine and generator, stacking and placing in gabion of size 1.8mx1.8mx0.5m (18nos. Geo bags per gabion) after loading,unloading and carriage with the help of trolley within 150m lead including cess all complete as per specification and direction of E/I
A . Assuming out put of filling and stiching of 40 nos. of Geo Bags per day
Stiching Roll(Nylon) 2 nos 30.00 60.00
Unskilled labour for filling,stacking 2 nos 428.00 856.00
Skilled labour for stacking 0.33 nos 541.00 178.53
Unskilled labour for carrying and placing 4 nos 428.00 1712.00
Hire charge of Stiching Machine 0.33 day 50.00 16.50
Hire Charge of manual Trolley 1 day 50.00 50.00
Hire charge of 3 KVA Generator 2.67 hrs 74.00 197.58
Add Overhead charge & C.P@15% 477.24
Add 1% Cess 0.00
Rate per bag=Total/40 91.47
Cost of filling & stiching of 18 nos of Geo bags 18 nos 91.47 1646.48 A
Add Overhead charge & C.P@15% 519.10
Add 1% cess 0.00
Total(A+B) 5626.27
Rate Say,Rs 5626.00 Each
Cariage of Local Sand by Tractor
Formula Ls Lus Lk Rate Per m3 Rate Per M3 with royality
Finished Rate Unit Basic Rate of Gabion Carriage of Local Sand for 18 Nos Geo Bag Say
1 Including Local Sand Carriage Lead 1/2 Km(K) Per Gabion 5626.27 368.27 5994.50
2 Including Local Sand Carriage Lead 1 Km(K) Per Gabion 5626.27 405.52 6031.80
3 Including Local Sand Carriage Lead 1.00km (s)+1.00 Km(K) Per Gabion 5626.27 453.18 6079.40
4 Including Local Sand Carriage Lead 2.00km (s)+1.00 Km(K) Per Gabion 5626.27 500.85 6127.10
5.7.48 Based Providing , laying and filling Geo bags of size 1mx0.7m (Type A 300 GSM nonwoven) weight of bag 420 gm,volume of filled bag 0.07 cum, weight of filled Geo bag 126 kg with local sand including stiching in four lines by approved nylon thred with stiching machine and generator, stacking and placing in gabion of size 1.8mx1.2mx0.5m (12nos. Geo bags per gabion) after loading,unloading and carriage with the help of trolley within 150m lead including cess all complete as per specification and direction of E/I
A . Assuming out put of filling and stiching of 40 nos. of Geo Bags per day
Stiching Roll(Nylon) 2 nos 30.00 60.00
Unskilled labour for filling,stacking 2 nos 428.00 856.00
Skilled labour for stacking 0.33 nos 541.00 178.53
Unskilled labour for carrying and placing 4 nos 428.00 1712.00
Hire charge of Stiching Machine 0.33 day 50.00 16.50
Hire Charge of manual Trolley 1 day 50.00 50.00
Hire charge of 3 KVA Generator 2.67 hrs 74.00 197.58
Add Overhead charge & C.P@15% 477.24
Add 1% Cess 0.00
Rate per bag=Total/40 91.47
Cost of filling & stiching of 12 nos of Geo bags 12 nos 91.47 1097.66 A
Geo Bag 12 nos 83.06 996.72
Gabion 1.8mx1.2mx0.5m 1 nos 1427.60 1427.60 M-280
Add Overhead charge & C.P@15% 363.65
Add 1% cess 0.00
Total(A+B) 3885.62
Rate Say,Rs 3885.60 Each
Cariage of Local Sand by Tractor
Formula Ls Lus Lk Rate Per m3 Rate Per M3 with royality
Finished Rate Unit Basic Rate of Gabion Carriage of Local Sand for 12 Nos Geo Bag Say
1 Including Local Sand Carriage Lead 1/2 Km(K) Per Gabion 3885.60 245.51 4131.10
2 Including Local Sand Carriage Lead 1 Km(K) Per Gabion 3885.60 270.34 4155.90
3 Including Local Sand Carriage Lead 1.00km (s)+1.00 Km(K) Per Gabion 3885.60 302.12 4187.70
4 Including Local Sand Carriage Lead 2.00km (s)+1.00 Km(K) Per Gabion 3885.60 333.90 4219.50
5.7.52 Based Supply of New bag and N.C with labour for filling New E.C bag with local sand (volume of filled bag 1.2 cft and weight 50kg),stiching on two lines by approved nylon thread with stiching machine & generator,Stacking the bags and placing in Nylon crate of size (1mx1mx1m) with a lead of 150m including supply of nylon threads etc , placing the filled crates in dry portion within a lead of 30m,all complete as per approved design,specification and direction of E/I.
Unit - Each bag
Taking output of 100 nos filled new bags in 4 nos N.C
New E.C bag 100 nos 11.24 1124.00 M-291
Nylon Crate(N.C) 4 nos 41.00 164.00 M-276
Add Overhead charge &C.P @15% 193.20
Add 1% cess 0.00
Rate of material for each N.C(Totalx25/100) 370.30 A
Unskilled labour for filling,stiching & stacking 1.67 nos 428.00 714.76
Unskilled labour for crrying &placing at work site 3 nos 428.00 1284.00
Skilled labour for stiching 0.33 nos 541.00 178.53
Stiching Roll(Nylon) 2 nos 30.00 60.00
Hire Charge of Stiching Machine 0.33 day 50.00 16.50
Hire charge of Generator 3KVA 2.67 hrs 74.00 197.58
Add Overhead charge &C.P @15% 367.71
Add 1% cess 0.00
Rate for each N.C(Totalx25/100) 704.77 B
Rate for each N.C in dry portion (A+B) 1075.07
Cariage of Local Sand by Tractor
Formula Ls Lus Lk Rate Per m3 Rate Per M3 with royality
Finished Rate Unit Basic Rate of NC Carriage of Local Sand for 25 Nos EC Bag Say total
1 Including Local Sand Carriage Lead 1/2 Km(K) Per NC 1075.10 248.44 1323.50
2 Including Local Sand Carriage Lead 1 Km(K) Per NC 1075.10 273.56 1348.70
3 Including Local Sand Carriage Lead 1.00km (s)+1.00 Km(K) Per NC 1075.10 305.72 1380.80
4 Including Local Sand Carriage Lead 2.00km (s)+1.00 Km(K) Per NC 1075.10 337.88 1413.00
5.7.53 Based Supply of New bag with labour for filling New E.C bag with local sand (volume of filled bag 1.2 cft and weight 50kg),stiching on two lines by approved nylon thread with stiching machine & generator,Stacking the bags and placing with a lead of 150m including supply of nylon threads etc ,all complete as per approved design,specification and direction of E/I.
Taking output 100nos filled new bags
New E.C.Bag 100 nos 11.24 1124.00
Stiching Roll(Nylon) 2 nos 30.00 60.00
Unskilled labour for filling,stacking 1.67 nos 428.00 714.76
Unskilled labour for crrying &placing at work site 3 nos 428.00 1284.00
Skilled labour for stiching 0.33 nos 541.00 178.53
Hire Charge of Machine
Hire Charge of Stiching Machine 0.33 day 50.00 16.50
Hire charge of Generator 3KVA 2.67 hrs 74.00 197.58
Total (A+B+C) 3575.37
Add Overhead charge &C.P @15% 536.31
Add 1% cess 0.00
Rate for 100 nos. E.C (A+B+C) 4111.68
Cariage of Local Sand by Tractor
Formula Ls Lus Lk Rate Per m3 Rate Per M3 with royality
Finished Rate Unit Basic Rate of % Nos EC Carriage of Local Sand for 100 Nos EC Bag Say total
1 Including Local Sand Carriage Lead 1/2 Km(K) % Nos 4111.68 993.75 5105.40
2 Including Local Sand Carriage Lead 1 Km(K) % Nos 4111.68 1094.25 5205.90
3 Including Local Sand Carriage Lead 1.00km (s)+1.00 Km(K) % Nos 4111.68 1222.88 5334.60
4 Including Local Sand Carriage Lead 2.00km (s)+1.00 Km(K) % Nos 4111.68 1351.50 5463.20
5.7.54 Based Providing,laying & filling Geo bags of size 1mX0.7m (Type A 300GSM nonwoven) Weight 420gm,volume of filled bag 0.07 cum,weight of filledf Geo bag 126kg with local sand including stiching in four lines by approved Nylon thread with stiching machine and generator,stacking and placing after loading,unloading and carriage with the help of Trolly within 150m lead ,including cess, all complete as per specification and direction of E/I.
Taking output of 40 nos Geo bags
Stiching roll(nylon) 2 nos 30.00 60.00
Unskilled labour for filling,stacking 2 nos 428.00 856.00
Unskilled labour for crrying &placing at work site 4 nos 428.00 1712.00
Skilled labour for stiching 0.33 nos 541.00 178.53
Hire Charge of Machine
Hire Charge of Stiching Machine 0.33 nos 50.00 16.50
Hire Charge of manual Trolley 1 day 50.00 50.00
Hire charge of Generator 3KVA 2.67 hrs 74.00 197.58
Add Overhead charge &C.P @15% 975.60
Add 1% cess 0.00
Rate per geo Bag 186.99
say,Rs 187.00 Each
Cariage of Local Sand by Tractor
Formula Ls Lus Lk Rate Per m3 Rate Per M3 with royality
Finished Rate Unit Basic Rate of Each Geo Bag Carriage of Local Sand for Each Bag Say total
1 Including Local Sand Carriage Lead 1/2 Km(K) Each 187.00 20.46 207.50
2 Including Local Sand Carriage Lead 1 Km(K) Each 187.00 22.53 209.50
3 Including Local Sand Carriage Lead 1.00km (s)+1.00 Km(K) Each 187.00 25.18 212.20
4 Including Local Sand Carriage Lead 2.00km (s)+1.00 Km(K) Each 187.00 27.83 214.80
5.8 MISCELLANEOUS
Sl.No Description Quantity Unit Rate Amount Ref.
5.8.1 Supplying, fitting and fixing copper strip of 16 gauge of approved quality ( with 99 % purity ) in expansion joints complete job as per drawing, specifications and direction of E/I.
Furnishing and installing seal
A. Cost of copper seal and acessries
Size of copper seal 250 mm x 1.6 mm
weight per sq metre= 14.70 kg 14.7 kg
Weight of strips per linear metre Allowing 2.5 % for wastage and incidental to work )=0.25 x1x14.70 x1.025=3.77 kg.
i.Cost per linear metre.Including furnishing, storing, handling and cutting etc. 3.77 kg 896.80 3378.13 M-087
ii. Cost of bracing, washers and nails etc. per running metre @ 3 % of item (i) 101.34
Sub-Total 3479.48
B.Labour charge
Taking that 1/4 mason and 1 helper can place seal in one lift of 15 mtr in one shift.
Head mason. 0.25 nos 660.00 165.00
Helper 1 nos 444.00 444.00
Total labour charge 609.00
Total charge per mtr= total labour charge / 15 40.60
Total A+B 3520.08
Hence rate per kg =Total (A+B)/ wt. Of seal per mtr 934.48
Add Overhead charge & C.P@15% 140.17
Add 1% Cess 0.00
Hence rate per kg of copper seal 1074.70 Per kg
5.8.2 Supplying, fitting and fixing rubber seal of ( water stop ) of approved quality for construction joints expansion joints complete job as per drawing, specifications and direction of E/I.
Taking Out put =1 M
Cost of rubber seal 1 m 85.00 85.00
Add for overlapping and valcanizing 10 % of the materials cost 8.50
+ Add Overhead charge & C.P@15% 14.03
Add 1% Cess 0.00
Hence rate per mtr of rubber seal 107.50 Per mtr
5.8.5.1 Providing and driving steel sheet piles on specified alignment and upto designed levels including painting the sheet piles with two coats of anti- corrosive bitumen paint ( portion of sheet pile inside concrete shell not be painted ) including cost of sheet piles and hire charges of sheet pile driving plant etc. all complete as per specifications and direction of E/I . ( For the purpose of payment of sheet pile driving, measurement of sheet pile duly driven shall be taken only )
Assuming pilling that can be expected to be driven per hour= 48.25 x 6.70= 323.275 Kg
(Assuming I.S.P.S. 1625 U& pilling section vide I.S. 2314, 1963 )
Hourly use rate of sheet pile
Cost of Sheet Pile with 10 % wastage 1.1 M.T 60300.00 66330.00
Sheet pile Driving plant (x) 4504.00
B. (i). Cost of driving pile per M.T =(x)x1000 / 323.275 13932.41 Rs 13932.41
(ii). Shifting of 3 to 4 nos of pile per M.T at the place ready for driving @ 1.5 % of Sub item (i) Rs 208.99
(iii). Erecting pilling machines and dismantling @ 0.5 % of sub item (i) Rs 69.66
(iv). Depreciation charges for track fand wooden sleeper, fish plates, bolts dog spikes @ 0.5 % of sub item (i) Rs 69.66
(v). Depreciation charges forsupply of rails @ 1 % of sub item (i) Rs 139.32
(vi). Welding piles 3 to 4 nos @ 8 % of sub item b(i) Rs 1114.59
(vii). Cutting piles 2 to 4 nos @ 2 % of sub item (i) Rs 278.65
(viii). Driving hole 3 to 4 nos @ 0.5 % of sub item (i) Rs 69.66
(ix).Carriage of sheet piles 1 M.T. @ 2 % of sub item (i) Rs 278.65
C. Surface area of 1 M.T. sheet piles to be painted both side with anti-corrasive bitumen, paint
Length of sheet pile per M.T=1 x 1000 /48.25= 11.56 m
Area of both side of sheet piles=11.56 x 1.71 =20.72 sqm
Surface of sheet piles to be painted with two coats of bitumen ( Assuming 0.5 Kg / M2 =20.72x 0.5 = 10.36 Kg 47.80 495.16
D. Unskilled mazdoor 2 nos 428.00 856.00
Total (A+B+C+D) 83842.75
Add Overhead charge & C.P@15% 12576.41
Add 1% Cess 0.00
Say Rs 96419.20 Per M.T
5.8.6(a) Providing weep holes with dry graded Stone metal filter of 20 mm to 40 mm siz in abutment and wing wall as per specification and direction of E/I
Stone metal filter 20 mm to 40 mm 0.113 M3 678.14 76.63 M-011
Fitting and cost of Wire netting @ 20% of above 15.33
Add Overhead charge & C.P@15% 13.79
Add 1% Cess 0.00
Say Rs 105.70 Each
5.8.7 Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15 Metre lead and disposal of unserviceable materials with all leads. as per building specifications and direction of E/I.
Taking Out put =2.832 Cum
Semi skilled mazdoor 1 nos 444.00 444.00
Unskilled mazdoor 3 nos 428.00 1284.00
Add Overhead charge & C.P@15% 259.20
Add 1% Cess 0.00
Say Rs 701.70 Per M3
5.8.8 Dismantling plain cement or lime concrete work including stacking serviceable materials in stacks within 15 Metre lead and disposal of unserviceable materials with all leads. as per building specifications and direction of E/I.
Unit :-Per Cum Per M3
Taking Out put =2.832 Cum 2.832 Cum
Semi skilled mazdoor 3 nos 444.00 1332.00
Unskilled mazdoor 4 nos 428.00 1712.00
Add Overhead charge & C.P@15% 456.60
Add 1% Cess 0.00
Say Rs 1236.10 Per M3
5.8.9 Dismantling R.C.C work including stacking serviceable materials in stacks within 15 Metre lead and disposal of unserviceable materials with all leads. as per building specifications and direction of E/I.
Taking Out put =2.832 Cum
Hammer man 2.25 nos 444.00 999.00
Skilled mazdoor 2.25 nos 541.00 1217.25
Unskilled mazdoor 7 nos 428.00 2996.00
Blacksmith Gr II 1 nos 541.00 541.00
Add Overhead charge & C.P@15% 929.59
Add 1% Cess 0.00
Say Rs 2516.50 Per M3
5.8.10 Dismantling old plaster and pointing in cement or lime and raking out joints to 15 mm. depth, watering and disposal of unserviceable materials with all leads. as per building specifications and direction of E/I.
Taking Out put =9.30 Sqm
Semi skilled mazdoor 0.35 nos 444.00 155.40
Unskilled mazdoor 0.10 nos 428.00 42.80
Bhisti 0.06 nos 417.00 25.02
Add Overhead charge & C.P@15% 33.48
Add 1% Cess 0.00
Say Rs 27.60 Per M2
5.7.21.2* Based Labour charge for pitching above water in appron and slope of bank with boulder in crates of specified size ( material within 50 mtr lead and all lifts ) including boxing and tying the crates with 12 to 14 gauge G.I wire including cost of G.I wire all complete as per approved design,specifications and direction of E/I
Taking Out put:- 2.832 cum
Skilled mazdoor 1.00 nos 541.00 541.00
Unskilled mazdoor 2.00 nos 428.00 856.00
Black smith Gr II 0.25 nos 541.00 135.25
Stone dresser 0.25 nos 541.00 135.25
Cost of 12 to 14 gauge binding wire for binding crate 0.30 Kg 75.04 22.51
Add Overhead charge & C.P 15 % 270.15
Add Labour Cess0% 0.00
Say Rs 731.34 Per M3 (a)
Supply of Boulder
Cost of material Rs 675.00
Add 10% CP 67.5
Add Labour Cess 0 % 0.00
Total (a+b) 1473.80 Per M3
(b) Supply of mechanically woven double hexaganal Crate 3.00mx1.50mx0.60m)
Cost of material Rs 2070.000
Add Labour Cess 0 % 0.000
Analysis of Rate
S.No. Description Quantity Unit Rate Amount Ref
5.1.3 Jungle clearance and weeding out shrubs including small tree up to 0.50M girth and removal as per specifications and direction of E/I.
Unit :- Per Sqm
Taking Out put:- 92.94 Sqm
Unskilled mazdoor for cutting shrubs and trees 1.50 nos 428.00 642.00
Unskilled mazdoor for collecting and removing shrubs, weeds and trees. 0.75 nos 428.00 321.00
Add Overhead charge & C.P @ 15% 144.45
Add cess @ 1% 0.00
Rate per Sqm 11.92
say, Rs 11.90 Per M2
5.1.27 Earth work in excavation of foundation trenches in ordinary soil (vide classification of soil item A ) and disposal of excavated earth so obtained to a distance up to 50 M and average lift of 1.5 M including leveling , ramming the foundation trenches, removing the roots of shrubs etc. all complete as per specifications and direction of E/I.
Unit :- Per Cum
Taking Out put =28.32 Cum
Unskilled mazdoor for cutting and carrying etc. 11 nos 428.00 4708.00
Head mason 0.25 nos 660.00 165.00
Add Overhead charge & C.P@15% 730.95
Add cess@1% 0.00
Say Rs 197.90 Per M3
5.1.31 Earth work in filling in foundation trenches and back filling of structures in layers not exceeding 150 mm thick well watered, rammed and fully compacted and finally dressed with suitable earth obtained from excavation of foundation trenches and placed in a suitable profile within a lead of 30 M and lift of 1.5 M, all complete job as per specifications and direction of E/I.
Taking Out put=28.32 Cum
Unskilled mazdoor for cutting . 4.5 nos 428.00 1926.00
Unskilled mazdoor for carrying . 4 nos 428.00 1712.00
Head mason 0.125 nos 660.00 82.50
Add Overhead charge & C.P@15% 558.08
Add cess@1% 0.00
Say Rs 151.10 Per M3
5.1.44. Earth work by tractor ( Rajashani) with bucket (Doli) with spreader ( Tractor leveller or Tractor Dozer) in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in odinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers and construction & removal of dhalas properly with lead of ............... metre (lead will be considered as perpendicular distance from C.G. of Pit to C.G. of banks or embankment ) and with all lifts all complete as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth )(Lead should be taken C.G to C.G.perpendicular to the bank Maximum Lead Upto -150 mtr. Note:- Track Path may not be taken as lead )
For C.G to C.G Lead in K.M ( L ) Speed (km/hr) ( V ) Time for loading, Unloading etc (hr) ( t )=1 min. Spacing of Dhalas (km) (S) Capacity Per Trip Cum (e ) Haulage Path (Distance travelled in one cycle) = 2(L+S)
Time of run per trip = 2(L+S)/ V Time per cycle (hr) =2(L+S) / V +t No of trips , N =8V/ (2L+2S+Vt) Output per day with 80% efficiency = 0.80xNxe Use Rate of Tractor Per Day (Tr ) Cost per Cubic Metre = Tr/Ne
Proportional Cost of Dhala (10% only) Cost of Dhala Per cubic metre Add for cutting (Use rate of tractor / Capacity of cutting 324 cum per day ) =Tr/324 Add for spreading cost =( Use rate of D-80 Dozer Per hr / Capacity of D-80 Dozer per hr 300 cum) Add for finishing and dressing =one mazdoor/100M3 Total cost (12+14+15+16+17 )
Add Overhead charge & C.P 15% Rate Per M3 Add 1% karmkar cess Total Total+Rs 33 for Royality
NOTE :- Add Royality of Earth Rs 33.00 Where needed without overhead charge & C.P
5.1.46 Earth work by Mechanical means with help of Excavator, Tipper and Spreader in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead of ............... metre (lead will be considered as track path i.e. half of distance travelled in one cycle i.e. half of haulage path from pit to bank or embankment. Pit will be beyond 150 meter from centre of bank i.e. perpendicular distance from centre of bank to nearest boundary of pit will be more than 150 meter) and with all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth )
Lead in K.M ( L ) Cost of cutting & Loading by Excavator one M3 capacity= Use rate of Excavator / Capacity of Excavator ( 60M3) Average Speed on Kucha track Km / hr = (V) Average haulage path ( Distance ) in one cycle ( D) in Km Haulage Time in minute ( Time taken in one cycle of run ) = 60D/V Loading Time one minute Per M3 For 5.5 M3
Unloading & Turning Time in minute Total Time Per trip in minute Col (5+6+7) =( T) No. of Trip per hour taken as 50 minute N =50/T Output per hour with 80 % efficiency Q = 0.8 X N X 5.5 Use Rate per hour of Tipper 5.5 M3 capacity = (Tr )
Carriage Cost per M3 = Tr/ Q Add for spreading cost =( Use rate of D-80 Dozer Per hr / Capacity of D-80 Dozer per hr 300 cum) =3000/300 Add 5 % for haul road maintenance, 5 % for processing and 2 % for extra labour for finishing = 12 % of column ( 2+12+13) Total Cost per M3 col (2+12+13+14 ) Add Overhead charge & C.P 15%
Rate Per M3 Add 1% cess Total Rate per Cum Total+Rs 33 for Royality
NOTE :- Add Royality of Earth Rs 33.00 Where needed without overhead charge & C.P
Sr.No. Description Quantity Unit Rate Amount
5.3.3 Providing and laying P.C.C. M-100 with nominal mix of (1:3:6 ) in foundation of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing, royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I.
Taking Out put=2.832 Cum
Coarse aggregates Gr IV (Rate of approved quality of aggregate as per Design) 2.66 M3 1145.16 3046.13 M-048
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 362.00 517.66 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 419.00 599.17 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
Add Overhead charge & C.P@15% 2240.34
Add 1% Cess 0.00
Say Rs 6064.90 Per M3
5.3.4 Providing and laying P.C.C. M-150 with nominal mix of (1:2:4 ) in foundation of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing., royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I.
Unit :- Per Cum
Taking Out put= 2.832 Cum
A. MATERIALS 8020.59
Coarse aggregates (20 mm To 10 mm) (Taking Rate of approved quality of aggregate as per Design) 2.548 M3 937.15 2387.86 M-045
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 362.00 517.66 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 419.00 599.17 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
Add Overhead charge & C.P@15% 2369.97
Add 1% Cess 0.00
Say Rs 6415.90 Per M3
5.3.5 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5:3 ) in foundation of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing., royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I.
Taking Out put=2.832 Cum
Coarse aggregates (20 mm To 10 mm) (Rate of approved quality of aggregate as per Design) 2.436 M3 937.15 2282.90
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 362.00 517.66 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 419.00 599.17 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
Add Overhead charge & C.P@15% 2559.74
Add 1% Cess 0.00
Say Rs 6929.60 Per M3
5.3.10 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5:3 ) in superstructure of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing., royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I.
Taking Out put=2.832 Cum
Coarse aggregates ( 20 mm to 10 mm ) (Cost of coarse aggregate as per Design) 2.436 M4 937.15 2282.90
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 362.00 517.66 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 419.00 599.17 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
Add Overhead charge & C.P@15% 2559.74
Add 1% Cess 0.00
Say Rs 6929.60 Per M3
5.3.13 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5:3 ) in deck slab with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing, royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I.
Taking Out put=2.832 Cum
Coarse aggregates ( 20 mm to 10 mm ) (Cost of coarse aggregate as per Design) 2.436 M3 937.15 2282.90
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1.25 nos 541.00 676.25
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 362.00 517.66 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 419.00 599.17 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
Add Overhead charge & C.P@15% 2580.03
Add 1% Cess 0.00
Say Rs 6984.50 Per M3
5.3.16 Providing and laying dry pitching with precast cement concrete blocks of size 600 mm x 600 mm x 300 mm in M-75 with nominal mix of (1:4:8) in floor and flank wall with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality of sand of requisite F.M washed and screened including necessary form work, tools and plants, vibrating, curing as well royalty and all taxes complete job as per specifications and direction of E/I.
Taking Out put =2.832 Cum
Coarse aggregates Gr III (Cost of coarse aggregate as per Design) 2.720 M3 1145.16 3114.84
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
Unskilled mazdoor for placing blocks in position 4 nos 428.00 1712.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 362.00 517.66 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 419.00 599.17 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
D SHUTTERING CHARGES
Shuttering 25 blocks 25 mm thick mango planks
Add 1 % for cost of nails and spikes 132.60
Carpenter Gr II 3 Rs 541.00 1623.00
Unskilled mazdoor 8 Rs 428.00 3424.00
Assuming 4 uses to calculate 18439.60 a
Cost of shuttering for 2.832 cum = a/4 4609.90 D
TOTAL(A+B+C+D) 20518.00
Add Overhead charge & C.P@15% 3077.70
Add 1% Cess 0.00
Say Rs 8331.80 Per M3
5.3.17 Providing and laying dry pitching with precast cement concrete blocks of size 600 mm x 600 mm x 300 mm in M-100 with nominal mix of (1:3:6) in floor and flank wall with approved quality of graded coarse aggregate of required grade( as per design ) and approved quality of sand of requisite F.M washed and screened including necessary form work, tools and plants, vibrating, curing as well royalty and all taxes complete job as per specifications and direction of E/I.
Taking Out put =2.832 Cum
Coarse aggregates Gr IV (Cost of coarse aggregate as per Design) 2.66 M3 1145.16 3046.13
Head mason 0.5 nos 660.00 330.00
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 12 nos 428.00 5136.00
Bhisti 1 nos 417.00 417.00
Unskilled mazdoor for placing blocks in position 4 nos 428.00 1712.00
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 Hr 362.00 517.66 PM21001
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 Hr 419.00 599.17 PM44001
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
D SHUTTERING CHARGES
Shuttering 25 blocks 25 mm thick mango planks
Add 1 % for cost of nails and spikes 132.60
Carpenter Gr II 3 Rs 541.00 1623.00
Unskilled mazdoor 8 Rs 428.00 3424.00
Assuming 4 uses to calculate 18439.60 a
Cost of shuttering for 2.832 cum = a/4 4609.90 D
TOTAL=A+B+C+D 21313.61
Add Overhead charge & C.P@15% 3197.04
Add 1% Cess 0.00
Say Rs 8654.90 Per M3
5.3.18 Providing shuttering including strutting, propping etc. and its removal after use in foundation as per specifications and direction of E/I.
Taking Out put=9.30 Sqm
Local wood planks 38 mm thick =9.3 x 38 / 1000 0.353 cum
Add 5 % wastage 0.017 cum
Cost of 0.37 cum lock wood planks 0.37 cum 26000.00 9620.00
Add cost for strutting and propping @ 10 % of above 962.00
Total cost of wood 10582.00
Assuming 4 uses to calculate 4 use
Cost of shuttering for 2.832 cum total cost/4 2645.50
Add 1 % for cost of nails and spikes on total cost of wood 105.82
Carpenter Gr II 1.5 nos 541.00 811.50
Unskilled mazdoor 2.5 nos 428.00 1070.00
C Carriage of materials
Cost of the carriage of materials from Godown and back to godown after use including loading unloading and stacking @ 1 % of Total cost of wooden materials 105.82 C
TOTAL cost per 9.3 sqm =A+B+C 4738.64
Add Overhead charge & C.P@15% 710.80
Add 1% Cess 0.00
Say Rs 586.00 Per M2
5.3.19 Providing shuttering including strutting, propping etc. and its removal after use in various components of canal structure or embankment structure as per specifications and direction of E/I.
Taking Out put=9.30 Sqm
Local wood planks 38 mm thick 9.3 x 38 / 1000 =0.353 cum 0.353 cum
Add 5 % wastage 0.017 cum
Cost of 0.37 cum lock wood planks 0.37 cum 26000.00 9620.00
Add cost for strutting and propping @ 10 % of above 962.00
Total cost of wood 10582.00
Assuming 4 uses to calculate 4 use
Cost of shuttering for 2.832 cum total cost/4 2645.50
Add 1 % for cost of nails and spikes on total cost of wood 105.82
Carpenter Gr II 1.5 nos 541.00 811.50
Unskilled mazdoor 2.5 nos 428.00 1070.00
C Carriage of materials
Cost of the carriage of materials from Godown and back to godown after use including loading unloading and stacking @ 1 % of Total cost of wooden materals 105.82 C
TOTAL cost per 9.3 sqm =A+B+C 4738.64
Add Overhead charge & C.P@15% 710.80
Add 1% Cess 0.00
Say Rs 586.00 Per M2
5.3.20 Providing centering including strutting,propping etc. and removing after use in deck slab as per specifications and direction of E/I.
Taking Out put =22.326 Sqm
(Assuming size in slab 7.32 x 3.05 =22.326 sqm )
a. 40 mm thick local wood planks 22.326 x40 / 1000
Add 5 % for wastages =0.045
Assuming 4 uses to calculate
Cost of planks per use =0.89 x rate of local wood /4 6110.00
b. Assuming av. Height of slab from G.L=3.66 M
150 mm sal bullah required =78 nos
Length of sal bullah =78 x3.66 =285.48 Mtr 285.48 M 70.57 20146.32 M-223
(Assuming sal bullah to be used 10 times for centerins
=285.48 x Rate per Mtr / 10 2014.63
c. Salwood scanting required (75 mm x 63 mm size) =0.311 cum 0.311 cum 60000.00 18660.00 BCD1199
( Assuming 10 uses )
Cost per use =0.311 x Rate per Mtr/10 1866.00
Add 1 % for cost of nails and spikes 99.91
Carpenter Gr II 4 nos 541.00 2164.00
Unskilled mazdoor 7 nos 428.00 2996.00
C. Carrage of matterials 5160.00 ( B )
Cost of the carriage of materials from Godowm and back to godown after use including loading unloading and stacking @ 1 % of Total cost of wooden materals ( A ) 99.91 ( C )
TOTAL cost per 22.326 sqm =A+B+C 15350.45
Add Overhead charge & C.P@15% 2302.57
Add 1% Cess 0.00
Say Rs 790.70 Per M2
5.3.22 Providing M.S reinforcement ( Tor steel ) as per approved design , drawing, removal of rust, cutting, bending, binding, including supplying annealed wire, placing M.S rods in position complete job as per specifications and direction of E/I.
Assuming 1.00 M.T
(i). T.M.T Fe -500 8 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 48200.00 50610.00
(B). i. Annealed wire 14 Kg 49.12 687.68 M-072
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 9301.60
Add 1% Cess 0.00
Say Rs 71312.30 Per M.T
(j). T.M.T Fe -500 10 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 46300.00 48615.00
(B). i. Annealed wire 14 Kg 49.12 687.68 M-072
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 9002.35
Add 1% Cess 0.00
Say Rs 69018.00 Per M.T
(k). T.M.T Fe -500 12 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 45700.00 47985.00
(B). i. Annealed wire 14 Kg 49.12 687.68
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 8907.85
Add 1% Cess 0.00
Say Rs 68293.50 Per M.T
(l). T.M.T Fe -500 16 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 45700.00 47985.00
(B). i. Annealed wire 14 Kg 49.12 687.68
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 8907.85
Add 1% Cess 0.00
Say Rs 68293.50 Per M.T
(m). T.M.T Fe -500 20 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 45700.00 47985.00
(B). i. Annealed wire 14 Kg 49.12 687.68 M-072
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 8907.85
Add 1% Cess 0.00
Say Rs 68293.50 Per M.T
(n). T.M.T Fe -500 25 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 45700.00 47985.00
(B). i. Annealed wire 14 Kg 49.12 687.68
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 8907.85
Add 1% Cess 0.00
Say Rs 68293.50 Per M.T
(o). T.M.T Fe -500- 28 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 45700.00 47985.00
(B). i. Annealed wire 14 Kg 49.12 687.68
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 8907.85
Add 1% Cess 0.00
Say Rs 68293.50 Per M.T
(p). T.M.T Fe -500 32 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 45700.00 47985.00
(B). i. Annealed wire 14 Kg 49.12 687.68
ii Black smith Gr II 9 nos 541.00 4869.00
iii. Head black smith 1 nos 660.00 660.00
iv. Skilled mazdoor 8 nos 541.00 4328.00
v Unskilled mazdoor 2 nos 428.00 856.00
Add Overhead charge & C.P@15% 8907.85
Add 1% Cess 0.00
Say Rs 68293.50 Per M.T
5.8.6(a) Providing weep holes with dry graded Stone metal filter of 20 mm to 40 mm siz in abutment and wing wall as per specification and direction of E/I
Stone metal filter 20 mm to 40 mm 0.113 M3 714.84 80.78 M-011
Fitting and cost of Wire netting @ 20% of above 16.16
Add Overhead charge & C.P@15% 14.54
Add 1% Cess 0.00
Say Rs 111.50 Each
Sl.No. Description Quantity Unit Rate Amount Ref.
5.4.2 Brick work in designation 100 A Brick with cement mortar (1 : 4 ) in foundation with approved quality of coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curing, scaffolding and its removal wherever required including royaliy and all taxes etc. complete job as per specification and direction of E / I.
Taking Out put=2.832 Cum
Head mason 0.125 nos 660.00 82.50
Mason Gr II 2.5 nos 541.00 1352.50
Unskilled mazdoor 5 nos 428.00 2140.00
Bhisti 1 nos 417.00 417.00
Add Overhead charge & C.P@15% 2052.22
Add 1% Cess 0.00
Say Rs 5555.70 Per M3
5.4.6 Brick work in designation 100 A Brick with cement mortar (1 : 4 ) in superstructure with approved quality of coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curing, scaffolding and its removal wherever required including royaliy and all taxes etc. complete job as per specification and direction of E / I.
Taking Out put =2.832 Cum
Head mason 0.125 nos 660.00 82.50
Mason Gr II 2.5 nos 541.00 1352.50
Unskilled mazdoor 6 nos 428.00 2568.00
Bhisti 1 nos 417.00 417.00
Add Overhead charge & C.P@15% 2116.42
Add 1% Cess 0.00
Say Rs 5729.50 Per M3
Sl.No. Description Quantity Unit Rate Amount
5.5.2 Providing 12 mm thick cement plaster (1: 4) with approved quality sand of requisite F.M . washed and screened including curing, scaffolding wherever required and its removal, royalty and all taxes etc. complete job as per specification and direction of E / I.
Taking Out put =9.30 Sqm
Mason Gr II 1 nos 541.00 541.00
Unskilled mazdoor 1.5 nos 428.00 642.00
Bhisti 0.5 nos 417.00 208.50
Add Overhead charge & C.P@15% 261.83
Add 1% Cess 0.00
Say Rs 215.80 Per M2
5.7 PITCHING AND PILING
Sl.no Description Quantity Unit Rate Amount
5.7.1 Labour for making 150 mm to 200 mm dia Sal ballah piles including cutting to size and dressing, making shoes for driving etc.all complete as per specification and direction of E/I.
Unit :-Per Pile
Taking Out put =10 Piles
Carpenter Gr II 0.5 nos 541.00 270.50
Add Overhead charge & C.P@15% 40.58
Add 1% Cess 0.00
Say Rs 31.10 Per pile
5.7.2 Providing two coats of coal tar painting over 150 mm to 200 mm dia Sal ballah piles and labour for driving it below ground level up to 5 metre including cost of all tools and plants required for the job all complete as per specification and direction of E / I.
Taking Out put =30.5 M
Coal tar 9 Kg 30.00 270.00 BCD324
Unskilled mazdoor 18 nos 428.00 7704.00
Add Overhead charge & C.P@15% 1262.70
Add 1% Cess 0.00
Say Rs 317.40 Per M
5.7.3 Labour for fitting and fixing 100 mm to 150 mm dia sal ballah cross pieces 1350 mm length in position with 16 mm dia bolts, nuts and washers at each joints including the cost of bolts nuts and washers complete job as per specification and direction of E / I.
Taking Out put =13.7 M
(Assuming 10 nos. of piles)
Total nos. of joints 2x10 =20 nos
Length of one cross pipe = 1.37 mtr
Hence total length 10 x 1.37 metre =13.7 mtr
Nuts and bolts 16 mm dia 375 mm long with washer etc. 20 nos 36.35 727.00 M-265
Carpenter Gr II 0.5 nos 541.00 270.50
Unskilled mazdoor 0.5 nos 428.00 214.00
Add Overhead charge & C.P@15% 181.73
Add 1% Cess 0.00
Say Rs 101.70 Per M
5.7.4 Labour for fitting and fixing 150 mm dia sal ballah in position as back stay with 16 mm dia bolts, nuts and washers at each joints including the cost of bolts nuts and washers complete job as per specification and direction of E / I.
Taking Out put =48.80 M
(Assuming 10 nos. of back stay each of 4.88 mt )
Total nos. of joints 3x10 =30 nos
Length of back stay including 2 % wastage =49.8 m
Nuts and bolts 16 mm dia 375 mm long with washer etc. 30 nos 36.35 1090.5 M-265
Carpenter Gr II 1 nos 541.00 541.00
Unskilled mazdoor 1 nos 428.00 428.00
Add Overhead charge & C.P@15% 308.93
Add 1% Cess 0.00
Say Rs 48.50 Per M
5.7.5 Labour for fitting and fixing 100 mm to 150 mm dia sal ballah walling pieces with 16 mm dia bolts, nuts and washers at each joints including the cost of bolts nuts and washers complete job as per specification and direction of E / I.
Taking Out put:- 6.10 Mtr
(Assuming 6.10 mtr long walling pieces)
Total nos. of joints with vertical pile at 1.22 mtr = 6 nos.
Nuts and bolts 16 mm dia 375 mm long with washer etc. 6 nos 36.35 218.10 M-265
Carpenter Gr II 0.125 nos 541.00 67.63
Unskilled mazdoor 0.125 nos 428.00 53.5
Add Overhead charge & C.P 15 % 50.88
Add Labour Cess 0 % 0.00
Say Rs 64.00 Per M
5.7.6 Labour for fitting and fixing 150 mm to 200 mm dia sal ballah piles with two nos 16 mm dia 225 mm long nuts and washers including the cost of bolts nuts and washers complete job as per specification and direction of E / I.
Taking Out put:- 10.00 Joints
(Assuming 10 joints )
Nuts and bolts 16 mm dia 225 mm long with washer etc. 20 nos 36.35 727.00 M-265
Carpenter Gr II 0.5 nos 541.00 270.50
Unskilled mazdoor 0.25 nos 428.00 107.00
Add Overhead charge & C.P 15 % 165.68
Add Labour Cess 0 % 0.00
Say Rs 127.00 Per M
5.7.7 Labour for cutting 62 mm to 75 mm dia bamboo piles to size and making shoes and driving etc. complete job as per specification and direction of E / I.
Taking Out put =30.50M
(Assuming 20 nos. pile sunk 1.525 mtr deep )
Total depth sunk 30.50 meter
Carpenter Gr II 0.25 nos 541.00 135.25
Unskilled mazdoor for pilling 2.5 nos 428.00 1070.00
Add Overhead charge & C.P@15% 180.79
Add 1% Cess 0.00
Say Rs 45.40 Per M
5.7.9 Labour for fitting and fixing 62mm to 75 mm dia bamboo runners in position at every vertical pile with 150 mm long nails or 38 swg G.I. wire including cost of G.I. wire or nails complete job as per specification and direction of E / I.
Taking Out put =30.50M
Cost of 150 mm long nails 0.5 Kg 58.00 29.00
Carpenter Gr II 0.125 nos 541.00 67.63
Unskilled mazdoor 0.25 nos 428.00 107
Add Overhead charge & C.P@15% 30.54
Add 1% Cess 0.00
Say Rs 7.70 Per M
5.7.10 Providing two coats of coal tar painting over 150 mm to 200 mm dia Sal ballah piles and labour for driving it below ground level in running water upto complete job as per specification and direction of E/I. (Assuming 30.5 meter of piles)
Taking Out put=30.50 M
Coal tar 9 Kg 30.00 270.00 BCD324
Unskilled mazdoor 28 nos 428.00 11984.00
Hire charge of 2 nos of boat of 40 quintal 2 nos 714.00 1428.00 PM66001
Add Overhead charge & C.P@15% 2118.90
Add 1% Cess 0.00
Say Rs 532.60 Per M
5.7.11 Labour for fitting and fixing 75 mm dia sal ballah runners on sal ballah verticals including cost of nails or spikes for fixing the same complete job as per specification and direction of E / I.
Taking Out put =30.50M
Cost of nails or spikes 2 Kg 58.00 116.00
Carpenter Gr II 0.75 nos 541.00 405.75
Unskilled mazdoor 0.75 nos 428.00 321.00
Add Overhead charge & C.P@15% 126.41
Add 1% Cess 0.00
Say Rs 31.80 Per M
5.7.12 Labour for fitting and fixing 75 mm but upto 150 mm dia sal ballah runners on sal ballah verticals including cost of nails or spikes for fixing the same complete job as per specification and direction of E / I.
Taking Out put =30.50M
Cost of nails or spikes 4 Kg 58.00 232.00
Carpenter Gr II 1 nos 541.00 541.00
Unskilled mazdoor 1 nos 428.00 428.00
Add Overhead charge & C.P@15% 180.15
Add 1% Cess 0.00
Say Rs 45.30 Per M
5.7.13(b) Labour for laying River bed Material (30 % sand and 70% Quarry spall) including light ramming etc.all complete job as per specification and direction of E / I.
Taking Out put =1 Cum
Unskilled mazdoor 0.75 nos 428.00 321.00
Add Overhead charge & C.P@15% 48.15
Add 1% Cess 0.00
Say Rs 369.20 Per M3
5.7.14 Providing brick flat soling with designation 100A bricks joints filled with coarse sand of approved quality including royalty and all taxes, all complete as per approved design, specifications and direction of E/I
Taking Out put =9.30 Sqm
Bricks 300 per%0nos 5123.00 1536.90
Local Sand 0.142 M3 143.32 20.35
Mason Gr II 0.50 nos 541.00 270.50
Unskilled mazdoor 1.00 nos 428.00 428.00
Add Overhead charge & C.P15% 338.36
Add 1% Cess 0.00
Say Rs 278.90 Per M2
5.7.14 Based B/S By Salvage Bricks Providing brick flat soling with designation 100A bricks joints filled with coarse sand of approved quality including royalty and all taxes, all complete as per approved design, specifications and direction of E/I
Taking Out put =9.30 Sqm
Bricks 300 per%0nos 6430.00 1929.00
Local Sand 0.142 M3 143.32 20.35
Mason Gr II 0.50 nos 541.00 270.50
Unskilled mazdoor 1.00 nos 428.00 428.00
Add Overhead charge & C.P15% 397.18
Add 1% Cess 0.00
Say Rs 327.40 Per M2
5.7.15 Providing brick on edge soling with designation 100A bricks joints filled with coarse sand of approved quality including royalty and all taxes, all complete as per approved design, specifications and direction of E/I
Taking Out put = 9.30 Sqm
Bricks 500 per%0nos 5123.00 2561.50
Local Sand 0.283 M3 143.32 40.56
Mason Gr II 0.625 nos 541.00 338.13
Unskilled mazdoor 1.25 nos 428.00 535.00
Add Overhead charge & C.P@15% 521.28
Add 1% Cess 0.00
Say Rs 429.70 Per M2
5.7.15 Based B/S By Salvage Bricks Providing brick on edge soling with designation 100A bricks joints filled with coarse sand of approved quality including royalty and all taxes, all complete as per approved design, specifications and direction of E/I
Taking Out put = 9.30 Sqm
Bricks 500 per%0nos 0.00 0.00
Local Sand 0.283 M3 143.32 40.56
Mason Gr II 0.625 nos 541.00 338.13
Unskilled mazdoor 1.25 nos 428.00 535.00
Add Overhead charge & C.P@15% 137.05
Add 1% Cess 0.00
Say Rs 113.00 Per M2
5.7.16 Providing pitching work with designation 100A bricks in panel and in herring bond pattern one brick on edge over a brick flat soling joints filled with local sand free from clay contents including royalty and all taxes, all complete as per approved design, specifications and direction of E/I
Taking Out put =9.30 Sqm
Bricks 800 per%0nos 5123.00 4098.40
Local Sand 0.425 M3 143.32 60.91
Mason Gr II 1.125 nos 541.00 608.63
Unskilled mazdoor 2.25 nos 428.00 963.00
Add Overhead charge & C.P@15% 859.64
Add 1% Cess 0.00
Say Rs 708.70 Per M2
5.7.16 Based B/S By Salvage Bricks Providing pitching work with designation 100A bricks in panel and in herring bond pattern one brick on edge over a brick flat soling joints filled with local sand free from clay contents including royalty and all taxes, all complete as per approved design, specifications and direction of E/I
Taking Out put =9.30 Sqm
Bricks 800 per%0nos 0.00 0.00
Local Sand 0.425 M3 143.32 60.91
Mason Gr II 1.125 nos 541.00 608.63
Unskilled mazdoor 2.25 nos 428.00 963.00
Add Overhead charge & C.P@15% 244.88
Add 1% Cess 0.00
Say Rs 201.90 Per M2
5.7.17 Providing pitching work with designation 100A Bricks in panel two brick on edge over a brick flat soling joints filled with local sand free from clay contents including royalty and all taxes, all complete as per approved design, specifications and direction of E/I
Taking Out put =9.30 Sqm
Bricks 1300 per%0nos 5123.00 6659.90
Local Sand 0.556 M3 143.32 79.69
Mason Gr II 2.00 nos 541.00 1082.00
Unskilled mazdoor 4.50 nos 428.00 1926.00
Add Overhead charge & C.P@15% 1462.14
Add 1% Cess 0.00
Say Rs 1205.30 Per M2
5.7.18.2 Labour charge for pitching work on apron slope of bank with stone boulder duly packed (Uncreated complete job ) materials within 50 m lead with all lifts, all complete as per approved design, specifications and direction of E/I
Taking Out put = 2.832 Cum
Unskilled mazdoor for carrying and laying boulder 2 nos 428.00 856.00
Mason Gr II 0.50 nos 541.00 270.50
Stone dresser 0.25 nos 541.00 135.25
Add Overhead charge & C.P@15% 205.91
Add 1% Cess 0.00
Say Rs 557.40 Per M3
5.7.24.2 Labour charge for pitching above water in apron and slope of bank with bricks packed in crates of specified size ( material within 50 M lead and all lifts ) including boxing and tying the crates with 12 to 14 gauge G.I wire including cost of G.I wire all complete as per approved design, specifications and direction of E/I
Taking Out put = 2.832 Cum
Skilled mazdoor 1.00 nos 541.00 541.00
Unskilled mazdoor 2.00 nos 428.00 856.00
Black smith Gr II 0.25 nos 541.00 135.25
Cost of 12 to 14 gauge binding wire for binding crate 0.30 Kg 75.04 22.51
Add Overhead charge & C.P@15% 249.86
Add 1% Cess 0.00
Say Rs 676.40 Per M3
5.7.29.1 Supplying fitting and packing jhawa bush wood ,Kans grass or local wood brush in bundle of 600 mm die tied with coir string as per specification including loading, unloading, stacking and carriage up to 1 K.M. lead etc.all complete job as per approved design, specifications and direction of E/I
Taking Out put =2.832 Cum
1. Cost of 2.832 cum of Jhankhi
Carriage for 1 K .M lead
Hire charge of bullock cart per day 136.60
Taking lead of 1 km and speed 2 km per hour
Nos. of trips per day =8/(2/S(L+3/4) )= 4.56 trip
Cost per trip= Hire charges/4.56=136.6/4.56= 29.96
Assuming bullock cart capacity as jhawa bush wood 1.70 cum
Carriage cost per 2.832 cum =Cost per trip x 2.832 /1.70 49.90
2. Cost of coir string 0.5 Kg 31.25 15.63 M-229
Unskilled mazdoor for loading, unloading
and placing 0.5 nos 428.00 214.00
Unskilled mazdoor for cutting jhankhi 0.33 nos 428.00 141.24
Add Overhead charge & C.P@15% 63.12
Add 1% Cess 0.00
Say Rs 170.90 Per M3
5.7.29.2 Extra for carriage of jhankhi for subsequent K.M. beyond initial 1st K.M.by bullock cart.
Unit :-Per Km per Cum
Taking Out put =2.832 Cum
Assuming 5 K.M lead
Nos of trips per day=8/(2/S(L+3/4) )= 1.4 trip
Hire charge of bullock cart per day 136.60 Rs
Cost per trip= Hire charges/1.4=136.6/1.4= 97.57 Rs
Assuming bullock cart capacity as jhawa bush wood 1.7 cum
Carriage cost for 5 K.M lead = Cost per trip x 2.832 /1.70 162.54 162.54
Hence rate for each subsequent K.M. beyond 1 k.m
(Carriage cost for 5 k.m-Carriage cost for 1 k.m)/4*2.832 9.94
Add Overhead charge & C.P@15% 1.49
Add 1% Cess 0.00
Say Rs 11.40 Per K.M Per M3
5.7.32.A (a).Labour charge for making crates box of size 3m x 1.5m x 0.6m including cutting of G.I wire or B.A wire, weaving of wire to make it taranga wire having 150 mm square mesh with double knot with 8 & 10 S.W.G. wire as per approved design, specifications and direction of E/I
As per T.E.C.letter no 33 dated 8.4.06 )
Taking Out put =10 nos.
Black smith Gr II for weaving the wire roll for cutting the taragana wire to size 2 nos 541.00 1082.00
Unskilled mazdoor for weaving the wire, as helper in making creates & tying joints 3 nos 428.00 1284.00
Add Overhead charge & C.P@15% 354.90
Add 1% Cess 0.00
Say Rs 272.10 Each
5.7.36.2 Supplying wire mesh crates of size 3 M x 1.5 M x 0.60 M and 150 mm square mesh made out of G.I wire 10 S.W.G. double knot at each joints in box type etc. all complete as per approved design, specifications and direction of E/I
As per T.E.C.letter no 37 dated 30.4.06 )
Cost of one M.T. of G.I Wire of 10 S.W.G
including carriage 1 M.T 78770.00 M-224 (i)
Av nos of crate manufactured 58 nos 58 nos
Materials cost of one box=Cost of 1 M.T G.I wire/58 1358.10
Labour charge as item 5.7.32.A 236.60
Add Overhead charge & C.P@15% 239.21
Add 1% Cess 0.00
Say Rs 1833.90 Each
5.7.38.2 Supplying wire mesh crates of size 3 M x 1.5 M x 0.60 M and 150 mm square mesh made out of Black annealed wire 10 S.W.G. double knot at each joints in box type etc. all complete as per approved design, specifications and direction of E/I
As per T.E.C.letter no 37 dated 30.4.06 )
Cost of one M.T. of B.A Wire of 10 S.W.G
including carriage 1 M.T 78770.00
Average nos of crate manufactured= 58nos 58 nos
Materials cost of one box=Cost of 1 M.T G.I wire/58 1358.10
Labour charge as item 5.7.32.A 236.60
Add Overhead charge & C.P@15% 239.21
Add 1% Cess 0.00
Say Rs 1833.90 Each
5.7.44 Earth work in cutting and making slope in all kinds of soil with all leads and lifts as per specifications and direction of E/I
Taking Out put =28.32 Cum
Unskilled mazdoor for cutting earth 4 nos 428.00 1712.00
Unskilled mazdoor for carrying earth and clod breaking and rough dressing of slope 3 nos 428.00 1284.00
Add Overhead charge & C.P@15% 457.73
Add 1% Cess 0.00
Say Rs 123.90 Per M3
5.7.45.1 Providing and Laying of a Geo-textile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment materials through the voids of the stone pitching/cement concrete block as well as to allow free movement of water without creating any uplift head on the pitching as per specifications and direction of E/I
Vide T.E.C. letter no 48 (e) dated 10.05.04
Taking Out put =10.0 Sqm
Permeable synthetic Geotextile including 5 % for overlap and wastage 10.50 Sqm 84.55 887.78 M-109
Unskilled mazdoor 0.30 nos 428.00 128.40
Skilled mazdoor 0.10 nos 541.00 54.10
Add Overhead charge & C.P@15% 161.87
Add 1% Cess 0.00
Say Rs 124.10 Per M2
5.7.48 Based Providing , laying and filling Geo bags of size 1mx0.7m (Type A 300 GSM nonwoven) weight of bag 420 gm,volume of filled bag 0.07 cum, weight of filled Geo bag 126 kg with local sand including stiching in four lines by approved nylon thred with stiching machine and generator, stacking and placing in gabion of size 1.8mx1.8mx0.5m (18nos. Geo bags per gabion) after loading,unloading and carriage with the help of trolley within 150m lead including cess all complete as per specification and direction of E/I
A . Assuming out put of filling and stiching of 40 nos. of Geo Bags per day
Stiching Roll(Nylon) 2 nos 30.00 60.00
Unskilled labour for filling,stacking 2 nos 428.00 856.00
Skilled labour for stacking 0.33 nos 541.00 178.53
Unskilled labour for carrying and placing 4 nos 428.00 1712.00
Hire charge of Stiching Machine 0.33 day 50.00 16.50
Hire Charge of manual Trolley 1 day 50.00 50.00
Hire charge of 3 KVA Generator 2.67 hrs 74.00 197.58
Add Overhead charge & C.P@15% 477.24
Add 1% Cess 0.00
Rate per bag=Total/40 91.47
Cost of filling & stiching of 18 nos of Geo bags 18 nos 91.47 1646.48 A
Add Overhead charge & C.P@15% 519.10
Add 1% cess 0.00
Total(A+B) 5626.27
Rate Say,Rs 5626.00 Each
Cariage of Local Sand by Tractor
Formula Ls Lus Lk Rate Per m3 Rate Per M3 with royality
Finished Rate Unit Basic Rate of Gabion Carriage of Local Sand for 18 Nos Geo Bag Say
1 Including Local Sand Carriage Lead 1/2 Km(K) Per Gabion 5626.27 368.27 5994.50
2 Including Local Sand Carriage Lead 1 Km(K) Per Gabion 5626.27 405.52 6031.80
3 Including Local Sand Carriage Lead 1.00km (s)+1.00 Km(K) Per Gabion 5626.27 453.18 6079.40
4 Including Local Sand Carriage Lead 2.00km (s)+1.00 Km(K) Per Gabion 5626.27 500.85 6127.10
5.7.48 Based Providing , laying and filling Geo bags of size 1mx0.7m (Type A 300 GSM nonwoven) weight of bag 420 gm,volume of filled bag 0.07 cum, weight of filled Geo bag 126 kg with local sand including stiching in four lines by approved nylon thred with stiching machine and generator, stacking and placing in gabion of size 1.8mx1.2mx0.5m (12nos. Geo bags per gabion) after loading,unloading and carriage with the help of trolley within 150m lead including cess all complete as per specification and direction of E/I
A . Assuming out put of filling and stiching of 40 nos. of Geo Bags per day
Stiching Roll(Nylon) 2 nos 30.00 60.00
Unskilled labour for filling,stacking 2 nos 428.00 856.00
Skilled labour for stacking 0.33 nos 541.00 178.53
Unskilled labour for carrying and placing 4 nos 428.00 1712.00
Hire charge of Stiching Machine 0.33 day 50.00 16.50
Hire Charge of manual Trolley 1 day 50.00 50.00
Hire charge of 3 KVA Generator 2.67 hrs 74.00 197.58
Add Overhead charge & C.P@15% 477.24
Add 1% Cess 0.00
Rate per bag=Total/40 91.47
Cost of filling & stiching of 12 nos of Geo bags 12 nos 91.47 1097.66 A
Geo Bag 12 nos 83.06 996.72
Gabion 1.8mx1.2mx0.5m 1 nos 1427.60 1427.60 M-280
Add Overhead charge & C.P@15% 363.65
Add 1% cess 0.00
Total(A+B) 3885.62
Rate Say,Rs 3885.60 Each
Cariage of Local Sand by Tractor
Formula Ls Lus Lk Rate Per m3 Rate Per M3 with royality
Finished Rate Unit Basic Rate of Gabion Carriage of Local Sand for 12 Nos Geo Bag Say
1 Including Local Sand Carriage Lead 1/2 Km(K) Per Gabion 3885.60 245.51 4131.10
2 Including Local Sand Carriage Lead 1 Km(K) Per Gabion 3885.60 270.34 4155.90
3 Including Local Sand Carriage Lead 1.00km (s)+1.00 Km(K) Per Gabion 3885.60 302.12 4187.70
4 Including Local Sand Carriage Lead 2.00km (s)+1.00 Km(K) Per Gabion 3885.60 333.90 4219.50
5.7.52 Based Supply of New bag and N.C with labour for filling New E.C bag with local sand (volume of filled bag 1.2 cft and weight 50kg),stiching on two lines by approved nylon thread with stiching machine & generator,Stacking the bags and placing in Nylon crate of size (1mx1mx1m) with a lead of 150m including supply of nylon threads etc , placing the filled crates in dry portion within a lead of 30m,all complete as per approved design,specification and direction of E/I.
Unit - Each bag
Taking output of 100 nos filled new bags in 4 nos N.C
New E.C bag 100 nos 11.24 1124.00 M-291
Nylon Crate(N.C) 4 nos 41.00 164.00 M-276
Add Overhead charge &C.P @15% 193.20
Add 1% cess 0.00
Rate of material for each N.C(Totalx25/100) 370.30 A
Unskilled labour for filling,stiching & stacking 1.67 nos 428.00 714.76
Unskilled labour for crrying &placing at work site 3 nos 428.00 1284.00
Skilled labour for stiching 0.33 nos 541.00 178.53
Stiching Roll(Nylon) 2 nos 30.00 60.00
Hire Charge of Stiching Machine 0.33 day 50.00 16.50
Hire charge of Generator 3KVA 2.67 hrs 74.00 197.58
Add Overhead charge &C.P @15% 367.71
Add 1% cess 0.00
Rate for each N.C(Totalx25/100) 704.77 B
Rate for each N.C in dry portion (A+B) 1075.07
Cariage of Local Sand by Tractor
Formula Ls Lus Lk Rate Per m3 Rate Per M3 with royality
Finished Rate Unit Basic Rate of NC Carriage of Local Sand for 25 Nos EC Bag Say total
1 Including Local Sand Carriage Lead 1/2 Km(K) Per NC 1075.10 248.44 1323.50
2 Including Local Sand Carriage Lead 1 Km(K) Per NC 1075.10 273.56 1348.70
3 Including Local Sand Carriage Lead 1.00km (s)+1.00 Km(K) Per NC 1075.10 305.72 1380.80
4 Including Local Sand Carriage Lead 2.00km (s)+1.00 Km(K) Per NC 1075.10 337.88 1413.00
5.7.53 Based Supply of New bag with labour for filling New E.C bag with local sand (volume of filled bag 1.2 cft and weight 50kg),stiching on two lines by approved nylon thread with stiching machine & generator,Stacking the bags and placing with a lead of 150m including supply of nylon threads etc ,all complete as per approved design,specification and direction of E/I.
Taking output 100nos filled new bags
New E.C.Bag 100 nos 11.24 1124.00
Stiching Roll(Nylon) 2 nos 30.00 60.00
Unskilled labour for filling,stacking 1.67 nos 428.00 714.76
Unskilled labour for crrying &placing at work site 3 nos 428.00 1284.00
Skilled labour for stiching 0.33 nos 541.00 178.53
Hire Charge of Machine
Hire Charge of Stiching Machine 0.33 day 50.00 16.50
Hire charge of Generator 3KVA 2.67 hrs 74.00 197.58
Total (A+B+C) 3575.37
Add Overhead charge &C.P @15% 536.31
Add 1% cess 0.00
Rate for 100 nos. E.C (A+B+C) 4111.68
Cariage of Local Sand by Tractor
Formula Ls Lus Lk Rate Per m3 Rate Per M3 with royality
Finished Rate Unit Basic Rate of % Nos EC Carriage of Local Sand for 100 Nos EC Bag Say total
1 Including Local Sand Carriage Lead 1/2 Km(K) % Nos 4111.68 993.75 5105.40
2 Including Local Sand Carriage Lead 1 Km(K) % Nos 4111.68 1094.25 5205.90
3 Including Local Sand Carriage Lead 1.00km (s)+1.00 Km(K) % Nos 4111.68 1222.88 5334.60
4 Including Local Sand Carriage Lead 2.00km (s)+1.00 Km(K) % Nos 4111.68 1351.50 5463.20
5.7.54 Based Providing,laying & filling Geo bags of size 1mX0.7m (Type A 300GSM nonwoven) Weight 420gm,volume of filled bag 0.07 cum,weight of filledf Geo bag 126kg with local sand including stiching in four lines by approved Nylon thread with stiching machine and generator,stacking and placing after loading,unloading and carriage with the help of Trolly within 150m lead ,including cess, all complete as per specification and direction of E/I.
Taking output of 40 nos Geo bags
Stiching roll(nylon) 2 nos 30.00 60.00
Unskilled labour for filling,stacking 2 nos 428.00 856.00
Unskilled labour for crrying &placing at work site 4 nos 428.00 1712.00
Skilled labour for stiching 0.33 nos 541.00 178.53
Hire Charge of Machine
Hire Charge of Stiching Machine 0.33 nos 50.00 16.50
Hire Charge of manual Trolley 1 day 50.00 50.00
Hire charge of Generator 3KVA 2.67 hrs 74.00 197.58
Add Overhead charge &C.P @15% 975.60
Add 1% cess 0.00
Rate per geo Bag 186.99
say,Rs 187.00 Each
Cariage of Local Sand by Tractor
Formula Ls Lus Lk Rate Per m3 Rate Per M3 with royality
Finished Rate Unit Basic Rate of Each Geo Bag Carriage of Local Sand for Each Bag Say total
1 Including Local Sand Carriage Lead 1/2 Km(K) Each 187.00 20.46 207.50
2 Including Local Sand Carriage Lead 1 Km(K) Each 187.00 22.53 209.50
3 Including Local Sand Carriage Lead 1.00km (s)+1.00 Km(K) Each 187.00 25.18 212.20
4 Including Local Sand Carriage Lead 2.00km (s)+1.00 Km(K) Each 187.00 27.83 214.80
5.8 MISCELLANEOUS
Sl.No Description Quantity Unit Rate Amount Ref.
5.8.1 Supplying, fitting and fixing copper strip of 16 gauge of approved quality ( with 99 % purity ) in expansion joints complete job as per drawing, specifications and direction of E/I.
Furnishing and installing seal
A. Cost of copper seal and acessries
Size of copper seal 250 mm x 1.6 mm
weight per sq metre= 14.70 kg 14.7 kg
Weight of strips per linear metre Allowing 2.5 % for wastage and incidental to work )=0.25 x1x14.70 x1.025=3.77 kg.
i.Cost per linear metre.Including furnishing, storing, handling and cutting etc. 3.77 kg 896.80 3378.13 M-087
ii. Cost of bracing, washers and nails etc. per running metre @ 3 % of item (i) 101.34
Sub-Total 3479.48
B.Labour charge
Taking that 1/4 mason and 1 helper can place seal in one lift of 15 mtr in one shift.
Head mason. 0.25 nos 660.00 165.00
Helper 1 nos 444.00 444.00
Total labour charge 609.00
Total charge per mtr= total labour charge / 15 40.60
Total A+B 3520.08
Hence rate per kg =Total (A+B)/ wt. Of seal per mtr 934.48
Add Overhead charge & C.P@15% 140.17
Add 1% Cess 0.00
Hence rate per kg of copper seal 1074.70 Per kg
5.8.2 Supplying, fitting and fixing rubber seal of ( water stop ) of approved quality for construction joints expansion joints complete job as per drawing, specifications and direction of E/I.
Taking Out put =1 M
Cost of rubber seal 1 m 85.00 85.00
Add for overlapping and valcanizing 10 % of the materials cost 8.50
+ Add Overhead charge & C.P@15% 14.03
Add 1% Cess 0.00
Hence rate per mtr of rubber seal 107.50 Per mtr
5.8.5.1 Providing and driving steel sheet piles on specified alignment and upto designed levels including painting the sheet piles with two coats of anti- corrosive bitumen paint ( portion of sheet pile inside concrete shell not be painted ) including cost of sheet piles and hire charges of sheet pile driving plant etc. all complete as per specifications and direction of E/I . ( For the purpose of payment of sheet pile driving, measurement of sheet pile duly driven shall be taken only )
Assuming pilling that can be expected to be driven per hour= 48.25 x 6.70= 323.275 Kg
(Assuming I.S.P.S. 1625 U& pilling section vide I.S. 2314, 1963 )
Hourly use rate of sheet pile
Cost of Sheet Pile with 10 % wastage 1.1 M.T 60300.00 66330.00
Sheet pile Driving plant (x) 4504.00
B. (i). Cost of driving pile per M.T =(x)x1000 / 323.275 13932.41 Rs 13932.41
(ii). Shifting of 3 to 4 nos of pile per M.T at the place ready for driving @ 1.5 % of Sub item (i) Rs 208.99
(iii). Erecting pilling machines and dismantling @ 0.5 % of sub item (i) Rs 69.66
(iv). Depreciation charges for track fand wooden sleeper, fish plates, bolts dog spikes @ 0.5 % of sub item (i) Rs 69.66
(v). Depreciation charges forsupply of rails @ 1 % of sub item (i) Rs 139.32
(vi). Welding piles 3 to 4 nos @ 8 % of sub item b(i) Rs 1114.59
(vii). Cutting piles 2 to 4 nos @ 2 % of sub item (i) Rs 278.65
(viii). Driving hole 3 to 4 nos @ 0.5 % of sub item (i) Rs 69.66
(ix).Carriage of sheet piles 1 M.T. @ 2 % of sub item (i) Rs 278.65
C. Surface area of 1 M.T. sheet piles to be painted both side with anti-corrasive bitumen, paint
Length of sheet pile per M.T=1 x 1000 /48.25= 11.56 m
Area of both side of sheet piles=11.56 x 1.71 =20.72 sqm
Surface of sheet piles to be painted with two coats of bitumen ( Assuming 0.5 Kg / M2 =20.72x 0.5 = 10.36 Kg 47.80 495.16
D. Unskilled mazdoor 2 nos 428.00 856.00
Total (A+B+C+D) 83842.75
Add Overhead charge & C.P@15% 12576.41
Add 1% Cess 0.00
Say Rs 96419.20 Per M.T
5.8.6(a) Providing weep holes with dry graded Stone metal filter of 20 mm to 40 mm siz in abutment and wing wall as per specification and direction of E/I
Stone metal filter 20 mm to 40 mm 0.113 M3 937.15 105.90 M-011
Fitting and cost of Wire netting @ 20% of above 21.18
Add Overhead charge & C.P@15% 19.06
Add 1% Cess 0.00
Say Rs 146.10 Each
5.8.7 Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15 Metre lead and disposal of unserviceable materials with all leads. as per building specifications and direction of E/I.
Taking Out put =2.832 Cum
Semi skilled mazdoor 1 nos 444.00 444.00
Unskilled mazdoor 3 nos 428.00 1284.00
Add Overhead charge & C.P@15% 259.20
Add 1% Cess 0.00
Say Rs 701.70 Per M3
5.8.8 Dismantling plain cement or lime concrete work including stacking serviceable materials in stacks within 15 Metre lead and disposal of unserviceable materials with all leads. as per building specifications and direction of E/I.
Unit :-Per Cum Per M3
Taking Out put =2.832 Cum 2.832 Cum
Semi skilled mazdoor 3 nos 444.00 1332.00
Unskilled mazdoor 4 nos 428.00 1712.00
Add Overhead charge & C.P@15% 456.60
Add 1% Cess 0.00
Say Rs 1236.10 Per M3
5.8.9 Dismantling R.C.C work including stacking serviceable materials in stacks within 15 Metre lead and disposal of unserviceable materials with all leads. as per building specifications and direction of E/I.
Taking Out put =2.832 Cum
Hammer man 2.25 nos 444.00 999.00
Skilled mazdoor 2.25 nos 541.00 1217.25
Unskilled mazdoor 7 nos 428.00 2996.00
Blacksmith Gr II 1 nos 541.00 541.00
Add Overhead charge & C.P@15% 929.59
Add 1% Cess 0.00
Say Rs 2516.50 Per M3
5.8.10 Dismantling old plaster and pointing in cement or lime and raking out joints to 15 mm. depth, watering and disposal of unserviceable materials with all leads. as per building specifications and direction of E/I.
Taking Out put =9.30 Sqm
Semi skilled mazdoor 0.35 nos 444.00 155.40
Unskilled mazdoor 0.10 nos 428.00 42.80
Bhisti 0.06 nos 417.00 25.02
Add Overhead charge & C.P@15% 33.48
Add 1% Cess 0.00
Say Rs 27.60 Per M2
5.7.21.2* Based Labour charge for pitching above water in appron and slope of bank with boulder in crates of specified size ( material within 50 mtr lead and all lifts ) including boxing and tying the crates with 12 to 14 gauge G.I wire including cost of G.I wire all complete as per approved design,specifications and direction of E/I
Taking Out put:- 2.832 cum
Skilled mazdoor 1.00 nos 541.00 541.00
Unskilled mazdoor 2.00 nos 428.00 856.00
Black smith Gr II 0.25 nos 541.00 135.25
Stone dresser 0.25 nos 541.00 135.25
Cost of 12 to 14 gauge binding wire for binding crate 0.30 Kg 75.04 22.51
Add Overhead charge & C.P 15 % 270.15
Add Labour Cess0% 0.00
Say Rs 731.34 Per M3 (a)
Supply of Boulder
Cost of material Rs 675.00
Add 10% CP 67.5
Add Labour Cess 0 % 0.00
Total (a+b) 1473.80 Per M3
(b) Supply of mechanically woven double hexaganal Crate 3.00mx1.50mx0.60m)
Cost of material Rs 2070.000
Add Labour Cess 0 % 0.000
ABSTRACT OF COST
Construction of SLR Bridge on Jalwar River
SL. No. Item of Work Unit Quantity Rate Amount
1 Earth work in excavation of foundation trenches in odinary soil (vide clasification of soil item A ) and disposal of excavated earth so obtained to a diustance upto 50 mtr and average lift of 1.5 mtr including levelling , ramming the foundation trenches, removing the roots of shrubs etc. all complete as per specifications and direction of E/I.(5.1.27) M3 995.86 197.90 197,080.69
2 Providing and laying P.C.C. M-150 with nominal mix of (1:2:4 ) in foundation of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing., royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. (5:3:4) M2 28.67 6,415.90 183,943.85
3 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5:3 ) in foundation of various components of canal or embankment structures with approved quality of qraded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing., royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. (5.3.5) M3 188.66 6,929.60 1,307,338.34
4 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5.:3 ) in superstructure of various components of canal or embankment structures with approved quality of qraded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing., royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. (5.3.10) M3 205.38 6,929.60 1,423,201.25
5 Providing and laying P.C.C. or R.C.C M-250 with nominal mix of (1:1.:2 ) superstructure of various components of canal or embankment structures with approved quality of qraded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing., royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. (5.3.11) M3 25.99 8,128.80 211,267.51
6 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5:3 ) in deck slab with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing, royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. (5.3.13) M3 126.93 6,984.50 886,542.59
7 Providing shuttering including strutting. Proping etc. and its removal after use in foundation as per specifications and direction of E/I. (WRD - 5.3.18) M2 209.57 586.00 122,808.02
8 Providing shuttering including strutting. Proping etc. and its removal after use in various components of canal structure or embankment structure as per specifications and direction of E/I. (WRD - 5.3.19) M2 1,016.42 586.00 595,622.12
9 Providing centering including strutting. Proping etc. and removing after use in deck slab as per specifications and direction of E/I. (5.3.20) M2 230.79 790.70 182,485.65
10 Earth work in filling in foundation trenches and back filling of structures in layers not exceeding 150 mm thick well watered, rammed and fully compacted and finaly dressed with semi -pervious or suitable earth obtained after cutting of borrow pits within a lead of 30 mtr and lift of 1.5 mtr. complete job as per specifications and direction of E/I. (5.1.31) M3 778.53 151.10 117,635.88
11 Providing M.S reinforcement ( Tor steel ) as per approved design , drawing, removal of rust, cutting, bending, binding, including supplying annealed wire, placing M.S rods in position complete job as per specifications and direction of E/I. (WRD - 5.3.22)
(i) 6 mm dia. (Plain Steel) MT 0.089 78,297.40 6,968.47
12 Labour charge for pitching work on apron slope of bank with stone boulder duly packed (Uncreated complete job ) materials within 50 m lead with all lifts, all complete as per approved design, specifications and direction of E/I. (5.7.18.2) M3 564.00 548.30 309,241.20
13 Supply of Boulder M3 564.00 782.60 441,386.40
14 Providing and Laying of a Geo-textile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment materials through the voids of the stone pitching/cement concrete block as well as to allow free movement of water without creating any uplift head on the pitching as per specifications and direction of E/I (5.7.45.1) M2 2,047.50 124.10 254,094.75
15 Bitumen felt (Tar Felt) as per IS 7193 Grade II M2 91.14 77.00 7,017.78
16 Prov. 50 x 50 x 6 mm M.S Angle in expanssio Joint Kg 204.00 55.00 11,220.00 55
17 Carriage of Materials
a) Stone Chips (148 km from Domchanch) M3 495.93 3,543.70 1,757,427.14
b) Stone Boulder (105 km from Sekhpura) M3 564.00 2,597.90 1,465,215.60
c) Coarse Sand (90P + 1K) from Nadariganj M3 247.97 2,269.60 562,792.71
d) Cement and Steel (58 km Pucca) from Fatuha MT 266.48 1,096.80 292,275.26
Add 1% Labour Cess Rs.(B) ₹ 117,762.36
Add 10% Signorage Fee Rs.(C) ₹ 38,952.91
Add 18%GST Rs.(A+B+C) ₹ 2,147,931.14
For 04 Nos. SLR Bridge at 7.77 Km, 9.48 Km, 13.62 Km = ₹ 57,015,844.00
J.E. A.E. Executive Engineer
Irrigation Division Uderasthan
5.3.11 Providing and laying P.C.C. or R.C.C M-250 with nominal mix of (1:1:2 ) superstructure of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing, royalty etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I.
Taking Out put=2.832 Cum
Coarse aggregates ( 20 mm to 10 mm ) (Cost of coarse aggregate as per Design) 2.379 M3 937.15 2229.48 M-044
Head mason 0.5 nos 569.00 284.50 {S II -3}
Mason Gr II 1 nos 508.00 508.00 {S II- 4}
Unskilled mazdoor 12 nos 424.00 5088.00 {SI-1}
Bhisti 1 nos 417.00 417.00 S II-13
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 hr 362.00 517.66 {P M -21001}
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 hr 419.00 599.17 {P M -44001}
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
Add Overhead charge & C.P@15% 3027.25
Rate per cum Say Rs 8195.20 Per M3
5.3.21 Providing M.S reinforcement( Plain steel ) as per approved design , drawing, removal of rust, cutting, bending, binding, including supplying annealed wire, placing M.S rods in position complete job as per specifications and direction of E/I.
Assumng 1.00M.T
(a).Dia of bar 6mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 54400 57120 A M-126
(B). i. Annealed wire 14 Kg 49.12 687.68 M-072
ii Black smith Gr II 9 nos 508 4572
iv. Skilled mazdoor 8 nos 536 4288
v Unskilled mazdoor 2 nos 424 848
Totalof A+B 68084.68
Add Overhead charge & C.P@15% 10212.702
Say Rs 78297.40 Per M.T
7.1.32 Labour for Rolling and compacting the earth in layers of 225 mm thick at O.M.C. by road roller to achieve minimum 95 % of maximum dry density including sprinking the required quanting of wate making arrangement for supply and carriage of water with all leads and lift including finishing the surface with proper grade, camber or superelevation including, hire charges of compaction machine tanker and other tools and plants etc. all complete as per specifications and direction of E/I. .( Mode of measurement - Sectional measurement of compacted earth )
Assuming out put= 28.32.Cum
Bhisti fo carrige of water and sprinking 3.0 nos 417 1251.00
Cost of water 61.60
(B). Hire charge of Road roller for 100 cum
Assuming 566 cum to be rolled in 8 hrs (Vide item no 4.16a ) 0.40 hrs 1616.00 646.40 PM 8001
Add Overhead charge & C.P@15% 293.85
Add 1% cess 0.00
Say Rs 79.50 Per M3
5.3.11 Providing and laying P.C.C. or R.C.C M-250 with nominal mix of (1:1:2 ) superstructure of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing, royalty etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I.
Taking Out put=2.832 Cum
Coarse aggregates ( 20 mm to 10 mm ) (Cost of coarse aggregate as per Design) 2.379 M3 937.15 2229.48 M-044
Head mason 0.5 nos 660.00 330.00 {S II -3}
Mason Gr II 1 nos 541.00 541.00 {S II- 4}
Unskilled mazdoor 12 nos 428.00 5136.00 {SI-1}
Bhisti 1 nos 417.00 417.00 S II-13
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 hr 362.00 517.66 {P M -21001}
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 hr 419.00 599.17 {P M -44001}
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
Add Overhead charge & C.P@15% 3002.69
Rate per cum Say Rs 8128.80 Per M3
5.3.21 Providing M.S reinforcement( Plain steel ) as per approved design , drawing, removal of rust, cutting, bending, binding, including supplying annealed wire, placing M.S rods in position complete job as per specifications and direction of E/I.
Assumng 1.00M.T
(a).Dia of bar 6mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 54400 57120 A M-126
(B). i. Annealed wire 14 Kg 49.12 687.68 M-072
ii Black smith Gr II 9 nos 541 4869
ii Black smith Gr I 1 nos 660 660
iv. Skilled mazdoor 8 nos 541 4328
v Unskilled mazdoor 2 nos 428 856
Totalof A+B 68520.68
Add Overhead charge & C.P@15% 10278.10
Say Rs 78798.80 Per M.T
7.1.32 Labour for Rolling and compacting the earth in layers of 225 mm thick at O.M.C. by road roller to achieve minimum 95 % of maximum dry density including sprinking the required quanting of wate making arrangement for supply and carriage of water with all leads and lift including finishing the surface with proper grade, camber or superelevation including, hire charges of compaction machine tanker and other tools and plants etc. all complete as per specifications and direction of E/I. .( Mode of measurement - Sectional measurement of compacted earth )
Assuming out put= 28.32.Cum
Bhisti fo carrige of water and sprinking 3.0 nos 428 1284.00
Cost of water 61.60
(B). Hire charge of Road roller for 100 cum
Assuming 566 cum to be rolled in 8 hrs (Vide item no 4.16a ) 0.40 hrs 1616.00 646.40 PM 8001
Add Overhead charge & C.P@15% 298.80
Add 1% cess 0.00
Say Rs 79.50 Per M3
EARTHEN MASONARY AND COCRETE DAM WITH SPILLWAY OUTLET INTAKE WELL, SURGE TANK AND TUNNELLING ETC.
Sl.no. Description Quantity unit Rate amount Ref.
7.1.28 Labour for Rolling and compacting the earth in layers of 225 mm thicl at O.M.C. by road roller to achieve minimum 95 % of maximum dry density including sprinking the required quanting of water by tanker within 1 km. lead and all lifts including cost of water, finishing the surface with proper grade, camber or superelevation including, hire charges of compaction machine tanker and other tools and plants etc. all complete as per specifications and direction of E/I. .( Mode of measurement - Sectional measurement of compacted earth )
Assuming out put=100 Cum
(A). Watering for compaction
Assuming additional moisture required 7 % including 1 % loss. Quantity of water reqwired = 100 x 62.5x 35.3x7/10x100 =1544.38 gal for 100 cum fill 1544.38 Gal for 100 cm fill
One lmp gail = 10 lbs
capacity of tanker 8000 gallon
Bound trip time for 8000 gal tankar =
Filling time 16 mts
Hauling (1 km ) 16 km / hr 3.75 mts
Returning Time @ 24 kmh 2.5 mts
Sprinkling Time at 500 gpm 16 mts
lost time 6 mts
Total time 44.25 mts
Quantity hauled per hour ( 50 mts )= 50 x 8000/44.25=9040 gallon 9040 gallon
Use Rate of tanker (vide item 3.29b ) 707.00
Cost of water 0.26 Per gallon
Rate per 100 cum fill=1544.38x Use rate of tanker/9040 gallom+cost of water per gallonx1544.38 515.36
(B). Hire charge of Road roller for 100 cum
Assuming 566 cum to be rolled in 8 hrs (Vide item no3.16a ) 1.41 hrs 1518.00 2145.58
Add Overhead charge & C.P@15% 399.14
Add 1% cess 0.00
Say Rs 30.60 Per M3
7.1.30 Labour for Rolling and compacting the earth in layers of 225 mm thicl at O.M.C. by road roller to achieve minimum 90 % of maximum dry density including sprinking the required quanting of water by tanker within 1 km. lead and all lifts including cost of water, finishing the surface with proper grade, camber or superelevation including, hire charges of compaction machine tanker and other tools and plants etc. all complete as per specifications and direction of E/I. .( Mode of measurement - Sectional measurement of compacted earth )
Assuming out put=100 Cum fill
(A). Watering for compaction
Assuming additional moisture required 7 % including 1 % loss. Quantity of water reqwired = 100 x 62.5x 35.3x7/10x100 =1544.38 gal for 100 cum fill 1544.38 Gal for 100 cm fill
One lmp gail = 10 lbs
capacity of tanker 8000 gallon
Bound trip time for 8000 gal tankar =
Filling time 16 mts
Hauling (1 km ) 16 km / hr 3.75 mts
Returning Time @ 24 kmh 2.5 mts
Sprinkling Timeat 500 gpm 16 mts
lost time 6 mts
Total time 44.25 mts
Quantity hauled per hour ( 50 mts )= 50 x 8000/44.25=9040 gallon 9039.55 gallon
Use Rate of tanker (vide item 3.29b ) 707.00
Cost of water = Rs 500 / gallon 0.255 Per gallon
Rate per 100 cum fill=1544.38x Use rate of tanker/9040 gallom+cost of water per gallonx1544.38 515.36
(B). Hire charge of Road roller for 100 cum
Assuming 623 cum to be rolled in 8 hrs (Vide item no 4.16a ) 1.28 hrs 1518.00 1943.04
Add Overhead charge & C.P@15% 368.76
Add 1% cess 0.00
Say Rs 28.30 Per M3
5.6.1 Labour for laying, fitting and fixing NP2 pipe with collars in line level and grade as well providing approved jointing materials and joints properly filled to make them water proof all complete as per specification and direction of E / I.
5.6.1.7 900 mm dia or 1000 mm dia NP2 H.P
Taking Out put =7.5 M
(Assuming 3 pipes of 2.5 mtr length and 2 collars)
Head Mason 2 nos 660.00 1320.00
Unskilled mazdoor 12 nos 428.00 5136.00
Fitter Gr I 0.75 nos 660.00 495.00
Add Overhead charge & C.P@15% 1131.79
Add 1% Cess 0.00
Say Rs 1156.90 Per M
5.6.2 Labour for laying, fitting and fixing NP3 pipe with collars in line level and grade as well providing approved jointing materials and joints properly filled to make them water proof all complete as per specification and direction of E / I. (Hume pipe available within a lead of 40 mtr )
5.6.2.4 900 mm dia or 1000 mm dia NP3 H.P
Taking Out put=7.5 M
(Assuming 3 pipes of 2.5 mtr length and 2 collars)
Labour cement punning
Head Mason 2 nos 660.00 1320.00
Unskilled mazdoor 21 nos 428.00 8988.00
Fitter Gr I 1 nos 660.00 660.00
Add Overhead charge & C.P@15% 1734.34
Add 1% Cess 0.00
Say Rs 1772.90 Per M
5.1.2 Preparation of borrow areas of embankment or canals by removing the grass and the jungle, bushes from the top including weeding out shrubs including roots and levelling all complete as per specifications and direction of E/I.
Taking Out put:- 92.94 Sqm
Unskilled mazdoor for levelling and ploughing 0.75 nos 428.00 321.00
Add Overhead charge & C.P 15 % 48.15
Add Labour Cess 1 % 0.00
Say Rs 4.00 Per M2
5.1.3 Jungle clearance and weeding out shurbs including small tree upto 0.50 mtr girth and removal as per specifications and direction of E/I.
Taking Out put:- 92.94 Sqm
Unskilled mazdoor for cutting shrubs and trees 1.50 nos 428.00 642.00
Unskilled mazdoor for collecting and removing shrubs and weeds and tree. 0.75 nos 428.00 321.00
Add Overhead charge & C.P 15 % 144.45
Add Labour Cess 1 % 0.00
Say Rs 11.90 Per M2
5.1.43* Jungle clearence in borrow area, building premises;flanks, slope of existing road and canal etc,embankment by removing the jungle , bushes from top including weedind out shurbs including roots and levelling complete job as per specifications and direction of E/I.
Taking Out put:- 92.94 Sqm
Unskilled mazdoor for carring 0.75 nos 428.00 321.00
Add Overhead charge & C.P 15 % 48.15
Add Labour Cess 1 % 0.00
Say Rs 4.00 Per M2
5.1.47* Earth work by excavtor and spreader or tractor- leveller in lower level canal or flood embankment or dhar ( Like, Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not neaded ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in odinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with.all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth )
(A) Cost of cutting, loading , unloading & placing by excavator 1 M3 capacity
Use rate of Excavator 2202.00 Per hrour
Output of Excavator per hrour 60 Cum
(B) Cost of spreading by D-80 Dozer
Use rate of D-80 Dozer 2930.00 Per hrour
Output of D-80 Dozer per hrour 300 Cum
( C) For dressing & finishing one labour for 100 M3
Unskilled labour 0.01 no 428.00 4.28
Add Overhead charge & C.P 15 % 7.61
Add Labour Cess 1 % 0.00
Say Rs 58.40 Per M3
NOTE :- Add Royality of Earth Rs 33.00 Where needed without overhead charge & C.P
5.7.7 Labour for cutting 62 mm to 75 mm dia bamboo piles to size and making shoes and driving etc. complete job as per specification and direction of E / I.
Taking Out put:- 30.50 Mtr
(Assuming 20 nos. pile sunk 1.525 mtr deep )
Total depth sunk 30.50 meter
Carpenter Gr II 0.25 nos 541.00 135.25
Unskilled mazdoor for pilling 2.5 nos 428.00 1070.00
Add Overhead charge & C.P 15 % 180.79
Add Labour Cess 1 % 0.00
Say Rs 45.40 Per M
5.7.8 Labour for fitting and fixing splite bamboo nwoven chachari in position with 20 swg G.I. wire or 75 mm to 100 mm long nails alternatively including cost of G.I. wire or nails complete job as per specification and direction of E / I.
Taking Out put:- 9.30 Sqm
(Assuming strip of 3.05x3.05 = 9.30 sqm )
75 mm to 100 mm long nails 0.25 Kg 58.00 14.50
Carpenter Gr II 1 nos 541.00 541.00
Unskilled mazdoor 1 nos 428.00 428.00
Add Overhead charge & C.P 15 % 147.53
Add Labour Cess 1 % 0.00
Say Rs 121.60 Per M2
5.7.9 Labour for fitting and fixing 62mm to 75 mm dia bamboo runners in position at every vertical pile with 150 mm long nails or 38 swg G.I. wire including cost of G.I. wire or nails complete job as per specification and direction of E / I.
Taking Out put:- 30.50 Mtr
Cost of 150 mm long nails 0.5 Kg 58.00 29.00
Carpenter Gr II 0.125 nos 541.00 67.63
Unskilled mazdoor 0.25 nos 428.00 107
Add Overhead charge & C.P 15 % 30.54
Add Labour Cess 1 % 0.00
Say Rs 7.70 Per M
5.7.29.1 Supplying fitting and packing jhawa bush wood kans grass or local wood brush in bundle of 600 mm dia tied with coir string as per specification including loading, unloding, stacking and carriage upto 1 K.M. lead etc.all complete job as per approved design,specifications and direction of E/I
Taking Out put:- 2.832 cum
1. Cost of 2.832 cum of Jhankhi
Carriage for 1 K .M lead
Hire charge of bullock cart per day 136.60 Rs
Taking lead of 1 km and speed 2 km per hour
Nos. of trips per day =8/(2/S(L+3/4) )= 4.56 trip
Cost per trip= Hire charges/4.56=136.6/4.56= 29.96 Rs
Assuming bullock cart capacity as jhawa bush wood 1.70 cum
Carriage cost per 2.832 cum =Cost per trip x 2.832 /1.70 49.90
2. Cost of coir string 0.5 Kg 31.25 15.63
Unskilled mazdoor for loading, unloading
and placing 0.5 nos 428.00 214.00
Unskilled mazdoor for cutting jhankhi 0.33 nos 428.00 141.24
Add Overhead charge & C.P 15 % 63.12
Add Labour Cess 1 % 0.00
Say Rs 170.90 Per M3
5.7.29.2 Extra for carriage of jhankhi for subsequent K.M. beyond initial 1st K.M.by bullock cart.
Unit :- Per K.M Per M3
Taking Out put:- 2.832 cum
Assuming 5 K.M lead
Nos of trips per day=8/(2/S(L+3/4) )= 1.4 trip
Hire charge of bullock cart per day 136.60 Rs
Cost per trip= Hire charges/1.4=136.6/1.4= 97.57 Rs
Assuming bullock cart capacity as jhawa bush wood 1.7 cum
Carriage cost for 5 K.M lead cost per = Cost per trip x 2.832 /1.70 = 162.54 162.54
Hence rate for each subsequent K.M. beyond 1 k.m
(Carriage cost for 5 k.m-Carriage cost for 1 k.m)/4*2.832 9.94
Add Overhead charge & C.P 15 % 1.49
Add Labour Cess 1 % 0.00
Say Rs 11.40 Per M3
5.7.39.3 Carriage of Filled E.C Bags by boat including loading, unloading and stacking with lead of 1/2 K.M.all complete as per approved design, specifications and direction of E/I
Unit :- Per % nos
Taking Out put:- 600 nos
Assuming Six trips per day by 40 quintal
Capacity of boat Filled E.C Bags carried in each trip100 nos filled E.C Bags
Total carried per day=6 x100=600 nos
Hire charge of 40 Qt Boat 1 Day 1882.40 1882.4
Unskilled mazdoor for loading and unloading 17 nos 428.00 7276.00
Add Overhead charge & C.P 15 % 1373.76
Add Labour Cess 1 % 0.00
Say Rs 1755.40 Per % No
5.7.40.1 (For old empty cement bag) Labour for filling empty cement bags with local sand, stitching the bags and placing including supply of sutli etc. all complete as per approved design, specifications and direction of E/I
Unit :-Per % nos
Taking Out put =100 nos
(a)For filling & stitching & stacking
Unskilled mazdoor for filling sand into bags and sewing 2 nos 428.00 856.00
Sutali 0.5 Kg 22.05 11.03
Add Overhead charge & C.P@15% 130.05
Add 1% Cess 0.00
say Rs. 997.10 Per % nos (a)
(b)Labour rate for carrying & placing filled E.C.Bags
Unskilled mazdoor for carrying filled bags and placing to work site 3 nos 428.00 1284.00
Add Overhead charge & C.P@15% 192.60
Add 1% Cess 0.00
say,Rs 1476.60 Per % nos (b)
Total (a+b) 2473.70 Per % nos
5.7.40.2 (For old empty cement bag) Labour for filling empty cement bags with local sand, stitching the bags and placing in Nylon crate of size (1 m x 1 m x 1 m ) with a lead of 150 M including supply of sutli etc. at site in dry portion all complete as per approved design, specifications and direction of E/I
Unit :-Each N.C
Taking Out put =25 nos.filled E.C Bags in each N/C
Cost of 25 nos of filled E.C.Bag (vide item no 5.7.40.1) 25 nos 2473.70 618.43 618.43
Say Rs 618.40 Each N.C
5.7.40.3 (For old empty cement bag) Labour for filling empty cement bags with local sand, stitching the bags and placing in Nylon crate of size (1 m x 1 m x 1 m ) with a lead of 150 M including supply of sutli etc.and placing the filled crates in water portion within a lead 30 M , all complete as per approved design, specifications and direction of E/I
Unit :-Each N.C
(i) Labour Cost for filling bags in one Nylon crate in dry portion (vide item no 5.7.40.2) 1 nos 618.40 618.40 (i)
(ii).Placing of filled N/C with 30 m lead in water Portion
a. Skilled mazdoor 1 No 541.00 541.00
b.Unskilled mazdoor 1 No 428.00 428.00
Add Overhead charge & C.P@15% 169.99
Add 1% Cess 0.00
Hence, Total Labour for 100cft 1303.27
Taking one E.C.bags to contain 1.20 cft of Sand
Hence, labour rate for placing one filled N.C 390.98 390.98 (ii)
Hence rate Per Nylon crate in water Portion( i+ii) 1009.38 1009.38
Say Rs 1009.40 Each
5.7.53 (For New E.C. Bag) Supply of New bag with labour for filling New E.C bag with local sand (volume of filled bag 1.2 cft and weight 50kg),stiching on two lines by approved nylon thread with stiching machine & generator,Stacking the bags and placing with a lead of 150m including supply of nylon threads etc ,all complete as per approved design,specification and direction of E/I
Unit :-Per % nos
Taking Out put =100 nos
(a) For filling & stitching & stacking
New E.C.Bag 100 nos 0.0000 0.00 Departmental
Stiching Roll(Nylon) 2 nos 30.00 60.00
Hire Charge of Machine
Hire Charge of Stiching Machine 0.33 day 50.00 16.50
Hire charge of Generator 3KVA 2.67 hrs 74.00 197.58
Skilled labour for stiching 0.33 nos 541.00 178.53
Unskilled labour for filling & stacking 1.67 nos 428.00 714.76
Total A+B 1167.37
Add Overhead charge & C.P@15% 175.11
Add 1% Cess 0.00
say Rs. 1342.50 Per % nos A
(b) Labour rate for carrying & placing filled E.C.Bags
Unskilled mazdoor for carrying filled bags and placing to work site 3 nos 428.00 1284.00
Add Overhead charge & C.P@15% 192.60
Add 1% Cess 0.00
say,Rs 1476.60 Per % nos B
Total (A+B) 2819.10 Per % nos
5.7.52 (For New Empty cement bag) Labour for filling New E.C bag with local sand (volume of filled bag 1.2 cft and weight 50kg),stiching on two lines by approved nylon thread with stiching machine & generator,Stacking the bags and placing in Nylon crate of size (1mx1mx1m) with a lead of 150m including supply of nylon threads etc , placing the filled crates in dry portion within a lead of 30m,all complete as per approved design,specification and direction of E/I.
Unit :-Each N.C
Taking Out put =25 nos.filled E.C Bags in each N/C
New E.C bag 100 nos 0 0.00
Nylon Crate(N.C) 4 nos 0.00 0.00
Add Overhead charge &C.P @15% 0.00
Add 1% cess 0.00
Rate of material for each N.C(Totalx25/100) 0.00 A
Unskilled labour for filling,stiching & stacking 1.67 nos 428.00 714.76
Unskilled labour for crrying &placing at work site 3 nos 428.00 1284.00
Skilled labour for stiching 0.33 nos 541.00 178.53
Stiching Roll(Nylon) 2 nos 30.00 60.00
Hire Charge of Stiching Machine 0.33 day 50.00 16.50
Hire charge of Generator 3KVA 2.67 hrs 74.00 197.58
Add Overhead charge &C.P @15% 367.71
Add 1% cess 0.00
Total 2819.08 B
Total (A+B) 2819.08
Rate for each N.C in dry portion (Totalx25/100) 25 nos 2819.10 704.78 704.78
Say Rs 704.80 Each N.C
Rate for each N.C in dry portion (Totalx25/100) from Stack 25 nos 1476.60 369.15 369.15
Say Rs 369.20 Each N.C
5.7.49 (For New empty cement bag) Labour for filling new empty cement bags with local sand, stitching on two lines by approved nylon thread with stiching machine & generator ,stacking the bags and placing in Nylon crate of size (1 m x 1 m x 1 m ) with a lead of 150 M including supply of sutli etc.and placing the filled crates in water portion within a lead 30 M , all complete as per approved design, specifications and direction of E/I
Unit :-Each N.C
(i) Labour Cost for filling bags in one Nylon crate in dry portion (vide item no 5.7.52) 1 nos 704.80 704.80 (i)
(ii).Placing of filled N/C with 30 m lead in water Portion
a. Skilled mazdoor 1 No 541.00 541.00
b.Unskilled mazdoor 1 No 428.00 428.00
Add Overhead charge & C.P@15% 169.99
Add 1% Cess 0.00
Hence, Total Labour for 100cft 1303.27
Taking one E.C.bags to contain 1.20 cft of Sand
Hence, labour rate for placing one filled N.C 390.98 390.98 (ii)
Hence rate Per Nylon crate in water Portion( i+ii) 1095.78 1095.78
Say Rs 1095.80 Each
Rate for each N.C in Water portion (Totalx25/100) from Stack 760.18 0 0
Say Rs 760.00 Each N.C
5.7.45.2 Laying of a Geo-textile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment materials through the voids of the stone pitching/cement concrete block as well as to allow free movement of water without creating any uplift head on the pitching as per specifications and direction of E/I
Taking Out put:- 10 Sqm
Unskilled mazdoor 0.30 nos 428.00 128.40
Skilled mazdoor 0.10 nos 541.00 54.10
Add Overhead charge & C.P 15 % 28.71
Add Labour Cess 1 % 0.00
Say Rs 22.00 Per M2
5.7.46(c)* Supplying and Placing bamboo roll each roll of 4 nos uncleaned full bamboo 75 mm dia 6 m to 8 m long at site binding properly each other in bunch with G.I Wire 8 to 10 SWG at least at three places along its length, 3 nos loads filled with sand in empty cement bags and tying it with G.I .Wire 20 to 25 SWG launching in river and placing in position and tying the bamboo roll at one end at least 15 M away from river bank to baboo post , including Piling, including Piling of baboo post ,including all taxes and royality etc and carriage of all materials at site all complete job as per specifications and direction of E/I
Assuming one nos of baboo roll
Bamboo 75 mm dia 6 m to 8 m long 4.25 Nos 137.55 584.59
Annealed wire 20 to 25 SWG 0.5 Kg 78.77 39.39
B.A.Wire 8 to 10 SWG 1.125 Kg 0.00 0.00 Departmental
E.C.bags 3 Nos 0 0.00 Departmental
Local sand Taking compact volume 0.75 cft per bags 0.06 Cum 143.32 9.17
Unskilled labour for Tying and Placing etc. 0.5 Nos 428.00 214.00
Unskilled Laour for filling E.C.Bags 0.06 Nos 428.00 25.68
Add Overhead charge & C.P 15 % 130.92
Add Labour Cess 1 % 0.00
Say Rs 1003.70 Each
Rate Including Royality 1003.70 Each
5.7.47(c) Supplying making and Placing in position Tree branches and Jhankhi covering over all space of about of 2.832 M3 providing 3 nos of loads by filling Local sand in E.C bags, tying with 20 to 25 SWG Annealed wire to the tree spur and anchoring the same with B.A .Wire 8 to 10 SWG to the bamboo post at least 15 M away from the river bank, including Piling of bamboo post ,including all taxes and royality etc and carriage of all materials at site all complete job as per specifications and direction of E/I
Assuming 10 nos Tree branches
Cost of Tree branches of dia150 mm to 200 mm and 3 M to 4.5 M long with jhankhi covering the space of 100 cft in volume 10 Nos 0.00 0.00
Bamboo 75 mm dia 6 m to 8 m long 3.25 Nos 137.55 447.04
Annealed wire 20 to 25 SWG 1.5 Kg 78.77 118.16
B.A.Wire 8 to 10 SWG 11.25 Kg 0.00 0.00 Departmental
E.C.bags 30 Nos 0.00 0.00 Departmental
Local sand Taking compact volume 0.75 cft per bags 0.64 Cum 143.32 91.72
Unskilled labour for Tying and Placing etc. 5 428.00 2140.00
Unskilled Labour for filling E.C.Bags 0.6 428.00 256.80
Add Overhead charge & C.P@15% 458.06
Add 1% Cess 0.00
Rate Including Royality 351.20 Each
5.7.13(b)* Labour for laying River bed Material (30 % sand And 70% Quarry spall) including light ramming etc.all complete job as per specification and direction of E / I.
Taking Out put:- 1 cun
Unskilled mazdoor 0.75 nos 428.00 321.00
Add Overhead charge & C.P 15 % 48.15
Add Labour Cess 1 % 0.00
Say Rs 369.20 Per M3 Use for Laying of Rubbish
5.7.14 Except bricks Supply Providing brick flat soling with designation 100A bricks joints filled with coarse sand of approved quality including royaltyand all taxes, all complete as per approved design,specifications and direction of E/I
Taking Out put:- 9.3 Sqm
Bricks 300 per%0nos 0.00 0.00
Local Sand 0.142 M3 143.32 20.35
Mason Gr II 0.50 nos 541.00 270.50
Unskilled mazdoor 1.00 nos 428.00 428.00
Add Overhead charge & C.P 15 % 107.83
Add Labour Cess 1 % 0.00
Say Rs 88.90 Per M2
Including Royality 88.90 Per M2
5.7.14 Providing brick flat soling with designation 100A bricks joints filled with coarse sand of approved quality including royaltyand all taxes, all complete as per approved design,specifications and direction of E/I
Taking Out put:- 9.3 Sqm
Bricks 300 per%0nos 5123.00 1536.90
Local Sand 0.142 M3 143.32 20.35
Mason Gr II 0.50 nos 541.00 270.50
Unskilled mazdoor 1.00 nos 428.00 428.00
Add Overhead charge & C.P 15 % 338.36
Add Labour Cess 1 % 0.00
Say Rs 278.90 Per M2
Including Royality 278.90 Per M2
5.7.15 Providing brick on edge soling with designation 100A bricks joints filled with coarse sand of approved quality including royaltyand all taxes, all complete as per approved design,specifications and direction of E/I
Taking Out put:- 9.3 Sqm
Bricks 500 per%0nos 5123.00 2561.50
Local Sand 0.283 M3 143.32 40.56
Mason Gr II 0.625 nos 541.00 338.13
Unskilled mazdoor 1.25 nos 428.00 535.00
Add Overhead charge & C.P 15 % 521.28
Add Labour Cess 1 % 0.00
Say Rs 429.70 Per M2
Rtae Including Royality 429.70 Per M2
5.7.32.A (a).Labour charge for making crates box of size 3m x 1.5m x 0.6m including cutting of G.I wire or B.A wire, weaving of wire to make it taranga wire having 150 mm square mesh with double knot with 8 & 10 S.W.G. wire as per approved design, specifications and direction of E/I
As per T.E.C.letter no 33 dated 8.4.06 )
Taking Out put =10 nos.
Black smith Gr II for weaving the wire roll for cutting the taragana wire to size 2 nos 541.00 1082.00
Unskilled mazdoor for weaving the wire, as helper in making creates & tying joints 3 nos 428.00 1284.00
Add Overhead charge & C.P@15% 354.90
Add 1% Cess 0.00
Say Rs 272.10 Each
5.9.4 Old Schedule Supplying and providing seasoned hill bamboo roof frame tied to rafter by string including the cost of all labour and materials all complete as per specification and direction
Taking Out put =9.30 m2
50 mm (avg) Normal bamboo 15 Nos 137.55 2063.25
Carpenter Gr-II 0.5 nos 541.00 270.50
Semi Skilled Mazdoor 0.5 nos 444.00 222.00
Unskilled Mazdoor 1 Nos 428.00 428.00
Add Overhead charge & C.P@15% 15 % 464.96
Add 1% Cess 0.00
Say Rs 383.30 Per M2
5.9.5 Old Schedule Providing 150 mm grass thatching over bamboo frame including laying grass uniformly in proper slope, typing with strings with split bamboo at the top including cost of all labour and materials (but excluding the cost of bamboo frame) taxes all complete as per building specification and direction of E/I
Taking Out put =9.30 m2
Grass 50 Bunches @2kg per Bunches 100 kg 4.96 496.00
Narial Srring 1.5 Kg 31.25 46.88
Bamboo (50 mm Avg) 1 nos 94.35 94.35
Skilled mazdoor 1 nos 541.00 541.00
Unskilled mazdoor 1 nos 428.00 428.00
Add Overhead charge & C.P@15% 15 % 240.93
Add 1% Cess 0.00
Say Rs 184.70 Per M2
5.7.48 Based Providing , laying and filling Geo bags of size 1mx0.7m (Type A 300 GSM nonwoven) weight of bag 420 gm,volume of filled bag 0.07 cum, weight of filled Geo bag 126 kg with local sand including stiching in four lines by approved nylon thred with stiching machine and generator, stacking and placing in gabion of size 1.8mx1.8mx0.5m (18nos. Geo bags per gabion) after loading,unloading and carriage with the help of trolley within 150m lead including cess all complete as per specification and direction of E/I
A . Assuming out put of filling and stiching of 40 nos. of Geo Bags per day
Stiching Roll(Nylon) 2 nos 30.00 60.00
Unskilled labour for filling,stacking 2 nos 428.00 856.00
Skilled labour for stacking 0.33 nos 541.00 178.53
Unskilled labour for carrying and placing 4 nos 428.00 1712.00
Hire charge of Stiching Machine 0.33 day 50.00 16.50
Hire Charge of manual Trolley 1 day 50.00 50.00
Hire charge of 3 KVA Generator 2.67 hrs 74.00 197.58
Add Overhead charge & C.P@15% 477.24
Add 1% Cess 0.00
Rate per bag=Total/40 91.47
Cost of filling & stiching of 18 nos of Geo bags 18 nos 91.47 1646.48 A
Geo Bag 18 nos 0.00 0.00 Dept.
Gabion 1 nos 0.00 0.00 Dept.
Add Overhead charge & C.P@15% 0.00
Add 1% cess 0.00
Total(A+B) 1646.48
Rate Say,Rs 1646.00 Each
5.7.54 Based Providing,laying & filling Geo bags of size 1mX0.7m (Type A 300GSM nonwoven) Weight 420gm,volume of filled bag 0.07 cum,weight of filledf Geo bag 126kg with local sand including stiching in four lines by approved Nylon thread with stiching machine and generator,stacking and placing after loading,unloading and carriage with the help of Trolly within 150m lead ,including cess, all complete as per specification and direction of E/I.
Taking output of 40 nos Geo bags
Geo bag 40 nos 0.00 0.00 Dept.
Stiching roll(nylon) 2 nos 30.00 60.00
Unskilled labour for filling,stacking 2 nos 428.00 856.00
Unskilled labour for crrying &placing at work site 4 nos 428.00 1712.00
Skilled labour for stiching 0.33 nos 541.00 178.53
Hire Charge of Machine
Hire Charge of Stiching Machine 0.33 nos 50.00 16.50
Hire Charge of manual Trolley 1 day 50.00 50.00
Hire charge of Generator 3KVA 2.67 hrs 74.00 197.58
Add Overhead charge &C.P @15% 477.24
Add 1% cess 0.00
Rate per geo Bag 91.47
say,Rs 91.50 Each
A Providing and laying of Bricks Bat
Taking output of 1.00 M3
Bricks Bat Including Royality 1.00 M3 1031.00 1031.00
Add 1% cess 0.00
5.7.13(b)* Labour for laying River bed Material (30 % sand And 70% Quarry spall) including light ramming etc.all complete job as per specification and direction of E / I.
Taking Out put:- 1 cun
Unskilled mazdoor 0.75 nos 428.00 321.00
Add Overhead charge & C.P 15 % 48.15
Add Labour Cess 1 % 0.00
Say Rs 369.20 Per M3 b
c Carriage of Biricks Bat by Tractor
Sr No Carriage of Bricks Bat Formula Lead Rate Per Per M3 Without Royality Say Rs
d Finished Rate of Bricks Bat
Including Lead Basic rate of Materials Labour Charge for laying Carriage of Bricks Bat Total (Per M3) Say Total
1 I/C Carriage lead upto 1/2 KmK by Tractor 1134.10 369.20 235.80 1739.10 1739.10
2 I/C Carriage lead upto 1 Km K by Tractor 1134.10 369.20 267.80 1771.10 1771.10
3 I/C Carriage lead upto 1 Km S by Tractor 1134.10 369.20 244.70 1748.00 1748.00
4 I/C Carriage lead upto 1 Km S+1 km US by Tractor 1134.10 369.20 296.10 1799.40 1799.40
5 I/C Carriage lead upto 1 Km S+1 km K by Tractor 1134.10 369.20 308.90 1812.20 1812.20
6 I/C Carriage lead upto 2 Km S+1 km K by Tractor 1134.10 369.20 349.90 1853.20 1853.20
7 I/C Carriage lead upto 3 Km S+1 km K by Tractor 1134.10 369.20 391.00 1894.30 1894.30
8 I/C Carriage lead upto 4 Km S+1 km K by Tractor 1134.10 369.20 432.00 1935.30 1935.30
9 I/C Carriage lead upto 5 Km S+1 km K by Tractor 1134.10 369.20 473.10 1976.40 1976.40
10 I/C Carriage lead upto 6 Km S+1 km K by Tractor 1134.10 369.20 514.10 2017.40 2017.40
11 I/C Carriage lead upto 7 Km S+1 km K by Tractor 1134.10 369.20 555.20 2058.50 2058.50
B Providing and laying of Rubbish
Taking output of 1.00 M3
Rubbish Including Royality 1.00 M3 160.00 160.00 M-007
Add 1% cess 0.00
5.7.13(b)* Labour for laying River bed Material (30 % sand And 70% Quarry spall) including light ramming etc.all complete job as per specification and direction of E / I.
Taking Out put:- 1 cun
Unskilled mazdoor 0.75 nos 428.00 321.00
Add Overhead charge & C.P 15 % 48.15
Add Labour Cess 1 % 0.00
Say Rs 369.20 Per M3 b
c Carriage of Rubbish by Tractor
Sr No Carriage of Rubbish Formula Lead Rate Per Per M3 Without Royality Say Rs
d Finished Rate of Rubbish
Including Lead Basic rate of Materials Labour Charge for laying Carriage Rate of Rubbish Total (Per M3) Say Total
1 I/C Carriage lead upto 1/2 KmK by Tractor 176.00 369.20 180.90 726.10 726.10
2 I/C Carriage lead upto 1 Km K by Tractor 176.00 369.20 205.50 750.70 750.70
3 I/C Carriage lead upto 1 Km S by Tractor 176.00 369.20 187.80 733.00 733.00
4 I/C Carriage lead upto 1 Km S+1 km US by Tractor 176.00 369.20 227.20 772.40 772.40
5 I/C Carriage lead upto 1 Km S+1 km K by Tractor 176.00 369.20 237.00 782.20 782.20
6 I/C Carriage lead upto 2 Km S+1 km K by Tractor 176.00 369.20 268.50 813.70 813.70
7 I/C Carriage lead upto 3 Km S+1 km K by Tractor 176.00 369.20 300.00 845.20 845.20
8 I/C Carriage lead upto 4 Km S+1 km K by Tractor 176.00 369.20 331.50 876.70 876.70
9 I/C Carriage lead upto 5 Km S+1 km K by Tractor 176.00 369.20 363.00 908.20 908.20
10 I/C Carriage lead upto 6 Km S+1 km K by Tractor 176.00 369.20 394.50 939.70 939.70
11 I/C Carriage lead upto 7 Km S+1 km K by Tractor 176.00 369.20 426.00 971.20 971.20
Supply of Materials
221 Bamboo Unit Revised Rate with ALL TAXES & ROYALITY Add CP 10% Say RS
i i. 75 mm dia 6m long to 8m long Each 137.55 151.31 151.30 Each
ii ii. 100 mm dia 6m long to 8m long Each 151.00 166.10 166.10 Each
iii iii. 50 mm dia Hill Bamboo Each 94.35 103.79 103.80 Each
M-004 Coarse sand at source quary Koilwar/Sone sand Per M3 494.00 543.40 543.40 Per M3
M-044 Aggregates 20 mm to 10 mm Per M3 886.00 974.60 974.60 Per M3
Departmental Rate
275 Empty plastic cement bag(old) Per % nos 407.00 Per % nos
276 Nylon Crate of size 1mx1mx1m (As per Annex-I) Each 41.00 Each
277 Geo bag (non woven)size 1mx0.70m (As per Annex-II) nos 83.06 nos
279 P.P. Rope Gabion of size 1.80mx1.80mx0.5m (As per Annex-IV) nos. 1965.60 nos.
280 P.P.Rope Gabion of size 1.80mx1.20mx0.5m (As per Annex-V) Nos. 1427.60 Nos.
M-108 Geotextile filter fabric sqm 84.60 sqm
ii. Black annealed wire 3.15mm dia.( IS 280-78 ) Per kg. 78.80 Per kg.
Percupine Each Set 6328.80 Each Set
291 New empty cement Bag Conforming to IS 11652:2000 (Supply) Each 14.85 Each
Departmental supply Rate of given material mention below by DPT
1 New empty cement Bag Conforming to IS 11652:2000 (Supply) Each 14.85 For 2021
2 Nylon Crate of size 1mx1mx1m Each 65.00
Departmental supply Rate of given material mention below by DPT
1 New empty cement Bag Conforming to IS 11652:2000 (Supply) Each 11.70 DPT Lt. No. 02 dated 13.05.2022 For 2022
2 Nylon Crate of size 1mx1mx1m Each 47.85 DPT Lt. No. 05 dated 16.05.2022
3 Geo bag (1m x 0.7m) Each 110.00 DPT Lt. No. 10 dated 24.05.2022
5.1.1 Preparation of seat of embankment or canals by 75 mm ploughing and removing the grass roots etc.as per specifications and direction of E/I.
Taking Out put:- 92.94 Sqm
Unskilled mazdoor for levelling and ploughing 0.50 nos 428.00 214.00
Unskilled mazdoor for removing grass roots and levelling 0.75 nos 428.00 321.00
Add Overhead charge & C.P 15 % 80.25
Add Labour Cess 1 % 0.00
Say Rs 6.60 Per M2
5.1.2 Preparation of borrow areas of embankment or canals by removing the grass and the jungle, bushes from the top including weeding out shrubs including roots and levelling all complete as per specifications and direction of E/I.
Taking Out put:- 92.94 Sqm
Unskilled mazdoor for levelling and ploughing 0.75 nos 428.00 321.00
Add Overhead charge & C.P 15 % 48.15
Add Labour Cess 1 % 0.00
Say Rs 4.00 Per M2
5.1.3 Jungle clearance and weeding out shurbs including small tree upto 0.50 mtr girth and removal as per specifications and direction of E/I.
Taking Out put:- 92.94 Sqm
Unskilled mazdoor for cutting shrubs and trees 1.50 nos 428.00 642.00
Unskilled mazdoor for collecting and removing shrubs and weeds and tree. 0.75 nos 428.00 321.00
Add Overhead charge & C.P 15 % 144.45
Add Labour Cess 1 % 0.00
Say Rs 11.90 Per M2
5.1.9 Earth work in filling for the maintaenance of canals having minimum full supply discharge upto 28 cumecs (1000 cusecs ) and flood embankment in odinary soil (vide clasification of soil item A ) including clod breaking having earth in 225 mm layers and rough dressing of soil with all leads and lift all complete as per specifications and direction of E/I.
As per labour deptt .Norms (Vide T.E.C no 63 dt 7.10.94 )
Taking Out put:- 28.32 Cum
Unskilled mazdoor for cutting, carring 9.09 nos 428.00 3890.52
Add Overhead charge & C.P 15 % 583.58
Add Labour Cess 1 % 0.00
Without Royality on Earth 158.00
Add Royality on Earth 33.00
Say Rs 191.00 Per M3
5.1.43* Jungle clearence in borrow area, building premises;flanks, slope of existing road and canal etc,embankment by removing the jungle , bushes from top including weedind out shurbs including roots and levelling complete job as per specifications and direction of E/I.
Taking Out put:- 92.94 Sqm
Unskilled mazdoor for carring 0.75 nos 428.00 321.00
Add Overhead charge & C.P 15 % 48.15
Add Labour Cess 1 % 0.00
Say Rs 4.00 Per M2
5.1.47* Earth work by excavtor and spreader or tractor- leveller in lower level canal or flood embankment or dhar ( Like, Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not neaded ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in odinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with.all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth )
(A) Cost of cutting, loading , unloading & placing by excavator 1 M3 capacity
Use rate of Excavator 2202.00 Per hrour
Output of Excavator per hrour 60 Cum
(B) Cost of spreading by D-80 Dozer
Use rate of D-80 Dozer 2930.00 Per hrour
Output of D-80 Dozer per hrour 300 Cum
( C) For dressing & finishing one labour for 100 M3
Unskilled labour 0.01 no 428.00 4.28
Add Overhead charge & C.P 15 % 7.61
Add Labour Cess 1 % 0.00
Say Rs 58.40 Per M3
NOTE :- Add Royality of Earth Rs 33.00 Where needed without overhead charge & C.P
5.7.7 Labour for cutting 62 mm to 75 mm dia bamboo piles to size and making shoes and driving etc. complete job as per specification and direction of E / I.
Taking Out put:- 30.50 Mtr
(Assuming 20 nos. pile sunk 1.525 mtr deep )
Total depth sunk 30.50 meter
Carpenter Gr II 0.25 nos 541.00 135.25
Unskilled mazdoor for pilling 2.5 nos 428.00 1070.00
Add Overhead charge & C.P 15 % 180.79
Add Labour Cess 1 % 0.00
Say Rs 45.40 Per M
5.7.8 Labour for fitting and fixing splite bamboo nwoven chachari in position with 20 swg G.I. wire or 75 mm to 100 mm long nails alternatively including cost of G.I. wire or nails complete job as per specification and direction of E / I.
Taking Out put:- 9.30 Sqm
(Assuming strip of 3.05x3.05 = 9.30 sqm )
75 mm to 100 mm long nails 0.25 Kg 58.00 14.50
Carpenter Gr II 1 nos 541.00 541.00
Unskilled mazdoor 1 nos 428.00 428.00
Add Overhead charge & C.P 15 % 147.53
Add Labour Cess 1 % 0.00
Say Rs 121.60 Per M2
5.7.9 Labour for fitting and fixing 62mm to 75 mm dia bamboo runners in position at every vertical pile with 150 mm long nails or 38 swg G.I. wire including cost of G.I. wire or nails complete job as per specification and direction of E / I.
Taking Out put:- 30.50 Mtr
Cost of 150 mm long nails 0.5 Kg 58.00 29.00
Carpenter Gr II 0.125 nos 541.00 67.63
Unskilled mazdoor 0.25 nos 428.00 107
Add Overhead charge & C.P 15 % 30.54
Add Labour Cess 1 % 0.00
Say Rs 7.70 Per M
5.7.29.1 Supplying fitting and packing jhawa bush wood kans grass or local wood brush in bundle of 600 mm dia tied with coir string as per specification including loading, unloding, stacking and carriage upto 1 K.M. lead etc.all complete job as per approved design,specifications and direction of E/I
Taking Out put:- 2.832 cum
1. Cost of 2.832 cum of Jhankhi
Carriage for 1 K .M lead
Hire charge of bullock cart per day 136.60 Rs
Taking lead of 1 km and speed 2 km per hour
Nos. of trips per day =8/(2/S(L+3/4) )= 4.56 trip
Cost per trip= Hire charges/4.56=136.6/4.56= 29.96 Rs
Assuming bullock cart capacity as jhawa bush wood 1.70 cum
Carriage cost per 2.832 cum =Cost per trip x 2.832 /1.70 49.90
2. Cost of coir string 0.5 Kg 31.25 15.63
Unskilled mazdoor for loading, unloading
and placing 0.5 nos 428.00 214.00
Unskilled mazdoor for cutting jhankhi 0.33 nos 428.00 141.24
Add Overhead charge & C.P 15 % 63.12
Add Labour Cess 1 % 0.00
Say Rs 170.90 Per M3
5.7.29.2 Extra for carriage of jhankhi for subsequent K.M. beyond initial 1st K.M.by bullock cart.
Unit :- Per K.M Per M3
Taking Out put:- 2.832 cum
Assuming 5 K.M lead
Nos of trips per day=8/(2/S(L+3/4) )= 1.4 trip
Hire charge of bullock cart per day 136.60 Rs
Cost per trip= Hire charges/1.4=136.6/1.4= 97.57 Rs
Assuming bullock cart capacity as jhawa bush wood 1.7 cum
Carriage cost for 5 K.M lead cost per = Cost per trip x 2.832 /1.70 = 162.54 162.54
Hence rate for each subsequent K.M. beyond 1 k.m
(Carriage cost for 5 k.m-Carriage cost for 1 k.m)/4*2.832 9.94
Add Overhead charge & C.P 15 % 1.49
Add Labour Cess 1 % 0.00
Say Rs 11.40 Per M3
5.7.39.3 Carriage of Filled E.C Bags by boat including loading, unloading and stacking with lead of 1/2 K.M.all complete as per approved design, specifications and direction of E/I
Unit :- Per % nos
Taking Out put:- 600 nos
Assuming Six trips per day by 40 quintal
Capacity of boat Filled E.C Bags carried in each trip100 nos filled E.C Bags
Total carried per day=6 x100=600 nos
Hire charge of 40 Qt Boat 1 Day 5712.00 5712
Unskilled mazdoor for loading and unloading 17 nos 428.00 7276.00
Add Overhead charge & C.P 15 % 1948.20
Add Labour Cess 1 % 0.00
Say Rs 2489.40 Per % No
5.7.40.1 (For old empty cement bag) Labour for filling empty cement bags with local sand, stitching the bags and placing including supply of sutli etc. all complete as per approved design, specifications and direction of E/I (volume of filled E.C. bag 1.0 cft )
Unit :-Per % nos
Taking Out put =100 nos
(a)For filling & stitching & stacking
Unskilled mazdoor for filling sand into bags and (2/1.2) sewing 1.67 nos 428.00 714.76
Add Overhead charge & C.P@15% 108.87
Add 1% Cess 0.00
say Rs. 834.70 Per % nos (a)
(b) Labour rate for carrying & placing filled E.C.Bags
Unskilled mazdoor for carrying filled bags and placing to work site (3/1.2) 2.5 nos 428.00 1070.00
Add Overhead charge & C.P@15% 160.50
Add 1% Cess 0.00
say,Rs 1230.50 Per % nos (b)
Total (a+b) 2065.20 Per % nos
5.7.40.2 (For old empty cement bag) Labour for filling empty cement bags with local sand, stitching the bags and placing in Nylon crate of size (1 m x 1 m x 1 m ) with a lead of 150 M including supply of sutli etc. at site in dry portion all complete as per approved design, specifications and direction of E/I
Unit :-Each N.C
Taking Out put =25 nos.filled E.C Bags in each N/C
Cost of 25 nos of filled E.C.Bag (vide item no 5.7.40.1) from EC bag filling, stacking & placing in NC 25 nos 2065.20 516.3 516.30
Say Rs 516.30 Each N.C
Cost of 25 nos of filled E.C.Bag (vide item no 5.7.40.1) from filled Stacked E.C. Bag 25 nos 1230.50 307.63 307.63
307.60 Each N.C
5.7.40.3 (For old empty cement bag) Labour for filling empty cement bags with local sand, stitching the bags and placing in Nylon crate of size (1 m x 1 m x 1 m ) with a lead of 150 M including supply of sutli etc.and placing the filled crates in water portion within a lead 30 M , all complete as per approved design, specifications and direction of E/I
Unit :-Each N.C
(i) Labour Cost for filling bags in one Nylon crate in dry portion (vide item no 5.7.40.2) 1 nos 516.30 516.30 (i)
(ii).Placing of filled N/C with 30 m lead in water Portion
a. Skilled mazdoor 1 No 541.00 541.00
b.Unskilled mazdoor 1 No 428.00 428.00
Add Overhead charge & C.P@15% 169.99
Add 1% Cess 0.00
Hence, Total Labour for 100cft 1303.27
Taking one E.C.bags to contain 1.00 cft of Sand
Hence, labour rate for placing one filled N.C 325.82 325.82 (ii)
Hence rate Per Nylon crate in water Portion( i+ii) 842.12 842.12
Say Rs 842.10 Each
5.7.53 (For New E.C. Bag) Supply of New bag with labour for filling New E.C bag with local sand (volume of filled bag 1.2 cft and weight 50kg),stiching on two lines by approved nylon thread with stiching machine & generator,Stacking the bags and placing with a lead of 150m including supply of nylon threads etc ,all complete as per approved design,specification and direction of E/I (volume of filled E.C. bag 1.0 cft )
Unit :-Per % nos
Taking Out put =100 nos
(a) For filling & stitching & stacking
New E.C.Bag 100 nos 0.0000 0.00 Departmental
Stiching Roll(Nylon) 2 nos 30.00 60.00
Hire Charge of Machine
Hire Charge of Stiching Machine 0.33 day 50.00 16.50
Hire charge of Generator 3KVA 2.67 hrs 74.00 197.58
Skilled labour for stiching 0.33 nos 541.00 178.53
Unskilled labour for filling & stacking (1.67/1.2) 1.39 nos 428.00 594.92
Total A+B 1047.53
Add Overhead charge & C.P@15% 157.13
Add 1% Cess 0.00
say Rs. 1204.70 Per % nos A
(b) Labour rate for carrying & placing filled E.C.Bags
Unskilled mazdoor for carrying filled bags and placing to work site (3/1.2) 2.50 nos 428.00 1070.00
Add Overhead charge & C.P@15% 160.50
Add 1% Cess 0.00
say,Rs 1230.50 Per % nos B
Total (A+B) 2435.16 Per % nos
5.7.52 (For New Empty cement bag) Labour for filling New E.C bag with local sand (volume of filled bag 1.2 cft and weight 50kg),stiching on two lines by approved nylon thread with stiching machine & generator,Stacking the bags and placing in Nylon crate of size (1mx1mx1m) with a lead of 150m including supply of nylon threads etc , placing the filled crates in dry portion within a lead of 30m,all complete as per approved design,specification and direction of E/I.
Unit :-Each N.C
Taking Out put =25 nos.filled E.C Bags in each N/C
New E.C bag 100 nos 0 0.00
Nylon Crate(N.C) 4 nos 0.00 0.00
Add Overhead charge &C.P @15% 0.00
Add 1% cess 0.00
Rate of material for each N.C(Totalx25/100) 0.00 A
Unskilled labour for filling & stacking (1.67/1.2) 1.39 nos 428.00 594.92
Unskilled labour for crrying & placing at work site (3/1.2) 2.5 nos 428.00 1070.00
Skilled labour for stiching 0.33 nos 541.00 178.53
Stiching Roll(Nylon) 2 nos 30.00 60.00
Hire Charge of Stiching Machine 0.33 day 50.00 16.50
Hire charge of Generator 3KVA 2.67 hrs 74.00 197.58
Add Overhead charge &C.P @15% 317.63
Add 1% cess 0.00
Total 2435.16 B
Total (A+B) 2435.16
Rate for each N.C in dry portion (Totalx25/100) 25 nos 2435.16 608.79 608.79
Say Rs 608.80 Each N.C
Rate for each N.C in dry portion (Totalx25/100) from Stack 25 nos 1230.50 307.63 307.63
Say Rs 307.60 Each N.C
5.7.49 (For New empty cement bag) Labour for filling new empty cement bags with local sand, stitching on two lines by approved nylon thread with stiching machine & generator ,stacking the bags and placing in Nylon crate of size (1 m x 1 m x 1 m ) with a lead of 150 M including supply of sutli etc.and placing the filled crates in water portion within a lead 30 M , all complete as per approved design, specifications and direction of E/I
Unit :-Each N.C
(i) Labour Cost for filling bags in one Nylon crate in dry portion (vide item no 5.7.52) 1 nos 608.80 608.80 (i)
(ii).Placing of filled N/C with 30 m lead in water Portion
a. Skilled mazdoor 1 No 541.00 541.00
b.Unskilled mazdoor 1 No 428.00 428.00
Add Overhead charge & C.P@15% 169.99
Add 1% Cess 0.00
Hence, Total Labour for 100cft 1303.27
Taking one E.C.bags to contain 1.00 cft of Sand
Hence, labour rate for placing one filled N.C 325.82 325.82 (ii)
Hence rate Per Nylon crate in water Portion( i+ii) 934.62 934.62
Say Rs 934.60 Each
5.7.44 Earth work in cutting and making slope in all kinds of soil with all leads and lifts as per specifications and direction of E/I
Taking Out put:- 28.32 cum
Unskilled mazdoor for cutting earth 4 nos 428.00 1712.00
Unskilled mazdoor for carring earth and clod breaking
and rough dressingof slope 3 nos 428.00 1284.00
Add Overhead charge & C.P 15 % 457.73
Add Labour Cess 1 % 0.00
Say Rs 123.90 Per No
5.7.45.2 Laying of a Geo-textile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment materials through the voids of the stone pitching/cement concrete block as well as to allow free movement of water without creating any uplift head on the pitching as per specifications and direction of E/I
Taking Out put:- 10 Sqm
Unskilled mazdoor 0.30 nos 428.00 128.40
Skilled mazdoor 0.10 nos 541.00 54.10
Add Overhead charge & C.P 15 % 28.71
Add Labour Cess 1 % 0.00
Say Rs 22.00 Per M2
5.7.46(c)* Supplying and Placing bamboo roll each roll of 4 nos uncleaned full bamboo 75 mm dia 6 m to 8 m long at site binding properly each other in bunch with G.I Wire 8 to 10 SWG at least at three places along its length, 3 nos loads filled with sand in empty cement bags and tying it with G.I .Wire 20 to 25 SWG launching in river and placing in position and tying the bamboo roll at one end at least 15 M away from river bank to baboo post , including Piling, including Piling of baboo post ,including all taxes and royality etc and carriage of all materials at site all complete job as per specifications and direction of E/I
Assuming one nos of baboo roll
Bamboo 75 mm dia 6 m to 8 m long 4.25 Nos 137.55 584.59 M-229
Annealed wire 20 to 25 SWG 0.5 Kg 78.77 39.39 M-224(ii)
B.A.Wire 8 to 10 SWG 1.125 Kg 0.00 0.00 Departmental
E.C.bags 3 Nos 0 0.00 Departmental
Local sand Taking compact volume 0.75 cft per bags 0.06 Cum 0.00 0.00
Unskilled labour for Tying and Placing etc. 0.5 Nos 428.00 214.00
Unskilled Laour for filling E.C.Bags 0.06 Nos 428.00 25.68
Add Overhead charge & C.P 15 % 129.55
Add Labour Cess 1 % 0.00
Say Rs 993.20 Each
Rate 993.20 Each
5.7.47(c) Supplying making and Placing in position Tree branches and Jhankhi covering over all space of about of 2.832 M3 providing 3 nos of loads by filling Local sand in E.C bags, tying with 20 to 25 SWG Annealed wire to the tree spur and anchoring the same with B.A .Wire 8 to 10 SWG to the bamboo post at least 15 M away from the river bank, including Piling of bamboo post ,including all taxes and royality etc and carriage of all materials at site all complete job as per specifications and direction of E/I
Assuming 10 nos Tree branches
Cost of Tree branches of dia150 mm to 200 mm and 3 M to 4.5 M long with jhankhi covering the space of 100 cft in volume 10 Nos 0.00 0.00
Bamboo 75 mm dia 6 m to 8 m long 3.25 Nos 137.55 447.04 M-229
Annealed wire 20 to 25 SWG 1.5 Kg 78.77 118.16 M-224(ii)
B.A.Wire 8 to 10 SWG 11.25 Kg 0.00 0.00 Departmental
E.C.bags 30 Nos 0.00 0.00 Departmental
Local sand Taking compact volume 0.75 cft per bags 0.64 Cum 0.00 0.00
Unskilled labour for Tying and Placing etc. 5 428.00 2140.00
Unskilled Labour for filling E.C.Bags 0.6 428.00 256.80
Add Overhead charge & C.P@15% 444.30
Add 1% Cess 0.00
Rate Including Royality 340.60 Each
5.7.13(b)* Labour for laying River bed Material (30 % sand And 70% Quarry spall) including light ramming etc.all complete job as per specification and direction of E / I.
Taking Out put:- 1 cun
Unskilled mazdoor 0.75 nos 428.00 321.00
Add Overhead charge & C.P 15 % 48.15
Add Labour Cess 1 % 0.00
Say Rs 369.20 Per M3 Use for Laying of Rubbish
5.7.14 Except bricks Supply Providing brick flat soling with designation 100A bricks joints filled with coarse sand of approved quality including royaltyand all taxes, all complete as per approved design,specifications and direction of E/I
Taking Out put:- 9.3 Sqm
Bricks 300 per%0nos 0.00 0.00
Local Sand 0.142 M3 143.32 20.35
Mason Gr II 0.50 nos 541.00 270.50
Unskilled mazdoor 1.00 nos 428.00 428.00
Add Overhead charge & C.P 15 % 107.83
Add Labour Cess 1 % 0.00
Say Rs 88.90 Per M2
Including Royality 88.90 Per M2
5.7.14 Providing brick flat soling with designation 100A bricks joints filled with coarse sand of approved quality including royaltyand all taxes, all complete as per approved design,specifications and direction of E/I
Taking Out put:- 9.3 Sqm
Bricks 300 per%0nos 5123.00 1536.90
Local Sand 0.142 M3 143.32 20.35
Mason Gr II 0.50 nos 541.00 270.50
Unskilled mazdoor 1.00 nos 428.00 428.00
Add Overhead charge & C.P 15 % 338.36
Add Labour Cess 1 % 0.00
Say Rs 278.90 Per M2
Including Royality 278.90 Per M2
5.7.15 Except bricks Supply Providing brick on edge soling with designation 100A bricks joints filled with coarse sand of approved quality including royaltyand all taxes, all complete as per approved design,specifications and direction of E/I
Taking Out put:- 9.3 Sqm
Bricks 500 per%0nos 0.00 0.00
Local Sand 0.283 M3 143.32 40.56
Mason Gr II 0.625 nos 541.00 338.13
Unskilled mazdoor 1.25 nos 428.00 535.00
Add Overhead charge & C.P 15 % 137.05
Add Labour Cess 1 % 0.00
Say Rs 113.00 Per M2
Rtae Including Royality 113.00 Per M2
5.7.15 Providing brick on edge soling with designation 100A bricks joints filled with coarse sand of approved quality including royaltyand all taxes, all complete as per approved design,specifications and direction of E/I
Taking Out put:- 9.3 Sqm
Bricks 500 per%0nos 5123.00 2561.50
Local Sand 0.283 M3 143.32 40.56
Mason Gr II 0.625 nos 541.00 338.13
Unskilled mazdoor 1.25 nos 428.00 535.00
Add Overhead charge & C.P 15 % 521.28
Add Labour Cess 1 % 0.00
Say Rs 429.70 Per M2
Rtae Including Royality 429.70 Per M2
5.7.16 Except bricks Supply Providing pitching work with designation 100A bricks in pannel and in herring bond pattern one brick on edge over a brick flat soling joints filled with local sand free from clay containts including royalty and all taxes, all complete as per approved design,specifications and direction of E/I
Taking Out put:- 9.3 Sqm
Bricks 800 per%0nos 0.00 0.00
Local Sand 0.425 M3 143.32 60.91
Mason Gr II 1.125 nos 541.00 608.63
Unskilled mazdoor 2.25 nos 428.00 963.00
Add Overhead charge & C.P 15 % 244.88
Add Labour Cess 1 % 0.00
Say Rs 201.90 Per M2
Rate Including Royality 201.90 Per M2
5.7.16 Providing pitching work with designation 100A bricks in pannel and in herring bond pattern one brick on edge over a brick flat soling joints filled with local sand free from clay containts including royalty and all taxes, all complete as per approved design,specifications and direction of E/I
Taking Out put:- 9.3 Sqm
Bricks 800 per%0nos 5123.00 4098.40
Local Sand 0.425 M3 143.32 60.91
Mason Gr II 1.125 nos 541.00 608.63
Unskilled mazdoor 2.25 nos 428.00 963.00
Add Overhead charge & C.P 15 % 859.64
Add Labour Cess 1 % 0.00
Say Rs 708.70 Per M2
Rate Including Royality 708.70 Per M2
5.7.32.A (a).Labour charge for making crates box of size 3m x 1.5m x 0.6m including cutting of G.I wire or B.A wire, weaving of wire to make it taranga wire having 150 mm square mesh with double knot with 8 & 10 S.W.G. wire as per approved design, specifications and direction of E/I
As per T.E.C.letter no 33 dated 8.4.06 )
Taking Out put =10 nos.
Black smith Gr II for weaving the wire roll for cutting the taragana wire to size 2 nos 541.00 1082.00
Unskilled mazdoor for weaving the wire, as helper in making creates & tying joints 3 nos 428.00 1284.00
Add Overhead charge & C.P@15% 354.90
Add 1% Cess 0.00
Say Rs 272.10 Each
5.9.4 Old Schedule Supplying and providing seasoned hill bamboo roof frame tied to rafter by string including the cost of all labour and materials all complete as per specification and direction
Taking Out put =9.30 m2
Bamboo 75mm dia. 6m to 8m long 15 Nos 137.55 2063.25 M-229
Carpenter Gr-II 0.5 nos 541.00 270.50
Semi Skilled Mazdoor 0.5 nos 444.00 222.00
Unskilled Mazdoor 1 Nos 428.00 428.00
Add Overhead charge & C.P@15% 15 % 464.96
Add 1% Cess 0.00
Say Rs 383.30 Per M2
5.9.5 Old Schedule Providing 150 mm grass thatching over bamboo frame including laying grass uniformly in proper slope, typing with strings with split bamboo at the top including cost of all labour and materials (but excluding the cost of bamboo frame) taxes all complete as per building specification and direction of E/I
Taking Out put =9.30 m2
Grass 50 Bunches @2kg per Bunches 100 kg 4.46 446.00
Narial Srring 1.5 Kg 31.25 46.88
Bamboo 75mm dia. 6m to 8m long 1 nos 137.55 137.55
Skilled mazdoor 1 nos 541.00 541.00
Unskilled mazdoor 1 nos 428.00 428.00
Add Overhead charge & C.P@15% 15 % 239.91
Add 1% Cess 0.00
Say Rs 197.80 Per M2
5.7.48 Based Providing , laying and filling Geo bags of size 1mx0.7m (Type A 300 GSM nonwoven) weight of bag 420 gm,volume of filled bag 0.07 cum, weight of filled Geo bag 126 kg with local sand including stiching in four lines by approved nylon thred with stiching machine and generator, stacking and placing in gabion of size 1.8mx1.8mx0.5m (18nos. Geo bags per gabion) after loading,unloading and carriage with the help of trolley within 150m lead including cess all complete as per specification and direction of E/I
A . Assuming out put of filling and stiching of 40 nos. of Geo Bags per day
Stiching Roll(Nylon) 2 nos 30.00 60.00
Unskilled labour for filling,stacking 2 nos 428.00 856.00
Skilled labour for stacking 0.33 nos 541.00 178.53
Unskilled labour for carrying and placing 4 nos 428.00 1712.00
Hire charge of Stiching Machine 0.33 day 50.00 16.50
Hire Charge of manual Trolley 1 day 50.00 50.00
Hire charge of 3 KVA Generator 2.67 hrs 74.00 197.58
Add Overhead charge & C.P@15% 477.24
Add 1% Cess 0.00
Rate per bag=Total/40 91.47
Cost of filling & stiching of 18 nos of Geo bags 18 nos 91.47 1646.48 A
Geo Bag 18 nos 0.00 0.00 Dept.
Gabion 1 nos 0.00 0.00 Dept.
Add Overhead charge & C.P@15% 0.00
Add 1% cess 0.00
Total(A+B) 1646.48
Rate Say,Rs 1646.00 Each
5.7.48 Based Providing , laying and filling Geo bags of size 1mx0.7m (Type A 300 GSM nonwoven) weight of bag 420 gm,volume of filled bag 0.07 cum, weight of filled Geo bag 126 kg with local sand including stiching in four lines by approved nylon thred with stiching machine and generator, stacking and placing in gabion of size 1.8mx1.2mx0.5m (12nos. Geo bags per gabion) after loading,unloading and carriage with the help of trolley within 150m lead including cess all complete as per specification and direction of E/I
A . Assuming out put of filling and stiching of 40 nos. of Geo Bags per day
Stiching Roll(Nylon) 2 nos 30.00 60.00
Unskilled labour for filling,stacking 2 nos 428.00 856.00
Skilled labour for stacking 0.33 nos 541.00 178.53
Unskilled labour for carrying and placing 4 nos 428.00 1712.00
Hire charge of Stiching Machine 0.33 day 50.00 16.50
Hire Charge of manual Trolley 1 day 50.00 50.00
Hire charge of 3 KVA Generator 2.67 hrs 74.00 197.58
Add Overhead charge & C.P@15% 477.24
Add 1% Cess 0.00
Rate per bag=Total/40 91.47
Cost of filling & stiching of 12 nos of Geo bags 18 nos 91.47 1646.48 A
Geo Bag 18 nos 0.00 0.00 Dept.
Gabion 1.8mx1.2mx0.5m 1 nos 0.00 0.00 Dept.
Add Overhead charge & C.P@15% 0.00
Add 1% cess 0.00
Total(A+B) 1646.48
Rate Say,Rs 1646.00 Each
5.7.54 Based Providing,laying & filling Geo bags of size 1mX0.7m (Type A 300GSM nonwoven) Weight 420gm,volume of filled bag 0.07 cum,weight of filledf Geo bag 126kg with local sand including stiching in four lines by approved Nylon thread with stiching machine and generator,stacking and placing after loading,unloading and carriage with the help of Trolly within 150m lead ,including cess, all complete as per specification and direction of E/I.
Taking output of 40 nos Geo bags
Geo bag 40 nos 0.00 0.00 Dept.
Stiching roll(nylon) 2 nos 30.00 60.00
Unskilled labour for filling,stacking 2 nos 428.00 856.00
Unskilled labour for crrying &placing at work site 4 nos 428.00 1712.00
Skilled labour for stiching 0.33 nos 541.00 178.53
Hire Charge of Machine
Hire Charge of Stiching Machine 0.33 nos 50.00 16.50
Hire Charge of manual Trolley 1 day 50.00 50.00
Hire charge of Generator 3KVA 2.67 hrs 74.00 197.58
Add Overhead charge &C.P @15% 477.24
Add 1% cess 0.00
Rate per geo Bag 91.47
say,Rs 91.50 Each
A Providing and laying of Bricks Bat
Taking output of 1.00 M3
Bricks Bat Including Royality 1.00 M3 1031.00 1031.00
Add 1% cess 0.00
5.7.13(b)* Labour for laying River bed Material (30 % sand And 70% Quarry spall) including light ramming etc.all complete job as per specification and direction of E / I.
Taking Out put:- 1 cun
Unskilled mazdoor 0.75 nos 428.00 321.00
Add Overhead charge & C.P 15 % 48.15
Add Labour Cess 1 % 0.00
Say Rs 369.20 Per M3 b
c Carriage of Biricks Bat by Tractor
Sr No Carriage of Bricks Bat Formula Lead Rate Per Per M3 Without Royality Say Rs
d Finished Rate of Bricks Bat
Including Lead Basic rate of Materials Labour Charge for laying Carriage of Bricks Bat Total (Per M3) Say Total
1 I/C Carriage lead upto 1/2 KmK by Tractor 1134.10 369.20 235.80 1739.10 1739.10
2 I/C Carriage lead upto 1 Km K by Tractor 1134.10 369.20 267.80 1771.10 1771.10
3 I/C Carriage lead upto 1 Km S by Tractor 1134.10 369.20 244.70 1748.00 1748.00
4 I/C Carriage lead upto 1 Km S+1 km US by Tractor 1134.10 369.20 296.10 1799.40 1799.40
5 I/C Carriage lead upto 1 Km S+1 km K by Tractor 1134.10 369.20 308.90 1812.20 1812.20
6 I/C Carriage lead upto 2 Km S+1 km K by Tractor 1134.10 369.20 349.90 1853.20 1853.20
7 I/C Carriage lead upto 3 Km S+1 km K by Tractor 1134.10 369.20 391.00 1894.30 1894.30
8 I/C Carriage lead upto 4 Km S+1 km K by Tractor 1134.10 369.20 432.00 1935.30 1935.30
9 I/C Carriage lead upto 5 Km S+1 km K by Tractor 1134.10 369.20 473.10 1976.40 1976.40
10 I/C Carriage lead upto 6 Km S+1 km K by Tractor 1134.10 369.20 514.10 2017.40 2017.40
11 I/C Carriage lead upto 7 Km S+1 km K by Tractor 1134.10 369.20 555.20 2058.50 2058.50
B Providing and laying of Rubbish
Taking output of 1.00 M3
Rubbish Including Royality 1.00 M3 160.00 160.00 M-007
Add 1% cess 0.00
5.7.13(b)* Labour for laying River bed Material (30 % sand And 70% Quarry spall) including light ramming etc.all complete job as per specification and direction of E / I.
Taking Out put:- 1 cun
Unskilled mazdoor 0.75 nos 428.00 321.00
Add Overhead charge & C.P 15 % 48.15
Add Labour Cess 1 % 0.00
Say Rs 369.20 Per M3 b
c Carriage of Rubbish by Tractor
Sr No Carriage of Rubbish Formula Lead Rate Per Per M3 Without Royality Say Rs
d Finished Rate of Rubbish
Including Lead Basic rate of Materials Labour Charge for laying Carriage Rate of Rubbish Total (Per M3) Say Total
1 I/C Carriage lead upto 1/2 KmK by Tractor 176.00 369.20 180.90 726.10 726.10
2 I/C Carriage lead upto 1 Km K by Tractor 176.00 369.20 205.50 750.70 750.70
3 I/C Carriage lead upto 1 Km S by Tractor 176.00 369.20 187.80 733.00 733.00
4 I/C Carriage lead upto 1 Km S+1 km US by Tractor 176.00 369.20 227.20 772.40 772.40
5 I/C Carriage lead upto 1 Km S+1 km K by Tractor 176.00 369.20 237.00 782.20 782.20
6 I/C Carriage lead upto 2 Km S+1 km K by Tractor 176.00 369.20 268.50 813.70 813.70
7 I/C Carriage lead upto 3 Km S+1 km K by Tractor 176.00 369.20 300.00 845.20 845.20
8 I/C Carriage lead upto 4 Km S+1 km K by Tractor 176.00 369.20 331.50 876.70 876.70
9 I/C Carriage lead upto 5 Km S+1 km K by Tractor 176.00 369.20 363.00 908.20 908.20
10 I/C Carriage lead upto 6 Km S+1 km K by Tractor 176.00 369.20 394.50 939.70 939.70
11 I/C Carriage lead upto 7 Km S+1 km K by Tractor 176.00 369.20 426.00 971.20 971.20
Supply of Materials
221 Bamboo Unit Revised Rate with ALL TAXES & ROYALITY Add CP 10% Say RS
i i. 75 mm dia 6m long to 8m long Per m 19.65 21.62 21.60 WRD SOR 2022
ii ii. 100 mm dia 6m long to 8m long Per m 20.98 23.08 23.10 WRD SOR 2022
iii iii. 50 mm dia Hill Bamboo Per m 13.12 14.43 14.40 WRD SOR 2022
i i. 75 mm dia 6m long to 8m long Each 137.55 151.31 151.30 Each
ii ii. 100 mm dia 6m long to 8m long Each 151.00 166.10 166.10 Each
iii iii. 50 mm dia Hill Bamboo Each 94.35 103.79 103.80 Each
M-004 Coarse sand at source quary Koilwar/Sone sand Per M3 494.00 543.40 543.40 Per M3
M-044 Aggregates 20 mm to 10 mm Per M3 886.00 974.60 974.60 Per M3
Departmental Rate
275 Empty plastic cement bag(old) Per % nos 407.00 Per % nos
276 Nylon Crate of size 1mx1mx1m (As per Annex-I) Each 41.00 Each
277 Geo bag (non woven)size 1mx0.70m (As per Annex-II) nos 83.06 nos
279 P.P. Rope Gabion of size 1.80mx1.80mx0.5m (As per Annex-IV) nos. 1965.60 nos.
280 P.P.Rope Gabion of size 1.80mx1.20mx0.5m (As per Annex-V) Nos. 1427.60 Nos.
M-108 Geotextile filter fabric sqm 84.60 sqm
ii. Black annealed wire 3.15mm dia.( IS 280-78 ) Per kg. 78.80 Per kg.
Percupine Each Set 6328.80 Each Set
291 New empty cement Bag Conforming to IS 11652:2000 (Supply) Each 14.85 Each
Departmental supply Rate of given material mention below by DPT For 2021
1 New empty cement Bag Conforming to IS 11652:2000 (Supply) Each 14.85
2 Nylon Crate of size 1mx1mx1m Each 65.00
Departmental supply Rate of given material mention below by DPT For 2022
1 New empty cement Bag Conforming to IS 11652:2000 (Supply) Each 11.70 DPT Lt. No. 02 dated 13.05.2022
2 Nylon Crate of size 1mx1mx1m Each 47.85 DPT Lt. No. 05 dated 16.05.2022
3 Geo bag (1m x 0.7m) Each 110.00 DPT Lt. No. 10 dated 24.05.2022
292 Making 3.00mx1.50mx0.60m B.A Wire crate frame with bamboos and placing with sand filled E.C bags and anchoring the same with nylone rope to bamboo post at least 15m away from the river bank, including piling of bamboo post ,including all taxes and royality etc and carriage of all materials at site all complete job as per specifications and direction of E/I .( Hathi Paw rate analysis)
Assuming 10 nos. of bamboo roll
Bamboo 75 mm dia 6 m to 8 m long 60 Nos. 137.55 8253.00
G.I.Wire 8 to 10 SWG 1 Kg 62.92 62.92
Nylone rope 20 Kg 200.00 4000.00
Labour for making B.A. Wire crate frame (Referance SOR Item 5.7.9)
Length of runner / frame = 25mx10 = 250m
Unskilled mazdoor (0.25x250/30.50) 2.05 nos 428.00 877.40
Add Overhead charge & C.P 15 % 2075.23
Add Labour Cess 1 % 0.00
Say Rs 1591.00 Each A
Placing of New E.C. Bag (Reference SOR item No. 5.7.53)
1st (80 Nos. New E.C. Bag in each frame) 80 Per% Nos. 2435.16 1948.128 1948.128
Say Rs 1948.10 Each B
Total A+B 3539.10 Each
2nd Placing of E.C. Bag from stocked (Reference SOR item No. 5.7.53)
(80 Nos. New E.C. Bag in each frame) 80 Per% Nos. 1230.50 984.4 984.4
Say Rs 984.40 Each C
Total A+C 2575.40 Each
5.7.38.2 Supplying wire mesh crates of size 3m x 1.5m x 0.60m and 150 mm square mesh made out of Black annealed wire 10 SWG double knot at each joints in box type etc. all complete as per approved design, specification and direction of E/I
Cost of one M.T. of B.A. wire of 10 SWG
incluiding carriage 1 M.T. 62924.00
Av. Nos. of crate manufactured= 58 Nos. 58 Nos.
Materials cost of one box = Cost of 1 M.T. G.I. wire/58 1084.90
Labour ( (Reference SOR item No. 5.7.32A)
Black Smith Gr-II 2 Nos. 541.00 1082.00
Unskilled labour 3 Nos. 428.00 1284.00
2366.00 For 10 Nos. BA wire crate
164.00 For each
Add Overhead charge & C.P 15 % 187.33
Add Labour Cess 1 % 0.00
Say Rs 1436.20 Each
For 100 Set Porcupine
Sl No Item of work Item No Unit Quantity Rate Amount
2 Shuttering In Fnd 5.3.18 M2 552.00 586.00 323472.00
S.Total 841194.19 A
6 Placing Charge in ( Dry ) for 12 Nos Assembly
Skilled Lab 3 No 3 541.00 1623.00
S.Skilled Lab 3 No 3 444.00 1332.00
M 130 Nut Bolt 48 Kg 48 69.15 0.00 Dep
Add Labour Cess 1 % 0.00
Rate Per % Assembly 138407.48 (II)
7 Carraige of Material per % Assembly
e Jhanki One Extra lead 5.7.29.2 M3 144.000 11.40 1641.60 (iii)
f Rehandling Beam 1km ( K) by tractor MT 45.000 461.40 20763.00 (iv)
Carriage Per % Assembly 73043.51 C
Total For Laying only (In Dry Portion)=(i)+(ii)+(iii) 164658.68 Per % Assembly
8 Extra For water portion 18039.67
Total For Laying only (In Water Portion)=(i)+(ii)+(iii)+(iv) 182698.35 Per % Assembly
9 Departmental Rate of Porcupine={A-(i)}+{C-(iii)-(iv)} 867223.50 Per % Assembly
Extra For Water portion Extra 40 quintal capacity boat 3 No trips per day one trip carry 4 No Assembly Boat 1 1882.40 1882.40
Add Labour Cess 1 % 0.00
Rate Per % Assembly 18039.67 (iv)
1 Carriage of Stone Aggregate from Shikhpura to Darbhanga by rail and from Darbhanga to work side by road
A Carriage from quary site to rail head Sheikhpura loading yard by tipper {lead 3km (s)+2 km (us))}
Sr No Carriage of Stone Chips by tipper Formula Lead Rate Per m3 Say Rs
B Loading and unloading at Railway stacking yard /4.99 0.00 0.00 B
C Cariage Charge By Railways
Add 15% Surchage
Add 5% Development
Add 4.2% Service Charge
Sub Total 394.06
Add Overhead charge & C.P 15% 59.11
Sub Total 453.17
D Carriage from Darbhanga to work site by tipper
Sr No Carriage of Stone Chips by tipper Formula Lead Rate Per m3 Say Rs
Total A+B+C+D 1698.12
Say Total 1698.10 Per M3
2 Carriage of Steel Shhet pile from kolkata
A Carriage from Stock Yard to railways r {lead 4km (s)
Sr No Carriage of sheet pile by tipper Formula Lead Rate Per m3 Say Rs
B Loading and unloading at Railway stacking yard 2240.80/8 280.10 280.10 B
C Cariage Charge By Railways
Add 15% Surchage
Add 5% Development
Add 4.2% Service Charge
Sub Total 1049.11
Add Overhead charge & C.P 15% 157.37
Sub Total 1206.48
D Carriage from Darbhanga to work site by tipper
Sr No Carriage of Stone Chips by tipper Formula Lead Rate Per m3 Say Rs
Total A+B+C+D 3079.48
Say Total 3079.50 Per M3
3 Carriage of Bitumen
Sr No Carriage of Bitumen by tipper Formula Lead Rate Per MT Say Rs Unit
4 Carriage of Bitumen Emulsion
Sr No Carriage of Bitumen Emulsion by tipper Formula Lead Rate Per MT Say Rs Unit
2 Carriage of Kiul Sand by road
Sr No Carriage of Kiul Sand by tipper Formula Lead Rate Per m3 Say Rs Unit
Sr No Carriage of Bricks by tipper Formula Lead Rate Per %0 Nos Say Rs Unit
4 Carriage of Bricks by tractor lead 7km (S)+1 km (K)
Sr No Carriage of Bricks by Tractor Formula Lead Rate Per %0 Nos Say Rs Unit
7 Carriage of Cement+Steel By tipper
Sr No Carriage of Cement+Steel by tipper Formula Lead Rate Per MT Say Rs Unit
7 Carriage of Cement+Steel By Tractor
Sr No Carriage of Cement+Steel by Tractor Formula Lead Rate Per MT Say Rs Unit
5 Carriage Local Sand by tractor
Sr No Carriage of Local Sand Formula Lead Rate Per Per M3 With Royality Rs 75 Say Rs Unit
6 (A) Carriage of Filled EC Bag by tractor
Sr No Carriage of Filled EC Bag by tractor Lead Rate Per Per M3 Carriage of 100 nos Filled Ec Bag 1.0 CFT Unit
10 Carriage of Boulder from Shikhpura to Darbhanga by rail and from Darbhanga to work side by road
A Carriage from quary site to rail head Sheikhpura loading yard by tipper {lead 3km (s)+2 km (us))}
Sr No Carriage of Boulder by tipper Formula Lead Rate Per m3 Say Rs
B Loading and unloading at Railway stacking yard /4.8 0.00 0.00 B
C Cariage Charge By Railways
Add 15% Surchage
Add 5% Development
Add 4.2% Service Charge
Sub Total 394.06
Add Overhead charge & C.P 15% 59.11
Sub Total 453.17
D Carriage from Darbhanga to work site by tipper
Sr No Carriage of Stone Chips by tipper Formula Lead Rate Per m3 Say Rs
Total A+B+C+D 1272.05
Say Total 1272.10 Per M3
10 Carriage of Ballah 100 mm dia by tipper
Sr No Carriage of Ballah Formula Lead Rate Per Nos Say Rs Unit
11 Carriage of Ballah 175 mm dia by tipper
Sr No Carriage of Ballah Formula Lead Rate Per Nos Say Rs Unit
6 (B) Carriage of Filled EC Bag by tractor
Sr No Carriage of Filled EC Bag by tractor Lead Rate Per Per M3 Carriage of 100 nos Filled Ec Bag 1.20 CFT Unit
7 Carriage of Bamboo by tipper
Sr No Carriage of Bamboo 50 mm to 75 mm dia Lead Rate Per Nos Say Rs Unit
8 Carriage of Bamboo by Tractor
Sr No Carriage of Bamboo 50 mm to 75 mm dia Lead Rate Per Nos Say Rs Unit
12 Carriage of NP-3 Hume Pipe
Sr No Carriage of NP-3 Hume Pipe 900mm & 1000 mm dia Lead Rate Per Nos Say Rs Unit
9 Carriage of E.C bag by tipper
Sr No Carriage of E.C bag by tipper Lead Rate Per %0 Nos Say Rs Unit
10 Carriage of Empty Geo Bag by tipper
Sr No Carriage of Empty Geo Bag by tipper Lead Rate Per %0 Nos Say Rs Unit
11 Carriage of Porcupine by Tractor
Sr No Carriage of Porcupine by Tractor Lead Rate Per MT Say for 100 nos porcupine =45 MT= Rs Unit
12 Carriage of Porcupine by Tractor
Sr No Carriage of Porcupine by Tractor Lead Rate Per MT Say for 100 nos porcupine =45 MT= Rs Unit
Carriage of Materials
1 Cement and Steel 58 km Pucca from Fatuha
(8Hsb.Ls+ 8HuLu+ 8Hkb.Lk) +8Xb/8
2 Coarse Sand (90 P+1K)from Nadariganj
(5.5Hsa.Ls+ 5.5HuaLu+ 5.5Hka.Lk) +5.5Xb/4.99
3 Stone Chips (148 Km From Domchanch)
(5.5Hsa.Ls+ 5.5HuaLu+ 5.5Hka.Lk) +5.5Xb/4.99
4 Stone Boulder (105 KmP From Shekhpura)
(5.5Hsa.Ls+ 5.5HuaLu+ 5.5Hka.Lk) +5.5Xb/4.99
5 Bricks (7 KmP+1km K)
(8Hsb.Ls+ 8HuLu+ 8Hkb.Lk) +8Xb/8
6 Bitumen ( 58 km from Fatuha)
(8Hsb.Ls+ 8HuLu+ 8Hkb.Lk) +8Xb/8
7 Local Sand (2 P+1K)
(5.5Hsa.Ls+ 5.5HuaLu+ 5.5Hka.Lk) +5.5Xb/4.99
Say Rs 250.10 Per cum
8 NP2 Hume Pipe 15 KM P
(8Hsb.Ls+ 8HuLu+ 8Hkb.Lk) +8Xb/8
Say Rs. 80.90 Per M
JE AE Executive Engineer
Irrigation Division, Uderasthan
CARRIAGE OF MATERIALS (By TRACTOR)
Sl.No Description Unit Quantity Rate(Rs) Cost(Rs) Remarks Ref.
4.1 Loading and Unloading of Stone Boulder/ Stone aggregates/Sand /Kanker/Moorum by Mechnical means
Placing tractor at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip.
Taking output = 2.25 cum
Time required for
i) Positioning of tipper at loading point 1Min
ii) Loading by front end loader 1cum bucket capacity @ 25 cum per hour 2.71 Min
iii) Maneuvering, reversing, dumping and turning for return 0 Min
iv) Waiting time, unforeseen contingencies etc 0 Min
Tractor 3.6 tonnes capacity hour 0.060 629.00 37.74 P&M-1B5 PM12001
Front end-loader 1cum bucket capacity @ 25 cum/hour hour 0.06 1366.00 81.96 P&M-017 PM5003
Overhead charges & C.P @ 15% 17.96
Cost for 2.25 cum 137.66
Rate per cum 61.18
say 61.20 Xa 5.5 Xa
Note:-Unloading will be done manually. 336.60
4.2 Loading and Unloading of stone Boulders by Manual means
Taking output = 2.25 cum
Mazdoor for loading and unloading no. 0.31 428.00 132.68 L-13
Tractor 3.60 tonne capacity hour 0.31 629.00 194.99 P&M-1B5 PM12001
Overhead charaes & C.P @ 15% 49.95
Cost for 2.25 cum 382.95
Rate per cum 170.2
Note:-Unloading will be done manually.
4.3 Loading and Unloading of Cement or Steel by manual means and stacking
Taking output = 3.6 tonnes
Mazdoor for loadina and unloading no. 0.72 428.00 308.16 L-13
Tractor 3.6 tonne capacity hour 0.72 629.00 452.88 P&M-1B5 PM12001
c) Overhead charges & C.P@ 15% 116.15
Cost for 3.6 tonnes 890.51
Rate per tonnes 247.36
4.4 Cost of Haulage Excluding Loading and Unloading
Haulage of materials by tractor excluding cost of loading, unloading and stacking.
Unit = t.km or cum.km
Taking output ( 3.60 tonnes load and lead 10 km ) =36 t. km
4.4a Surfaced Road
Speed with load : 15 km I hour.
Speed while Returning empty :25 km I hour.
Tractor 3.60 tonne capacity
Time taken for onward haulage with load hour 0.667 629.00 419.54
Time taken for empty return trip. hour 0.40 629.00 251.6 P&M-1B5 PM12001
Overhead charges & C.P @ 15% 100.67
cost for 36 t km 771.81
Rate per t.km 21.44
say 21.40 t.km Hsb
Say 34.30 cum.km Has
4.4b Unsurfaced Graveled Road
Speed with load: 12 km / hour
Speed for empty return trip : 20 km / hour
Tractor 3.6 tonnes capacity
Time taken for onward haulage with load hour 0.833 629.00 523.96
Time taken for empty return trip hour 0.50 629.00 314.5 P&M-1B5 PM12001
b) Overhead charges & C.P @15% 125.77
Cost for 36 t .km 964.23 26.78
Say 26.80 t.km Hub
Say 42.90 cum.km Hua
4.4c Katcha Track and Track in River Bed/Nallah Bed and choe Bed
Speed with load :10 km I hour
Soeed while returning empty : 15 km I hour
Tractor 3.6 tonnes capacitv
Time taken for onward haulage hour 1.00 629.00 629.00 P&M-1B5 PM12001
Time taken for empty return trip hour 0.667 629.00 419.54
b)Overhead charges & C.P.@ 15% 157.28
Cost for 36 t.km 1205.82 33.49
Say 33.50 t.km Hkb
Say 53.60 cum.km Hka
CARRIAGE OF MATERIALS (By TIPPER)
No. Description Unit Quantity Rate Cost
4.1 A Loading and Unloading of Stone Boulder/ Stone aggregates/Sand /Kanker/Moorum
Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip.
Taking output = 5.5 cum
Time required for
i) Positioning of tipper at loading point Min 1
ii) Loading by front end loader 1cum bucket capacity @ 25 cum per hour Min 6.633
iii) Maneuvering, reversing, dumping and turning for return Min 2
iv) Waiting time, unforeseen contingencies etc Min 4
Total Min 13.633
Tipper 5.5 tonnes capacity hour 0.227 1426.00 323.7 PM6004
Front end-loader 1cum bucket capacity @ 25 cum/hour hour 0.227 1419.00 322.11 PM5003
b) Overhead charges &C.P.@ 15% 96.87
Cost for 5.5 cum 742.68
Rate per cum 135.03
say 135.00 5.5Xa
Note:-Unloading will be by tipping. 742.5
4.1 B Loading and Unloading of Stone Boulder/ Stone aggregates/Sand /Kanker/Moorum
Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip.
Taking output = 10.0 cum
Time required for
i) Positioning of tipper at loading point Min 1
ii) Loading by front end loader 1cum bucket capacity @ 25 cum per hour Min 12.06
iii) Maneuvering, reversing, dumping and turning for return Min 2
iv) Waiting time, unforeseen contingencies etc Min 4
Total Min 19.06
Tipper 10 Cum tonnes capacity hour 0.318 1785.00 567.63 PM6003
Front end-loader 1cum bucket capacity @ 25 cum/hour hour 0.318 1419.00 451.24 PM5003
b) Overhead charges &C.P.@ 15% 152.83
Cost for 10.0 cum 1171.7
Rate per cum 117.17
Note:-Unloading will be by tipping.
4.1 C Loading and Unloading of Stone Boulder/ Stone aggregates/Sand /Kanker/Moorum
Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip.
Taking output = 14.0 cum
Time required for
i) Positioning of tipper at loading point Min 1
ii) Loading by front end loader 1cum bucket capacity @ 25 cum per hour Min 8.029
iii) Maneuvering, reversing, dumping and turning for return Min 2
iv) Waiting time, unforeseen contingencies etc Min 4
Total Min 15.029
Tipper 14.0 tonnes capacity hour 0.25 1998.00 499.5 PM6002
Front end-loader 2.1 cum bucket capacity @ 25 cum/hour hour 0.25 2033.00 508.25 PM5002
b) Overhead charges &C.P.@ 15% 151.16
Cost for 14.0 cum 1158.91
Rate per cum 82.78
Note:-Unloading will be by tipping.
4.1 D Loading and Unloading of Stone Boulder/ Stone aggregates/Sand /Kanker/Moorum
Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip.
Taking output = 18.0 cum
Time required for
i) Positioning of tipper at loading point Min 1
ii) Loading by front end loader 1cum bucket capacity @ 25 cum per hour Min 6.996
iii) Maneuvering, reversing, dumping and turning for return Min 2
iv) Waiting time, unforeseen contingencies etc Min 4
Total Min 13.996
Tipper 5.5 tonnes capacity hour 0.233 2239.00 521.69 PM6001
Front end-loader 3.1 cum bucket capacity @ 25 cum/hour hour 0.233 3433.00 799.89 PM5001
b) Overhead charges &C.P.@ 15% 198.24
Cost for 18.0 cum 1519.82
Rate per cum 84.43 L-12
Note:-Unloading will be by tipping. L-13
4.2 Loading and Unloading of Stone Boulders by Manual means
Takina output = 10.0 cum
Mazdoor for loading and unloading no. 1.364 428.00 583.79
Tipper 10.0 Cum capacity hour 1.364 1371.00 1870.04 PM6004
c) Overhead charges &C.P.@ 15% 371.7375
Cost for 10.0 cum 2849.9875
Rate oer cum = (a+b+c+d)/10.0 285.00
Note:-Unloading will be by tipping.
4.3 Loading and Unloading of Cement or Steel by manual means and stacking. By 10T Tipper
Taking output = 18.00 tonnes
Mazdoor for loading and unloading no. 3.60 395.00 1422.00
Truck 18 tonne capacity hour 3.60 1847.00 6649.2 PM6004
Overhead charges &C.P @ 15% 1219.86
Cost for 18 tonnes 9352.26
Rate per tonnes 519.57 8Xb
4.4 Cost of Haulage Excluding Loading and Unloading
Haulage of materials by tipper excluding cost of loading, unloading and stacking.
4.4 A Case-I : Surfaced Road
Taking output (for 10 tonnes load and lead 10 km) =100t.km
Speed with load : 25 km I hour.
Speed while Returning empty :35 km I hour.
Tipper 10 tonne capacity
Time taken for onward haulage with load hour 0.40 1426.00 570.4 PM6004
Time taken for empty return trip. hour 0.286 1426.00 407.84 PM6004
Overhead charges &C.P @ 15% 146.74
cost for 100 t.km 1124.98
Rate per t.km 11.25 8Hsb
say 11.30 Hsb 90.40
Rate per cum.km 20.45 5.50Has
say 20.50 Has 112.75
Cost of Haulage Excluding Loading and Unloading
Haulage of materials by tipper excluding cost of loading, unloading & stacking
4.4 B Case-I : Surfaced Road
Taking output ( for 18 tonnes load and lead 10 km) =180t.km
Speed with load : 25 km I hour.
Speed while Returning empty :35 km I hour.
Tipper 18 tonne capacity
Time taken for onward haulage with load hour 0.40 1847.00 738.8 PM6003
Time taken for empty return trip. hour 0.286 1847.00 528.24 PM6003
Overhead charges &C.P @ 15% 190.06
cost for 180 t.km 1457.1
Rate per t.km 8.1
Rate per cum.km 14.72
Cost of Haulage Excluding Loading and Unloading
Haulage of materials by tipper excluding cost of loading, unloading & stacking
4.4 C Case-I : Surfaced Road
Taking output (for 25 tonnes load and lead 10 km) =250 t.km
Speed with load : 25 km I hour.
Speed while Returning empty :35 km I hour.
Tipper 25 tonne capacity
Time taken for onward haulage with load hour 0.40 2065.00 826 PM6002
Time taken for empty return trip. hour 0.286 2065.00 590.59 PM6002
Overhead charges &C.P @ 15% 212.49
cost for 250 t.km 1629.08
Rate per t.km 6.52
Rate per cum.km 11.85
Cost of Haulage Excluding Loading and Unloading
Haulage of materials by tipper excluding cost of loading, unloading & stacking
4.4 D Case-I : Surfaced Road
Taking output (for 32 tonnes load and lead 10 km) =320 t.km
Speed with load : 25 km I hour.
Speed while Returning empty :35 km I hour.
Tipper 32 tonne capacity
Time taken for onward haulage with load hour 0.40 2310.00 924 PM6001
Time taken for empty return trip. hour 0.286 2310.00 660.66 PM6001
Overhead charges &C.P @ 15% 237.7
cost for 320 t.km 1822.36
Rate per t.km 5.69
Rate per cum.km 10.35
Cost of Haulage Excluding Loading and Unloading
Haulage of materials by tipper excluding cost of loading, unloading & stacking
4.5 A Case-II : Unsurfaced Graveled Road
Haulage of materials by tipper excluding cost of loading, unloading & stacking
Taking output (for 10 tonnes load and lead 10 km) =100t.km
Speed with load: 20 km / hour
Speed for empty return trip :30 km / hour
Tipper 10 tonnes capacity
Time taken for onward haulage with load hour 0.40 1426.00 570.40 PM6004
Time taken for empty return trip hour 0.286 1426.00 407.84 PM6004
Overhead charges &C.P @ 15% 146.74
Cost for 100 t .km or 55 cum.km 1124.98
Rate per t.Km 11.25
say 11.30 Hub 90.4
Rate per cum.km 20.45
4.5 B Case-II : Unsurfaced Graveled Road
Haulage of materials by tipper excluding cost of loading, unloading & stacking
Taking output (for 18 tonnes load and lead 10 km) =180t.km
Speed with load: 20 km / hour
Speed for empty return trip :30 km / hour
Tipper 18 tonnes capacity
Time taken for onward haulage with load hour 0.50 1785.00 892.50 PM6003
Time taken for empty return trip hour 0.333 1785.00 594.41 PM6003
Overhead charges &C.P @ 15% 223.04
Cost for 180 t .km or 99 cum.km 1709.95
Rate per t.Km 17.10
Rate per cum.km 17.27
4.5 C Case-II : Unsurfaced Graveled Road
Haulage of materials by tipper excluding cost of loading, unloading & stacking
Taking output (for 25 tonnes load and lead 10 km) =250 t.km
Speed with load: 20 km / hour
Speed for empty return trip :30 km / hour
Tipper 25 tonnes capacity
Time taken for onward haulage with load hour 0.50 1998.00 999.00 PM6002
Time taken for empty return trip hour 0.333 1998.00 665.33 PM6002
Overhead charges &C.P @ 15% 249.65
Cost for 250 t .km or 137.50 cum.km 1913.98
Rate per t.Km 7.66
Rate per cum.km 13.92
4.5 D Case-II : Unsurfaced Graveled Road
Haulage of materials by tipper excluding cost of loading, unloading & stacking
Taking output (for 32 tonnes load and lead 10 km) =320 t.km
Speed with load: 20 km / hour
Speed for empty return trip :30 km / hour
Tipper 32 tonnes capacity
Time taken for onward haulage with load hour 0.50 2239.00 1119.50 PM6001
Time taken for empty return trip hour 0.333 2239.00 745.59 PM6001
Overhead charges &C.P @ 15% 279.76
Cost for 320 t .km or 176.0 cum.km 2144.85
Rate per t.Km 6.70
Rate per cum.km 12.19
4.4c Katcha Track and Track in River Bed/Nallah Bed and choe Bed
Speed with load :10 km I hour
Speed while returning empty: 15 km I hour
Tipper 10 tonnes capacitv
Time taken for onward haulage hour 1.00 2310.00 2310.00 PM6004
Time taken for empty return trip hour 0.667 2310.00 1540.77 PM6004
Overhead charges & C.P.@ 15% 577.62 14.64
Cost for 100 t .km 4428.39
Rate per t.Km 44.28 8Hku
say 44.30 Hkb 354.40
Rate per cum.km 80.52 5.50Hka
say 80.50 Hka 442.75
CARRIAGE OF MATERIAL BY TIPPER OF 5.5 CUM CAPACITY INCLUDING OVER HEAD CHARGES & C.P.
Sr.No Name of Materials Unit Gross Tipper Capacity per trip (F0r void) Multiplying Factor Net Tippeer capacity (Payable Qyantity) Per Triop Cost of loading,Unloading & Stacking per Trip Of Tipper (Tipper capacity 5.5 cumx Xa) Cost Of Haulage Per cum Cost of Haulage per Tipper of 5.5 cum capacity (Tipper capacity 5.5cumx H) Lead in KM Cost of Carriage= [(5.5Hsa.Ls+5.5Hua.Lu+5.5Hka.Lk)+5.5Xa] Per Unit Rate =(col17/Net Payable capacity)
For Surface Road For Unsurfaced graveted Road For Hatcha track & Track in river bed/ Nallah bed & Choe Bed For Surface Road For Unsurfaced graveted Road For Hatcha track & Track in river bed/ Nallah bed & Choe Bed For Surface Road For Unsurfaced graveted Road For Hatcha track & Track in river bed/ Nallah bed & Choe Bed
5.5Xa Hsa Hua Hka 5.5Hsa 5.5Hua 5.5Hka Ls Lu Lk
1 Lime, Moorum, Rubbish M³ 6 1 6 742.50 20.50 20.50 80.50 112.75 112.75 442.75 INPUT INPUT INPUT #VALUE! #VALUE!
2 Earth M³ 6 0.8 4.8 742.50 20.50 20.50 80.50 112.75 112.75 442.75 INPUT INPUT INPUT #VALUE! #VALUE!
3 Manur or Sludge M³ 6 0.92 5.52 742.50 20.50 20.50 80.50 112.75 112.75 442.75 INPUT INPUT INPUT #VALUE! #VALUE!
4 Excavated Rock (120lbs) M³ 6 0.67 4.02 742.50 20.50 20.50 80.50 112.75 112.75 442.75 INPUT INPUT INPUT #VALUE! #VALUE!
5 Stone metal (above 50 mm) M³ 5.4 0.85 4.59 742.50 20.50 20.50 80.50 112.75 112.75 442.75 INPUT INPUT INPUT #VALUE! #VALUE!
6 Boulder M³ 6 0.8 4.8 742.50 20.50 20.50 80.50 112.75 112.75 442.75 INPUT INPUT INPUT #VALUE! #VALUE!
8 Soling stone M³ 5 0.85 4.25 742.50 20.50 20.50 80.50 112.75 112.75 442.75 INPUT INPUT INPUT #VALUE! #VALUE!
CARRIAGE OF MATERIAL BY TIPPER OF 10 Tonnes CAPACITY INCLUDING OVERHEAD CHARGES & C.P.
Sr.No Name of Materials Unit Gross Tipper Capacity per trip (F0r void) Multiplying Factor Net Tippeer capacity (Payable Qyantity) Per Triop Cost of loading,Unloading & Stacking per Trip Of Tipper (Tipper capacity 8t x Xb) Cost Of Haulage Per cum Cost of Haulage per Tipper of 8t capacity ( 8x H) Lead in KM Cost of carriage= [(8Hsb.Ls+8Hub.Lu+8Hkb.Lk)+8Xb] Per Unit Rate =(col17/Net Payable capacity)
For Surface Road For Unsurfaced graveted Road For Katcha track & Track in river bed/ Nallah bed & Choe Bed For Surface Road For Unsurfaced graveted Road For Katcha track & Track in river bed/ Nallah bed & Choe Bed For Surface Road For Unsurfaced graveted Road For Hatcha track & Track in river bed/ Nallah bed & Choe Bed
8Xb Hsb Hub Hkb 8Hsb 8Hub 8Hkb Ls Lu Lk
3 G.I. Crate (3x1.5x0.75) Per % 80 1 80 4156.80 11.30 11.30 44.30 90.4 90.4 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
4 Bitumen, Tar, Steam, Coal MT 8 1 8 4156.80 11.30 11.30 44.30 90.4 90.4 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
5 R.C.C hume, A.C. pipe 4156.80 11.30 11.30 44.30 90.4 90.4 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
100 mm dia mtr 290 1 290 4156.80 11.30 11.30 44.30 90.4 90.4 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
125 mm dia mtr 200 1 200 4156.80 11.30 11.30 44.30 90.4 90.4 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
150 mm dia mtr 180 1 180 4156.80 11.30 11.30 44.30 90.4 90.4 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
200 mm dia mtr 100 1 100 4156.80 11.30 11.30 44.30 90.4 90.4 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
250 mm dia mtr 75 1 75 4156.80 11.30 11.30 44.30 90.4 90.4 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
300 mm dia mtr 60 1 60 4156.80 11.30 11.30 44.30 90.4 90.4 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
350 mm dia mtr 47.5 1 47.5 4156.80 11.30 11.30 44.30 90.4 90.4 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
400 mm & 450 dia mtr 32.5 1 32.5 4156.80 11.30 11.30 44.30 90.4 90.4 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
500 mm & 600 mm dia mtr 15 1 15 4156.80 11.30 11.30 44.30 90.4 90.4 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
700 mm & 800 mm dia mtr 12.5 1 12.5 4156.80 11.30 11.30 44.30 90.4 90.4 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
75 mm to 100 mm dia Per % 280 1 280 4156.80 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
8 Timber Cum 9.6 1 9.6 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
9 Sal ballah av.6m length
125 mm dia Nos 80 1 80 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
150 mm dia Nos 60 1 60 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
225 mm dia Nos 20 1 20 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
10 S.W.Pipe 60 cm length
100 mm dia Mtr 480 1 480 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
150 mm dia Mtr 240 1 240 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
200 mm dia Mtr 135 1 135 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
230 mm dia Mtr 105.6 1 105 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
250 mm dia Mtr 84 1 84 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
300 mm dia Mtr 67.2 1 67.2 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
350 mm dia Mtr 48 1 48 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
400 mm dia Mtr 33.6 1 33.6 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
450 mm dia Mtr 26.4 1 26.4 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
500 mm dia Mtr 24 1 24 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
600 mm dia Mtr 19.2 1 19.2 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
11 Tiles (Manglore / Mosaic ) Per %0 3200 1 3200 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
12 Brick Tiles(300x150x50mm) Per %0 1760 1 1760 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
13 Steel and C.I pipe
100 mm dia Mtr 292.8 1 292.8 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
125 mm dia Mtr 219.6 1 219.6 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
150 mm dia Mtr 183 1 183 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
200 mm dia Mtr 109.8 1 109.8 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
250 mm dia Mtr 80.52 1 80.52 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
300 mm dia Mtr 62.22 1 62.22 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
350 mm dia Mtr 43.92 1 43.92 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
400 mm dia Mtr 32.94 1 32.94 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
500 mm dia Mtr 25.62 1 25.62 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
600 mm dia Mtr 18.3 1 18.3 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
700 mm & 800 mm dia Mtr 15 1 15 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
900mm & 1000 mm dia Mtr 10 1 10 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
1100mm & 1200mm dia Mtr 7.5 1 7.5 4156.8 11.30 11.30 44.30 90.40 90.40 354.40 INPUT INPUT INPUT #VALUE! #VALUE!
Supply of Ballah Rate as per Apar Pradhan Mukhy Ban Sanrakshan Prashasan and Manav Sansadhan Vikash, Bihar, Patna Lt-HRD/340 Dated 31-10-2018)
Sl No Eucalyptus Ballah Dia Avg Length (M) Calculation Unit Say Basic Rate For One pices 10% CP Supply Rate Per Ballah
Statement For SF Materials Statemnt
SOR Sl No Item of work Unit Materials Involve in Item Per Unit Quantity Sub Unit Qty As per Est. Total Quantity Basic Rate of Materials Including Royality Amount Local Sand (Per M3) Stone chips/Aggregate (Per M3) Stone metal M-039 (Per M3) Kiul Sand (Per M3) Cement (Per M3) Bricks (Nos) Steel
5.1.37 Providing coarse clean local sand in filling in foundation trenches including ramming, watering, royalty and all other taxes complete job as per specifications and direction of E/I. Per M3 Local Sand 1.0000 Per M3 4480.00 4480.000 143.32 642073.6 4480.000
5.1.44. Earth work by tractor ( Rajashani) Per M3 E/W 1.0000 Per M3 0.000 33.00 0.00
5.1.46 Earth work by Mechanical means Per M3 E/W 1.0000 Per M3 35052.482 35052.482 34.78 1219125.31
5.2.2 Providing filter of stone chips 20 mm and down well graded as per design for lined canal, rains including hand packing etc . all complete as per specification and direction of E/I Per M3 Stone chips (M-040+M-045)/2 1.0000 Per M3 0.000 736.00 0.00 0.000
5.2.7 Supplying and laying stone metal graded filter of size 90 mm to 45 mm size in slope and bed of canal below lining including royalty, all taxes etc. . all complete as per specification and direction of E/I (where depth of cutting is more than 6 M ) Per M3 Stone metal M-039 0.9999 Per M3 0.000 975.00 0.00 0.000
5.2.8 Supplying and laying sand filter free from clay and other organic materials ( F.M 2.5 to 3.0 ) in slope and bed of the canal, below lining including the cost of watering, compaction, including royalty, all taxes etc. . all complete as per specification and direction of E/I (where depth of cutting is more than 6M) Per M3 Sand 1.0000 Per M3 0.000 494.00 0.00 0.000
5.3.3 Providing and laying P.C.C. M-100 with nominal mix of (1:3:6 ) in foundation of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing, royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. Per M3 Coarse aggregates Gr IV 0.9393 Per M3 0.000 1080.50 0.00 0.000
5.3.4 Providing and laying P.C.C. M-150 with nominal mix of (1:2:4 ) in foundation of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing., royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. Per M3 Coarse aggregates (20 mm To 10 mm) 0.8997 Per M3 0.000 886.00 0.00 0.000
5.3.5 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5:3 ) in foundation of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing., royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. Per M3 Coarse aggregates (20 mm To 10 mm) 0.8602 Per M3 0.000 886.00 0.00 0.000
5.3.10 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5:3 ) in superstructure of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing., royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. Per M3 Coarse aggregates ( 20 mm to 10 mm ) 0.8602 Per M3 0.000 886.00 0.00 0.000
5.3.13 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5:3 ) in deck slab with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing, royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. Per M3 Coarse aggregates ( 20 mm to 10 mm ) 0.8602 Per M3 0.000 886.00 0.00 0.000
5.3.16 Providing and laying dry pitching with precast cement concrete blocks of size 600 mm x 600 mm x 300 mm in M-75 with nominal mix of (1:4:8) in floor and flank wall with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality of sand of requisite F.M washed and screened including necessary form work, tools and plants, vibrating, curing as well royalty and all taxes complete job as per specifications and direction of E/I. Per M3 Coarse aggregates Gr III 0.9605 Per M3 0.000 752.36 0.00 0.000
5.3.17/5.3.17 Based Providing and laying dry pitching with precast cement concrete blocks of size 600 mm x 600 mm x 300 mm in M-100 with nominal mix of (1:3:6) in floor and flank wall with approved quality of graded coarse aggregate of required grade( as per design ) and approved quality of sand of requisite F.M washed and screened including necessary form work, tools and plants, vibrating, curing as well royalty and all taxes complete job as per specifications and direction of E/I. Per M3 Coarse aggregates Gr IV 0.9393 Per M3 0.000 1080.50 0.00 0.000
5.4.2 Brick work in designation 100 A Brick with cement mortar (1 : 4 ) in foundation with approved quality of coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curing, scaffolding and its removal wherever required including royaliy and all taxes etc. complete job as per specification and direction of E / I. Per M3 Bricks 406.0734 Nos 0.000 5.123 0.00 0.000
5.4.6 Brick work in designation 100 A Brick with cement mortar (1 : 4 ) in superstructure with approved quality of coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curing, scaffolding and its removal wherever required including royaliy and all taxes etc. complete job as per specification and direction of E / I. Per M3 Bricks 406.0734 Nos 4800.00 1949152.000 5.123 9985505.70 1949152.000
5.5.2 Providing 12 mm thick cement plaster (1: 4) with approved quality sand of requisite F.M . washed and screened including curing, scaffolding wherever required and its removal, royalty and all taxes etc. complete job as per specification and direction of E / I. Per M2 Cement 0.0037 Per M3 0.000 0.00 0.00 0.000
5.7.14 Providing brick flat soling with designation 100A bricks joints filled with coarse sand of approved quality including royalty and all taxes, all complete as per approved design, specifications and direction of E/I Per M2 Bricks 32.2581 Nos 0.000 5.123 0.00 0.00
5.7.15 Providing brick on edge soling with designation 100A bricks joints filled with coarse sand of approved quality including royalty and all taxes, all complete as per approved design, specifications and direction of E/I Per M2 Bricks 53.7634 Nos 0.000 5.123 0.00 0.00
5.7.16 Providing pitching work with designation 100A bricks in panel and in herring bond pattern one brick on edge over a brick flat soling joints filled with local sand free from clay contents including royalty and all taxes, all complete as per approved design, specifications and direction of E/I Per M2 Bricks 86.0215 Nos 54640.00 4700215.000 5.123 24079201.45 4700215.00
5.7.16 Based Providing pitching work with designation 100A bricks in panel and in herring bond pattern one brick on edge over a brick flat soling joints filled with local sand free from clay contents including royalty and all taxes, all complete as per approved design, specifications and direction of E/I Per M2 Bricks 0.0000 Nos 0.000 0 0.00 0.00
5.7.17 Providing pitching work with designation 100A Bricks in panel two brick on edge over a brick flat soling joints filled with local sand free from clay contents including royalty and all taxes, all complete as per approved design, specifications and direction of E/I Per M2 Bricks 139.7849 Nos 0.000 5.123 0.00 0.00
5.7.48 Based Gabion of size 1.8mx1.8mx0.5m (18nos. Geo bags per gabion) Nos Local Sand in Geo Bag 1.2600 Per M3 0.000 75.00 0.00
5.7.48 Based gabion of size 1.8mx1.2mx0.5m (12nos. Geo bags per gabion) Nos Local Sand in Geo Bag 0.8400 Per M3 0.000 75.00 0.00 0.000
5.7.52 Based Supply of New bag and N.C with labour for filling New E.C bag with local sand ,stiching on two lines by approved nylon thread with stiching machine & generator,Stacking the bags and placing in Nylon crate of size (1mx1mx1m) with Nos Local Sand in EC 0.8500 Per M3 0.000 75.00 0.00
5.7.53 Based Supply of New bag with labour for filling New E.C bag with local sand Nos Local Sand in EC 0.0340 Per M3 0.000 75.00 0.00
5.7.54 Based Providing,laying & filling Geo bags of size 1mX0.7m (Type A 300GSM nonwoven) Weight 420gm,volume of filled bag 0.07 cum,weight Nos Local Sand in Geo Bag 0.07 Per M3 0.000 75.00 0.00
5.8.6(a) Providing weep holes with dry graded Stone metal filter of 20 mm to 40 mm siz in abutment and wing wall as per specification and direction of E/I Each Stone metal filter 20 mm to 40 mm 0.113 M3 0.000 678.14 0.00 0.000
Boulder Per M3 Boulder 1 M3 0.000 675.000 0.00
RCD 4.1a(i) Granular Sub-Base with Close Graded Material (Table:- 400-1) Per M3 53 mm to 9.5 mm @ 50 per cent 0.6400 Per M3 16631.07 10643.885 915.67 9746285.99 10643.885
5.6.2 Labour for laying, fitting and fixing NP3 pipe with collars in line level and grade as well providing approved jointing materials and joints properly filled to make them water proof all complete as per specification and direction of E / I. (Hume pipe available within a lead of 40 mtr ) per m Cement 0.0060 Per M3 0.000 0.00 0.00 0.000
Brick Bats Per M3 Bricks Bat 1.0000 Per M3 0.000 1031.00 0.00
Total Amount of Materials Including Royality 49621347.46 6977.05 0.00 0.00 1559.52 389.76 6649367.00
3.13 304 Excavation for Structures
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.
(i) Ordinary soil
Taking output = 10 cum
A Manual Means (Depth upto 3 m)
Mazdoor day 8.00 428.00 3424.00 L-13
b)Overhead charge & C.P @ 0.15 on (a) 534.91
Cost for 10 cum = a+b 4100.99
Rate per cum = (a+b)/10 410.10
12.8 11500, 1700 & 2100 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
A PCC Grade M15
Taking output = 15 cum
Cement tonne 4.13 9305.90 38433.37 M-081
Coarse sand cum 6.75 494.00 3334.50 M-004
40 mm Aggregate cum 8.1 975.00 7897.50 M-055
20 mm Aggregate cum 4.05 1186.00 4803.30 M-053
10 mm Aggregate cum 1.35 586.00 791.10 M-051
Concrete mixer (cap. 0.40/0.28 cum) hour 6.00 283.00 1698.00 P&M-009
Generator 63 KVA hour 6.00 1068.00 6408.00 P&M-019
Per Cum Basic Cost of Labour, Material & Machinery (a+b+c) 4874.61
d) Formwork @ 4 per cent on cost of concrete i.e. cost of material, labour and machinery 2924.76
e)Overhead charge & C.P @ 0.15 on (a+b+c+d) 11406.58
Cost for 15 cum = a+b+c+d+e 87450.45
Rate per cum = (a+b+c+d+e)/15 5830.00
8.3 801 Printing New Letter and Figures of any Shade
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade
(ii) English and Roman
Hyphens and the like not to be measured and paid for
Detail for 100 letters of 16 cm height. i.e.1600 cm
Unit = per cm height per letter
Painter Ist class day 1.25 538 672.50 L-18
Mazdoor day 0.5 428 214.00 L-13
Paint Litre 0.5 246.65 123.33 M-131
c)Overhead charge & C.P @ 0.15 on (a+b) 156.14
Cost for 1600 cm = a+b+c 1197.04
Rate per cm height per letter = (a+b+c )/1600 0.75
8.8 803 Painting Two Coats on New Concrete Surfaces
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
Taking output = 40 sqm
Painter day 2.00 538.00 1076.00 L-18
Mazdoor day 1.00 428.00 428.00 L-13
Paint conforming to requirement of clause 803.3. Litre 6.00 246.65 1479.90 M-131
Add for scaffolding @ 1 percent of labour cost where required 15.57
c)Overhead charge & C.P @ 0.15 on (a+b) 457.91292
Cost for 40 sqm = a+b+c 3510.67
Rate per sqm= (a+b+c)/40 87.80
8.9 803 Painting on Steel Surfaces
Providing and applying two coats of ready mix paint of approved brand on steel surface after through cleaning of surface to give an even shade
Taking output = 10 sqm
Painter day 0.45 538.00 242.10 L-18
Mazdoor day 0.25 428.00 107.00 L-13
Paint ready mixed approved brand. Litre 1.25 246.65 308.31 M-131
Add @ 1 per cent on cost of material for scaffolding 3.08
c)Overhead charge & C.P @ 0.15 on (a+b) 101.07234375
Cost for 10 sqm = a+b+c 774.89
Rate per sqm= (a+b+c)/10 77.50
13.6 Section 1600 & 2200 Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
Taking output = 1 MT
HYSD bars including 5 per cent overlaps and wastage tonne 1.05 54810.00 57550.50 M-082
Binding wire kg 6.00 75.04 450.24 M-072
b) Labour for cutting, bending, shifting to site, tying and placing in position
Blacksmith day 2.00 541.00 1082.00 L-02a
Mazdoor day 6.50 428.00 2782.00 L-13
c)Overhead charge & C.P @ 0.15 on (a+b) 9302.36
Rate for per MT (a+b+c) 71318.10
Analysis or Rate
Sr No Ref. to MoRTH Spec. Description Unit Quantity Rate Rs Cost Rs Remarks/ Input ref. Reference
3.18 305 Construction of Subgrade and Earthen Shoulders
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Taking output = 100 cum
Mazdoor day 1.000 428.00 428.00 L-13
Hydraulic excavator1 cum bucket capacity @ 60 cum per hour hour 1.670 2202.00 3677.34 P&M-026
Tipper 10 tonne capacity tonne.km 175xL 9.41 1646.75 Lead =1 km & P&M-047
Add 10 per cent of cost of carriage to cover cost of loading and unloading 164.68
Dozer 80 HP for spreading @ 200 cum per hour hour 0.500 2930.00 1465.00 P&M-014
Motor grader for grading @ 50 cum per hour hour 2.000 4403.00 8806.00 P&M-032
Water tanker with 6 km lead hour 4.000 707.00 2828.00 P&M-060
Vibratory roller 8-10 tonnes @ 80 cum per hour hour 1.250 1996.00 2495.00 P&M-059
Cost of water KL 24.000 56.20 1348.80 M-189
Compensation & Royality for earth taken from private land cum 100.000 35.01 3501.00 M-092
d) Overhead charge & C.P @ 0.15 on (a+b+c) 3956.75
Cost for 100 cum = a+b+c+d 30335.07
Rate per cum = (a+b+c+d+e)/100 303.35
Labour Cess 0.00
4.1 401 Granular Sub-Base with Close Graded Material (Table:- 400-1)
A Plant Mix Method
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401
Taking output = 225 cum (450 tonne)
Mazdoor skilled day 2.000 541.00 1082.00 L-15
Wet mix plant @ 75 tonne capacity per hour hour 6.000 2923.00 17538.00 P&M-094
Electric generator 125 KVA hour 6.000 1587.00 9522.00 P&M-018
Water tanker 6 KL capacity 5 km lead with one tripper hour hour 4.500 707.00 3181.50 P&M-060
Front end loader 1 cum bucket capacity hour 6.000 1366.00 8196.00 P&M-017
Tipper 10 tonne tonne.km 450 x L 9.41 4234.50 Lead =1 km & P&M-047
Add 10 per cent of cost of carriage to cover loading and unloading 423.45
Motor Grader 110 HP hour 6.000 4403.00 26418.00 P&M-032
Vibratory roller 8-10 t hour 6.000 1996.00 11976.00 P&M-059
Close graded Granular sub-base Material as per table 400-1
For Grading-I Material
2.36 mm below @ 30 per cent cum 86.400 262.42 22673.09 M-020
Cost of water KL 27.000 56.20 1517.40 M-189
4.1A (i) Rate per cum for grading-I Material
d) Overhead charge & C.P @ 0.15 on (a+b+c) 39960.00
Cost for 225 cum = a+b+c+d 306359.99
Rate per cum = (a+b+c+d+e)/225 1361.60
Labour Cess 0.00
4.12 406 Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Taking output = 225 cum (495 tonnes)
Mazdoor skilled day 2.000 541.00 1082.00 L-15
Wet mix plant of 75 tonne hourly capacity hour 6.600 2923.00 19291.80 P&M-094
Electric generator 125 KVA hour 6.000 1587.00 9522.00 P&M-018
Front end loader 1 cum capacity hour 6.000 1366.00 8196.00 P&M-017
Sensor Paver finisher hour 6.000 2078.00 12468.00 P&M-035
Vibratory roller 8 - 10 tonne hour 6x0.65 1996.00 7784.40 P&M-059
Water tanker 6 KL capacity hour 3.000 707.00 2121.00 P&M-060
Tipper tonne.km 495 x L 9.41 4657.95 Lead =1 km & P&M-047
Add 10 per cent of cost of carriage to cover cost of loading and unloading 465.80
c) Material ( Table 400-11)
2.36 mm to 75 micron@ 30 per cent cum 89.100 262.42 23381.62 M-022
Cost of water KL 18.000 56.20 1011.60 M-189
d) Overhead charge & C.P @ 0.15 on (a+b+c) 40696.63
Cost for 225 cum = a+b+c+d 312007.50
Rate per cum = (a+b+c+d)/225 1386.70
Labour Cess 0.00
5.1 502 Prime Coat
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.
Taking output = 3500 sqm
Mazdoor day 2.000 428.00 856.00 L-13
Mechanical broom @ 1250 sqm per hour hour 2.800 746.00 2088.80 P&M-031
Air compressor 250 cfm hour 2.800 391.00 1094.80 P&M-001
Bitumen pressure distributor @ 1750 sqm per hour hour 2.000 1299.00 2598.00 P&M-004
Water tanker 6 KL capacity @ 1 tripper hour hour 1.000 707.00 707.00 P&M-060
Bitumen emulsion @ 0.6 kg per sqm tonne 2.100 59884.00 125756.40 M-077
Cost of water KL 6.000 56.20 337.20 M-189
d) overhead charge & C.P @ 0.15 on (a+b+c) 20021.06
Cost for 3500 sqm = a+b+c+d 153494.78
Rate per sqm = (a+b+c+d+e)/3500 43.86
Labour Cess 0.00
5.2 503 Tack Coat
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
Taking output = 3500 sqm
Mazdoor day 2.000 428.00 856.00 L-13
Mechanical broom @ 1250 sqm per hour hour 2.800 746.00 2088.80 P&M-031
Air compressor 250 cfm hour 2.800 391.00 1094.80 P&M-001
Emulsion pressure distributor @ 1750 sqm per hour hour 2.000 1299.00 2598.00 P&M-016
Bitumen emulsion @ 0.2 kg per sqm tonne 0.700 59884.00 41918.80 M-077
d) overhead charge & C.P @ 0.15 on (a+b+c) 7288.79
Cost for 3500 sqm = a+b+c+d 55880.71
Rate per sqm = (a+b+c+d+e)/3500 15.97
Labour Cess 0.00
5.3 504 Bituminous Macadam
Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.
Taking output = 205 cum (450 tonnes)
Mazdoor working with HMP, mechanical broom, paver, roller, asphalt cutter and assistance for setting out lines, levels and layout of construction day 16.000 428.00 6848.00 L-13
Skilled mazdoor for checking line & levels day 5.000 541.00 2705.00 L-15
Batch mix HMP 100-120 TPH @ 75 tonne per hour actual output hour 6.000 40270.00 241620.00 P&M-022
Mechanical broom hydraulic @ 1250 sqm per hour hour 2.200 746.00 1641.20 P&M-031
Air compressor 250 cfm hour 2.200 391.00 860.20 P&M-001
Sensor Paver finisher hydrostatic with sensor control @ 75 cum per hour hour 6.000 3566.00 21396.00 P&M-034
Generator 250 KVA hour 6.000 3034.00 18204.00 P&M-081
Front end loader 1 cum bucket capacity hour 6.000 1366.00 8196.00 P&M-017
Tipper 10 tonne capacity tonne.km 450 x L 9.41 4234.50 Lead =1 km & P&M-047
Add 10 per cent of cost of carriage to cover cost of loading and unloading 423.45
Smooth wheeled roller 8-10 tonnes for initial break down rolling. hour 6.00x0.65* 1518.00 5920.20 P&M-044
Vibratory roller 8 tonnes for intermediate rolling. hour 6.00x0.65* 1996.00 7784.40 P&M-059
Finish rolling with 6-8 tonnes smooth wheeled tandem roller. hour 6.00x0.65* 1978.00 7714.20 P&M-045
i) Bitumen@ 3.3 per cent of mix tonne 14.850 62048.00 921412.80 M-074
weight of mix = 205 x 2.2 = 450 tonne
Total weight of mix = 450 tonnes
Weight of bitumen = 14.85 tonnes
Weight of aggregate = 450 -14.85 = 435.15 tonnes
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 290.1 cum
GradingII(19 mm nominal size)
5 mm and below 20 per cent cum 58.020 424.21 24612.66 M-030
(ii) for GradingII(19 mm nominal size)
d) Overhead charges & C.P @ 0.15 on (a+b+c) 216713.47
Cost for 205 cum = a+b+c+d 1661469.92
Rate per cum = (a+b+c+d+e)/205 (For Grading-II) 8104.73
Labour Cess 0.00
5.7 508 Semi-Dense Bituminous Concrete
Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects.
Taking output = 195 cum (450 tonnes)
Mazdoor working with HMP, mechanical broom, paver, roller, asphalt cutter and assistance for setting out lines, levels and layout of construction day 16.000 428.00 6848.00 L-13
Skilled mazdoor for checking line & levels day 5.000 541.00 2705.00 L-15
Batch mix HMP @ 75 tonne per hour hour 6.000 40270.00 241620.00 P&M-022
Paver finisher hydrostatic with sensor control @ 75 cum per hour hour 6.000 3566.00 21396.00 P&M-034
Generator 250 KVA hour 6.000 3034.00 18204.00 P&M-081
Front end loader 1 cum bucket capacity hour 6.000 1366.00 8196.00 P&M-017
Tipper 10 tonne capacity tonne.km 450 x L 9.41 3973.50 Lead =1 km & P&M-047
Add 10 per cent of cost of carriage to cover cost of loading and unloading 397.35
Smooth wheeled roller 8-10 tonnes for initial break down rolling. hour 6.00x0.65* 1518.00 5920.20 P&M-044
Vibratory roller 8 tonnes for intermediate rolling. hour 6.00x0.65* 1996.00 7784.40 P&M-059
Finish rolling with 6-8 tonnes smooth wheeled tandem roller hour 6.00x0.65* 1978.00 7714.20 P&M-045
Grading II: 10 mm (Nominal Size)
Bitumen@5 per cent of weight of mix tonne 22.500 62048.00 1396080.00 M-074
weight of mix = 450 tonne
Total weight of mix = 450 tonnes
Weight of bitumen = 22.5 tonnes
Weight of aggregate = 450 -22.50 = 427.50 tonnes
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 285 cum
4.75 and below@ 41 per cent cum 116.850 424.21 49568.94 M-030
Filler @ 2 per cent of weight of aggregates. tonne 8.620 3873.95 33393.45 M-188
5.7 (ii) for GradingII(10 mm nominal size)
d) Overhead charges & C.P @ 0.15 on (a+b+c) 284905.45
Cost for 195 cum = a+b+c+d+e 2184275.15
Rate per cum = (a+b+c+d+e)/195 (For Grading-II) 11201.41
Labour Cess 0.00
10.1 3002 Restoration of Rain Cuts
Restoration of rain cuts with soil, moorum, gravel or a mixture of these, clearing the loose soil, benching for 300 mm width, laying fresh material in layers not exceeding 250 mm and compacting with plate compactor or power rammers to restore the original alignment, levels and slopes
Taking output = 10 cum
Mazdoor day 2.000 428.00 856.00 L-13
Excavator1.0 cum bucket capacity @ 60 cum per hour hour 0.130 2202.00 286.26 P&M-026
Tipper ( L is average lead in km for borrow earth) tonne.km 12 x L 3.50 42.00 Lead =1 km & P&M-058
Add 10 per cent of cost of carriage towards loading and unloading charges. 4.20
Plate compactor hour 0.500 469.70 234.85 P&M-086
c) Overhead charges & C.P @ 0.15 on (a+b) 218.82
Cost for 10 cum = a+b+c 1677.65
Rate per cum = (a+b+c)/10 167.77
Labour Cess 0.00
10.2 3003 Maintenance of Earthen Shoulder (filling with fresh soil)
Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
Taking output = 100 sqm
Assuming average thickness of filling to be 150 mm
Quantity of fresh material = 15 cum
Excavator1.0 cum bucket capacity @ 60 cum per hour hour 0.250 2202.00 550.50 P&M-026
Tipper ( L is average lead in km for borrow earth) tonne.km 24xL 3.50 84.00 Lead =1 km & P&M-058
Add 10 per cent of cost of transportation to cover cost of loading and unloading 8.40
Plate compactor @ 25 sqm per hour hour 12.000 469.70 5636.40 P&M-086
c) Overhead charges & C.P @ 0.15 on (a+b) 1242.78
Cost for 100 sqm = a+b+c 9528.00
Rate per sqm = (a+b+c+d)100 95.28
Labour Cess 0.00
10.4 3004.2 Filling Pot-holes and Patch Repairs with open-Graded Premix surfacing, 20mm.
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 511, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
Taking out put = 10250 sqm (205 cum)(405 tonne)
Mazdoor skilled Day 4.000 541.00 2164.00 L-15
Air compressor 250 cfm hour 6.000 391.00 2346.00 P&M-001
HMP 100-110 TPH Capacity hour 6.000 40270.00 241620.00 P&M-022
Tipper 10 tonnes capacity hour 45.000 1371.00 61695.00 P&M-048
Smooth wheeled roller 8-10 tonnes hour 12.000 1518.00 18216.00 P&M-044
Crushed stone aggregates nominal size 13.2mm @ 0.18 cum per 10 sqm cum 184.500 586.00 108117.00 M-052
Crushed stone aggregates nominal size 11.2mm @ 0.09 cum/10 sqm cum 92.250 586.00 54058.50 M-051
Bitumen emulsion for tack coat including vertical sides of pot hole. tonne 2.460 59884.00 147314.64 M-077
d) Overhead charges & C.P @ 0.15 on (a+b+c) 238890.47
Cost for 10250 sqm = a+b+c+d+e 1831493.61
Rate per sqm = (a+b+c+d)/10250 178.68
Labour Cess 0.00
10.5 3004.2 Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm.
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
Taking out put = 4900 sqm (196 cum)(450 Tonnes)
Mazdoor skilled Day 3.000 541.00 1623.00 L-15
Air compressor 250 cfm hour 6.000 391.00 2346.00 P&M-001
HMP 100-110 TPH Capacity hour 6.000 40270.00 241620.00 P&M-022
Tipper 10 tonnes capacity hour 45.000 1371.00 61695.00 P&M-048
Smooth wheeled roller 8-10 tonnes hour 12.000 1518.00 18216.00 P&M-044
ii) Bitumen emulsion for tack coat . tonne 1.180 59884.00 70663.12 M-077
iii) Aggregates
Grading I - 19mm(Nominal size)
Filler 2 per cent by weight of aggregate tonne 8.620 3873.95 33393.45 M-188 0.05700000000
Add 5 per cent for wastage 1669.67
10.5 (i) for grading I Material
d) Overhead charges & C.P @ 0.15 on (a+b+c) 302357.02
Cost for 4900 cum = a+b+c+d 2318070.48
Rate per cum = (a+b+c+d+e)/4900 473.08
Labour Cess 0.00
8.13 803 Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Providing and laying of hot applied thermoplastic compound 2.5 mmthickincludingreflectorisingglassbeads@250gmspersqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
Taking output = 640 sqm
Mazdoor day 2 428.00 856.00 L-13
b) Machinery hour0
Road marking machine @ 80 sqm per hour hour 8 1349.00 10792.00 P&M-043
Tractor-trolley our 8.000 8 629.00 5032.00 P&M-053
Hot applied thermoplastic compound Litre 2000 198.46 396920.00 M-118
Reflectorising glass beads kg 200 72.00 14400.00 M-152
Cost for 640 sqm 428222.00
d) Overhead charges & C.P @ 0.15 on (a+b+c) 64233.30
Rate per sqm =/640 769.46140625
Say 769.50 Per M2
2.4 202 Dismentaling of Structure
Dismentaling of Existing Structure like colvert bridge retaining wall …etc
Taking output 1.25 cum
2.4 (ii) D Dry pitching or brick solling
Mazdoor Day 0.35 428.00 149.80
Tractor Trolly hour 0.27 629.00 169.83 P&M-053
d) Overhead charge & C.P @ 0.15 on (a+b) 48.88
Cost for 1.25 cum = a+b 374.72
Rate per cum = (a+b+c )/1.25 299.78
Labour Cess 0.00
8.5 801 Direction and Place Identification Signs upto 0.9 sqm Size Board.
Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing
Taking output = 0.9 sqm
i) Excavation for foundation cum 0.22 0.00 0.00 Item No. 3.13 A
ii) Cement concrete M15 grade cum 0.12 0 0.00 Item 12.8 (A)
iii) Painting angle iron post two coats sqm 0.43 0.00 0.00 Item 8.9
a) Labour (For fixing at site)
Mazdoor day 0.2 428 85.60 L-13
Mild steel angle iron 75 mm x 75 mm x 6 mm,2.85 metres long kg 19 57.03 1083.63 M-179 /1000
Aluminium sheeting fixed with encapsulated lens type reflective sheeting of size 0.9 sqm sqm 0.9 8945.43 8050.89 M-061
Add 2 per cent of cost of materials for drilling holes, nuts, bolts, fabrication etc. 182.69
Tractor-trolley hour 0.02 629.00 12.58 P&M-053
Add (a+b+c) 9419.82
d)Overhead charge & C.P @ 0.15 on (a+b+c) 1413.0
Cost for 0.9 sqm =I+ii+ii+ a+b+c+d 10832.80
Rate per sqm (for sign having area upto 0.9 sqm) =(I+ii+iii+a+b+c+d)/0.90 10832.80
8.14 804 Kilometre Stone
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc
(i) 5th kilometre stone (precast)
Taking output = 6 Nos
a) M-15 grade of concrete cum 2.35 0.00 0.00 Item 12.8 (A)
b) Steel reinforcement @ 5 kg per sqm kg 22.08 0.00 0.00 Item 13.6/1000
c) Excavation in soil for foundation cum 1.68 0.00 0.00 Item No. 3.13A
d) Painting two coats on concrete surface sqm 9.85 0.00 0.00 Item 8.8
e) Lettering on km post (average 30 letters of 10 cm height each) per cm per letter 1800.00 0.00 0.00 Item 8.3(ii)
Transportation and fixing
Mason day 0.6 541 324.60 L-11
Mazdoor including loading/unloading day 6 428 2568.00 L-13
Tractor-trolley hour 6 629.00 3774.00 P&M-053
h)Overhead charge & C.P @ 0.15 on (a+b+c+d+e+f+g) 1017.306
Cost for 6 Nos. 5th km stone = a+b+c+ d+e +f+g+h 7799.35
Rate for each 5th km stone = (a+b+c+d+e+f+g+h)/ 6 1299.89
8.14 (ii) Ordinary kilometer stone (precast)
Taking output = 14 Nos.
a) M-15 grade of concrete cum 3.77 0.00 0.00 Item 12.8 (A)
b) Steel reinforcement @ 5 kg per sqm kg 26.32 0.00 0.00 Item 13.6 /1000
c) Excavation in soil for foundation cum 2.77 0.00 0.00 Item No. 3.13 A
d) Painting two coats on concrete surface sqm 11.41 0.00 0.00 Item 8.8
e) Lettering on km post ( average 12 letters of 10 cm height each) per cm per letter 1680.00 0.00 0.00 Item 8.3(ii)
Transportation and fixing
Mazdoor day 7.00 428.00 2996.00 L-13
Tractor-trolley hour 6.00 629.00 3774.00 P&M-053
h)Overhead charge & C.P @ 0.15 on (a+b+c+d+e+f+g) 1117.96
Cost for 14 Nos. ordinary km stone = (a+b+ c+d+e+f+g+h) 8571.04
Rate for each ordinary km stone = (a+b+ c+d+e+f+g+h+j)/14 612.22
Sl .No. Item of Work Unit Basic Rate Carriage of Agg. Carriage of Lime Carriage of Bitumen Carriage of Bitumen Emulsion Cement Sand Steel Total Say Total
Quantity (In M3) carriage rate Remarks Quantity (In M3) carriage rate Quantity (In MT) carriage rate Quantity (In MT) carriage rate Quantity (In MT) Carriage Rate Quantity (In M3) Carriage Rate Quantity (In MT) Carriage Rate
9 Direction and Place Identification Signs upto 0.9 sqm Size Board. 8.5 Nos 10832.80 0.12 1698.10 Sheikhpura 0.0367 689.10 0.060 2122.30 11189.20 11189.20
11 Ordinary kilometer stone (precast) 8.14(ii) Nos 612.20 0.24 1698.10 Sheikhpura 0.0741 689.10 0.121 2122.30 0.002 689.10 1333.48 1333.50
Note Lime 8.62 Tone =3.253 M3
Sl .No. Item of Work Unit Basic Rate Carriage of Agg. Carriage of Lime Carriage of Bitumen Carriage of Bitumen Emulsion Cement Sand Steel Total Say Total
Quantity (In M3) carriage rate Remarks Quantity (In M3) carriage rate Quantity (In MT) carriage rate Quantity (In MT) carriage rate Quantity (In MT) Carriage Rate Quantity (In M3) Carriage Rate Quantity (In MT) Carriage Rate
9 Direction and Place Identification Signs upto 0.9 sqm Size Board. 8.5 Nos 10832.80 0.12000 1698.10 Sheikhpura 0.0367 689.10 0.0600 2122.30 11189.20 11189.20
11 Ordinary kilometer stone (precast) 8.14(ii) Nos 612.20 0.24240 1698.10 Sheikhpura 0.0741 689.10 0.1212 2122.30 0.002 689.10 1333.48 1333.50
Note Lime 8.62 Tone =3.253 M3
FIVE YEAR MAINTENANCE OF ROAD
Name of Project :-For Construction of Pucca Road on Ekmi-Sirnia embankment Under Flood Control Division, Darbhanga
District :-Begusarai Total Length :-8.30km
Sl. No. Description of item Length (m) Width (m) Thickness/Height (m) % of total for Maint. Unit Quantity Rate Amount
1 10.1/3002/Restoration of rain cuts
Restoration of rain cuts with soil, moorum, gravel or a mixture of these, clearing the loose soil, benching for 300 mm width, laying fresh material in layers not exceeding 250 mm and compacting with plate compactor or power rammers to restore the original alignment, levels and slopes
2 10.2/3003/ Maintenance of Earthen Shoulder (filling with fresh soil)
Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
3 10.4/3004.2/Filling Pot-holes and Patch Repairs with open-Graded Premix surfacing, 20mm.
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 511, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Including Carriage of Materials)
4 10.5/3004.2/Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm.
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Including Carriage of Materials)
Year wise Cost for Maintenance
First Year 246828.31
Second Year 337402.47
Third Year 657972.60
Fourth Year 825211.52
Fifth Year 992452.12
Total Cost for Maintenance 3059867.03
SL NO. SOR DESCRIPTION Qty Unit Rate Amount
1 15.7.4 Demolishing brick work including stacking of serviceable materials and disposal of unserviceable materials within 50 metres leads.
Details of cost for 1 cum
Beldar 1.06 per day 254.00 269.24
Coolie 0.9 per day 254.00 228.60
Sundries 2.4 1 time 1.76 4.22
Add Water charges @1% 5.02
Add overhead charge & C.P@15% 76.06
Rate per cum 583.15
Add cess @ 1% 5.83
2 15.56 Dismantaling old plaster or skirting raking out joints and cleaning the surface ………………
Details of cost for 1 cum
Beldar 0.36 per day 254.00 91.440
Coolie 0.08 per day 254.00 20.320
Bhishti 0.07 per day 252.00 17.640
Sundries 1.43 1 time 1.76 2.517
Add Water charges @1% 1.319
Add overhead charge & C.P@15% 19.985
Rate per 10 cum 153.221
Rate per 1cum 15.322
Add cess @ 1% 0.153
3 5.22.7A Reinforcement for RCC work including straightening , cutting , bending ,placing in posotion and binding all complete.
Detail of cost for 1 quintal
Steel bars 1.05 quintal 5266.30 5529.62
Binding wire 5.0 kg 63.39 316.95
cover block 26.0 L.S 1.76 45.76
Same as per item no-5.22.1B 1.0 kg 643.36 643.36
Sundries 26.91 L.S 1.76 47.36
Add Water charges @1% 65.83
Add overhead charge & C.P@15% 997.33
cost for 100 kg 7646.21
Cost for 1 kg 76.46
Add cess @ 1% 0.76
4 4.1.2 Providing and laying in position pecified mix of (1:1.5:3) with stone aggregate 20 mm nominal size………….
Details of cost for 1 cum
20 mm stone aggregate 0.57 cum 491.23 280.00
10 mm stone aggregate 0.28 cum 560.23 156.86
Coarse sand 0.425 cum 95.22 40.47
Cement 0.4 Tonne 4978.00 1991.20
Mason 2nd class 0.1 per day 295.00 29.5
Beldar 1.63 per day 247.00 402.61
Bhishti 0.7 per day 243.00 170.10
Hire charge of Mixer 0.07 per day 800.00 56.00
Vibrator 0.07 per day 350.00 24.50
Sundries 14.3 L.S 1.76 25.17
Add Water charges @1% 31.76
Add overhead charge & C.P@15% 481.23
Add cess @ 1% 36.89
5 5.1.2 Providing and laying in position specified mix of RCC in (1:1.5:3) with stone aggregate 20 mm nominal size………….
Details of cost for 1 cum
Cement concrete 1.0 cum 3381.35 3381.35
Mason 2nd class 0.17 per day 305.00 51.85
Beldar 2 per day 254.00 508
Bhishti 0.9 per day 252.00 226.80
Hire charge of Mixer 0.07 per day 800.00 56.00
Vibrator 0.07 per day 350.00 24.50
Sundries 14.30 L.S 1.76 25.17
Add Water charges @1% 42.74
Add overhead charge & C.P@15% 647.46
Add cess @ 1% 49.64
5 2112 Cement mortar(1:3)
Details of cost for 1 cum
Cement 0.51 Tonne 5468.00 2788.68
Coarse sand 1.07 cum 110.69 118.44
Beldar 0.75 per day 254.00 190.50
Bhishti 0.07 per day 252.00 17.64
Hire charge of Mixer 26.91 1 time 1.76 47.36
Sundries 13.52 1 time 1.76 23.80
6 2113 Cement mortar(1:4)
Details of cost for 1 cum
Cement 0.38 Tonne 4568.00 1735.84
Coarse sand 1.07 cum 175.80 188.11
Beldar 0.75 per day 277.00 207.75
Bhishti 0.07 per day 293.00 20.51
Hire charge of Mixer 26.91 1 time 1.80 48.44
Sundries 13.52 1 time 1.8 24.34
7 2115 Cement mortar(1:6)
Details of cost for 1 cum
Cement 0.25 Tonne 4568.00 1142.00
Coarse sand 1.07 cum 175.80 188.11
Beldar 0.75 per day 277.00 207.75
Bhishti 0.07 per day 293.00 20.51
Hire charge of Mixer 26.91 1 time 1.80 48.44
Sundries 13.52 1 time 1.8 24.34
7 6.1.14A + 6.4A Providing B/W in cement mortar (1:6) with bricks of class designation 100A …………………….
Details of cost for 1 cum
Bricks 0.494 thousnd 5982.90 2955.55
Cement Mortar(1:6) 0.25 cum 1619.81 404.95
Sundries 1.05 1 time 1.76 1.85
Mason 1st class 0.36 per day 330.00 118.80
Mason 2nd class 0.36 per day 295.00 106.20
coolie 1.37 per day 247.00 338.39
Bhishti 0.2 per day 243.00 48.60
Extra coolie 1.5 per day 247.00 370.50
Add Water charges @1% 43.45
Add overhead charge & C.P@15% 658.24
Add cess @ 1% 50.47
8 13.11.2 Providing 12 mm thick cement plaster In CM (1:4)……………..
Details of cost for 10 sqm
Cement Mortar(1:4) 0.144 cum 3116.75 448.81
Mason 2nd class 0.67 per day 305.00 204.35
coolie 0.75 per day 254.00 190.50
Bhishti 0.92 per day 252.00 231.84
Sundries 12.61 1 time 1.76 22.19
Add Water charges @1% 10.98
Add overhead charge & C.P@15% 166.30
Rate for 10 sqm 1274.97
Rate for 1 sqm 127.50
Add cess @ 1% 1.27
8 13.11.2 12 mm cement plaster 1:4 finished with a floating coat of neat cement
Details of cost for 10 sqm
Cement Mortar(1:4) 0.144 cum 3116.75 448.81
Mason 2nd class 0.67 per day 305.00 204.35
coolie 0.75 per day 254.00 190.50
Bhishti 0.92 per day 252.00 231.84
Sundries 12.61 1 time 1.76 22.19
cement 0.02 tonne 6999 139.98
mason 0.27 per day 305 82.35
coolie 0.27 per day 254 68.58
scaffoldinf & sundries 1388.61
Add Water charges @1% 13.89
Add overhead charge & C.P@15% 210.37
Rate for 10 sqm 1612.87
Rate for 1 sqm 161.29
Add cess @ 1% 1.61
SL NO. SOR DESCRIPTION Qty Unit Rate Amount
1 11.73 Providing designation 100 A brick on edge soling in foundation and plinth……………………..
Details of cost for 9.3sqm
Bricks 500.00 thousand 5982.90 2991.45
Local Sand 0.283 cum 72.84 20.61
Sundries 1.50 1 time 1.76 2.64
Mason 2nd class 0.65 per day 295.00 191.75
unskilled labour 1.25 per day 247.00 308.75
Add overhead charge & C.P@15% 527.281
Add cess @ 1% 40.425
Rate per sqm 439.02
2 4.1.3 Providing and laying in position specified mix of RCC in (1:2:4) with stone aggregate 20 mm nominal size………….
Details of cost for 1 cum
20 mm stone aggregate 0.67 cum 491.23 329.12
10 mm stone aggregate 0.22 cum 560.23 123.25
Coarse sand 0.445 cum 95.22 42.37
Cement 0.32 Tonne 4978.00 1592.96
Mason 2nd class 0.1 per day 295.00 29.50
Beldar 1.63 per day 247.00 402.61
Bhishti 0.7 per day 243.00 170.10
Hire charge of Mixer 0.07 per day 800.00 56.00
Vibrator 0.07 per day 350.00 24.50
Sundries 14.30 L.S 1.76 25.17
Add Water charges @1% 27.96
Add overhead charge & C.P@15% 423.53
Add cess @ 1% 32.47
3 2.26 Filling available excavated earth in trenches, plinth, sides of foundation etc…..
Details of cost for 10 cum
Mate 0.2 per day 261.00 52.20
Coolie 2.5 per day 247.00 617.50
Bhishti 0.2 per day 243.00 48.60
Add Water charges @1% 7.18
Add overhead charge & C.P@15% 108.82
Rate per 10 cum 834.31
Rate per 1 cum 83.43
Add cess @ 1% 0.83
14 13.11.2 Providing 12 mm thick cement plaster In CM (1:6)……………..
Details of cost for 10 sqm
Cement Mortar(1:6) 0.144 cum 1764.10 254.03
Mason 2nd class 0.67 per day 295.00 197.65
coolie 0.75 per day 247.00 185.25
Bhishti 0.92 per day 243.00 223.56
Sundries 12.61 1 time 1.76 22.19
Add Water charges @1% 8.83
Add overhead charge & C.P@15% 133.73
Rate for 10 sqm 1025.24
Rate for 1 sqm 102.52
Add cess @ 1% 1.03
13.79.1 Painting walls with water proofing cement paint of approved rands and manufacture and of required shade to give an even shade.
New work (three or more coats)
Details of cost for 10 sqm
water profing cement paint 5.47 kg 46.83 256.16
carriage of materials 1.56 1 time 1.76 2.75
painter 0.6 per day 323 193.80
coolie 0.3 per day 254.00 76.20
Bhishti 0.1 per day 252.00 25.20
Brusher , Sand paper etc 7.15 1 time 1.76 12.58
Sundries 8.06 1 time 1.76 14.19
Add Water charges @1% 5.81
Add overhead charge & C.P@15% 88.00
Rate per 10 cum 674.69
Rate per 1 cum 67.47
Add cess @ 1% 0.67
Providing 12 mm thick cement plaster In CM (1:6)……………..
Details of cost for 10 sqm
Cement Mortar(1:6) 0.144 cum 1619.81 233.25
Mason 2nd class 0.67 per day 295.00 197.65
coolie 0.75 per day 247.00 185.25
Bhishti 0.92 per day 243.00 223.56
Sundries 12.61 1 time 1.76 22.19
Add Water charges @1% 8.62
Add overhead charge & C.P@15% 130.58
Rate for 10 sqm 1001.10
Rate for 1 sqm 100.11
Add cess @ 1% 1.00
SL NO. SOR DESCRIPTION Qty Unit Rate Amount
1 15.7.4 Demolishing brick work including stacking of serviceable materials and disposal of unserviceable materials within 50 metres leads.
Details of cost for 1 cum
Beldar 1.06 per day 277.00 293.62
Coolie 0.9 per day 273.00 245.70
Sundries 2.4 1 time 1.8 4.32
Add Water charges @1% 5.44
Add overhead charge & C.P@15% 82.36
Rate per cum 631.44
Add cess @ 1% 0.00
2 2.8.1 Earth work inexcavation in foundation trenches ………………..
Details of cost for 10 cum
Mate 0.8 per day 298.00 238.40
Coolie 8.2 per day 273.00 2238.60
Add Water charges @1% 24.77
Add overhead charge & C.P@15% 375.27
Rate per 10 cum 2877.04
Rate per 1 cum 287.70
Add cess @ 1% 0.00
3 2.26 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc in layer not…………………………..
Upto50m and lift upto 1.5m
Details of cost for 10 m
Mate 0.2 per day 298.00 59.60
Coolies 2.5 per day 273.00 682.50
Bhisti 0.2 per day 293.00 58.60
Add Water charges @1% 8.01
Add overhead charge & C.P@15% 121.31
Rate per 10 cum 930.01
Rate per 1 cum 93.00
Add cess @ 1% 0.00
4 2.28 Providing clean and coarse local sand filling in foundation and plinth……………………..
Details of cost for 10 cum
Local sand 10.0 cum 141.85 1418.50
Beldar 0.89 per day 277.00 246.53
Coolie 1.07 per day 273.00 292.11
Bhishti 0.35 per day 293.00 102.55
Add Water charges @1% 20.60
Add overhead charge & C.P@15% 312.04
Rate per 10 cum 2392.33
Rate per 1 cum 239.23
Add cess @ 1% 0.00
5 2.29.1 Surface dressing of the ground including removing vegetation and inqualities not exceeding vegetation 15 cm deep …………
Details of cost for 100 sqm
Beldar 1.97 per day 277.00 545.69
Coolies 1.29 per day 273.00 352.17
Add water charges @ 1% 8.98
Add overhead charge & C.P@15% 136.03
Cost of 100 sqm 1042.86
Add cess @ 1% 0.00
Rate per Sqm 10.43
6 4.1.2 Providing and laying in position pecified mix of (1:1.5:3) with stone aggregate 20 mm nominal size………….
Details of cost for 1 cum
20 mm stone aggregate 0.57 cum 600.85 342.48
10 mm stone aggregate 0.28 cum 664.17 185.97
Coarse sand 0.425 cum 175.80 74.72
Cement 0.4 Tonne 4568.00 1827.20
Mason 2nd class 0.1 per day 331.00 33.1
Beldar 1.63 per day 277.00 451.51
Bhishti 0.7 per day 293.00 205.10
Hire charge of Mixer 0.07 per day 800.00 56.00
Vibrator 0.07 per day 350.00 24.50
Sundries 14.3 L.S 1.8 25.74
Sundries 14.3 L.S 1.8 25.74
Add Water charges @1% 32.52
Add overhead charge & C.P@15% 492.69
Add cess @ 1% 0.00
7 4.1.3 Providing and laying in position specified mix of RCC in (1:2:4) with stone aggregate 20 mm nominal size………….
Details of cost for 1 cum
20 mm stone aggregate 0.67 cum 600.85 402.57
10 mm stone aggregate 0.22 cum 664.17 146.12
Coarse sand 0.445 cum 175.80 78.23
Cement 0.32 Tonne 4568.00 1461.76
Mason 2nd class 0.1 per day 331.00 33.10
Beldar 1.63 per day 277.00 451.51
Bhishti 0.7 per day 293.00 205.10
Hire charge of Mixer 0.07 per day 800.00 56.00
Vibrator 0.07 per day 350.00 24.50
Sundries 14.30 L.S 1.8 25.74
Sundries 14.30 L.S 1.8 25.74
Add Water charges @1% 29.10
Add overhead charge & C.P@15% 440.92
Add cess @ 1% 0.00
8 4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level 1:3:6……………………
Details of cost for 1 cum
20 mm stone aggregate 0.7 cum 600.85 420.595
10 mm stone aggregate 0.24 cum 664.17 159.401
Coarse sand 0.47 cum 175.80 82.626
Cement 0.22 Tonne 4568.00 1004.960
Mason 2nd class 0.10 per day 331.00 33.100
Beldar 1.63 per day 277.00 451.510
Bhishti 0.70 per day 293.00 205.100
Hire charge of Mixer 0.07 per day 800.00 56.000
Vibrator 0.07 per day 350.00 24.500
Sundries 14.30 L.S 1.8 25.740
Sundries 13.52 L.S 1.8 24.336
Add Water charges @1% 24.88
Add overhead charge & C.P@15% 376.91
Add cess @ 1% 0.00
9 4.11 Providing and laying damp-proof course 50 mm thick with cement concrete 1:2:4 ……………...
Details of cost for 10 sqm
cement concrete (1:2:4) 0.50 cum 2939.47 1469.736
Mason 1st class 0.40 per day 372.00 148.800
Mason 2nd class 0.40 per day 331.00 132.400
Sundries 13.52 1 time 1.8 24.336
Add Water charges @1% 17.75
Add overhead charge & C.P@15% 268.95
Rate per 10 cum 2061.98
Rate per 1 cum 206.20
Add cess @ 1% 0.00
10 4.12 Extra for providing and mixing water proofing material in cement concrete work in the proportion recommended by……………….
Approved water proffing marterials 1.0 kg 32.58 32.58
carriage of water proofing materials 3.64 1 time 1.8 6.55
Add Water charges @1% 0.39
Add overhead charge & C.P@15% 5.93
Cost of 1 per 50 kg cement 45.45
Add cess @ 1% 0.00
11 4.17 Making plinth protection 50 mm thick of cement concrete (1:3:6)……………………………..
Detail of cost for 10 sqm
Brick aggregates 40 mm 0.75 cum 1378.65 1033.99
Fine sand 0.75 cum 121.00 90.75
Labour for dressing
Beldar 0.16 per day 254.00 40.64
Coolie 0.11 per day 254.00 27.94
20 mm stone aggregate 0.35 cum 579.15 202.70
10 mm stone aggregate 0.12 cum 646.44 77.57
Coarse sand 0.23 cum 166.20 38.23
Cement 0.11 Tonne 6999.00 769.89
Labour for C.C 1:3:6 0.00
Beldar 1.0 per day 254.00 254.00
Mason 1st class 0.05 per day 342.00 17.10
Bhisti 0.33 per day 252.00 83.16
Hire charge of Mixer 13.39 L.S 1.76 23.57
Sundries 6.76 L.S 1.76 11.90
Mason (ave) 0.27 per day 305.00 82.35
Beldar 1.08 per day 254.00 274.32
Coolie 1.08 per day 254.00 274.32
Add Water charges @1% 33.02
Add overhead charge & C.P@15% 500.32
Rate per 10 cum 3835.76
Rate per 1 cum 383.58
Add cess @ 1% 3.84
12 5.1.2 Providing and laying in position specified mix of RCC in (1:1.5:3) with stone aggregate 20 mm nominal size………….
Details of cost for 1 cum
Cement concrete (from 4.1.2) 1.0 cum 3284.58 3284.577671
Mason 2nd class 0.17 per day 331.00 56.27
Beldar 2 per day 277.00 554
Bhishti 0.9 per day 293.00 263.70
Hire charge of Mixer 0.07 per day 800.00 56.00
Vibrator 0.07 per day 350.00 24.50
Sundries 14.30 L.S 1.8 25.74
Add Water charges @1% 42.65
Add overhead charge & C.P@15% 646.12
Add cess @ 1% 0.00
13 5.2.2 Reinforcement cement concrete work in wall (any thickness) including attached pilasters, buttresses, plinth and string courses,fillets, columns ,pillers, piers…………………………(1:1.5:3
Details of cost for 9.18 cum
Cement concrete (from 4.1.2) 9.2 cum 3284.58 30152.42302
Beldar 11.29 per day 277.00 3127.33
Coolie 7.53 per day 273.00 2055.69
Bhishti 8.26 per day 293.00 2420.18
Mason 1st class 0.92 per day 372.00 342.24
Mason 2nd class 0.92 per day 331.00 304.52
Hire charge of Mixer 0.64 per day 800.00 512.00
Vibrator 0.64 per day 350.00 224.00
Sundries 131.82 L.S 1.8 237.28
Scaffolding 420.03 L.S 1.8 756.05
Extra labour for lifiting material upto floor V level 17.20 per day 277 4764.40
Add Water charges @1% 448.96
Add overhead charge & C.P@15% 6801.76
Add cess @ 1% 0.00
Cost of 9.18 cum 52146.84
cost of 1 cum 5680.48
14 5.3 Reinforcement cement concrete work in beams,suspended floors,roofs having slope upto…………………………(1:2:4))
Details of cost for 1 cum
Cement concrete (1:2:4) 1.0 cum 2939.47 2939.471579
Mason 2nd class 0.24 per day 305.00 73.20
Beldar 2.75 per day 254.00 698.50
Bhishti 0.9 per day 252.00 226.80
Hire charge of Mixer 0.08 per day 800.00 64.00
Vibrator 0.08 per day 350.00 28.00
Sundries 14.30 L.S 1.8 25.74
Extra labour for lifiting material upto fllor V level 1.88 per day 254.00 477.52
Add Water charges @1% 45.33
Add overhead charge & C.P@15% 686.78
Add cess @ 1% 52.65
15 5.9.1 Providing shuttering including strutting proping etc. and its removal of form work for foundation, footing,beams, columns etc. for mass concrete.
Taking out put = 10.80sqm
Wall for panel 1250x500mm 16.00 each 837.65 13402.4
Corner angle 91.5 m long) 4.00 each 232.68 930.72
100 mm channel shoulders 2.5 m long 8.00 each 884.19 7073.52
Double clip 16.00 each 74.46 1191.36
single clip 8.00 each 57.3 458.4
Assembly nuts & bolts 1040.0 L.S 1.8 1872.00
Carriage 78 L.S 1.8 140.4
Cost for using once 759.83
Carriage 78 L.S 1.8 140.4
Fitter Gr-1 0.75 per day 379.00 284.25
Beldar 1.5 per day 277.00 415.50
Shuttering oil 52.00 L.S 1.8 93.60
sundries 26.00 L.S 1.8 46.80
Add for water charge @ 1% 17.40
Add overhead charge & C.P@15% 263.67
Rate per 10.8 sqm 2021.45
Rate per 1 sqm 187.17
Add cess @ 1% 1.87
16 5.22.7A TMT- Fe-500 8mm dia
Detail of cost for 1 quintal
Steel bars 1.05 quintal 3550.00 3727.50
Binding wire 5.0 kg 62.27 311.35
cover block 26.0 L.S 1.8 46.80
Same as per item no-5.22.1B 1.0 kg 650.80 650.80
Sundries 26.91 L.S 1.8 48.44
Add Water charges @1% 47.85
Add overhead charge & C.P@15% 724.91
cost for 100 kg 5557.65
Cost for 1 kg 55.58
Add cess @ 1% 0.00
17 5.22.7B TMT- Fe-500 10 mm dia
Detail of cost for 1 quintal
Steel bars 1.05 quintal 3450.00 3622.50
Binding wire 5.0 kg 62.27 311.35
cover block 26.0 L.S 1.8 46.80
Same as per item no-5.22.1B 1.0 kg 650.8 650.80
Sundries 26.91 L.S 1.8 48.44
Add Water charges @1% 46.80
Add overhead charge & C.P@15% 709.00
cost for 100 kg 5435.69
Cost for 1 kg 54.36
Add cess @ 1% 0.54
18 5.22.7C TMT- Fe-500 12 mm dia
Detail of cost for 1 quintal
Steel bars 1.05 quintal 3400.00 3570.00
Binding wire 5.0 kg 62.27 311.35
cover block 10.0 L.S 1.8 18.00
Same as per item no-5.22.1B 1.0 kg 650.8 650.80
Sundries 10.35 L.S 1.8 18.63
Add Water charges @1% 45.69
Add overhead charge & C.P@15% 692.17
cost for 100 kg 5306.64
Cost for 1 kg 53.07
Add cess @ 1% 0.00
19 5.22.7D TMT- Fe-500 16 mm dia
Detail of cost for 1 quintal
Steel bars 1.05 quintal 3400.00 3570.00
Binding wire 5.0 kg 62.27 311.35
cover block 26.0 L.S 1.8 46.80
Same as per item no-5.22.1B 1.0 kg 650.8 650.80
Sundries 26.91 L.S 1.8 48.44
Add Water charges @1% 46.27
Add overhead charge & C.P@15% 701.05
cost for 100 kg 5374.71
Cost for 1 kg 53.75
Add cess @ 1% 0.54
20 5.22.7E TMT- Fe-500 20 mm dia
Detail of cost for 1 quintal
Steel bars 1.05 quintal 3400.00 3570.00
Binding wire 5.0 kg 62.24 311.18
cover block 26.0 L.S 1.8 46.80
Same as per item no-5.22.1B 1.0 kg 650.8 650.80
Sundries 26.91 L.S 1.8 48.44
Add Water charges @1% 46.27
Add overhead charge & C.P@15% 701.02
cost for 100 kg 5374.51
Cost for 1 kg 53.75
Add cess @ 1% 0.00
21 6.1.12A Providing B/W in cement mortar (1:4) with bricks of class designation 100A …………………….
Details of cost for 1 cum
Bricks 0.494 thousnd 5259.00 2597.95
Cement Mortar(1:4) 0.25 cum 0.00 0.00
Sundries 2.73 1 time 1.8 4.91
Mason 1st class 0.36 per day 372.00 133.92
Mason 2nd class 0.36 per day 331.00 119.16
coolie 1.37 per day 273.00 374.01
Bhishti 0.2 per day 293.00 58.60
Add Water charges @1% 32.89
Add overhead charge & C.P@15% 498.22
Add cess @ 1% 0.00
22 6.1.14A Providing B/W in cement mortar (1:6) with bricks of class designation 100A …………………….
Details of cost for 1 cum
Bricks 0.494 thousnd 5259.00 2597.95
Cement Mortar(1:6) 0.25 cum 0.00 0.00
Sundries 2.73 1 time 1.8 4.91
Mason 1st class 0.36 per day 372.00 133.92
Mason 2nd class 0.36 per day 331.00 119.16
coolie 1.37 per day 273.00 374.01
Bhishti 0.2 per day 293.00 58.60
Add Water charges @1% 32.89
Add overhead charge & C.P@15% 498.22
Add cess @ 1% 0.00
23 6.3A Extra for Brick work in superstructure above plinth level upto loor V cum
Details of cost for 1 cum
Mason 1st class 0.11 per day 372.00 40.92
Mason 2nd class 0.11 per day 331.00 36.41
Coolie 0.43 per day 273.00 117.39
Sundries 22.36 1 time 1.8 40.25
Coolie 1.13 per day 273.00 308.49
Add water charges @ 1% 5.43
Add overhead charge & C.P@15% 82.33
Add cess @ 1% 0.00
24 6.18 Half brick masonary with brick of class designation 100A in foundation and plinth in
6.18.4A Cement mortar 1:4
Details of cost for 10 sqm
Bricks 0.565 thousnd 5485.00 3099.03
Cement Mortar(1:4) 0.28 cum 3116.75 872.69
Sundries 13.52 1 time 1.76 23.80
Mason 1st class 0.45 per day 342.00 153.90
Mason 2nd class 0.45 per day 305.00 137.25
coolie 1.55 per day 254.00 393.70
Bhishti 0.7 per day 252.00 176.40
Add Water charges @1% 48.57
Add overhead charge & C.P@15% 735.80
Cost of 10 sqm 5641.13
Cost of 1 sqm 564.11
Add cess @ 1% 56.41
25 6.19A Extra for half Brick work in superstructure above plinth level upto loor V level
Details of cost for 10 cum
Mason 1st class 0.15 per day 342.00 51.30
Mason 2nd class 0.15 per day 305.00 45.75
Coolie 0.45 per day 254.00 114.30
Extra labour for lifting of materials Coolie 1.29 per day 254.00 327.66
Add water charges @ 1% 5.39
Add overhead charge & C.P@15% 81.66
Cost of 10 sqm 626.06
Cost of 1 sqm 62.61
Add cess @ 1% 0.63
26 8.11A Providing and laying machine cut mirror/eggshell polished , marble stone work for wall lining (veneer work) including dado ,skirting ,risers of step etc………………..
Details of cost for 1.0 sqm
Details of cost for 0.5 sqm
Finished work = 0.5 sqm
Add for wastage 2 0% = 0.1 sqm
18 mm thick italian Marble stone slab 0.6 sqm 3465.08 2079.05
Carriage of stone blocks 0.03 tonne 94.80 2.84
Rate as per Item no-2112 of mortar(1:3) 0.008 cum 3254.47 26.04
White cement 0.00165 tonne 14567.90 24.04
Slurry @ 3.3 kg/sqm
carriage of cement 0.00165 tonne 94.80 0.16
Mortar for pointing in white cement 25.35 L.S 1.76 44.62
Mason 1st class 0.335 per day 342.00 114.57
Bandhani 0.335 per day 261.00 87.44
Beldar 0.335 per day 254.00 85.09
Coolie 0.335 per day 254.00 85.09
Bhishti 0.335 per day 252.00 84.42
Mate 0.135 per day 275.00 37.13
Blacksmith 1st class 0.135 per day 342.00 46.17
Scaffolding 13.39 per day 1.76 23.57
Add water charges @ 1% 27.40
Add overhead charge & C.P@15% 415.14
Cost of 0.5 sqm 3182.75
Cost of 1 sqm 6365.49
Add cess @ 1% 63.65
27 9.1 Providing wood work in frames of doors, windows, clerestory windows and and other frames ,wrought framed and ixed in position.
Details of cost for chowkhat of a door 0.036 cum
Carriage of timber 0.04 cum 121.88 4.88
Carpenter(Ave) 0.72 per day 305.00 219.60
Beldar 0.07 per day 254.00 17.78
Add water charges @ 1% 22.98
Add overhead charge & C.P@15% 348.21
Cost of 0.036 cum 2669.59
Cost of 1 sqm 74155.23
Add cess @ 1% 741.55
28 9.5 Providing and fixing panelled or panelled and glazed shutters for door,windows and clestory windows, inludinh ISI marked ….
9.5.1.2 30 mm thick shutters
Details of cost for 2.16 sqm
Second class teak wood in planks 44.00 10cudm 754.41 3319.40
Screws20 mm 8.00 100Nos 31.21 2.50
Carpenter(Ave) 1.83 Day 305.00 558.15
Beldar 0.76 Day 254.00 193.04
Sundries 35.88 L.S 1.76 63.15
Add water charges @ 1% 42.25
Add CP& OH @ 15% 640.04
Cost of 2.16 sqm 4906.97
Cost of 1 sqm 2271.75
Labour cess @ 1 % 22.72
Rate including cess 2294.46
29 9.2 Providing and fixing ISI marked flush door shutters conferming to Is:2202 ( PartI ) decorative type …………………………
9.20.2 30 mm thick shutters
Details of cost for 2.20 sqm
Flush door 2.20 sqm 1612.87 3548.31
Carriage of door 29.64 L.S 1.76 52.17
Carpenter(Ave) 0.55 Day 305.00 167.75
Beldar 0.55 Day 254.00 139.70
Add water charges @ 1% 41.58
Add CP& OH @ 15% 629.89
Cost of 2.2 sqm 4829.14
Cost of 1 sqm 2195.06
Labour cess @ 1 % 21.95
Rate including cess 2217.01
30 9.48 Providing and fixing M.S grills of required opattern in frames of windows etc. with M.S flats, square or round bars etc including…….
9.48.2 Details of cost for a grill 90x120cm=1.08 sqm
M.S. bar 16 mm dia metre 11x86cm=9.46m @1.58 kg/m=14.95 kg Add water charges @ 10% =1.50 kg=16.45kg say 0 .165 Q
M.S flat 25x3.15mm 2x120 cm =2.40m 2x90cm = 1.80m 1x120cm = 1.20m 2x15cm =.30 = 5.70m 5.70m @ 0.63kg/m =3.59kg Add wastage @10%=0.36 = 3.95kg say 4 kg or 0.04q 0.165 quintal 3606.75 595.11
Flats upto 10 mm thick 0.04 quintal 4370.37 174.81
carriage of steel 0.165+0.04=0.205q =0.0205 t say 0.02 0.02 tonne 94.8 1.90
sundries 26.91 L.S 1.76 47.36
Welding charges 19.76 L.S 1.76 34.78
Priming coat Rate as per item no-13.81.3 1.08 sqm 25.20 27.22 A
blacksmith 1st dass 0.86 per day 342.00 294.12
beldar 1.1 per day 254.00 279.40
Rawl plug 50 mm 8 each 10.4 83.20
Fixing of rawl plugs 26 L.S 1.76 45.76
Add water charges @ 1% except on A=1583.66 -27.22=1556.44 15.56
Cost of 18.54 kg 1835.02
Cost of 1 kg 98.98
labout cess @ 1 % 0.99
31 10.18 Providing and fixing circular/hexagonal cast iron or M.S sheet box for ceiling fan clamp 140 mm internal dia………………………………
Circular C.I box 1 each 62.43 62.43
Wastage 0.008 quintal 3606.75 28.85
Black smith 2nd class 0.03 per day 305 9.15
Beldar 0.03 per day 254 7.62
Sundries 0.7 L.S 1.76 1.23
Add Water charges @1% 0.01
Add overhead charge & C.P@15% 16.58
Add cess @ 1% 1.27
32 11.36 Providing and laying 1st quality ceramic glazed wall tiles conferming to IS : 15622………………
Details of cost for 1 sqm
cerasmic tiles 1.05 sqm 312.17 327.78
Carriage of tiles 6.24 L.S 1.76 10.98
mortar for pointing in white cement 40.43 L.S 1.76 71.16
Cement for [email protected] Kg/sqm 0.003 tonne 6999 21.00
Mason 1st class 0.25 per day 342 85.50
Coolie 0.25 per day 254 63.50
Sundries 26.91 L.S 1.76 47.36
Add Water charges @1% 0.64
Add overhead charge & C.P@15% 117.65
Add cess @ 1% 9.02
33 11.38 Providing and laying 1st quality ceramic glazed floor tiles 300x300 mmconferming to IS : 15622………………
Details of cost for 1 sqm
cerasmic tiles 1.05 sqm 390.21 409.72
Carriage of tiles 6.24 L.S 1.76 10.98
mortar for pointing in white cement 40.43 L.S 1.76 71.16
Cement for [email protected] Kg/sqm 0.003 tonne 6999 21.00
Mason 1st class 0.25 per day 342 85.50
Coolie 0.25 per day 254 63.50
Sundries 26.91 L.S 1.76 47.36
Add Water charges @1% 0.64
Add overhead charge & C.P@15% 134.33
Add cess @ 1% 10.30
34 11.46 Providing and laying verified tiles in different sizes ( Thickness to be specified by manufactures) wirh ………………………
11.46.2 Size of tiles 600x600 mm
Details of cost for 1 sqm
Vitrified floor tiles 1.025 sqm 915.7 938.59
Carriage of tiles 6.24 L.S 1.76 10.98
mortar for pointing in white cement 3.64 L.S 1.76 6.41
Cement for [email protected] Kg/sqm 0.0033 tonne 6999 23.10
Mason 1st class 0.25 per day 342 85.50
Coolie 0.25 per day 254 63.50
Sundries 26.91 L.S 1.76 47.36
Add Water charges @1% 0.64
Add overhead charge & C.P@15% 199.87
Add cess @ 1% 15.32
35 11.72 Providing designation 100 A brick flat soling in foundation and plinth……………………..
Details of cost for 9.3sqm
Bricks 300.00 thousand 5485.00 1645.50
Local Sand 0.14 cum 121.00 16.94
Sundries 1.50 1 time 1.76 2.64
Mason 2nd class 0.50 per day 305.00 152.50
unskilled labour 1.00 per day 254.00 254.00
Add overhead charge & C.P@15% 310.737
Add cess @ 1% 23.823
Rate per sqm 258.72
36 13.11.4 Providing 12 mm thick cement plaster In CM (1:6)……………..
Details of cost for 10 sqm
Cement Mortar(1:6) 0.144 cum 2206.58 317.75
Mason 2nd class 0.67 per day 305.00 204.35
coolie 0.75 per day 254.00 190.50
Bhishti 0.92 per day 252.00 231.84
Sundries 12.61 1 time 1.76 22.19
Add Water charges @1% 9.67
Add overhead charge & C.P@15% 146.44
Rate for 10 sqm 1122.74
Rate for 1 sqm 112.27
Add cess @ 1% 1.12
37 13.24.2 6 mm thick cement plaster to celing of mix 1:4
Details of cost for 10 sqm
Cement Mortar(1:4) 0.072 cum 3116.75 224.41
Mason 2nd class 0.51 per day 305.00 155.55
coolie 0.92 per day 254.00 233.68
Bhishti 0.92 per day 252.00 231.84
Extra for removing burrs, cleaning with wire 12.61 L.S 1.76 22.19
Scaffolding & Sundries 8.06 L.S 1.76 14.19
Add Water charges @1% 8.82
Add overhead charge & C.P@15% 133.60
Rate for 10 sqm 1024.27
Rate for 1 sqm 102.43
Add cess @ 1% 1.02
38 13.40A Providing and laying plaster of paris putty of 2 mm thickness over plastered surface to preoare the surface even and smooth complete.
Details of cost for 10 sqm
Plaster of paris 23.00 Kg 4.16 95.68
Carriage of plaster of paris 3.90 L.S 1.76 6.86
Mason special 0.91 per day 342.00 311.22
Beldar 0.91 per day 254.00 231.14
Scaffolding & Sundries 83.98 L.S 1.76 147.80
Add Water charges @1% 7.93
Add overhead charge & C.P@15% 120.10
Rate for 10 sqm 920.73
Rate for 1 sqm 92.07
Add cess @ 1% 0.92
39 13.46 Finishing walls with Acrylic exterior paint of required shade:
13.46.1 New work (Two or more coat applied @1.67 ltr/10 sqm over and including priming coat of exterior primer applied @2.20 Kg/10 sqm.
Details of cost for 10 sqm
Acylic exterior paint 1.67 Litre 145.68 243.29
Exterior primer 2.20 Kg 41.62 91.56
Carriage of Materials 1.56 L.S 1.76 2.75
Painter 0.60 per day 323.00 193.80
Coolie 0.3 per day 254.00 76.20
Bhisti 0.05 per day 252.00 12.60
Brushers, sand paper etc. 7.15 L.S 1.76 12.58
Sundries 8.06 L.S 1.76 14.19
Add Water charges @1% 6.47
Add overhead charge & C.P@15% 98.02
Rate for 10 sqm 751.45
Rate for 1 sqm 75.14
Add cess @ 1% 0.75
40 13.78 Applying one coat of cement primer of approved brand and manufacture on wall surface:
13.78.2 Distemper primer
Details of cost for 10 sqm
Distemper primer 0.81 Litre 93.65 75.86
Brushes , putty etc 2.75 Kg 1.76 4.84
Painter 0.40 per day 323.00 129.20
Coolie 0.20 per day 254.00 50.80
Sundries including carriage 3.1 L.S 1.76 5.46
Add Water charges @1% 2.66
Add overhead charge & C.P@15% 40.32
Rate for 10 sqm 309.14
Rate for 1 sqm 30.91
Add cess @ 1% 0.31
41 13.81.1 Applying priming coat with ready mixed pink or grey primer of approved brand and manufacture on wood work ( hard and soft wood)
Details of cost for 10 sqm
Primer 0.75 Litre 93.65 70.24
Putty 2.73 1 time 1.76 4.80
Carriage of Materials 0.39 1 time 1.76 0.69
Painter 0.25 per day 323.00 80.75
Coolie 0.25 per day 254.00 63.50
Brushers, sand paper etc. 5.33 L.S 1.76 9.38
Sundries 10.79 L.S 1.76 18.99
Add Water charges @1% 2.48
Add overhead charge & C.P@15% 37.63
Rate for 10 sqm 288.46
Rate for 1 sqm 28.85
Add cess @ 1% 0.29
42 13.92.1 Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:- Two or more coat on new work
Details of cost for 10 sqm
Plastic emulsion paint 1.21 Litre 187.30 226.63
Materials for filling in holes & cracks9putty etc.) 2.60 1 time 1.76 4.58
Carriage of Materials 0.55 1 time 1.76 0.97
Painter 0.54 per day 323.00 174.42
Coolie 0.54 per day 254.00 137.16
Brushers, sand paper etc. 4.15 L.S 1.76 7.30
Sundries 2.60 L.S 1.76 4.58
Add Water charges @1% 5.56
Add overhead charge & C.P@15% 84.18
Rate for 10 sqm 645.37
Rate for 1 sqm 64.54
Add cess @ 1% 0.65
43 13.94.1 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:- Two or more coat on new work; on new work over an under coat of suitable shade with…………………………….
Details of cost for 10 sqm
Primer 0.75 Litre 93.65 70.24
Putty 1.05 1 time 1.76 1.85
Carriage of Materials 0.15 1 time 1.76 0.26
Painter 0.25 per day 323.00 80.75
Coolie 0.25 per day 254.00 63.50
Brushers, sand paper etc. 2.05 L.S 1.76 3.61
Sundries 4.15 L.S 1.76 7.30
Enamel paint 1.16 Litre 135.27 156.91
Carriage of paint and material 0.55 1 time 1.76 0.97
Painter 0.54 per day 323 174.42
Coolie 0.54 per day 254 137.16
Brushers, sand paper etc. 2.6 1 time 1.76 4.58
Sundries 3.1 1 time 1.76 5.46
Add Water charges @1% 7.07
Add overhead charge & C.P@15% 107.11
Rate for 10 sqm 821.19
Rate for 1 sqm 82.12
Add cess @ 1% 0.82
SL NO. SOR DESCRIPTION Qty Unit Rate Amount
1 2.8 Earth work inexcavation in foundation trenches ………………..
Details of cost for 10 cum
Mate 0.8 per day 261.00 208.80
Coolie 8.2 per day 254.00 2082.80
Add Water charges @1% 22.916
Add overhead charge & C.P@15% 347.177
Rate per 10 cum 2661.693
Rate per 1 cum 266.169
Add cess @ 1% 2.662
2 2.28 Providing clean and coarse local sand filling in foundation and plinth……………………..
Details of cost for 10 cum
Local sand 10 cum 67.66 676.60
Beldar 0.89 per day 254.00 226.06
Coolie 1.07 per day 254.00 271.78
Bhishti 0.35 per day 243.00 85.05
Add Water charges @1% 12.595
Add overhead charge & C.P@15% 190.813
Rate per 10 cum 1462.898
Rate per 1 cum 146.290
Add cess @ 1% 1.463
3 11.73 Providing designation 100 A brick on edge soling in foundation and plinth……………………..
Details of cost for 9.3sqm
Bricks 500.00 thousand 5196.00 2598.00
Local Sand 0.283 cum 67.66 19.15
Sundries 1.50 1 time 1.76 2.64
Mason 2nd class 0.65 per day 295.00 191.75
unskilled labour 1.25 per day 254.00 317.50
Add overhead charge & C.P@15% 469.356
Add cess @ 1% 35.984
Rate per sqm 390.79
4 4.1.3 Providing and laying in position specified mix of RCC in (1:2:4) with stone aggregate 20 mm nominal size………….
Details of cost for 1 cum
20 mm stone aggregate 0.67 cum 456.33 305.74
10 mm stone aggregate 0.22 cum 520.42 114.49
Coarse sand 0.445 cum 110.69 49.26
Cement 0.32 Tonne 5468.00 1749.76
Mason 2nd class 0.1 per day 295.00 29.50
Beldar 1.63 per day 254.00 414.02
Bhishti 0.7 per day 243.00 170.10
Hire charge of Mixer 0.07 per day 800.00 56.00
Vibrator 0.07 per day 350.00 24.50
Sundries 14.30 L.S 1.76 25.17
Add Water charges @1% 29.39
Add overhead charge & C.P@15% 445.19
Add cess @ 1% 34.13
5 5.9.1 Providing shuttering including strutting proping etc. and its removal after use in various companants of canal structure or embankment structure as per specification & direction of E/1
Taking out put = 10.80sqm
Wall for panel 1250x500mm 16.00 each 1127.16 18034.56
Corner angle 91.5 m long) 4.00 each 322.05 1288.2
100 mm channel shoulders 2.5 m long 8.00 each 1245.24 9961.92
Double clip 16.00 each 104.13 1666.08
single clip 8.00 each 82.66 661.28
Assembly nuts & bolts 1040.0 L.S 1.76 1830.40
Carriage 78 L.S 1.76 137.28
Cost for using once 783.98
Carriage 78 L.S 1.76 137.28
Fitter Gr-1 0.75 per day 336.00 252.00
Beldar 1.5 per day 247.00 370.50
Shuttering oil 52.00 L.S 1.76 91.52
sundries 26.00 L.S 1.76 45.76
Add for water charge @ 1% 16.81
Add overhead charge & C.P@15% 254.68
Rate per 10.8 sqm 1952.53
Rate per 1 sqm 180.79
Add cess @ 1% 1.81
6 2.26 Filling available excavated earth in trenches, plinth, sides of foundation etc…..
Details of cost for 10 cum
Mate 0.2 per day 261.00 52.20
Coolie 2.5 per day 247.00 617.50
Bhishti 0.2 per day 243.00 48.60
Add Water charges @1% 7.18
Add overhead charge & C.P@15% 108.82
Rate per 10 cum 834.31
Rate per 1 cum 83.43
Add cess @ 1% 0.83
SL NO. SOR DESCRIPTION Qty Unit Rate Amount
1 15.7.4 Demolishing brick work including stacking of serviceable materials and disposal of unserviceable materials within 50 metres leads.
Details of cost for 1 cum
Beldar 1.06 per day 254.00 269.24
Coolie 0.9 per day 254.00 228.60
Sundries 2.4 1 time 1.76 4.22
Add Water charges @1% 5.02
Add overhead charge & C.P@15% 76.06
Rate per cum 567.21
Add cess @ 1% 5.67
2 2.8.1 Earth work inexcavation in foundation trenches ………………..
Details of cost for 10 cum
Mate 0.8 per day 275.00 220.00
Coolie 8.2 per day 254.00 2082.80
Add Water charges @1% 23.03
Add overhead charge & C.P@15% 348.87
Rate per 10 cum 2674.70
Rate per 1 cum 267.47
Add cess @ 1% 2.67
3 2.28 Providing clean and coarse local sand filling in foundation and plinth……………………..
Details of cost for 10 cum
Local sand 10.0 cum 121.00 1210.00
Beldar 0.89 per day 254.00 226.06
Coolie 1.07 per day 254.00 271.78
Bhishti 0.35 per day 252.00 88.20
Add Water charges @1% 17.96
Add overhead charge & C.P@15% 272.10
Rate per 10 cum 2086.10
Rate per 1 cum 208.61
Add cess @ 1% 2.09
4 5.1.2 Providing and laying in position specified mix of RCC in (1:1.5:3) with stone aggregate 20 mm nominal size………….
Details of cost for 1 cum
Cement concrete (from 4.1.2) 1.0 cum 3381.35 3381.35
Mason 2nd class 0.17 per day 305.00 51.85
Beldar 2 per day 254.00 508
Bhishti 0.9 per day 252.00 226.80
Hire charge of Mixer 0.07 per day 800.00 56.00
Vibrator 0.07 per day 350.00 24.50
Sundries 14.30 L.S 1.76 25.17
Add Water charges @1% 42.74
Add overhead charge & C.P@15% 647.46
Add cess @ 1% 49.64
5 5.9.1 Providing shuttering including strutting proping etc. and its removal of form work for foundation, footing,beams, columns etc. for mass concrete.
Taking out put = 10.80sqm
Wall for panel 1250x500mm 16.00 each 1092.59 17481.44
Corner angle 91.5 m long) 4.00 each 322.05 1288.2
100 mm channel shoulders 2.5 m long 8.00 each 1245.24 9961.92
Double clip 16.00 each 104.13 1666.08
single clip 8.00 each 82.66 661.28
Assembly nuts & bolts 1040.0 L.S 1.76 1830.40
Carriage 78 L.S 1.76 137.28
Cost for using once 759.83
Carriage 78 L.S 1.76 137.28
Fitter Gr-1 0.75 per day 348.00 261.00
Beldar 1.5 per day 254.00 381.00
Shuttering oil 52.00 L.S 1.76 91.52
sundries 26.00 L.S 1.76 45.76
Add for water charge @ 1% 16.76
Add overhead charge & C.P@15% 253.97
Rate per 10.8 sqm 1947.13
Rate per 1 sqm 180.29
Add cess @ 1% 1.80
6 5.22.7A TMT- Fe-500 8mm dia
Detail of cost for 1 quintal
Steel bars 1.05 quintal 5266.30 5529.62
Binding wire 5.0 kg 63.39 316.95
cover block 26.0 L.S 1.76 45.76
Same as per item no-5.22.1B 1.0 kg 643.36 643.36
Sundries 26.91 L.S 1.76 47.36
Add Water charges @1% 65.83
Add overhead charge & C.P@15% 997.33
cost for 100 kg 7646.21
Cost for 1 kg 76.46
Add cess @ 1% 0.76
7 5.22.7B TMT- Fe-500 10 mm dia
Detail of cost for 1 quintal
Steel bars 1.05 quintal 5161.30 5419.37
Binding wire 5.0 kg 63.39 316.95
cover block 26.0 L.S 1.76 45.76
Same as per item no-5.22.1B 1.0 kg 643.36 643.36
Sundries 26.91 L.S 1.76 47.36
Add Water charges @1% 64.73
Add overhead charge & C.P@15% 980.63
cost for 100 kg 7518.15
Cost for 1 kg 75.18
Add cess @ 1% 0.75
8 5.22.7C TMT- Fe-500 12 mm dia
Detail of cost for 1 quintal
Steel bars 1.05 quintal 5108.20 5363.61
Binding wire 5.0 kg 63.39 316.95
cover block 10.0 L.S 1.76 17.60
Same as per item no-5.22.1B 1.0 kg 643.36 643.36
Sundries 10.35 L.S 1.76 18.22
Add Water charges @1% 63.60
Add overhead charge & C.P@15% 963.50
cost for 100 kg 7386.83
Cost for 1 kg 73.87
Add cess @ 1% 0.74
9 6.18 Half brick masonary with brick of class designation 100A in foundation and plinth in
6.18.4A Cement mortar 1:4
Details of cost for 10 sqm
Bricks 0.565 thousnd 5485.00 3099.03
Cement Mortar(1:4) 0.28 cum 3116.75 872.69
Sundries 13.52 1 time 1.76 23.80
Mason 1st class 0.45 per day 342.00 153.90
Mason 2nd class 0.45 per day 305.00 137.25
coolie 1.55 per day 254.00 393.70
Bhishti 0.7 per day 252.00 176.40
Add Water charges @1% 48.57
Add overhead charge & C.P@15% 735.80
Cost of 10 sqm 5641.13
Cost of 1 sqm 564.11
Add cess @ 1% 56.41
10 6.19A Extra for half Brick work in superstructure above plinth level upto loor V level
Details of cost for 10 cum
Mason 1st class 0.15 per day 342.00 51.30
Mason 2nd class 0.15 per day 305.00 45.75
Coolie 0.45 per day 254.00 114.30
Extra labour for lifting of materials Coolie 1.29 per day 254.00 327.66
Add water charges @ 1% 5.39
Add overhead charge & C.P@15% 81.66
Cost of 10 sqm 626.06
Cost of 1 sqm 62.61
Add cess @ 1% 0.63
11 11.72 Providing designation 100 A brick flat soling in foundation and plinth……………………..
Details of cost for 9.3sqm
Bricks 300.00 thousand 5485.00 1645.50
Local Sand 0.14 cum 121.00 16.94
Sundries 1.50 1 time 1.76 2.64
Mason 2nd class 0.50 per day 305.00 152.50
unskilled labour 1.00 per day 254.00 254.00
Add overhead charge & C.P@15% 310.737
Add cess @ 1% 23.823
Rate per sqm 258.72
12 13.11.4 Providing 12 mm thick cement plaster In CM (1:6)……………..
Details of cost for 10 sqm
Cement Mortar(1:6) 0.144 cum 2206.58 317.75
Mason 2nd class 0.67 per day 305.00 204.35
coolie 0.75 per day 254.00 190.50
Bhishti 0.92 per day 252.00 231.84
Sundries 12.61 1 time 1.76 22.19
Add Water charges @1% 9.67
Add overhead charge & C.P@15% 146.44
Rate for 10 sqm 1122.74
Rate for 1 sqm 112.27
Add cess @ 1% 1.12
13 13.79.1 Painting walls with water proofing cement paint of approved rands and manufacture and of required shade to give an even shade.
New work (three or more coats)
Details of cost for 10 sqm
water profing cement paint 5.47 kg 46.83 256.16
carriage of materials 1.56 1 time 1.76 2.75
painter 0.6 per day 323 193.80
coolie 0.3 per day 254.00 76.20
Bhishti 0.1 per day 252.00 25.20
Brusher , Sand paper etc 7.15 1 time 1.76 12.58
Sundries 8.06 1 time 1.76 14.19
Add Water charges @1% 5.81
Add overhead charge & C.P@15% 88.00
Rate per 10 cum 674.69
Rate per 1 cum 67.47
Add cess @ 1% 0.67
SCHEDULE II Dt 17.06.2021
Approved Schedule of Rates for labour engaged in Dam construction & Irrigation works
Sl. No. Category of Employee Minimum Rates of wages per day as per SRC Lt 15(inc) dated 26.04.2022
Labour Dept.Noti.No. 1231/31.03.21 Labour Dept.Noti.No. 1231/31.03.21 Labour Dept.Noti.No. 1231/31.03.21 Labour Dept.Noti.No. 1231/31.03.21 Labour Dept.Noti.No. 1231/31.03.21
1 Unskilled Labour 428 428 428 428 428
5 Printer Class-I 538 538 538 538 538
6 Printer Class-II 508 508 508 508 508
7 Head Carpenter 660 660 660 660 660
9 Head Black Smith 660 660 660 660 660
12 Stone Dressoer 541 541 541 541 541
13 Water Carrieer 417 417 417 417 417
14 Fitter clss-I 660 660 660 660 660
15 Fitter clss-II 541 541 541 541 541
19 Road Roller Driver 660 660 660 660 660
20 Concrete Mixer Operator, Class-I 660 660 660 660 660
21 Concrete Mixer Operator, Class-II 541 541 541 541 541
22 Stone Crusher Driver, Class-I 660 660 660 660 660
23 Stone Crusher Driver, Class-II 541 541 541 541 541
24 Truck Driver 660 660 660 660 660
25 Compresser Operator, Class-I 660 660 660 660 660
26 Compresser Operator, Class-II 541 541 541 541 541
27 Pump Driver, Class-I 541 541 541 541 541
28 Pump Driver, Class-II 444 444 444 444 444
29 Concrete Mixer Attendant 444 444 444 444 444
30 Cleaner or Oilman 444 444 444 444 444
31 TarBoiler Man 541 541 541 541 541
34 Khalasi / Chainman 444 444 444 444 444
37 Stone Breaker 444 444 444 444 444
40 Welder, Grade-I 660 660 660 660 660
41 Welder, Grade-II 541 541 541 541 541
42 Wireman/Lineman 541 541 541 541 541
43 Mechanic, Grade-I 660 660 660 660 660
44 Mechanic, Grade-II 541 541 541 541 541
46 Drill Operator 541 541 541 541 541
47 Tractor Operator 541 541 541 541 541
48 Gauge Reader-cum-silt Observer 445 445 445 445 445
49 Crane Operator, Grade-I 660 660 660 660 660
50 Crane Operator, Grade-II 541 541 541 541 541
51 Dragline /Scraper/ Showel Operator 660 660 660 660 660
52 Dragline/Scraper/Showel Operator 541 541 541 541 541
53 Dumper Operator 541 541 541 541 541
55 Junior Forman 444 444 444 444 444
57 Electrician, Grade-I 660 660 660 660 660
58 Electrician, Grade-II 541 541 541 541 541
59 Electrician, Grade-III 445 445 445 445 445
61 Compounder 660 660 660 660 660
62 Superviser / (Diploma holder) 660 660 660 660 660
63 Surveyer / Supervisor 541 541 541 541 541
64 Blue Printer 445 445 445 445 445
66 Vibrator Operator 541 541 541 541 541
67 Clerk / Typist / Typist Clerk 541 541 541 541 541
68 Earth Excavator
(a) For every 110 cubic feet of soft earth 444 444 444 444 444
(b) For every 100 cubic feet of hard earth 444 444 444 444 444
(c) For every 90 cubic feet of highly hard earth 444 444 444 444 444
69 Any other category of semi-skilled workers not mentioned above 444 444 444 444 444
70 Any other category of skilled workers not mentioned above 541 541 541 541 541
71 Highly skilled labour 660 660 660 660 660
CHAPTER-II WRD SOR 01.10.2020 and Cement+Bitumin+Steel Rate from Lt dt 21.06.2021
LIST OF APPROVED BASIC RATES OF CONSTRUCTION MATERIALS AT SOURCE (Latest)
The rate are inclusive of all taxes and Royality and Exclusive of Contractor's profit and Overhead charges
Sr.No. Ref. Code No. NAME OF MATERIALS UNIT Basic rate without Tax & Royality Enhanced by …... % as per R.B.I.Price index Revised rate without VAT & Royality Enhanced by…. % as per R.B.I.Price index Royality Revised Rate with Royality and without GST GST IN %(In Rate witout Royality) Revised Rate with ALL TAXES & ROYALITY Refrence
1 Cement (as per T.E.C Letter No.23 dated 28.02.06,capacity of one bag of cement = 0.034 Cum)
M-1 (i) Ordinary Portland Cement (O.P.C-43 Grade) (Unit-Per bag of 50 kg)approved by State Level schedule rate Committee(for preparation of schedule of rate only) - materials should conform to relevant BIS/IRC/MORT&H Specifications. Per M3
M-2 (ii) Ordinary Portland Cement (O.P.C-33 Grade) (Unit-Per bag of 50 kg)approved by State Level Committee(for preparation of schedule of rate only) - Materials should conform to relevant BIS/IRC/MORT&H Specifications.
M-3A (iii) Portland Pozzolana Cement (P.P.C) (Unit-Per bag of 50 kg)approved by State Level Committee(for preparation of schedule of rate only) - Materials should conform to relevant BIS/IRC/MORT&H Specifications.
M-3B (iv) Portland Slag Cement (P.S.C) (Unit-Per bag of 50 kg)approved by State Level Committee(for preparation of schedule of rate only)-Materials should conform to relevant BIS/IRC/MORT&H Specifications.
a Bitumen Grade VG 40 (30/40) Packed
(i) Ex.Haldia Per M.T INPUT 0 #VALUE! 0 #VALUE! 18 #VALUE!
(ii) Ex.Barauni Per M.T INPUT 0 #VALUE! 0 #VALUE! 18 #VALUE!
(iii) Ex.Giddha Per M.T INPUT 0 #VALUE! 0 #VALUE! 18 #VALUE!
b Bitumen Grade VG 30 (60/70) Packed
c Bitumen Grade VG10 (80/100) Packed
d Bitumen GradeVG30 ( 60/70) Bulk
(i) Ex.Haldia Per M.T INPUT 0 #VALUE! #VALUE! 18 #VALUE!
e Bitumen Grade VG 10 ( 80/100 ) Bulk
(i) Ex.Haldia Per M.T INPUT 0 #VALUE! #VALUE! 18 #VALUE!
f Modified Graded Bitumen 0.00 SRC LT 23 (Anu) Dated 06.06.2022
(i)CRMB- 50 Packed Ex.Barauni Per M.T INPUT 0 #VALUE! #VALUE! 18 #VALUE!
(ii)CRMB -50 Packed Ex.Muzaffarpur Per M.T INPUT 0 #REF! #REF! 18 #REF!
(iii)CRMB- 50 Packed Ex.Gaya Per M.T INPUT 0 63040.00 63040.00 18 74387.20
(iv)CRMB- 50 Packed Ex.Patna (Fatuha) Per M.T 63040.00 0 63040.00 63040.00 0 63040.00 SRC LT 23 (Anu) Dated 06.06.2022
(v) CRMB -55 Packed Ex.Barauni Per M.T 50452.00 0 50452.00 50452.00 0 50452.00
(vi)CRMB -55 Packed Ex.Gaya Per M.T 32170.00 0 32170.00 32170.00 18 37960.60
(vii)CRMB- 55 Packed Ex Patna Per M.T 32367.50 0 32367.50 32367.50 18 38193.70
(viii)CRMB- 55 Packed Ex Muzaffarpur Per M.T 47795.00 0 47795.00 47795.00 0 47795.00
(ix)CRMB- 60 Packed Ex.Barauni Per M.T INPUT 0 #VALUE! #VALUE! 18 #VALUE!
(x)CRMB -60 Packed Ex-Patna Per M.T 0 0.00 0.00 18 0.00
(xi) CRMB- 60 Packed Ex Muzaffarpur Per M.T 0 0.00 0.00 18 0.00
(xii)CRMB -60 Packed Ex Gaya Per M.T 0 0.00 0.00 18 0.00
g Bitumen Emulsion
(A) RS1 (packed) Drum
(i) RS1 (packed) Drum Ex. Patna Per M.T 33645.00 0 33645.00 33645.00 18 39701.10
(ii) RS1 (packed) Drum Ex. Gaya Per M.T 33845.00 0 33845.00 33845.00 18 39937.10
(iii) RS1 (packed) Drum Ex. Muzaffarpur Per M.T 33395.00 0 33395.00 33395.00 18 39406.10
(B) MS (packed) Drum
(i) MS (packed) Drum Ex. Patna Per M.T 35281.00 0 35281.00 35281.00 18 41631.60
(ii) MS (packed) Drum Ex. Gaya Per M.T 35431.00 0 35431.00 35431.00 18 41808.60
(iii) MS (packed) Drum Ex. Muzaffarpur Per M.T 34981.00 0 34981.00 34981.00 18 41277.60
(c) SS1 (Packed) Drum
(i) SS1 (Packed) Drum Ex.Patna Per M.T 35895.00 0 35895.00 35895.00 18 42356.10
(ii) SS1 (Packed) Drum Ex.Gaya Per M.T 36095.00 0 36095.00 36095.00 18 42592.10
(iii) SS1 (Packed) Drum Ex.Muzaffarpur Per M.T 35645.00 0 35645.00 35645.00 18 42061.10
3 0368 White Cement Per M.T
4 M-5 G.C sheets thickness in mm
5 M-6 Wire Rod in COIL
6 M-7 Joist size in mm
iv. 200x100 Per M.T INPUT 0 INPUT INPUT 18 #VALUE!
vi. 250x125 Per M.T INPUT 0 INPUT INPUT 18 #VALUE!
vii. 300x140 Per M.T INPUT 0 INPUT INPUT 18 #VALUE!
ix.400x140 Per M.T INPUT 0 INPUT INPUT 18 #VALUE!
x. 450 x 150 Per M.T INPUT 0 INPUT INPUT 18 #VALUE!
xii. 600x210 Per M.T INPUT 0 INPUT #REF! 18 #REF!
7 M-8 Channel size in mm
i. 75x40 Per M.T INPUT 0 #VALUE! #VALUE! 18 #VALUE!
v.175x75 Per M.T INPUT 0 #VALUE! #VALUE! 18 #VALUE!
vi.200 x 75 Per M.T input 0 #VALUE! #VALUE! 18 #VALUE!
vii.250 x 82 Per M.T INPUT 0 #VALUE! #VALUE! 18 #VALUE!
viii.300 x 90 Per M.T INPUT 0 #VALUE! #VALUE! 18 #VALUE!
ix.400 x 100 Per M.T INPUT 0 #VALUE! #VALUE! 18 #VALUE!
8 M-9 Steel Angle size in mm
i) 50 x50 x6 Per M.T input 0 #VALUE! #VALUE! 18 #VALUE!
ii) 60 x 60 x6 Per M.T input 0 #VALUE! #VALUE! 18 #VALUE!
iii) 65x65x6 Per M.T input 0 #VALUE! #VALUE! 18 #VALUE!
9 M-10A T.M.T bars
T.M.T Fe -500- 36 mm Per M.T INPUT 0 #VALUE! #VALUE! 18 #VALUE!
10 M-11 100A Bricks (Rate of 02.03.2017 of SCRC)
(ii) For Darbhanga,Bhagalpur,Munger &Muzaffarpur Per %0 nos 5078.00 0 5078.00 45.00 5123.00 0 5123.00 RCD SOR 01.04.2022
(ii) For Darbhanga,Baghalpur,Munger &Muzaffarpur Per %0 nos 5302.00 0 5302.00 29.00 5331.00 5 5596.00
c (iii).Bricks Tiles (300mmx150mmx50mm)
(i) For Urban Patna and Rural Patna Per %0 nos 6850.00 0 6850.00 29.00 6879.00 5 7222.00
(ii) For Saharsa,Bhagalpur,Darbhanga,& Muzaffarpur Per %0 nos 6880.00 0 6880.00 29.00 6909.00 5 7253.00
d Picket Jhama Brick
(ii) For Darbhanga,Bhagalpur,munger & Muzaffarpur Per %0 nos 4831.00 0 4831.00 29.00 4860.00 5 5102.00
(ii) For Purnea,Saharsa,Bhagalpur, Munger & Darbhanga Per M3 1013.00 0 1013.00 18.00 1031.00 0 1031.00 RCD SOR 01.04.2022
(a) 63mm to 40mm size
(ii) For Purnea,Saharsa,Bhagalpur, Munger & Darbhanga Per M3 1367.40 0 1367.40 11.60 1379.00 0 1379.00
(b) 40mm to 20mm size
(ii) For Purnea,Saharsa,Bhagalpur, Munger & Darbhanga Per M3 1526.40 0 1526.40 11.60 1538.00 0 1538.00
(c) 20mm & down
(ii) For Purnea,Saharsa,Bhagalpur,Munger & Darbhanga Per M3 1749.40 0 1749.40 11.60 1761.00 0 1761.00
(ii) For Purnea,Saharsa,Bhagalpur, Munger & Darbhanga Per M3 1812.40 0 1812.40 11.60 1824.00 5 1915.00
12 1157 Rough dressed stone boulder masonary work Per M3 598.47 0 598.47 100 698.47 5 728.39
13 1158 Stone for pitching 150mmX225mm Cum 350.72 350.72 100 450.72 5 468.26
14 Ashlar stone masonary Per M3 IINPUT 0 #VALUE! 100 #VALUE! 5 #VALUE!
15 M-001 Stone Boulder of size 150 mm and below at Crusher Plant Per M3 211.53 0 211.53 100 311.53 0 311.50
16 M-002 Supply of quarried stone 150 - 200 mm size for Hand Broken Per M3 211.53 0 211.53 100 311.53 0 311.50
17 M-003 Boulder with minimum size of 300 mm for Pitching Per M3 525.00 0 525.00 150 675.00 0 675.00 RCD SOR 01.04.2022
18 M-004 Coarse sand at source quary Koilwar/Sone sand Per M3 419.00 0 419.00 75 494.00 0 494.00 RCD SOR 01.04.2022
19 M-005 Coarse sand at Doriganj Equivalent to koilwar/Sone sand Per M3 225.53 0 225.53 50 275.53 5 286.80 RCD SOR 01.04.2022
22 M-008 Gravel/Quarry spall Per M3 211.53 0 211.53 100 311.53 5 322.10 RCD SOR 01.04.2022
23 M-006 M-008 River bed material (30 % sand And 70 % Quarry spall) Per M3 168.57 0 168.57 92.50 261.07 5 269.50 RCD SOR 01.04.2022
River bed material (50% sand And 50% Quarry spall) Per Cum 139.93 0 139.93 87.50 227.43 5 232.71 RCD SOR 01.04.2022
24 M-009 Granular Material or hard murrum for GSB works at site Per M3 84.60 0 84.60 50 134.60 0 134.60 RCD SOR 01.04.2022
25 M-010 Granular Material or hard murrum for GSB works at Mixing Plant Per Cum 84.60 0 84.60 50 134.60 0 134.60 RCD SOR 01.04.2022
26 M-011 Fly ash conforming to IS: 3812 ( Part II & I) at Plant Per M3 #VALUE! 0 #VALUE! 0 Input 0 #VALUE! RCD SOR 01.04.2022
27 M-011 Filter media/Filter Material as per Table 300-3 (MoRT&H Specification) Per M3 528.14 0 528.14 150 678.14 0 678.14 RCD SOR 01.04.2022
28 M-012 Close graded Granular sub-base Material 53 mm to 9.5 mm Per M3 765.67 0 765.67 150 915.67 0 915.67 RCD SOR 01.04.2022
29 M-014 Close graded Granular sub-base Material 37.5 mm to 9.5 mm Per M3 459.39 0 459.39 50 509.39 0 509.40 RCD SOR 01.04.2021
30 M-015 Close graded Granular sub-base Material 26.5 mm to 9.5 mm Per M3 522.28 0 522.28 50 572.28 0 572.30 RCD SOR 01.04.2021
31 M-016 Close graded Granular sub-base Material 9.5 mm to 4.75 mm Per M3 499.54 0 499.54 50 549.54 5 574.50 RCD SOR 01.04.2021
32 M-016 Close graded Granular sub-base Material 9.5 mm to 2.36 mm Per M3 274.21 0 274.21 150 424.21 0 424.21 RCD SOR 01.04.2022
33 M-018 Close graded Granular sub-base Material 4.75mm to 2.36 mm Per M3 158.57 0 158.57 50 208.57 5 216.50 RCD SOR 01.04.2021
34 M-019 Close graded Granular sub-base Material 4.75mm to 75 micron Per M3 0 150 0 0.00 RCD SOR 01.04.2022
35 M-019 Close graded Granular sub-base Material 2.36 mm Per M3 112.42 0 112.42 150 262.42 0 262.42 RCD SOR 01.04.2022
36 M-021 Stone crusher dust finer than 3mm with not more than 10% passing 0.075 sieve. Per M3 91.64 0 91.64 9.16 100.80 0 100.80 RCD SOR 01.04.2022
37 M-021 Coarse graded Granular sub-base Material 2.36 mm & below Per M3 112.42 0 112.42 150 262.42 0 262.42 RCD SOR 01.04.2022
38 M-022 Coarse graded Granular sub-base Material 4.75mm to 75 micron mm Per M3 112.42 0 112.42 150 262.42 0 262.40 RCD SOR 01.04.2022
39 M-023 Coarse graded Granular sub-base Material 4.75 mm to 2.36mm Per M3 112.42 0 112.42 150 262.42 0 262.40 RCD SOR 01.04.2022
40 M-024 Coarse graded Granular sub-base Material 9.5 mm to 4.75 mm Per M3 436.00 0 436.00 150 586.00 0 586.00 RCD SOR 01.04.2022
41 M-025 Coarse graded Granular sub-base Materia 26.5 mm to 4.75 mm Per M3 736.00 0 736.00 150 886.00 5 922.80 RCD SOR 01.04.2022
42 M-026 Coarse graded Granular sub-base Material 26.5 mm to 9.5 mm Per M3 736.00 0 736.00 150 886.00 0 886.00 RCD SOR 01.04.2022
43 M-027 Coarse graded Granular sub-base Material 37.5 mm to 9.5 mm Per M3 765.67 0 765.67 150 915.67 0 915.70 RCD SOR 01.04.2022
44 M-028 Coarse graded Granular sub-base Material 53 mm to 26 .5mm Per M3 930.50 0 930.50 150 1080.50 0 1080.50 RCD SOR 01.04.2022
51 M-035 Aggregates 53 mm to 22.4 mm ( Grade III ) Per M3 602.36 0 602.36 150 752.36 0 752.36 RCD SOR 01.04.2022
53 M-037 Aggregates 63 mm to 45 mm ( Grade II ) Per M3 825.00 0 825.00 150 975.00 0 975.00 RCD SOR 01.04.2022
54 M-038 Aggregates 90 mm to 45 mm ( Grade I ) Per M3 825.00 0 825.00 150 975.00 0 975.00 RCD SOR 01.04.2022
56 M-040 Aggregates 11.2 mm to 0.09 mm (Key aggregate Type B) Per M3 274.21 0 274.21 150 424.21 0 424.20 RCD SOR 01.04.2022
57 M-041 Aggregates 13.2 mm to 0.09 mm (Key aggregate Type A) Per M3 274.21 0 274.21 150 424.21 0 424.20 RCD SOR 01.04.2022
63 M-047 Aggregates 37.5 mm to 19 mm ( Grade IV) Per M3 930.50 0 930.50 150 1080.50 0 1080.50 RCD SOR 01.04.2022
65 M-049 Aggregates 6 mm nominal size Per M3 324.21 0 324.21 100 424.21 0 424.20 RCD SOR 01.04.2022
66 M-050 Aggregates 10 mm nominal size Per M3 436.00 0 436.00 150 586.00 0 586.00 RCD SOR 01.04.2022
67 M-051 Aggregates 13.2/12.5 mm nominal size Per M3 436.00 0 436.00 150 586.00 0 586.00 RCD SOR 01.04.2022
68 M-052 Aggregates 20 mm nominal size at Crusher Plant Per M3 1036.00 0 1036.00 150 1186.00 0 1186.00 RCD SOR 01.04.2022
69 M-054 Aggregates 25 mm nominal size Per M3 1086.00 0 1086.00 100 1186.00 0 1186.00 RCD SOR 01.04.2022
70 M-054 Aggregates 40 mm nominal size Per M3 825.00 0 825.00 150 975.00 0 975.00 RCD SOR 01.04.2022
71 M-056 AC pipe 100 mm dia metre 44.28 0 44.30 RCD SOR 01.04.2022
72 M-057 Acrylic polymer bonding coat litre 131.88 131.90 RCD SOR 01.04.2022
73 M-058 Alluminium Paint litre 124.7 0 124.70 RCD SOR 01.04.2022
74 M-059 Aluminium alloy plate 2mm Thick sqm 9512.21 0 9512.20 RCD SOR 01.04.2022
75 M-060 Aluminium alloy/galvanised steel tonne 57033 0 57033.00 RCD SOR 01.04.2022
76 M-061 Aluminium sheeting fixed with encapsulated lens type reflective sheeting including 2% towards lettering, cost of angle iron, cost of drilling holes, nuts, bolts etc.and signs as applicable sqm 8945.43 0 8945.43 RCD SOR 01.04.2022
77 M-062 Road Stud with Micro Prismatic lens reflectors( with shank) each 172.45 0 172.45 172.45 input #VALUE! RCD SOR 01.04.2021
79 M-064 Bearing (Cost of parts) nos input 0 #VALUE! input 18 #VALUE! RCD SOR 01.04.2021
80 M-065 Bearing (Cast steel rocker bearing assembly of 250 tonne ) nos 80639.15 0 80639.15 80639.15 input #VALUE! RCD SOR 01.04.2021
81 M-066 Bearing (Elastomeric bearing assembly consisting of 7 internal layers of elastomer bonded to 6 nos. internal reinforcing steel laminates by the process of vulcanisation,) cubic cm 0.63 0 0.63 0.63 value #VALUE! RCD SOR 01.04.2021
82 M-067 Bearing (Forged steel roller bearing of 250 tonne) nos 48383.48 0 48383.48 48383.48 value #VALUE! RCD SOR 01.04.2021
83 M-068 Bearing (Pot type bearing assembly consisting of a metal piston supported by a disc, PTFE pads providing sliding surfaces against stainless steel mating together with cast steel assemblies/ fabricated structural steel assemblies duly painted with all components MT 145.39 0 140.00 145.39 value #VALUE! RCD SOR 01.04.2021
(a)Fixed POT-PTFE Bearing MT 145.39 0 140.00 145.39 value #VALUE! RCD SOR 01.04.2021
(b) Free POT-PTFE Bearing MT 155.78 0 150.00 155.78 value #VALUE! RCD SOR 01.04.2021
( c) Guide Slide (L) POT-PTFE Bearing MT 166.16 0 160.00 166.16 value #VALUE! RCD SOR 01.04.2021
(d) Guide Slide (T) POT-PTFE Bearing MT 160.97 0 155.00 160.97 value #VALUE! RCD SOR 01.04.2021
84 M-069 Bearing (PTFE sliding plate bearing assembly of 80 T ) nos input 0 #VALUE! input value #VALUE! RCD SOR 01.04.2021
85 M-070 Bearing (Supply of sliding plate bearing of 80 tonne) nos 32581.47 0 32581.47 32581.47 value #VALUE! RCD SOR 01.04.2021
86 M-071 Bentonite kg 3.31 0 3.31 3.31 value #VALUE! RCD SOR 01.04.2021
88 M-073 Bitumen ( Cationic Emulsion ) Ex- Patna(RS1)Packed tonne 56620 0 56620.00 56620.00 0 56620.00 SRC LT 23 (Anu) Dated 06.06.2022
89 M-074 Bitumen VG-30 (60-70 grade) Packed Ex- Barauni tonne 62048 0 62048.00 62048.00 0 62048.00 SRC LT 23 (Anu) Dated 06.06.2022
Bitumen VG-30 (60-70 grade) Packed Ex-Muzaffarpur 60720 0 60720.00 60720.00 0 60720.00 SRC LT 23 (Anu) Dated 06.06.2022
90 M-075 Bitumen VG-10(80-100 grade ) Packed Ex-Barauni tonne 61248.00 0 61248.00 61248.00 0 61248.00 SRC LT 23 (Anu) Dated 06.06.2022
91 M-076 Bitumen (Cutback ) Packed Ex- Barauni tonne 36676.1 0 36676.10 36676.10 0 36676.10 SRC LT23 (Anu) Dated 21.06.2021
Bitumen VG-10 (80-100 grade ) Packed Ex-Muzaffarpur 59920.00 0 59920.00 59920.00 0 59920.00 SRC LT 23 (Anu) Dated 06.06.2022
92 M-077 Bitumen (emulsion) Packed Ex- Muzaffarpur (M.S) tonne 59884 0 59884.00 59884.00 0 59884.00 SRC LT 23 (Anu) Dated 06.06.2022
93 M-078 Bitumen (modified graded) Packed Ex - Barauni (CRMB - 55) tonne 39480.5 0 39480.50 39480.50 18 46587.00
94 M-079 Brick 100A for - Patna Urban, Darbhanga, Bhagalpur, Munger, Muzzarfarpur, Gaya, Patna, Saran, Saharsa, Purnea each 6.88 0 6.88 6.88 5 7.20
95 M-080 C.I. shoes for the pile kg 46.26 0 46.26 46.26 input #VALUE!
96 M-081 Cement - OPC 43 Grade at Darbhanga tonne 9305.90 0 9305.90 9305.90 0 9305.90 SRC LT 23 (Anu) Dated 06.06.2022
97 M-083 Cold twisted bars (HYSD Bars) - Fe 500 tonne 54810.00 0 54810.00 0 54810.00 0 54810.00 RCD SOR 01.04.2022
98 M-083 Coller for joints 300 mm dia nos 54810.00 0 54810.00 54810.00 54810.00 RCD SOR 01.04.2022
99 M-084 Compressible Fibre Board (20mm thick) sqm 54810.00 0 54810.00 54810.00 18 64675.80 RCD SOR 01.04.2022
100 M-085 Connectors / Staples each 54810.00 0 54810.00 54810.00 54810.00 RCD SOR 01.04.2022
101 M-087 Copper Plate (12m long x 250mm wide) kg 896.80 0 896.80 896.80 0 896.80 RCD SOR 01.04.2022
102 M-087 Corrosion resistant Structural steel tonne 54810.00 0 54810.00 54810.00 18 64675.80 RCD SOR 01.04.2022
103 M-088 Corrugated sheet, 3 mm thick, "Thrie" beam section railing kg 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2022
104 M-089 Credit for excavated rock found suitable for use cum 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2022
105 M-090 Curing compound litre 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2022
106 M-091 Delineators from ISI certified firm as per the standard drawing given in IRC - 79 each 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2022
107 M-093 Earth Cost or compensation for earth taken from private land cum 2.01 0 2.01 33 35.01 0 35.01 RCD SOR 01.04.2022
108 M-093 Elastomeric slab seal expansion joint assembly manufactured by using chloroprene, elastomer for elastomeric slab unit conforming to clause 915.1 of IRC: 83 (part II) metre 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2022
109 M-094 Electric Detonators @ 1 detonator for 1/2 gelatin stick of 125 gms each 100 nos 54810.00 0 54810.00 54810.00 18 64675.80 RCD SOR 01.04.2022
110 M-095 Epoxy compound with accessories for preparing epoxy mortar kg 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2022
111 M-096 Epoxy mortar kg 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2022
112 M-097 Epoxy primer kg 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2022
113 M-098 Epoxy resin-hardner mix for prime coat kg 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2022
114 M-099 Flag of red color cloth 600 x 600 mm each 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2022
115 M-100 Flowering Plants each 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2022
116 M-101 Galvanised MS flat clamp nos 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2022
117 M-102 Galvanised steel wire crates of mesh size 100 mm x 100 mm woven with 4mm dia. GI wire in rolls of required size. sqm 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2022
118 M-103 Galvanised structural steel plate 200 mm wide, 6 mm thick, 24 m long kg 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2022
120 M-105 Geo grids sqm 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
121 M-106 Geomembrane sqm 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
122 M-107 Geonets sqm 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
123 M-108 Geotextile sqm 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
124 M-108 Geotextile filter fabric sqm 84.55 0 84.55 84.55 0 84.55 RCD SOR 01.04.2022
125 M-110 GI bolt 10 mm Dia nos 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
126 M-111 Grouting pump with agitator hour 54810.00 0 54810.00 54810.00 12 61387.20 RCD SOR 01.04.2022
129 M-114 HDPE pipes 75mm dia metre 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
130 M-115 HDPE pipes 90mm dia metre 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
131 M-116 Hedge plants each 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
132 M-117 Helical pipes 600mm diameter metre 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
133 M-117 Hot applied thermoplastic compound (Sp.gr. - 2.10) litre 198.46 0 198.46 198.46 0 198.46 RCD SOR 01.04.2022
134 M-119 HTS strand tonne 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2021
135 M-120 Joint Sealant Compound kg 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2021
136 M-121 Jute netting, open weave, 2.5 cm square opening for seeding and Mulching sqm 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2021
137 M-122 LDO for steam curing litre 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2021
142 M-127 Modular strip/box seal expansion joint including anchorage catering to a horizontal movement beyond 70 mm and upto 140mm assembly comprising of edge beams, central beam, 2 modules chloroprene seal, anchorage elements, support and control system, all steel sections protected against corrosion and installed by the manufacturer or his authorised representative metre 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
143 M-128 Modular strip/box seal expansion joint catering to a horizontal movement beyond 140mm and upto 210mm box/box seal joint assembly containing 3 modules/cells and comprising of edge beams, two central beams, chloroprene seal, anchorage elements, support and control system, all steel sections protected against corrosion and installed by the manufacturer or his authorised representative metre 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
144 M-129 Nipples 12mm nos 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
147 M-132 Pavement Marking Paint litre 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2021
148 M-133 Paving Fabric sqm 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2021
149 M-134 Perforated geosynthetic pipe 150 mm dia metre 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2021
150 M-135 Perforated pipe of cement concrete, internal dia 100 mm metre 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2021
151 M-136 Pesticide kg 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2021
152 M-137 Pipes 200 mm dia, 2.5 m long for drainage metre 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2021
153 M-138 Plastic sheath, 1.25 mm thick for dowel bars sqm 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2021
154 M-139 Plastic tubes 50 cm dia, 1.2 m high nos 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2021
155 M-140 Polymer braids metre 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2021
156 M-141 Pre moulded Joint filler, 25 mm thick for expansion joint. sqm 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2021
157 M-142 Pre-coated stone chips of 13.2 mm nominal size cum 54810.00 0 54810.00 54810.00 value #VALUE! RCD SOR 01.04.2021
158 M-143 Preformed continuous chloroprene elastomer or closed cell foam sealing element with high tear strength, vulcanised in a single operation for the full length of a joint to ensure water tightness. metre 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2021
159 M-144 Pre-moulded asphalt filler board sqm 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2021
160 M-145 Pre-packed cement based polymer concrete of strength 45 Mpa at 28 days kg 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2021
161 M-146 Primer kg 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2021
162 M-147 Quick setting compound kg 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2021
163 M-148 Random Rubble Stone cum 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2021
164 M-149 RCC Pipe NP 4 heavy duty non presure pipe 1000 mm dia metre 54810.00 0 54810.00 54810.00 28 70156.80 RCD SOR 01.04.2021
165 M-150 RCC Pipe NP 4 heavy duty non presure pipe 1200 mm dia metre 54810.00 0 54810.00 54810.00 28 70156.80 RCD SOR 01.04.2021
166 M-151 RCC Pipe NP 4 heavy duty non presure pipe 300 mm dia metre 54810.00 0 54810.00 54810.00 28 70156.80 RCD SOR 01.04.2021
167 M-153 Reflectorising glass beads kg 72.00 0 72.00 72.00 0 72.00 RCD SOR 01.04.2022
168 M-153 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Copper Strips) metre 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
169 M-154 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Galvanised carbon steel strips) metre 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
170 M-155 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Glass reinforced polymer/fibre reinforced polymer/polymeric strips) metre 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
171 M-156 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Stainless steel strips) metre 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
172 M-157 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Aluminium strips) metre 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
173 M-158 Rivets each 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
174 M-159 Sand bags (Cost of sand and Empty cement bag) nos 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
175 M-160 Sapling 2 m high 25 mm dia each 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
176 M-161 Scrap tyres of size 900 x 20 nos 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
177 M-162 Seeds kg 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
178 M-163 Selected earth (Including royalty @ Rs 22.0 per cum & compensation @ Rs 1.65 per cum) cum 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
179 M-164 Separation Membrane of impermeable plastic sheeting 125 micron thick sqm 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
180 M-165 Sheathing duct metre 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
181 M-166 Shrubs each 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
182 M-167 Sludge / Farm yard manure @ 0.18 cum per 100 sqm at site of work for turfing cum 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
183 M-168 Sodium vapour lamp each 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
184 M-169 Square Rubble Coursed Stone cum 54810.00 0 54810.00 54810.00 5 57550.50 RCD SOR 01.04.2022
185 M-170 Steel circular hollow pole of standard specification for street lighting to mount light at 5 m height above deck level each 54810.00 0 54810.00 54810.00 18 64675.80 RCD SOR 01.04.2022
186 M-171 Steel circular hollow pole of standard specification for street lighting to mount light at 9 m height above road level each 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
187 M-172 Steel drum 300 mm dia 1.2 m high/empty bitumen drum nos 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
188 M-173 Steel helmet and cushion block on top of pile head during driving. kg 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
189 M-174 Steel pipe 25 mm external dia as per IS:1239 metre 54810.00 0 54810.00 54810.00 18 64675.80 RCD SOR 01.04.2022
190 M-175 Steel pipe 50 mm external dia as per IS:1239 metre 54810.00 0 54810.00 54810.00 18 64675.80 RCD SOR 01.04.2022
193 M-178 Strip seal expansion join metre 54810.00 0 54810.00 54810.00 18 64675.80 RCD SOR 01.04.2022
194 M-181 Structural Steel 75 mm x 75 mm x 6 tonne 57033.00 0 57033.00 57033.00 0 57033.00 RCD SOR 01.04.2022
195 M-180 Super plastisizer admixture IS marked as per 9103-1999 kg 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
196 M-181 Synthetic Geogrids as per clause 3102.8 and approved design and specifications. sqm 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
197 M-182 Through and bond stone each 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
199 M-184 Tiles size 300 x 300 mm and 25 mm thick each 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
200 M-185 Timber cum 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
201 M-186 Traffic cones with 150 mm reflective sleeve nos 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
202 M-187 Tube anchorage set complete with bearing plate, permanent wedges etc nos 54810.00 0 54810.00 54810.00 input #VALUE! RCD SOR 01.04.2022
205 M-190 Water based cement paint litre 122.34 0 122.34 122.34 input #VALUE!
206 M-191 Welded steel wire fabric kg 38.24 0 38.24 38.24 18 45.10
207 M-192 Wire mesh 50mm x 50mm size of 3mm wire kg 38.24 0 38.24 38.24 input #VALUE!
208 M-193 Wooden ballies 2" Dia for bracing (Sal) each 25.08 0 25.08 25.08 input #VALUE!
209 M-194 Wooden ballies 8" Dia and 9 m long (9 m @ Rs 67.94/m) - Sal each 606.69 0 606.69 606.69 input #VALUE!
210 M-195 Wooden packing cum input 0 #VALUE! input 12 #VALUE!
211 M-196 Wooden staff for fastening of flag 25 mm dia, 1.0 m long each 31.36 0 31.36 31.36 12 35.10
212 M-197 Bitumen (30/40 grade) Ex-Patna Packed tonne input 0 input input 18 #VALUE!
213 M-198 Fly Ash Brick conforming to IS: 3812 ( Part I & II ) (Excluding the carrige cost* of Fly Ash from point of production to Kiln site) (*Carrige cost of fly ash is same as of sand)(Cost of 1000nos. is Rs. 5691) each 6.23 0 6.23 6.23 12 7.00
214 M-199 Paver Block
i) M -35 Grade and 60 mm thickness
(a) White Per M2 466.3 0 457.26 466.3 Input #VALUE!
(b) Red Per M2 474.6 0 465.46 474.6 Input #VALUE!
(c)Yellow Per M2 489.5 0 480.09 489.5 Input #VALUE!
ii) M-40 Grade and 80mm thickness
215 M-200 Ker-Stone Block-M30 Grade(sise 375mmx300mmx150mm) each 79.94 0 79.94 79.94 79.90
216 M-201 Autoclved Airated concrete(AAC) block cum 2261.4 0 2261.40 2261.40 2261.40
217 1199 Seasonal Sal wood Scantling Per M3 60000.00 0 60000.00 60000.00 60000.00 BCD 1199
218 1195 Local Wood in scantling Per M3 32671.00 0 31670.00 31670.00 33253.00
220 1198 Local wood Planks12mm to 20mm Per M3 26000.00 0 26000.00 26000.00 26000.00 WRD SOR 01.10.2020
i. 75 mm dia 6m long to 8m long Each 137.55 0 137.55 137.55 137.55 WRD SOR 01.07.2022 0
ii. 100 mm dia 6m long to 8m long Each 151.00 0 151.00 151.00 151.00 WRD SOR 01.10.2020
iii. 50 mm dia Hill Bamboo Each 94.35 0 94.35 94.35 94.35 WRD SOR 01.10.2020
222 Sal Ballah Post 0
i. 100 mm dia Per M input 0 INPUT Value #VALUE!
ii. Black annealed wire 3.15mm dia.( IS 280-78 ) Per kg. 78.77 0 78.77 78.77 78.77 WRD SOR 01.07.2022
i. Annealled wire ( 20 to 25 gauge ) Per Kg input 0 #VALUE! #VALUE! #VALUE!
ii. Black annealed wire ( 8 to 10 gauge ) Per Kg input 0 #VALUE! #VALUE! #VALUE!
224 1029 Galvanised steel Barbed wire Per M.T 45870.68 0 45870.68 45870.68 18 54109.40
Welded mesh (8 to 10 SWG ) 100 to 125 mm square size Per M2 94.44 0 94.44 94.44 18 111.00
225 1213 Ciko Powder / Impermoo water proofing compound Per Kg 28.96 0 28.96 28.96 33.30
227 M-229 Narial coir string Per Kg 31.25 0 31.25 31.25 31.25 WRD SOR 01.07.2022
228 Narial rope 20 mm to 25 mm dia Per Kg 39.81 0 39.81 39.81 39.80
229 Narial rope above 25 mm dia Per Kg 48.15 0 48.15 48.15 48.20
231 Sabey string Per Kg 16.67 0 16.67 16.67 16.70 WRD SOR 01.07.2022
232 322 Bitumen feltType 3,grade I,confirming toIS 1322-1992 Sqm 58.90 0 58.90 58.90 62.43 WRD SOR 01.07.2022
233 370 Coal (steam) Per quintal 392.66 416.22 WRD SOR 01.07.2022
234 1207 Limpmat washer G.I.(cadmium Coated) Per % nos 34.36 36.42 WRD SOR 01.07.2022
235 1208 Bitumen washer Per % nos 30.70 0 29.44 31.21 WRD SOR 01.07.2022
236 341 Flat pressed 3 layer particle board(medium density)Grade-I 12mm thick Per M2 319.04 338.18 WRD SOR 01.07.2022
237 1701 NP2 RCC 150mm dia.Hume pipe as per I.S 458-1971 Per M 190.02 0 190.02 190.02 28 218.52 WRD SOR 01.07.2022
238 1703 NP2 RCC 300mm dia.Hume pipe as per I.S 458-1971 Per M 271.45 0 271.45 271.45 28 312.17 WRD SOR 01.07.2022
239 1706 NP2 RCC 600mm dia.Hume pipe as per I.S 458-1971 Per M 832.45 0 832.45 832.45 28 957.32 WRD SOR 01.07.2022
242 1715 RCC Collars NP2 class Hume ppipe 150mm dia. Each 31.67 0 31.67 31.67 36.42 WRD SOR 01.07.2022
243 1717 RCC Collars NP2 class Hume ppipe 300mm dia. Each 49.77 0 49.77 49.77 57.23 WRD SOR 01.07.2022
244 1720 RCC Collars NP2 class Hume ppipe 600mm dia. Each 126.68 0 126.68 126.68 145.68 WRD SOR 01.07.2022
245 1724 RCC Collars NP2 class Hume ppipe 900mm dia. Each 212.63 0 212.63 212.63 244.53 WRD SOR 01.07.2022
246 1727 RCC Collars NP2 class Hume ppipe 1200mm dia. Each 316.70 0 316.70 316.70 364.20 WRD SOR 01.07.2022
247 (i) Analysis of rate of brick khoa (63 mm to 40 mm size) WRD SOR 01.07.2022
For 2.832 Cum Khoa (i) Material- 100B Bricks (Patna Urban) 800nos 800 6702.00 5361.60 WRD SOR 01.07.2022
(ii) Labour -Unskilled mazdoor 3nos 3 428 1284.00 WRD SOR 01.07.2022
Rate per Cum 2346.61 WRD SOR 01.07.2022
For 2.832 Cum Khoa (i) Material -100B Bricks (Patna Urban) 850nos 850 6702.00 5696.7 WRD SOR 01.07.2022
(ii) Labour- Unskilled mazdoor 4nos 4 428.00 1712.00 WRD SOR 01.07.2022
Rate per Cum 2616.07 WRD SOR 01.07.2022
249 (ii) Analysis of rate of brick khoa (20 mm and down) WRD SOR 01.07.2022
For 2.832 Cum Khoa (i) Material- 100B Bricks (Patna Urban) 900nos 900 6702.00 6031.8 WRD SOR 01.07.2022
(ii) Labour- Unskilled mazdoor 5nos 5 428.00 2140.00 WRD SOR 01.07.2022
Rate per Cum 2885.52 WRD SOR 01.07.2022
250 Pressure release valves(Vertical non return valve ) Each INPUT #REF! #VALUE! #VALUE! #VALUE! WRD SOR 01.07.2022
251 Pocket valve (non return pocket valve ) Each INPUT #REF! #VALUE! #VALUE! #VALUE! WRD SOR 01.07.2022
252 Safety valve Each INPUT #REF! #VALUE! #VALUE! #VALUE! WRD SOR 01.07.2022
253 Reflex valve Each INPUT #REF! #VALUE! #VALUE! #VALUE! WRD SOR 01.07.2022
254 Burnt clay pipe of internal dia 30 mm . External dia 31.75 mm WRD SOR 01.07.2022
(a). 100 mm long Each INPUT 0 #VALUE! #VALUE! #VALUE! WRD SOR 01.07.2022
(b) 222mm long Each INPUT 0 #VALUE! #VALUE! #VALUE! WRD SOR 01.07.2022
256 M.S Bends Each INPUT 0 #VALUE! #VALUE! #VALUE! WRD SOR 01.07.2022
257 Rubber seal metre INPUT 0 #VALUE! #VALUE! #VALUE! WRD SOR 01.07.2022
258 Sheet Pile Per M.T INPUT 0 #VALUE! #VALUE! #VALUE! WRD SOR 01.07.2022
259 Tree branches of dia150 mm to 200 mm and 3 M to 4.5 M long with jhankhi covering the space of 100 cft in volume nos INPUT 0 #VALUE! #VALUE! #VALUE! WRD SOR 01.07.2022
261 0326 Blasting Material/blasting fuse(Fuse coil) nos 14.73 0 14.73 14.73 15.61 WRD SOR 01.07.2022
262 Cardium compound kg INPUT 0 #VALUE! #VALUE! #VALUE! WRD SOR 01.07.2022
M-265 Nuts and bolts 16mm dia. 375mm long with washer Each 36.35 0 36.35 36.35 36.35 WRD SOR 01.07.2022
263 M.S. Bolt 20mm dia.,25 Cm long Each 32.88 0 32.88 32.88 32.88 WRD SOR 01.10.2020
264 8509 Special primer (C.W) Litre 81.48 0 81.48 81.48 86.37
266 0818 Oil/Fuel Linssed oil(double boiled) lit 107.98 0 107.98 107.98 114.46
267 Electric Charge K.W.H INPUT 0 #VALUE! #VALUE! 0 #VALUE!
268 Slotted pins and wedges 10 mm dia and 60 mm long nos INPUT 0 #VALUE! #VALUE! #VALUE!
269 Tube and nuts 26 no. 25 mm dia and above nos INPUT 0 #VALUE! #VALUE! #VALUE!
270 M.S Electrodes nos INPUT 0 #VALUE! #VALUE! #VALUE!
271 Gun metal in gate Kg INPUT 0 #VALUE! #VALUE! #VALUE!
275 Empty plastic cement bag(old) Per % nos 407.00 0 407.00 407.00 0 407.00 WRD SOR 15.07.2019
276 Nylon Crate of size 1mx1mx1m (As per Annex-I) Each 41.00 0 41.00 41.00 0 41.00 WRD SOR 01.07.2022
277 Geo bag (non woven)size 1mx0.70m (As per Annex-II) nos 83.06 0 83.06 83.06 0 83.06 WRD SOR 01.07.2022
278 Mega Geo Bag of size 2mx1.5m (As per Annex-III) nos 614.15 0 566.67 566.67 5 595.00
279 P.P. Rope Gabion of size 1.80mx1.80mx0.5m (As per Annex-IV) nos. 1965.60 0 1965.60 1965.60 0 1965.60 WRD SOR 01.07.2022
280 P.P.Rope Gabion of size 1.80mx1.20mx0.5m (As per Annex-V) Nos. 1427.60 0 1427.60 1427.60 0 1427.60 WRD SOR 01.07.2022
278 Shalitex Board(For use as per expansion Joint)
(i)25mm thick Per Sqm 537.96 0 537.96 537.96 input #VALUE!
(ii)12mm thick Per Sqm 307.41 0 307.41 307.41 input #VALUE!
(iii)18mm thick Per Sqm 450.93 0 450.93 450.93 input #VALUE!
279 Shalitex Primer Per litre 37.04 0 37.04 37.04 input #VALUE!
289 Machanically Woven double twisted hexagonal shaped wire mesh Gabion Boxes/Crates of required Size, mesh type 10cmx12cm, heavely zinc coated mesh wire dia 8 to 10 (SWG), Mechanically edged/swlvedged with partitions at every one mt. Interval as per IS 16014:12
291 New empty cement Bag Conforming to IS 11652:2000 Each 9.5 0 9.5 0 9.5 0 9.5 WRD SOR 01.10.2020
Rate per cm width per cm depth per 100M 0.00
Schedule -P&M/ MORTH-1A Date: 01.07.2022 WRD SOR
Approved Usages Rates of Plants and Machinery. The Usages charges for the machines include ownership charges, cost of repair & maintenance including replacement of tyre and running and operating charges which includes crew, fuel & lubricants. These rates are for the preparation of Schedule of Rates only
Sl. No. Description of Machine Activity Output of Machine Output Unit Rate(Rs) Ref. Remarks
P&M-001 Air Compressor- 250cfm General Purpose capacity in cfm 170/250 hour 391.00 PM15001 RCD SOR dated 01.04.22
Air Compressor- 500cfm hour 1831.00 PM15002
P&M-002 Batching and Mixing Plant (a) 30 cum capacity Concrete Mixing cum/hour 20 hour 2775.00 RCD SOR dated 01.04.21
P&M-003 Batching and Mixing Plant (b) 15 - 20 cum capacity Concrete Mixing cum/hour 13 hour 1804.00 RCD SOR dated 01.04.21
P&M-004 Bitumen Pressure Distributor Applying bitumen tack coat sqm/hour 1750 hour 1299.00 PM24001 RCD SOR dated 01.04.22
P&M-005 Bitumen Boiler oil fired Bitumen Spraying capacity in litre 1500 hour 270.00 RCD SOR dated 01.04.22
P&M-006 Concrete Paver Finisher with 40 HP Motor Paving of concrete surface cum / hour 20 hour 1333.00 RCD SOR dated 01.04.22
P&M-007 Concrete Pump of 45 & 30 cum capacity Pumping of concrete cum / hour 33 / 22 hour 349.00 RCD SOR dated 01.04.22
P&M-008 Concrete Bucket For Pouring concrete capacity in cum 1 hour 86.00 PM64001 RCD SOR dated 01.04.22
P&M-009 Concrete Mixer (a) 0.4/0.28 cum Concrete Mixing cum/hour 2.5 hour 283.00 PM21001 RCD SOR dated 01.04.22
P&M-010 Concrete Mixer (b) 1 cum Concrete Mixing cum/hour 7.5 hour 240.00
P&M-011 Crane (a) 80 tonnes Lifting Purpose hour 1745.00
P&M-012 Cranes b) 35 tonnes Lifting Purpose hour 1163.00
P&M-013 Cranes c) 3 tonnes Lifting Purpose hour 487.00
Dozer (240 HP) cum/hour hour 5523.00 PM1001 RCD SOR dated 01.04.22
Dozer (175 HP) cum/hour hour 4249.00 PM1002 RCD SOR dated 01.04.22
P&M-014 Dozer D - 80 - A 12 (90 HP) Spreading /Cutting / Clearing cum/hour 300/ 150/250 hour 2930.00 PM1003 RCD SOR dated 01.04.22
P&M-015 Dozer D - 50 - A 15 Spreading /Cutting / Clearing cum/hour 200/ 120/150 hour 3009.00
P&M-016 Emulsion Pressure Distributor Applying emulsion tack coat sqm/hour 1750 hour 1299.00 PM25001 RCD SOR dated 01.04.22
P&M-017 Front End loader 1 cum bucket capacity Soil loading / Aggregate loading cum/hour 60 /25 hour 1366.00 PM5003 RCD SOR dated 01.04.22
P&M-018 Generator (a) 125 KVA Genration of electric Energy KVA 100 hour 1587.00 PM22005 RCD SOR dated 01.04.22
P&M-019 Generator( b) 63 KVA Genration of electric Energy KVA 50 hour 1068.00 State Level Schedule Committee Lt 29(Anu) Dated 16.04.2020
P&M-020 GSB Plant 50 cum Producing GSB cum/hour 40 hour 1418.00
P&M-021 Hotmix Plant - 120 TPH capacity DBM/BM/SDC/ Premix cum/hour 40 hour 48294.00
P&M-022 Hotmix Plant - 100 TPH capacity DBM/BM/SDC/ Premix cum/hour 30 hour 40270.00 State Level Schedule Committee Lt 29(Anu) Dated 16.04.2020
P&M-023 Hotmix Plant - 60 to 90 TPH capacity DBM/BM/SDC/ Premix cum/hour 25 hour 30931.00
P&M-024 Hotmix Plant - 40 to 60 TPH capacity DBM/BM/SDC/ Premix cum/hour 17 hour 21633.00
P&M-025 Hydraulic Chip Spreader Surface Dressing sqm/hour 1500 hour 3594.00
P&M-026 Hydraulic Excavator of 0.9 cum bucket Soil Ordinary/Soil Marshy / Soil Unsuitable cum/hour 60 /60 /60 hour 2202.00 PM3005 State Level Schedule Committee Lt 29(Anu) Dated 16.04.2020
P&M-027 Integrated Stone Crusher 100THP Crushing of Spalls TPH 100 hour 11820.00
P&M-028 Integrated Stone Crusher 200 THP Crushing of Spalls TPH 200 hour 24865.00
P&M-029 Kerb Casting Machine Kerb Making Rm/hour 80 hour 423.00
P&M-030 Mastic Cooker Mastic Wearing coat capacity in tonne 1 hour 84.00
P&M-031 Mechanical Broom Hydraulic Surface Cleaning sqm/hour 1250 hour 746.00 PM23001 RCD SOR dated 01.04.22
P&M-032 Motor Grader 3.35 mtr blade Clearing /Spreading /GSB /WBM cum/hour 200/200/50/50 hour 4403.00 PM2003 RCD SOR dated 01.04.22
P&M-033 Mobile slurry seal equipment Mixing and laying slurry seal sqm/hour 2700 hour 1375.00
P&M-034 Paver Finisher Hydrostatic with sensor control 100 TPH Paving of DBM/ BM/SDC/ Premix cum/hour 40 hour 3566.00 State Level Schedule Committee Lt 29(Anu) Dated 16.04.2020
P&M-035 Paver Finisher Mechanical 75/ 100 TPH Paving of WMM /Paving of DLC cum/hour 40/30 hour 2078.00 PM28001 RCD SOR dated 01.04.22
P&M-036 Piling Rig with Bantonite Pump 0.75 m dia to 1.2 m dia Boring attachment Rm/hour 2 to 3 hour 7453.00 RCD SOR dated 01.04.22
P&M-037 Pneumatic Road Roller Rolling of Asphalt Surface cum/hour 25 hour 1698.00 RCD SOR dated 01.04.22
P&M-038 Pneumatic Sinking Plant Pneumatic Sinking of wells cum/hour 1.5 to 2.00 hour 5688.00 RCD SOR dated 01.04.22
P&M-039 Pot Hole Repair Machine Repair of potholes cum/hour 4 hour 1236.00 RCD SOR dated 01.04.22
P&M-040 Prestressing Jack with Pump & access Stressing of steel wires/stands hour 176.00 RCD SOR dated 01.04.22
P&M-041 Ripper Scarifying cum/hour 60 hour 39.00 RCD SOR dated 01.04.22
P&M-042 Rotavator Scarifying cum/hour 25 hour 24.00 RCD SOR dated 01.04.22
P&M-043 Road marking machine Road marking Sqm/hour 100 hour 1349.00 PM40001 RCD SOR dated 01.04.22
P&M-044 Smooth Wheeled Roller 8 tonne Soil Compaction /BM Compaction cum/hour 70/25 hour 1518.00 PM8001 RCD SOR dated 01.04.22
P&M-045 Tandem Road Roller Rolling of Aspalt Surface cum/hour 30 hour 1978.00 PM9001 RCD SOR dated 01.04.22
P&M-046 Tipper - 5 cum Transportation of soil, GSB, WMM, Hotmix etc. Capacity in cum 5.5 km 33.50
P&M-047 Tipper - 5 cum Transportation of soil, GSB, WMM, Hotmix etc. Capacity in cum 5.5 tonne.km 9.41 PM75001 RCD SOR dated 01.04.22
P&M-048 Tipper -10T(out put- 5.5 cum,4.0 km/lt) Transportation of soil, GSB, WMM, Hotmix etc. Capacity in cum 5.5 hour 1371.00 PM6004 RCD SOR dated 01.04.22
P&M-049 Transit Mixer 4.0/4.5 cum Transportation of Concrete Mix to site cum/hour 4.5 hour 1268.00 RCD SOR dated 01.04.22
P&M-050 Transit Mixer 4/4.5 cum Transportation of Concrete Mix to site cum/hour 4.5 tonne.km 6.30 RCD SOR dated 01.04.22
P&M-051 Transit Mixer 3.0 cum Transportation of Concrete Mix to site cum/hour 3 hour 1163.00 RCD SOR dated 01.04.22
P&M-052 Transit Mixer 3.0 cum Transportation of Concrete Mix to site cum/hour 3 tonne.km 8.38 RCD SOR dated 01.04.22
P&M-053 Tractor Pulling capacity in HP 50 hour 629.00 PM12001 RCD SOR dated 01.04.22
P&M-054 Tractor with Rotevator Rate of Tractor + Rotevator hour 646.00 PM13001 RCD SOR dated 01.04.22
P&M-055 Tractor with Ripper Rate of Tractor 6+ Ripper hour 533.00 RCD SOR dated 01.04.22
P&M-056 Truck 5.5 cum per 10 tonnes Material Transport capacity/cum 4.5 km 30.00 RCD SOR dated 01.04.22
P&M-055 Farm tractor with ripper @ 60 cum per hour 650.00 PM14001 RCD SOR dated 01.04.22
P&M-057 Truck 5.5 cum per 10 tonnes Material Transport capacity/cum 4.5 hour 934.30 State Level Schedule Committee Lt 29(Anu) Dated 16.04.2020
P&M-058 Truck 5.5 cum per 10 tonnes Material Transport capacity/cum 4.5 tonne.km 3.50 State Level Schedule Committee Lt 29(Anu) Dated 16.04.2020
P&M-059 Vibratory Roller 8 tonne Earth or soil / GSB / WBM cum/hour 100/60/60 hour 1996.00 PM10001 RCD SOR dated 01.04.22
P&M-060 Water Tanker Water Transport capacity in KL 6 hour 707.00 PM11003 RCD SOR dated 01.04.22
P&M-061 Water Tanker Water Transport capacity in KL 6 km 34.00
P&M-062 Wet Mix Plant 60 TPH Wet Mix cum/hour 25 hour 1643.00
Sl. No. Description of Machine Unit Rate ( `)
P&M-063 Air compressor with pneumatic chisel attachment for cutting hard clay. hour 846.00
P&M-064 Batch type cold mixing plant 100-120 TPH capacity producing an average output of 75 tonne per hour hour 3382.00
P&M-065 Belt conveyor system hour input
P&M-066 Boat to carry atleast 20 persons hour 714.00 PM66001 RCD SOR dated 01.04.22
P&M-067 Cement concrete batch mix plant @ 175 cum per hour (effective output) hour 7102.00 RCD SOR dated 01.04.22
P&M-068 Cement concrete batch mix plant @ 75 cum per hour hour 3043.00 RCD SOR dated 01.04.22
P&M-069 Cold milling machine @ 20 cum per hour hour 1268.00 RCD SOR dated 01.04.22
P&M-070 Crane 5 tonne capacity hour 1163.00 RCD SOR dated 01.04.22
P&M-071 Crane 10 tonne capacity hour 1163.00 RCD SOR dated 01.04.22
P&M-072 Crane 15 tonne capacity hour 1163.00 RCD SOR dated 01.04.22
P&M-073 Crane 20 tonne capacity hour 1163.00 RCD SOR dated 01.04.22
P&M-074 Crane 40 T capacity hour 1745.00 RCD SOR dated 01.04.22
P&M-075 Crane with grab 0.75 cum capacity hour 1745.00 RCD SOR dated 01.04.22
P&M-076 Compressor with guniting equipment along with accessories hour 212.00 RCD SOR dated 01.04.22
P&M-077 Drum mix plant for cold mixes of appropriate capacity but not less than 75 tonnes/hour. hour 1643.00 RCD SOR dated 01.04.22
P&M-078 Epoxy Injection gun hour 158.00 RCD SOR dated 01.04.22
P&M-079 Generator 33 KVA hour 507.00 RCD SOR dated 01.04.22
P&M-080 Generator 100 KVA hour 1842.00 RCD SOR dated 01.04.22
P&M-081 Generator 250 KVA hour 3034.00 PM22004 RCD SOR dated 01.04.22
P&M-082 Induction, deinduction and erection of plant and equipment including all components and accessories for pneumatic method of well sinking. hour input
P&M-083 Joint Cutting Machine with 2-3 blades (for rigid pavement) hour 317.00
P&M-084 Jack for Lifting 40 tonne lifting capacity. day 1163.00
P&M-085 Piling rig Including double acting pile driving hammer (Hydraulic rig) hrs 7453.00
P&M-086 Plate compactor hour 469.70 State Level Schedule Committee Lt 29(Anu) Dated 16.04.2020
P&M-087 Snow blower equipment 140 HP @ 600 cum per hour hour input
P&M-088 Texturing machine (for rigid pavement) hour 107.00
P&M-089 Truck Trailor 30 tonne capacity hour 3382.00
P&M-090 Truck Trailor 30 tonne capacity t.km 3.14
P&M-091 Tunnel Boring machine hour input
P&M-092 Vibrating Pile driving hammer complete with power unit and accessories. hour input
P&M-093 Wet Mix Plant 100 TPH hour 2719.00
P&M-094 Wet Mix Plant 75 TPH hour 2923.00 State Level Schedule Committee Lt 29(Anu) Dated 16.04.2020
Schedule -P&M/ MORTH-1B Date: 01.07.2022 WRD SOR
Approved Usages Rates of Plants and Machinery. The Usages charges for the machines include ownership charges, cost of repair & maintenance including replacement of tyre and running and operating charges which includes crew, fuel & lubricants. These rates are for the preparation of Schedule of Rates only
Sl. No. Description of Machine Activity Output of Machine Output Unit Rate(Rs)
1 WMM Paver Finisher Paving of WMM/Paving of DLC Cum/hour hour 1519.00
2 Tipping Truck 14Cum Transportation of Soil,Gsb,WMM,Hot Mix etc. Capacity in cum hour 2175.00
3 6.5 KVA Generator Generator of electric energy KVA hour 231.00
4 Vibratory Earth Compactor Cum/hour hour 1736.00
5 Tractor(25 HP) carriage 25 HP 2.25 cum hour 629.00 PM12001 RCD SOR dated 01.04.22
6 5 Kva silent Type Generator set Generator of electric energy KVA hour 204.00
6 Needle Vibrator hour 325.00 PM44001 RCD SOR dated 01.04.22
Usage Rate of Plant And Machinery
TABULATION OF OPERATING & MAINTENANCE CREW ADOPTED IN THE HOURLY USE RATE OF EQUIPMENT
S.N Name of Equipment Operation & Maintenance crew required for the operational of the M/C
Fore-man Operator Mechanic Helper Watchman Electrician Supervisior Driver Cableman Beldar Cleaner Chargeman Fitter Grea-ser Khalasi Tar man
3.3 Scalling hammer 1 0 1/2 0 1/10 0 1/8
3.4 Diamond core drilling machine and diesel pump. 0 1/8 2 0 1/4 3 0 1/4
3.6 Paving Breakers (85 Lb or 38.6 Kg )
3.8 Shot crete Machine 0 1/8 1 0 1/2 1 0 1/4
3.9 Convey muckers (1.5 cubic yard 42 '' wide conveyor) 0 1/8 1 0 1/6 1 0 1/4
Shovel (Electric) 5 cum 350 H.P 0 1/4 1 0 1/2 1 0 1/4 0 1/2 1 2
3.11 D.8 Tractor Dozer (Push Plate )H.P 270 0 1/4 0 1/4 1 0 1/4 1
D.9 Tractor Dozer H.P 385 0 1/4 0 1/4 1 0 1/4 1
3.12 Dumper /Tipper ( 7 T) 4.5 cum 1 0 1/8 0 1/6 1
3.13 Batching and mixing plant (25-35 cum ) 0 1/2 2 0 1/2 1 6
3.14 Ventilation blower (20000cfm) 0 1/4 0 1/4 0 1/2
Vacaum pumping set
Smooth drum( 8-10 MT )
Vibratory roller 0 1/8 1 0 1/4 1 0 1/8
Pneumatic tyred rollers 0 1/8 1 0 1/4 1 0 1/8
Drawn Sheep foot roller
D-4 Tractor (drawn by) For Sheep foot roller 0 1/8 0 1/6 0 1/2 1
3.17 Locomotives
Diesel Locomotives 0 1/8 1 0 1/4 1 0 1/4
Battery Locomotive 0 1/8 1 0 1/4 1 0 1/4
3.18 Grouting machine 0 1/8 1 0 1/6 1 0 1/6
3.19 Air Compressor.
A. Diesel compressors
B.Electric compressors
Moible Crawler Mounted Upto 10 T 0 1/4 1 0 1/4 1 0 1/4 0 1/4 1
3.21 Muck / Car (12 cubic yard )
3.22 Concrete vibrator 1
3.23 Scraper Motorised Push Loaded Upto 10 cuyds 0 1/4 1 0 1/4 1 0 1/4
3.25 Concrete mixer
3.26 Diesel Truck 1 1
3.28 Tractors 1 1
3.29 Water Tanker 6kl 1 1
3.30 Concrete buckets
3.32 Drill extractors (electrical) 0 1/8 1 0 1/8 1 0 1/4 0 1/4 0 1/4
Compressed air 0 1/8 1 0 1/8 1 0 1/4 0 1/4
3.34 Pile Driving plant 0 1/8 1 0 1/4 1 0 1/4
Front end loader 2cu.yd 0 1/8 1 0 1/4 1 0 1/2
Overhead loader 1cu. yd 0 1/8 1 0 1/4 1 0 1/6
3.36 Pneumatic concrete placer (1 Cubic yard ) 0 1/8 1 0 1/6 1 0 1/6
3.37 Draglines (Diesel ) 2 cum 262 H.P 0 1/4 1 0 1/2 1 0 1/4 1
Draglines (Electric) 5 cum 350 H.P 0 1/4 1 0 1/2 1 0 1/4 0 1/2 1 1
3.38 Hydraulic excavators (Diesel )1.25cu.yd or 0.96 cum 0 1/4 1 0 1/4 1 0 1/4
Hydraulic excavators (Diesel )0.3 cum 0 1/4 1 0 1/4 1 0 1/4
3.39 Wet Mix Plant (Soil Stabilization Plantr ) 60 TPH 0 1/4 2 0 1/4 2 0 1/4 2
Wet Mix Plant (Soil Stabilization Plantr ) 110 HP 0 1/4 2 0 1/4 2 0 1/4 2
3.41 Generator set
3.42 Crushing & Processing Plant
Integrated Stone Crusher 100 TPH 1 2 0 1/4 1 15
Integrated Stone Crusher 200 TPH 1 2 0 1/4 1 20
3.43 40 quintal capacity boat 2
100 quintal capacity boat 2
100 quintal capacity boat (Moter Fitted) 1 1
3.44 Bullock cart 1 1
Transit Mixer 3.0 cum 0 1/8 1 0 1/4 1 0 1/6
TABULATION OF COST & LIFE OF MACHINES , FUEL CONSUMPTION ADOPTED IN THE HOURLY USE RATE OF EQUIPMENT & ADOPTED USE RATE
Sl No Description of machine Cost of machine Life of Machine Repair provision in X% Engine Horse Power Fuel consumption per hours Output of machine Hourly use rate(By calculation ) Adopted Use Rate of Machine vide P.W.D.S.R.
Machine Activity Year In Hours Quty Unit Output Unit Rates Unit Rate Ref Building
3.1 Drill Jumbo Number of holes drilled simultaneously IINPUT 10 12000 60 #VALUE! Per hr #VALUE!
3.2 Jack hammer (52 lb ) Drilling IINPUT 10 10000 60 100 cfm 2.3 M 35mmhole/hr #VALUE! Per hr #REF!
3.3 Scalling hammer Drilling IINPUT 10 10000 60 100 cfm #VALUE! Per hr #VALUE!
3.4 Diamond core drilling machine and diesel pump. Core samples IINPUT 8 8000 80 32.25 3.55 lit/hr 0.5 mtr/hour #VALUE! Per hr #VALUE!
3.5 Wagon Drill Drilling IINPUT 8 8000 80 400.00 cfm 0.2 mtr/hour #VALUE! Per hr #VALUE!
3.6 Pneumatic Breakers (85 Lb or 38.6 Kg ) IINPUT 10 10000 60 100.00 cfm Per hr #REF!
3.7 Hoist winch 30T IINPUT 12 15000 120 0 lit/hr #VALUE! Per hr #REF!
3.8 Shot crete Machine Pumping of Concrete IINPUT 10 15000 80 600 cfm 33/22 cum/hour #VALUE! Per hr #REF!
3.9 Convey muckers (1.5 cubic yard 42 '' wide conveyor) or 1.15 cum Transporting IINPUT 10 15000 100 165 123.09 KWH 76.5 cum/hour #VALUE! Per hr #VALUE!
3.10 Shovel (Diesel) 2 cum 262 H.P Excavation IINPUT 12 15000 150 262 28.55 lit/hr 100 cum/hour #VALUE! Per hr #VALUE!
Shovel (Electric) 5 cum 350 H.P IINPUT 20 40000 150 350 175.86 KWH 28.08 #VALUE! Per hr
3.11 D.8 Tractor Dozer (Push Plate )H.P 270 Spreading IINPUT 10 12000 100 270 29.42 lit/hr 300 cum/hour #VALUE! Per hr
b D.9 Tractor Dozer H.P 385 IINPUT 10 12000 100 385 41.95 lit/hr #VALUE! Per hr #VALUE!
c BD 50 Bulldozer with suitable diesel engine Spreading, cutting clearing IINPUT 10 12000 100 50 5.45 lit/hr 200 100 150 cum/hour Per hr 3009.00 P&M-015
d BD 80 Bulldozer with suitable diesel engine Spreading, cutting clearing IINPUT 10 12000 100 80 8.72 lit/hr 300 150 250 cum/hour Per hr 2930.00 P&M-014
3.12 Dumper or Tipper( 7 T) 4.5 cum Trasportation of soil, GSB,WMM,Hotmix etc IINPUT 8 10000 140 110 11.99 lit/hr #VALUE! Per hr #VALUE!
b Dumper or Tipper( 10 T) 5.5 cum IINPUT 8 10000 140 0.00 lit/hr Per hr 1371.00 P&M-048
c Dumper ( 15 T) IINPUT 8 10000 140 200 21.79 lit/hr 25.22 cum/hour #VALUE! Per hr #VALUE!
d Rear Dumper( 35 T) 17 cum IINPUT 10 12000 140 560 61.02 lit/hr #VALUE! Per hr #VALUE!
3.13 Batching and mixing plant ( 35 cu.yd/hr )or 27 cum Cocrete Mixing IINPUT 18 30000 75 80 59.68 kwh 27 cum/hour #VALUE! Per hr 2775.00 P&M-002
b Batching and mixing plant ( 15- 20 cum ) IINPUT 13 cum/hour Per hr 1804.00 P&M-003
3.14 Ventilation blower (20000cfm) IINPUT 12 58000 80 20 14.92 kwh #VALUE! Per hr #VALUE!
3.15 Pump Pumping, water supply, sewage, dredging etc
a 5 H.P IINPUT 8 10000 100 5 0.61 lit/hr #VALUE! Per hr #VALUE!
b 10 H.P IINPUT 8 10000 100 10 1.21 lit/hr #VALUE! Per hr #VALUE!
c 15 H.P IINPUT 8 10000 100 15 1.82 lit/hr #VALUE! Per hr #VALUE!
d 20 H.P IINPUT 8 10000 100 20 2.42 lit/hr #VALUE! Per hr #VALUE!
e 25 H.P IINPUT 8 10000 100 25 3.03 lit/hr #VALUE! Per hr #VALUE!
f 30 H.P IINPUT 8 10000 100 30 3.63 lit/hr #VALUE! Per hr #VALUE!
(ii) Electric Pump
g 5 H.P IINPUT 12 20000 70 5 3.73 kwh #VALUE! Per hr #VALUE!
h 10 H.P IINPUT 12 20000 70 10 7.46 kwh #VALUE! Per hr #VALUE!
I 15 H.P IINPUT 12 20000 70 15 11.19 kwh #VALUE! Per hr #VALUE!
j 20 H.P IINPUT 12 20000 70 20 14.92 kwh #VALUE! Per hr #VALUE!
k 30 H.P IINPUT 12 20000 70 30 22.38 kwh #VALUE! Per hr #VALUE!
l 40 H.P IINPUT 12 20000 70 40 29.84 kwh #VALUE! Per hr #VALUE!
m 50 H.P IINPUT 12 20000 70 50 37.3 kwh #VALUE! Per hr #VALUE!
(iii) Vacaum pumping set 5 H.P IINPUT 12 20000 50 5 3.73 kwh #VALUE! Per hr #VALUE!
a Smooth drum( 8-10 MT ) Roller Soil, BM Compaction IINPUT 8 12000 80 3 lit/hr Per hr 1518.00 P&M-044
b Vibratory roller Earth/ Soil GSB WMM Compaction IINPUT 8 8000 150 62 7.51 lit/hr Per hr 1996.00 P&M-059
c Pneumatic Road rollers Rolling of Aspalt Surface Compaction IINPUT 8 10000 80 60 7.26 lit/hr Per hr 1698.00 P&M-037
d Sheep foot roller Compaction of Earth #VALUE! Per hr #VALUE!
Sheep foot roller Drawn by Tractor IINPUT 8 10000 70 Per hr #VALUE! P&M-053+Sheep foot roller
3.17 Locomotives
a Diesel Locomotives IINPUT 10 16000 120 98 10.79 lit/hr #VALUE! Per hr #VALUE!
b Battery Locomotive (For 12 cubic yard capacity muckurcar) IINPUT 22 40000 120 #VALUE! Per hr #VALUE!
3.18 Grouting machine IINPUT 10 10000 80 200 cfm #VALUE! Per hr 212.00
3.19 Air Compressor. General Purpose
A. Diesel compressors
210 cfm IINPUT 8 10000 100 61.50 6.77 lit/hr #VALUE! Per hr 391.00 P&M-001
300 cfm. IINPUT 10 10000 100 94.30 10.38 lit/hr #VALUE! Per hr #VALUE!
500 cfm IINPUT 10 12000 100 148.00 16.13 lit/hr #VALUE! Per hr #VALUE!
B.Electric compressors
500 cfm IINPUT 12 20000 80 90.00 kwh #VALUE! Per hr #VALUE!
1500 cfm Staionery IINPUT 20 30000 80 240.00 kwh #VALUE! Per hr #VALUE!
3.20 Crane 10 tonne capacity Lifting purpose IINPUT 10 12000 120 lit/hr #VALUE! Per hr 1163.00 P&M-071
3.21 Muck car (12 cubic yard ) Transporting IINPUT 20 30000 50 #VALUE! Per hr #VALUE!
3.22 Concrete vibrator 5 8000 150 1.5 lit/hr #REF! Per hr #REF!
3.23 Scraper Motorised Push Loaded upto 10 cuyds IINPUT 8 9000 150 165 17.98 lit/hr #VALUE! Per hr #VALUE!
3.24 GRADER 115 hp Clearing Spreading GSB WMM IINPUT 10 12000 150 115 12.53 lit/hr 200 200 50 50 Per hour #VALUE! Per hr 4403.00 P&M-032
3.25 Concrete mixer IINPUT
(I). Concrete mixer 0.4/0.28 cum Concrete Mixing IINPUT 5 8000 80 5 lit/hr 0.40 cum/hour Per hr 283.00 P&M-009
(ii). 10/7 (0.20 cum) cft. Capacity fitting drum type concrete mixer etc. radiator cooled diseal engine. Concrete Mixing IINPUT 5 8000 80 4.5 lit/hr 2.5 cum/hour Per hr #REF!
3.26 Truck 5.5 cum per 10 tonnes Material Transport IINPUT 10 12000 150 3.2 lit/hr 8t/4.8cum Tone,cum Per hr 934.30 P&M-057
3.27 a. Farm Tractor with Ripper Loosen the hard earth and other material IINPUT 150 cum/hour Per hr 533.00 P&M-055
b Tractor 50H.P IINPUT 5 12000 150 50 6.05 lit/hr cum/hour Per hr 629.00 P&M-053
c.Ripper IINPUT 10 12000 100 nil Per hr 39.00 P&M-041
3.28 Tractor 30H.P with Leveller/Bucket Excavation of Earth 684000 5 12000 150 30 2.75 lit/hr 499.57 Per hr 646.00 P&M-054
3.29a Water Tanker 6kl Water Transport IINPUT 10 16000 100 Per hr 707.00 P&M-060
b Water Tanker 6kl(With Tractor ) Per hr 1336.00 (P&M-060)+(P&M-053)
3.30 Concrete buckets 3.06 cum 4 cuyd IINPUT 10 15000 50 Per hr 86.00 P&M-008
3.31 Trolley Transporting IINPUT 10 15000 50 Per hr #REF!
3.32 Drill extractors (Compressed air) IINPUT 8 8000 80 400 cfm #VALUE! Per hr #VALUE!
3.33 Grinder IINPUT 8 8000 80 400 cfm #VALUE! Per hr #VALUE!
3.34 Sheet Pile Driving plant Sheet Pile Driving INPUT 10 15000 50 400 cfm #VALUE! Per hr #VALUE!
a Front end loader 1.0cum bucket capacity Soil, Aggregate loading IINPUT 10 15000 150 130 12.79 lit/hr 60 /25 cum/hour #VALUE! Per hr 1366.00 P&M-017
b Overhead loader 1cu. Yd or 0.768 cum IINPUT 16 20000 70 160 119.36 kwh #VALUE! Per hr #VALUE!
3.36 Pneumatic concrete placer (1 Cubic yard ) or 0.768 cum Placing Concrete IINPUT 10 10000 120 200 Cfm #VALUE! Per hr #VALUE!
3.37 Draglines (Diesel ) 2 cum 262 H.P (Crane with grab ) In well Shinking, Excavators IINPUT 12 15000 150 262 28.55 lit/hr #VALUE! Per hr 1745.00 P&M-075
3.38 Hydraulic excavators (Diesel ) 1 cum bucket Excavators 4283885 10 12000 150 103.5 11.28 60/60/60 cum/hour #VALUE! Per hr 2202.00 P&M-026
3.39 Wet Mix Plant (Soil Stabilization Plant ) 60 TPH Stabilization Wet Mix IINPUT 10 12000 150 38.5 4.19 lit/hr 25 cum/hour Per hr 1643.00 P&M-062
3.40 Agitating car 4cu.yd or 3.07 cum IINPUT 10 10000 120 5 5.33 kwh #VALUE! Per hr #VALUE!
3.41 Generator set
a 250 KVA Generation of Electric Energy IINPUT 15 30000 120 0.00 lit/hr Per hr 3034.00 P&M-081
b 125 KVA IINPUT 15 30000 120 0.00 lit/hr 100 KVA Per hr 1587.00 P&M-018
c 100 KVA IINPUT 15 30000 120 0.00 lit/hr Per hr 1842.00 P&M-080
d 63 KVA IINPUT 15 30000 120 0.00 lit/hr Per hr 1068.00 P&M-019
e 33 KVA IINPUT 10 20000 100 0.00 lit/hr 50 KVA Per hr 507.00 P&M-079
3.42 Crushing & Processing Plant
a Integrated Stone Crusher 100 TPH Crushing of Spoil IINPUT 12 18000 80 400 kwh 100 TPH #VALUE! Per hr 11820.00 P&M-027
b Integrated Stone Crusher 200 TPH IINPUT 12 18000 80 800 kwh 200 TPH #VALUE! Per hr 24865.00 P&M-028
3.43 40 quintal capacity boat Transportation in River 500000 8 35000 150 nil 707.00 hour 191.00 Approved Rate in S.R(Sharsa Zone)
b 100 quintal capacity boat 900000 8 35000 150 nil 925.00 Per day 252.70 Approved Rate in S.R(Sharsa Zone)
c 100 quintal capacity boat (Moter Fitted) 1000000 8 35000 150 5 0.54 lit/hr #VALUE! Per day #VALUE!
d Boat to carry atleast 20 persons 7500000 per hr 714.00 P&M-066
3.44 Bullock cart Transportation IINPUT 8 40000 50 Per day 136.60 Approved Rate in S.R(Sharsa Zone)
3.45 Transit Mixer 4.0/4.5 cum Transportation of concrete mix to site IINPUT 10 10000 120 0 lit/hr 4.5 cum/hour Per hr 1268.00 P&M-049
b Transit Mixer 3.0 cum IINPUT 10 10000 120 0 lit/hr 3 cum/hour Per hr 1163.00 P&M-051
Machine Related Material
Sl.No Material Cost Unit Life of Material Approved Rate
1 Jumbo drill steel IINPUT per mtr IINPUT per mtr
2a. Jack Hammer drill rod IINPUT per mtr 130 IINPUT per mtr
2b. Jack Hammer drill bit IINPUT per mtr 130 IINPUT per mtr
3 For Diamond core drilling machine IINPUT
3a Diamond bit for N x size (53 mm to 75 mm)(Internal dia To External dia) 'D' IINPUT per mtr 10 IINPUT per mtr
3b Diamond bit for (Bxsize (41mm to 59 mm)(Internal dia To External dia) 'T' IINPUT per mtr 10 IINPUT per mtr
3c Tungaton Carbide bit IINPUT per mtr 20 IINPUT per mtr
3d (NxSize ) Reaming shell 'S' IINPUT per mtr 50 IINPUT per mtr
3e (BxSize ) Reaming shell 'TK' IINPUT per mtr 50 IINPUT per mtr
3f Reaming shell 'N' IINPUT per mtr 100 IINPUT per mtr
3g Core box (wooden 3m long x 0.85 m wide x 0.15 m deep) with longitudinal compartment to acccomodate 5 rows of 3 m long cores. i.e total 15 m IINPUT Each IINPUT Each
4 Wagon Drill(Steel) equipment required with Wagon drill IINPUT
4a Shank adopter IINPUT per mtr 460 IINPUT per mtr
4b Coupling sleeves IINPUT per mtr 460 IINPUT per mtr
4c Extension rod 1 x 3.00metre IINPUT per mtr 460 IINPUT per mtr
4d Extension rod 1 x 2.50 metre IINPUT per mtr 460 IINPUT per mtr
4e Extension rod 1 x 2.00 metre IINPUT per mtr 460 IINPUT per mtr
4f Extension rod 1 x 1.50 metre IINPUT per mtr 460 IINPUT per mtr
4g Extension rod 1 x 1.00 metre IINPUT per mtr 460 IINPUT per mtr
4h Cost of 4 point drill bit IINPUT per mtr 130 IINPUT per mtr
CALCULATION OF HIRE CHARGES OF MACHINE
Sr.No. Description Quantity Unit Rate Amount Ref.
3.1 Drill Jumbo
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 10 Year
Rated life of machine 12000 hrs
Working Hours per year (Rated life in hrs/yr) 1200 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Rated life of Machines 0 #VALUE! A
B Repaire and Maintenance charge 60 % of Depreciation of machine /hr 60 % #VALUE! B
C Running charges (P.O.L)
b.Lubricant and grease waste etc 25% of above Fuel 25 % 0.00
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
Direct labour charge Nos Days Rate Amount
i.Operator Gr I 2 30 541.00 32460.00
Total Direct labour charge 96048.75
Direct labour charge per hr (Total labour charge/Working hr in year) 960.49 D
Hourly use rate #VALUE! Per hr
3.2 Jack hammer (52 lb )
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 10 Year
Rated life of machine 10000 hrs
Working Hours per year (Rated life in hrs/yr) 1000 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Rated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 60 % #VALUE! B
C Running charges (P.O.L)
a.Fuel compressed air 100/100cfm #VALUE!
b.Lubricant and grease waste etc 25% of above Fuel 25 % #VALUE!
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
d.Pneumatic rubber hose pipe 38 mm with fitting per 100 working hrs 15 mtr 46.80 7.02
Total charge #VALUE! C
D Labour charge
Direct labour charge Nos Days Rate Amount
i.Operator Gr I 1 30 541.00 16230.00
iii.Mechanic 0 1/8 30 660.00 2475.00
iv.Chawkidar 0 1/8 30 444.00 1665.00
Total Direct labour charge 27030.00 Per hr
Direct labour charge per hr= Total labour charge/Working hr in year 324.36 D
Hourly use rate #VALUE!
3.2a a. Jack Hammer drill rod
Cost of m drill rod at site per mtr IINPUT Per mtr
Economic life 130 mtr
Use rate of drill rod #VALUE!
3.2b b.Jack Hammer drill bit
Cost of bit IINPUT
Economic life 130 mtr
Use rate of drill bit #VALUE! Per mtr
3.3 Scalling hammer
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 10 Year
Rated life of machine 10000 hrs
Working Hours per year (Rated life in hrs/yr) 1000 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Rated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 60 % #VALUE! B
C Running charges (P.O.L)
a.Fuel compressed air 100 /100cfm 0.00
b.Lubricant and grease waste etc 25% of above Fuel 25 % 0.00
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
Direct labour charge Nos Days Rate Amount
i.Operator Gr I 1 30 541.00 16230.00
iii.Chaukidar 0 1/10 30 444.00 1332.00
iv. Supervisor 0 1/8 30 660.00 2475.00
Total Direct labour charge 24222.00
Direct labour charge per hr 290.66 D
Hourly use rate #VALUE! Per hr
3.4 Diamond core drilling machine and diesel pump.
A Depreciation charge
Capital cost of machine input
Life of machine 8 Year
Rated life of machine 8000 hrs
Working Hours per year (Rated life in hrs/yr) 1000 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 80 % #VALUE! B
C Running charges (P.O.L)
b.Lubricant and grease waste etc 25% of above Fuel 25 % 200.43
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
1 For Drilling Machine
i.Operator Gr I 2 30 541.00 32460.00
Total Direct labour charge 82728.75
Direct labour charge per hr 992.75 D
Hourly use rate #VALUE! Per hr
3.5 Wagon Drill
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 8 Year
Rated life of machine 8000 hrs
Working Hours per year (Rated life in hrs/yr) 1000 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 80 % #VALUE! B
C Running charges (P.O.L)
a.Fuel Compressed air 400.00 /100cfm 0.00 0.00
b.Lubricant and grease waste etc 25% of above Fuel 25 % 0.00
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
i.Operator Gr I 1 30 541.00 16230.00
iv. Supervisor 0 1/4 30 660.00 4950.00
Total Direct labour charge 42333.75
Direct labour charge per hr 508.01 D
Hourly use rate #VALUE!
3.7 Hoist winch 30T
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 12 Year
Rated life of machine 15000 hrs
Working Hours per year (Rated life in hrs/yr) 1250 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 120 % #VALUE! B
C Running charges (P.O.L)
a.Fuel Diesel lit 56.10 0.00
b.Lubricant and grease waste etc 25% of above Fuel 25 % 0.00
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
i.Operator Gr I 30 541.00 #VALUE!
ii.Helper 0 30 444.00 0.00
iii.Formen 0 30 541.00 0.00
iv.Mechanic 0 30 660.00 0.00
v.Choukidar 0 30 444.00 0.00
iv. Supervisor 0 30 660.00 0.00
Total Direct labour charge #VALUE!
Direct labour charge per hr #VALUE! D
Hourly use rate #VALUE!
3.8 Shot crete Machine
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 10 Year
Rated life of machine 15000 hrs
Working Hours per year (Rated life in hrs/yr) 1500 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 80 % #VALUE! B
C Running charges (P.O.L)
a.Fuel Compressed air 600 per100cfm input #VALUE!
b.Lubricant and grease waste etc 25% of above Fuel 25 % #VALUE!
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
i.Operator Gr I 1 30 541.00 16230.00
Total Direct labour charge 44808.75
Direct labour charge per hr 358.47 D
Hourly use rate #VALUE!
3.9 Convey muckers (1.5 cubic yard42 "wide converyor 165 H.P)
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 10 Year
Rated life of machine 15000 hrs
Working Hours per year (Rated life in hrs/yr) 1500 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 100 % #VALUE! B
C Running charges (P.O.L)
a.Electtrical energy charge (H.Px0.746) 123.09 KWH #VALUE! #VALUE!
b.Lubricant and grease waste etc 25% of above Fuel 25 % #VALUE!
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
i.Operator Gr I 1 30 541.00 16230.00
Total Direct labour charge 38208.75
Direct labour charge per hr 305.67 D
Hourly use rate #VALUE! Per hr
3.10 Shovel (Diesel) 2 cum 262 H.P
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 12 Year
Rated life of machine 15000 hrs
Working Hours per year (Rated life in hrs/yr) 1250 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 150.00 % #VALUE! B
C Running charges (P.O.L)
a.Fuel Diesel (2/3x0.5xh.Px0.6x4.546/8.26) 28.55 lit 56.10 1601.50
b.Lubricant and grease waste etc 25% of above Fuel 25 % 400.37
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
i.Operator Gr I 1 30 541.00 16230.00
iv. Supervisor 1 30 660.00 19800.00
Total Direct labour charge 66637.50
Direct labour charge per hr 639.72 D
Hourly use rate #VALUE! Per hr
Shovel (Electric) 5 cum 350 H.P
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 20 Year
Rated life of machine 40000 hrs
Working Hours per year (Rated life in hrs/yr) 2000 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 150 % #VALUE! B
C Running charges (P.O.L)
H.P motor =350 Electric energy required=350x0.746=261 KWH Electric energy for 40 kv .A.C. control @ 0.80 Power factor=40x0.80=32 KWH Total Electric energy required=261+32=-293 KWH Assuming diversity factor @ 60 % energy required=0.6x293=175.86 KWH
a.Electtrical energy charge 175.86 KWH #VALUE! #VALUE!
b.Lubricant and grease waste etc 25% of above Fuel 25 % #VALUE!
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % 0.00
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
i.Operator Gr I 1 30 541.00 16230.00
vi. Electrician 0 1/2 30 541.00 8115.00
vii. Cableman 2 30 444.00 26640.00
viii.Supervisor 1 30 660.00 19800.00
Total Direct labour charge 101392.50
Direct labour charge per hr 608.36 D
Hourly use rate #VALUE! Per hr
3.11 D.8 Tractor Dozer (Push Plate) 270 H.P
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 10 Year
Rated life of machine 12000 hrs
Working Hours per year (Rated life in hrs/yr) 1200 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 100 % #VALUE! B
C Running charges (P.O.L)
Rated H.P=270 Consumption of diesel oil= 0.5xB.H.P x0.6/8.26 Gallons / hr =0.04 BHP gallons / hr Actual consumption adoped= 65 % or 2/3 of above =0.026 BHPx4.546 litres/hr=
a.Fuel Diesel 29.42 lit 56.10 1650.40
b.Lubricant and grease waste
Hydraulic oil 0.25 lit Input #VALUE!
Petrol 1 lit Input #VALUE!
Lubricant oil 0.75 lit Input #VALUE!
Filter oil 0.6 lit Input #VALUE!
Gear oil 0.25 lit 254.00 63.50
Grease 0.5 kg Input #VALUE!
Cardium compound 200 gm Input #VALUE!
c.Sundries and miseellenceous supplies at site @ 15 % of R/M(B) 15 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
Total Direct labour charge 41887.50
Direct labour charge per hr 418.88 D
Hourly use rate #VALUE! Per hr
D.9 Tractor Dozer 385 H.P
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 10 Year
Rated life of machine 12000 hrs
Working Hours per year (Rated life in hrs/yr) 1200 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 100 % #VALUE! B
C Running charges (P.O.L)
Rated H.P=385 Consumption of diesel oil= 0.5xB.H.P x0.6/8.26 Gallons / hr =0.04 BHP gallons / hr Actual consumption adoped= 65 % or 2/3 of above =0.026 BHPx4.546 litres/hr
a.Fuel Diesel 41.95 lit input #VALUE!
b.Lubricant and grease waste
Hydraulic oil 0.25 lit Input #VALUE!
Petrol 1 lit Input #VALUE!
Lubricant oil 0.75 lit Input #VALUE!
Filter oil 0.6 lit Input #VALUE!
Gear oil 0.25 lit 254.00 63.50
Grease 0.5 kg Input #VALUE!
Cardium compound 200 gm Input #VALUE!
c.Sundries and miseellenceous supplies at site @ 15 % of R/M(B) 15 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
i.Operator Gr I 1 26 541.00 14066.00
Total Direct labour charge 36302.50
Direct labour charge per hr 363.03 D
Hourly use rate #VALUE! Per hr
3.12 Dumper or Tipper( 7T ) 4.5 cum
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 8 Year
Rated life of machine 10000 hrs
Working Hours per year (Rated life in hrs/yr) 1250 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 140 % #VALUE! B
C Running charges (P.O.L)
b.Lubricant and grease waste etc 25% of above Fuel 25 % 168.10
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
ii.Cleaner 1 30 #REF! #REF!
Total Direct labour charge #REF!
Direct labour charge per hr #REF!
Hourly use rate #VALUE! Per hr
Dumper or Tipper( 15 T) Rear Dumper 35 T
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 8 Year
Rated life of machine 10000 hrs
Working Hours per year (Rated life in hrs/yr) 1250 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 140 % #VALUE! B
C Running charges (P.O.L)
b.Lubricant and grease waste etc 25% of above Fuel 25 % 305.63
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
Total Direct labour charge 37098.75
Direct labour charge per hr 356.15 D
Hourly use rate #VALUE! Per hr
Dumper or Tipper( 35 T)
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 10 Year
Rated life of machine 12000 hrs
Working Hours per year (Rated life in hrs/yr) 1200 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 140 % #VALUE! B
C Running charges (P.O.L)
b.Lubricant and grease waste etc 25% of above Fuel 25 % 855.76
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
Total Direct labour charge 41887.50
Direct labour charge per hr 418.88 D
Hourly use rate #VALUE! Per hr
3.13 Batching and mixing plant (35cu.yd/hr)
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 18 Year
Rated life of machine 30000 hrs
Working Hours per year (Rated life in hrs/yr) 1666.67 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 100 % #VALUE! B
C Running charges (P.O.L)
a.Electtrical energy charge 59.68 KWH #VALUE! #VALUE!
b.Lubricant and grease waste etc 25% of above Fuel 25 % #VALUE!
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
i.Operator Gr I 2 30 660.00 39600.00
v.Choukidar 1 30 444.00 13320.00
Total Direct labour charge 173505.00
Direct labour charge per hr 1249.24 D
Hourly use rate #VALUE! Per hr
3.14 Ventilation blower (20000cfm)
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 12 Year
Rated life of machine 58000 hrs
Working Hours per year (Rated life in hrs/yr) 4833.33 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of blower /hr 80 % #VALUE! B
C Running charges (P.O.L)
a.Electtrical energy charge 14.92 KWH #VALUE! #VALUE!
b.Lubricant and grease waste etc 25% of above Fuel 25 % #VALUE!
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
iii.Mechanic 0 1/2 30 660.00 9900.00
Total Direct labour charge 17287.50
Direct labour charge per hr 42.92 D
Hourly use rate #VALUE! Per hr
(I). DIESEL PUMP 5 H.P 10H.P 15H.P 20H.P 25H.P 30 H.P
Capital cost IINPUT IINPUT IINPUT IINPUT IINPUT IINPUT
Life in year 8 Years
Rated life 10000 hrs
Annual operational hours 1250 hrs
Annual operational days 300.00 Days
A Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
B Major & Minor repair @ 100 % of depreciation 80 % #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
C Operation charge
Nos Days Rate Amount
Operator -----x26 per month . 1.00 30 444.00 13320
Annual operational hours 1250.00 hr 0.01 0.01 0.01 0.01 0.01 0.01
ii. Lubricant, cotton waste etc 10 % of (i) 10 % 3.40 6.79 10.19 13.58 16.98 20.38
Hourly use rate (A+B+C+D) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
(II). ELECTRIC PUMP 5 H.P 10H.P 15HP 20H.P 30H.P 40H.P 50H.P
Capital cost IINPUT IINPUT IINPUT IINPUT IINPUT IINPUT IINPUT
Life in year 12 Years
Rated life 20000 hrs
a. Depreciation /hr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
b. Major & Minor repair @ --- % of depreciation 70 % #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
c Labour charge Upto 15 H.P Above 15 H.P
Nos Days Rate Amount Nos Days Rate Amount
d Running charges (P.O.L) Unit = 3.73 7.46 11.19 14.92 22.38 29.84 37.30
Rate = #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
a.Electtrical energy charge Amount = #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
b.Lubricant and grease waste etc 25% of above Fuel 25 % #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Total charge #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Hire charge of Electric Pump Per /hour ( a+b+c+d) Per hour #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
(iii). 5 H.P vacaum pumping set
A Capital cost of machine IINPUT
Life of machine 12 Year
Rated life of machine 20000 hrs
Working Hours per year (Rated life in hrs/yr) 1666.67 hrs
a. Depreciation of machine /hr #VALUE! A
B Repaire and Maintenance charge % of Depreciation of blower /hr 50 % #VALUE! B
C Running charges (P.O.L)
a.Electtrical energy charge 3.73 KWH #VALUE! #VALUE!
b.Lubricant and grease waste etc 25% of above Fuel 25 % #VALUE!
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
i.Operator 1 26 444.00 11544
Direct labour charge per hr 83.12 D
Hourly use rate #VALUE! Per hr
Sheep foot roller
A Capital cost of machine IINPUT
Life of machine 8 Year
Rated life of machine 10000 hrs
Working Hours per year 1250 hrs
a. Depreciation of machine /hr #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 70 % #VALUE! B
Hourly use rate of Sheep foot roller #VALUE! Per hr
3.17 Locomotives
1 Diesel Locomotives
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 10 Year
Rated life of machine 16000 hrs
Working Hours per year (Rated life in hrs/yr) 1600 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 120 % #VALUE! B
C Running charges (P.O.L)
a.Diesel 10.79 lit 56.10 605.16
b.Lubricant and grease waste etc 25% of above Fuel 25 % 151.29
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
Total Direct labour charge 43428.75
Direct labour charge per hr 325.72
Hourly use rate #VALUE! Per hr
2 Battery Locomotive
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 22 Year
Rated life of machine 40000 hrs
Working Hours per year (Rated life in hrs/yr) 1818.18 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 120 % #VALUE! B
Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
Total Direct labour charge 43428.75
Direct labour charge per hr 286.63
Hourly use rate #VALUE! Per hr
3.18 Grouting machine
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 10 Year
Rated life of machine 10000 hrs
Working Hours per year (Rated life in hrs/yr) 1000 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 80 % #VALUE! B
C Running charges (P.O.L)
a.Fuel Compressed air 200.00 /100cfm input #VALUE!
b.Lubricant and grease waste etc 25% of above Fuel 25 % #VALUE!
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
Total Direct labour charge 37098.75
Direct labour charge per hr 445.19
Hourly use rate #VALUE! Per hr
3.19 Air Compressor.
A. Diesel compressors
1.Diesel Air compressor ….cfm 210cfm 300cfm 500cfm
A Depreciation charge
Capital cost of machine IINPUT IINPUT IINPUT
Life of machine 8 Year
Rated life of machine 10000 hrs
Working Hours per year (Rated life in hrs/yr) 1250 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A #VALUE! #VALUE!
B Repaire and Maintenance charge % of Depreciation of machine /hr 100 % #VALUE! B #VALUE! #VALUE!
C Running charges (P.O.L)
b.Lubricant and grease waste etc 25% of above Fuel 25 % 94.94 145.58 226.17
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE! #VALUE! #VALUE!
Total charge #VALUE! C #VALUE! #VALUE!
D Labour charge
(a) Direct labour charge Nos Days Rate Amount Amount Amount
Total Direct labour charge 43428.75 43428.75 43428.75
Direct labour charge per hr 416.92 D 416.92 416.92
Hourly use rate #VALUE! Per hr #VALUE! Per hr #VALUE!
B.Electric compressors
1.Electric Air compressor 500 cfm
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 12 Year
Rated life of machine 20000 hrs
Working Hours per year (Rated life in hrs/yr) 1666.67 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 80 % #VALUE! B
C Running charges (P.O.L)
a.Electtrical energy charge 90.00 KWH #VALUE! #VALUE!
b.Lubricant and grease waste etc 25% of above Fuel 25 % #VALUE!
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
v.Elctrician 0 1/2 30 541.00 8115.00
vi.Choukidar 0 1/4 30 444.00 3330.00
Total Direct labour charge 51543.75
Direct labour charge per hr 371.12
Hourly use rate #VALUE! Per hr
2.Electric Air compressor 1500 cfm
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 8 Year
Rated life of machine 8000 hrs
Working Hours per year (Rated life in hrs/yr) 1000 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 150 % #VALUE! B
C Running charges (P.O.L)
a.Electtrical energy charge 240.00 KWH #VALUE! #VALUE!
b.Lubricant and grease waste etc 25% of above Fuel 25 % #VALUE!
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
v.Elctrician 0 1/2 30 541.00 8115.00
vi.Choukidar 0 1/4 30 444.00 3330.00
Total Direct labour charge 53193.75
Direct labour charge per hr 638.33
Hourly use rate #VALUE! Per hr
Crawler Mounted 10 T
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 10 Year
Rated life of machine 12000 hrs
Working Hours per year (Rated life in hrs/yr) 1200 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 120 % #VALUE! B
C Running charges (P.O.L)
a.i.Diesel 3.50 lit 56.10 196.35
ii.Petrol 8.00 lit Input #VALUE!
b.Lubricant and grease waste etc 25% of above Fuel 25 % #VALUE!
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
vi.Supervisor 0 1/4 31 660.00 5115.00
Total Direct labour charge 45457.50
Direct labour charge per hr 454.58
Hourly use rate #VALUE! Per hr
3.21 Muck / car (12 cubic yard )
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 20 Year
Rated life of machine 30000 hrs
Working Hours per year (Rated life in hrs/yr) 1500 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 150 % #VALUE! B
C Running charges (P.O.L)
Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
Hourly use rate #VALUE! Per hr
A Depreciation charge
Capital cost of machine 21840.00
Life of machine 5 Year
Rated life of machine 8000 hrs
Working Hours per year (Rated life in hrs/yr) 1600 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines 2.46 A
B Repaire and Maintenance charge % of Depreciation of machine /hr 150 % 3.69 B
C Running charges (P.O.L)
a.Diesel 0.50 lit 62.80 31.29
b.Lubricant and grease waste etc 25% of above Fuel 25 % 7.82
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % 0.37
Total charge 39.48 C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
i.Driver 1 30 #REF! #REF!
Total Direct labour charge #REF!
Direct labour charge per hr #REF!
Hourly use rate #REF! Per hr
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 8 Year
Rated life of machine 9000 hrs
Working Hours per year (Rated life in hrs/yr) 1125 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 150 % #VALUE! B
C Running charges (P.O.L)
a.Diesel 17.98 lit 62.80 1129.03
b.Lubricant and grease waste etc 25% of above Fuel 25 % 282.26
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
Total Direct labour charge 45457.50
Direct labour charge per hr 484.88
Hourly use rate #VALUE! Per hr
3.24 GRADER 110 hp
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 10 Year
Rated life of machine 12000 hrs
Working Hours per year (Rated life in hrs/yr) 1200 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 150 % #VALUE! B
C Running charges (P.O.L)
a.Diesel 12.53 lit 62.80 786.90
b.Lubricant and grease waste etc 25% of above Fuel 25 % 196.73
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
iv.Mechanic 0 30 660.00 0.00
Total Direct labour charge 41808.75
Direct labour charge per hr 418.09
Hourly use rate #VALUE! Per hr
A Depreciation charge
Capital cost of machine 684000.00
Life of machine 5 Year
Rated life of machine 12000 hrs
Working Hours per year (Rated life in hrs/yr) 2400 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines 51.30 A
B Repaire and Maintenance charge % of Depreciation of machine /hr 150 % 76.95 B
C Running charges (P.O.L)
a.Diesel 2.75 lit 62.80 172.70
b.Lubricant and grease waste etc 25% of above Fuel 25 % 43.18
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % 7.70
Total charge 223.57 C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
Total Direct labour charge 29550.00
Direct labour charge per hr 147.75 D
Hourly use rate 499.57 Per hr
Hire charge of Tractor per day 3996.56 Per day
3.32 Drill extractors (Compressed air)
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 8 Year
Rated life of machine 8000 hrs
Working Hours per year (Rated life in hrs/yr) 1000 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 80 % #VALUE! B
C Running charges (P.O.L)
a.Fuel Compressed air 400 /100cfm input #VALUE!
b.Lubricant and grease waste etc 25% of above Fuel 25 % #VALUE!
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
i.Operator Gr I 1 30 660.00 19800.00
iv. Supervisor 0 1/4 30 660.00 4950.00
Total Direct labour charge 45903.75
Direct labour charge per hr 550.85 D
Hourly use rate #VALUE!
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 8 Year
Rated life of machine 8000 hrs
Working Hours per year (Rated life in hrs/yr) 1000 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 80 % #VALUE! B
C Running charges (P.O.L)
a.Fuel Compressed air 400 /100cfm input #VALUE!
b.Lubricant and grease waste etc 25% of above Fuel 25 % #VALUE!
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
i.Operator Gr I 1 30 660.00 19800.00
Total Direct labour charge 40953.75
Direct labour charge per hr 491.45 D
Hourly use rate #VALUE!
3.34 Sheet Pile Driving plant
A Depreciation charge
Capital cost of machine INPUT
Life of machine 10 Year
Rated life of machine 15000 hrs
Working Hours per year (Rated life in hrs/yr) 1500 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 50 % #VALUE! B
C Running charges (P.O.L)
a.Fuel Compressed air 400 /100cfm input #VALUE!
b.Lubricant and grease waste etc 25% of above Fuel 25 % #VALUE!
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
i.Operator Gr I 1 30 660.00 19800.00
Total Direct labour charge 43428.75
Direct labour charge per hr 347.43 D
Hourly use rate #VALUE!
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 10 Year
Rated life of machine 15000 hrs
Working Hours per year (Rated life in hrs/yr) 1500 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 150 % #VALUE! B
C Running charges (P.O.L)
a.Diesel 12.79 lit 62.80 803.42
b.Lubricant and grease waste etc 25% of above Fuel 25 % 200.85
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
Total Direct labour charge 46758.75
Direct labour charge per hr 374.07
Hourly use rate #VALUE! Per hr
Overhead loader 1cu. yd
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 16 Year
Rated life of machine 20000 hrs
Working Hours per year (Rated life in hrs/yr) 1250 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 70 % #VALUE! B
C Running charges (P.O.L)
a.Diesel 119.36 lit 62.80 7495.81
b.Lubricant and grease waste etc 25% of above Fuel 25 % 1873.95
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
Total Direct labour charge 42318.75
Direct labour charge per hr 406.26
Hourly use rate #VALUE! Per hr
3.36 Pneumatic concrete placer (1 CUBIC YARD )
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 10 Year
Rated life of machine 10000 hrs
Working Hours per year (Rated life in hrs/yr) 1000 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 120 % #VALUE! B
C Running charges (P.O.L)
a.Fuel Compressed air 200.00 /100cfm input #VALUE!
b.Lubricant and grease waste etc 25% of above Fuel 25 % #VALUE!
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
Total Direct labour charge 40668.75
Direct labour charge per hr 488.03
Hourly use rate #VALUE! Per hr
3.37 Draglines 2 cum 262 H.P
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 12 Year
Rated life of machine 15000 hrs
Working Hours per year (Rated life in hrs/yr) 1250 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 150 % #VALUE! B
C Running charges (P.O.L)
a.Diesel 28.55 lit 62.80 1792.77
b.Lubricant and grease waste etc 25% of above Fuel 25 % 448.19
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
Total Direct labour charge 50407.50
Direct labour charge per hr 483.91
Hourly use rate #VALUE! Per hr
3.38 Hydraulic excavators (Diesel )1.25cu.yd
A Depreciation charge
Capital cost of machine input
Life of machine 10 Year
Rated life of machine 12000 hrs
Working Hours per year (Rated life in hrs/yr) 1200 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Rated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 150 % #VALUE! B
C Running charges (P.O.L)
a.Diesel 11.28 lit 62.80 708.21
b.Lubricant and grease waste etc 25% of above Fuel 25 % 177.05
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
Total Direct labour charge 45457.50
Direct labour charge per hr 454.58
Hourly use rate #VALUE! Per hr
3.40 Agitating car 4cu.yd
A Depreciation charge
Capital cost of machine IINPUT
Life of machine 10 Year
Rated life of machine 10000 hrs
Working Hours per year (Rated life in hrs/yr) 1000 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 120 % #VALUE! B
C Running charges (P.O.L)
a.Diesel 5.33 lit 62.80 334.63
b.Lubricant and grease waste etc 25% of above Fuel 25 % 83.66
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
Total Direct labour charge 25758.75
Direct labour charge per hr 309.11
Hourly use rate #VALUE! Per hr
3.42 Crushing & Processing Plant
Integrated Stone Crusher …. TPH 100 TPH 200TPH
A Depreciation charge
Capital cost of machine IINPUT IINPUT
Life of machine 12 Year
Rated life of machine 8000 hrs
Working Hours per year (Rated life in hrs/yr) 666.67 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines #VALUE! A #VALUE!
B Repaire and Maintenance charge % of Depreciation of machine /hr 80 % #VALUE! B #VALUE!
C Running charges (P.O.L)
b.Lubricant and grease waste etc 25% of above Fuel 25 % 0.00 0.00
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE! #VALUE!
Total charge #VALUE! C #VALUE!
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
Total Direct labour charge 74100.00 330900
Direct labour charge per hr 1333.80 5956.20
Hourly use rate #VALUE! Per hr #VALUE!
40 quintal capacity boat 100 quintal capacity boat
A Depreciation charge
Capital cost of machine 500000.00 900000.00
Life of machine 8 Year
Rated life of machine 35000 hrs
Working Hours per year (Rated life in hrs/yr) 4375 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Tated life of Machines 12.86 A 23.14
B Repaire and Maintenance charge % of Depreciation of machine /hr 150 % 19.29 B 34.71
C Running charges
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % 1.93 C 3.47
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
Total Direct labour charge 19800.00 19800.00
Direct labour charge per hr 54.31 D 54.31
Hourly use rate 88.38 Per hr 115.64
100 quintal capacity boat (Pump Fitted)
A Depreciation charge
Capital cost of machine input
Life of machine 8 Year
Rated life of machine 35000 hrs
Working Hours per year (Rated life in hrs/yr) 4375 hrs
Depreciation of machine /hr = 0.9x Cost of Machine/Rated life of Machines #VALUE! A
B Repaire and Maintenance charge % of Depreciation of machine /hr 150 % #VALUE! B
C Running charges (P.O.L)
a.Diesel 0.54 lit 62.80 34.21
b.Lubricant and grease waste etc 25% of above Fuel 25 % 8.55
c.Sundries and miseellenceous supplies at site @ 10 % of R/M(B) 10 % #VALUE!
Total charge #VALUE! C
D Labour charge
(a) Direct labour charge Nos Days Rate Amount
Direct labour charge per hr 90.84
Hourly use rate #VALUE! Per hr
#VALUE! Per day
Flood fighting 2022 Rate
Item No. Name Unit Rate
5.1.2 Jungle Clearance Sqm 3.00
5.7.29.1 Jhanki filling Cum 139.20
5.7.29.2 Extra for carriage of jhankhi Cum 11.40
5.7.39.3 Carriage of Filled E.C Bags by boat Per % Nos. 1396.90
5.7.54 Providing , laying and filling Geo bags of size 1mx0.7m Each 70.50
OLD E.C. Bag (filled Ec bag capacity taken by 1.00 cft)
5.7.40.1 (a) For filling & stitching & stacking Per % Nos. 834.70
(b) Labour rate for carrying & placing filled E.C.Bags Per % Nos. 1230.50
(C ) For filling ,Stiching & Placing Per % Nos. 2065.20
5.7.40.2 Nylon crate work in dry portion (With old EC Bag Filling & Placing) Each 516.30
5.7.40.3 (a) Labour cost of Placing of filled N/C with 30 m lead in water Portion Each 292.50
(b) Nylon crate work in water portion Each 842.10
NEW E.C. Bag (filled Ec bag capacity taken by 1.00 cft as per specification of New EC Bag)
5.7.53 (a) For filling & stitching & stacking Per % Nos. 1204.70
(b) Labour rate for carrying & placing filled E.C.Bags Per % Nos. 1230.50
(C ) For filling ,Stiching & Placing Per % Nos. 2435.16
5.7.40.2 Nylon crate work in dry portion Each 608.80
5.7.40.3 (a) Labour cost of Placing of filled N/C with 30 m lead in water Portion Each 292.50
(b) Nylon crate work in water portion Each 934.60
5.7.45.2 Laying of a Geo-textile filter between pitching and embankment slopes Sqm 16.40
5.7.46 ( C) Supplying and Placing bamboo roll Each 957.30
5.7.47 (C ) Supplying making and Placing in position Tree branches and Jhankhi Each 237.90
5.7.7 Labour for cutting 62 mm to 75 mm dia bamboo piles Per M 33.60
5.7.8 Labour for fitting and fixing splite bamboo nwoven chachari Sqm 87.60
5.7.9 Labour for fitting and fixing 62mm to 75 mm dia bamboo runners M 5.40
5.9.5 Providing 150 mm grass thatching over bamboo frame Sqm 167.30
Hydraulic Excavator of 0.9 cum bucket per hour 2202.00
Front End loader 1 cum bucket capacity (JCB) per hour 1366.00
Flood fighting 2022 Rate
Item No. Name Unit Rate
5.1.2 Jungle Clearance Sqm 3.00
5.7.29.1 Jhanki filling Cum 170.90
5.7.29.2 Extra for carriage of jhankhi Cum 11.40
5.7.39.3 Carriage of Filled E.C Bags by boat Per % Nos. 1396.90
5.7.54 Providing , laying and filling Geo bags of size 1mx0.7m Each 70.50
5.7.40.1 (a) For filling & stitching & stacking Per % Nos. 834.70
(b) Labour rate for carrying & placing filled E.C.Bags Per % Nos. 1230.50
(C ) For filling ,Stiching & Placing Per % Nos. 2065.20
5.7.40.2 Nylon crate work in dry portion Each 516.30
5.7.40.3 (a) Labour cost of Placing of filled N/C with 30 m lead in water Portion Each 292.50
(b) Nylon crate work in water portion Each 842.10
5.7.53 (a) For filling & stitching & stacking Per % Nos. 1204.70
(b) Labour rate for carrying & placing filled E.C.Bags Per % Nos. 1230.50
(C ) For filling ,Stiching & Placing Per % Nos. 2435.16
5.7.40.2 Nylon crate work in dry portion Each 608.80
5.7.40.3 (a) Labour cost of Placing of filled N/C with 30 m lead in water Portion Each 292.50
(b) Nylon crate work in water portion Each 934.60
5.7.45.2 Laying of a Geo-textile filter between pitching and embankment slopes Sqm 16.40
5.7.46 ( C) Supplying and Placing bamboo roll Each 957.30
5.7.47 (C ) Supplying making and Placing in position Tree branches and Jhankhi Each 237.90
5.7.7 Labour for cutting 62 mm to 75 mm dia bamboo piles Per M 33.60
5.7.8 Labour for fitting and fixing splite bamboo nwoven chachari Sqm 87.60
5.7.9 Labour for fitting and fixing 62mm to 75 mm dia bamboo runners M 5.40
5.9.4 Supplying and providing bamboo roof frame tied to rafter Sqm 354.00
5.9.5 Providing 150 mm grass thatching over bamboo frame Sqm 197.80
Hydraulic Excavator of 0.9 cum bucket per hour 2202.00
Front End loader 1 cum bucket capacity (JCB) per hour 1366.00
CARRIAGE OF MATERIAL BY TIPPER OF 5.5 CUM CAPACITY INCLUDING OVER HEAD CHARGES & C.P.
Sr.No Name of Materials Unit Gross Tipper Capacity per trip (F0r void) Multiplying Factor Net Tippeer capacity (Payable Qyantity) Per Triop Cost of loading,Unloading & Stacking per Trip Of Tipper (Tipper capacity 5.5 cumx Xa) Cost Of Haulage Per cum Cost of Haulage per Tipper of 5.5 cum capacity (Tipper capacity 5.5cumx H) Lead in KM Cost of Carriage= [(5.5Hsa.Ls+5.5Hua.Lu+5.5Hka.Lk)+5.5Xa] Per Unit Rate =(col17/Net Payable capacity)
For Surface Road For Unsurfaced graveted Road For Hatcha track & Track in river bed/ Nallah bed & Choe Bed For Surface Road For Unsurfaced graveted Road For Hatcha track & Track in river bed/ Nallah bed & Choe Bed For Surface Road For Unsurfaced graveted Road For Hatcha track & Track in river bed/ Nallah bed & Choe Bed
5.5Xa Hsa Hua Hka 5.5Hsa 5.5Hua 5.5Hka Ls Lu Lk
1 Lime, Moorum, Rubbish M³ 6 1 6 1129.20 14.60 17.60 35.40 80.30 96.80 194.70 INPUT INPUT INPUT #VALUE! #VALUE!
2 Earth M³ 6 0.8 4.8 1129.20 14.60 17.60 35.40 80.30 96.80 194.7 INPUT INPUT INPUT #VALUE! #VALUE!
3 Manur or Sludge M³ 6 0.92 5.52 1129.20 14.60 17.60 35.40 80.30 96.80 194.70 INPUT INPUT INPUT #VALUE! #VALUE!
4 Excavated Rock (120lbs) M³ 6 0.67 4.02 1129.20 14.60 17.60 35.40 80.30 96.80 194.70 INPUT INPUT INPUT #VALUE! #VALUE!
5 Stone metal (above 50 mm) M³ 5.4 0.85 4.59 1129.20 14.60 17.60 35.40 80.30 96.80 194.70 INPUT INPUT INPUT #VALUE! #VALUE!
6 Boulder M³ 6 0.8 4.8 1129.20 14.60 17.60 35.40 80.30 96.80 194.70 INPUT INPUT INPUT #VALUE! #VALUE!
7 Stone chips / Sand / Stone Agg M³ 5.4 0.924 4.99 1129.20 14.60 17.60 35.40 80.3 96.80 194.70 INPUT INPUT INPUT #VALUE! #VALUE!
8 Soling stone M³ 5 0.85 4.25 1129.20 14.60 17.60 35.40 80.30 96.80 194.70 INPUT INPUT INPUT #VALUE! #VALUE!
CARRIAGE OF MATERIAL BY Tractor OF 2.25 CUM CAPACITY INCLUDING OVER HEAD CHARGES & C.P
Sr No Name Of Materials Unit Gross Tractor Capacity Per Trip ( For Void) Multiplying Factor Net Tractor capacity ( Payable Quantity ) Per Trip Cost of Loading,Unloading & Stacking Per Trip of Tractor ( Tractor capacity 2.25 cum x Xa) Cost of Haulage Per cum Cost of Haulage Per Tractor 2.25 cum capacity (Tractor 2.25 cum x H ) Lead in KM Cost of Carriage =[(5.5Hsa.Ls+5.5Hua.Lu+5.5Hka.Lk)+5.5 Xa Per Unit Rate =(col 17 / Net Payable capacity)
For Surface Road For Unsurfaced Graveted Road For Kacha Track & Track in River Bed / Nallah Bed & Choe Bed For Surface Road For Unsurfaced Graveted Road For Kacha Track & Track in River Bed / Nallah Bed & Choe Bed For Surface Road For Unsurfaced Graveted Road For Kacha Track & Track in River Bed / Nallah Bed & Choe Bed
2.25Xa HSa Hua Hka 2.25HSa 2.25HUa 2.25HKa LS LU LK
1 Lime, Moorum, Rubbish M3 2.45 1.00 2.45 292.10 28.40 35.50 44.40 63.90 79.90 99.90 INPUT INPUT INPUT #VALUE! #VALUE!
2 Earth M3 2.45 0.80 1.96 292.10 28.40 35.50 44.40 63.90 79.90 99.90 INPUT INPUT INPUT #VALUE! #VALUE!
3 Manur or Sludge M3 2.45 0.92 2.26 292.10 28.40 35.50 44.40 63.90 79.90 99.90 INPUT INPUT INPUT #VALUE! #VALUE!
4 Excavated Rock (120lbs) M3 2.45 0.67 1.64 292.10 28.40 35.50 44.40 63.90 79.90 99.90 INPUT INPUT INPUT #VALUE! #VALUE!
5 Stone metal (above 50 mm) M3 2.21 0.85 1.88 292.10 28.40 35.50 44.40 63.90 79.90 99.90 INPUT INPUT INPUT #VALUE! #VALUE!
6 Boulder (90 to 120 lbs ) M3 2.45 0.80 1.96 292.10 28.40 35.50 44.40 63.90 79.90 99.90 INPUT INPUT INPUT #VALUE! #VALUE!
7 Stone chips / Sand / Stone Agg 50 mm & down Including Gr III M3 2.21 0.924 2.04 292.10 28.40 35.50 44.40 63.90 79.90 99.90 INPUT INPUT INPUT #VALUE! #VALUE!
8 Soling stone M3 2.05 0.85 1.74 292.10 28.40 35.50 44.40 63.90 79.90 99.90 INPUT INPUT INPUT #VALUE! #VALUE!
CARRIAGE OF MATERIAL BY TIPPER OF 10 Tonnes CAPACITY INCLUDING OVERHEAD CHARGES & C.P.
Sr.No Name of Materials Unit Gross Tipper Capacity per trip (F0r void) Multiplying Factor Net Tippeer capacity (Payable Qyantity) Per Triop Cost of loading,Unloading & Stacking per Trip Of Tipper (Tipper capacity 8t x Xb) Cost Of Haulage Per cum Cost of Haulage per Tipper of t capacity ( 8x H) Lead in KM Cost of carriage= [(8Hsb.Ls+8Hub.Lu+8Hkb.Lk)+8Xb] Per Unit Rate =(col17/Net Payable capacity)
For Surface Road For Unsurfaced graveted Road For Hatcha track & Track in river bed/ Nallah bed & Choe Bed For Surface Road For Unsurfaced graveted Road For Hatcha track & Track in river bed/ Nallah bed & Choe Bed For Surface Road For Unsurfaced graveted Road For Hatcha track & Track in river bed/ Nallah bed & Choe Bed
8Xb Hsb Hub Hkb 8Hsb 8Hub 8Hkb Ls Lu Lk
8Xb Hsb Hub Hkb 8Hsb 8Hub 8Hkb Ls Lu Lk
1 Cement, Steel, Stone CC pipe M.T 8 1 8 2110.40 8.10 9.70 19.50 64.8 77.6 156.00 INPUT INPUT INPUT #VALUE! #VALUE!
3 G.I. Crate (3x1.5x0.75) Per % 80 1 80 2110.40 8.10 9.70 19.50 64.8 77.6 156.00 INPUT INPUT INPUT #VALUE! #VALUE!
4 Bitumen, Tar, Steam, Coal MT 8 1 8 2110.40 8.10 9.70 19.50 64.8 77.6 156.00 INPUT INPUT INPUT #VALUE! #VALUE!
5 R.C.C hume, A.C. pipe 2110.40 8.10 9.70 19.50 64.8 77.6 156.00 INPUT INPUT INPUT #VALUE! #VALUE!
100 mm dia mtr 290 1 290 2110.40 8.10 9.70 19.50 64.8 77.6 156.00 INPUT INPUT INPUT #VALUE! #VALUE!
125 mm dia mtr 200 1 200 2110.40 8.10 9.70 19.50 64.8 77.6 156.00 INPUT INPUT INPUT #VALUE! #VALUE!
150 mm dia mtr 180 1 180 2110.40 8.10 9.70 19.50 64.8 77.6 156.00 INPUT INPUT INPUT #VALUE! #VALUE!
200 mm dia mtr 100 1 100 2110.40 8.10 9.70 19.50 64.8 77.6 156.00 INPUT INPUT INPUT #VALUE! #VALUE!
250 mm dia mtr 75 1 75 2110.40 8.10 9.70 19.50 64.8 77.6 156.00 INPUT INPUT INPUT #VALUE! #VALUE!
300 mm dia mtr 60 1 60 2110.40 8.10 9.70 19.50 64.8 77.6 156.00 INPUT INPUT INPUT #VALUE! #VALUE!
350 mm dia mtr 47.5 1 47.5 2110.40 8.10 9.70 19.50 64.8 77.6 156.00 INPUT INPUT INPUT #VALUE! #VALUE!
400 mm & 450 dia mtr 32.5 1 32.5 2110.40 8.10 9.70 19.50 64.8 77.6 156.00 INPUT INPUT INPUT #VALUE! #VALUE!
500 mm & 600 mm dia mtr 15 1 15 2110.40 8.10 9.70 19.50 64.8 77.6 156.00 INPUT INPUT INPUT #VALUE! #VALUE!
700 mm & 800 mm dia mtr 12.5 1 12.5 2110.40 8.10 9.70 19.50 64.8 77.6 156.00 INPUT INPUT INPUT #VALUE! #VALUE!
900mm & 1000 mm dia mtr 10 1 10 2110.40 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
1100 & 1200 m dia mtr 7.5 1 7.5 2110.40 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
75 mm to 100 mm dia Per % 280 1 280 2110.40 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
50 mm to 75 mm dia Per % 300 1 300 2110.40 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
7 E.C bag 30000 nos Per %0 30000 1 30000 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
8 Timber Cum 9.6 1 9.6 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
9 Sal ballah av.6m length
100 mm dia Nos 125 1 125 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
125 mm dia Nos 80 1 80 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
150 mm dia Nos 60 1 60 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
175 mm dia Nos 45 1 45 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
200 mm dia Nos 25 1 25 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
225 mm dia Nos 20 1 20 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
10 S.W.Pipe 60 cm length
100 mm dia Mtr 480 1 480 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
150 mm dia Mtr 240 1 240 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
200 mm dia Mtr 135 1 135 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
230 mm dia Mtr 105.6 1 105 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
250 mm dia Mtr 84 1 84 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
300 mm dia Mtr 67.2 1 67.2 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
350 mm dia Mtr 48 1 48 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
400 mm dia Mtr 33.6 1 33.6 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
450 mm dia Mtr 26.4 1 26.4 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
500 mm dia Mtr 24 1 24 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
600 mm dia Mtr 19.2 1 19.2 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
11 Tiles (Manglore / Mosaic ) Per %0 3200 1 3200 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
12 Brick Tiles(300x150x50mm) Per %0 1760 1 1760 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
13 Steel and C.I pipe
100 mm dia Mtr 292.8 1 292.8 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
125 mm dia Mtr 219.6 1 219.6 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
150 mm dia Mtr 183 1 183 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
200 mm dia Mtr 109.8 1 109.8 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
250 mm dia Mtr 80.52 1 80.52 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
300 mm dia Mtr 62.22 1 62.22 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
350 mm dia Mtr 43.92 1 43.92 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
400 mm dia Mtr 32.94 1 32.94 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
500 mm dia Mtr 25.62 1 25.62 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
600 mm dia Mtr 18.3 1 18.3 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
700 mm & 800 mm dia Mtr 15 1 15 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
900mm & 1000 mm dia Mtr 10 1 10 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
1100mm & 1200mm dia Mtr 7.5 1 7.5 2110.4 8.10 9.70 19.50 64.8 77.6 156 INPUT INPUT INPUT #VALUE! #VALUE!
CARRIAGE OF MATERIAL BY Tractor OF 3.6 Tonnes CAPACITY INCLUDING OVER HEAD CHARGES & C.P
Sr No Name Of Materials Unit Gross Tipper Capacity Per Trip ( For Void) Multiplying Factor Net Tipper capacity ( Payable Quantity ) Per Trip Cost of Loading,Unloading & Stacking Per Trip of Tipper ( Tipperr capacity 8 t x Xb) Cost of Haulage Per cum Cost of Haulage Per Tipper of in t capacity (8 x H ) Lead in KM Cost of Carriage =[(8Hsb.Ls+8Hub.Lu+8Hkb.Lk)+8 Xb Per Unit Rate =(col 17 / Net Payable capacity)
For Surface Road For Unsurfaced Graveted Road For Kacha Track & Track in River Bed / Nallah Bed & Choe Bed For Surface Road For Unsurfaced Graveted Road For Kacha Track & Track in River Bed / Nallah Bed & Choe Bed For Surface Road For Unsurfaced Graveted Road For Kacha Track & Track in River Bed / Nallah Bed & Choe Bed
3.6Xb HSb Hub HKb 3.6HSb 3.6HUb 3.6HKb LS LU LK
1 Cement, Steel, Stone CC pipe below 10 mm or other heavy materials M.T 3.6 1 3.6 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
3 G.I. Crate (3x1.5x0.75) Per % 36 1 36 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
4 Bitumen, Tar, Steam, Coal MT 3.6 1 3.6 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
5 R.C.C hume, A.C. pipe
100 mm dia mtr 130.5 1 130.5 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
125 mm dia mtr 90 1 90 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
150 mm dia mtr 81 1 81 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
200 mm dia mtr 45 1 45 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
250 mm dia mtr 33.75 1 33.75 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
300 mm dia mtr 27 1 27 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
350 mm dia mtr 21.38 1 21.38 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
500 mm & 600 mm dia mtr 6.75 1 6.75 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
700 mm & 800 mm dia mtr 5.63 1 5.63 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
900mm & 1000 mm dia mtr 4.5 1 4.50 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
75 mm to 100 mm dia Per % 126 1 126 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
50 mm to 75 mm dia Per % 135 1 135 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
7 E.C bag 30000 nos Per %0 13500 1 13500 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
8 Timber Cum 4.32 1 4.32 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
9 Sal ballah av.6m length
100 mm dia Nos 56.25 1 56.25 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
125 mm dia Nos 36 1 36 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
150 mm dia Nos 27 1 27 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
175 mm dia Nos 20.25 1 20.25 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
200 mm dia Nos 11.25 1 11.25 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
225 mm dia Nos 9 1 9 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
10 S.W.Pipe 60 cm length
100 mm dia Mtr 216 1 216 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
150 mm dia Mtr 108 1 108 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
200 mm dia Mtr 60.75 1 60.75 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
230 mm dia Mtr 47.52 1 47.52 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
250 mm dia Mtr 37.8 1 37.8 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
300 mm dia Mtr 30.24 1 30.24 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
350 mm dia Mtr 21.6 1 21.6 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
400 mm dia Mtr 15.12 1 15.12 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
450 mm dia Mtr 11.88 1 11.88 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
500 mm dia Mtr 10.8 1 10.8 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
600 mm dia Mtr 8.64 1 8.64 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
11 Tiles (Manglore / Mosaic ) Per %0 1440 1 1440 651.20 17.80 22.20 27.70 64.10 79.90 99.70 INPUT INPUT INPUT #VALUE! #VALUE!
12 Brick Tiles(300x150x50mm) Per %0 792 1 792 651.20 17.80 22.20 27.70 0.00 0.00 0.00 INPUT INPUT INPUT #VALUE! #VALUE!
13 Steel and C.I pipe
100 mm dia Mtr 131.76 1 131.76 651.20 17.80 22.20 27.70 0.00 0.00 0.00 INPUT INPUT INPUT #VALUE! #VALUE!
125 mm dia Mtr 98.82 1 98.82 651.20 17.80 22.20 27.70 0.00 0.00 0.00 INPUT INPUT INPUT #VALUE! #VALUE!
150 mm dia Mtr 82.35 1 82.35 651.20 17.80 22.20 27.70 0.00 0.00 0.00 INPUT INPUT INPUT #VALUE! #VALUE!
200 mm dia Mtr 49.41 1 49.41 651.20 17.80 22.20 27.70 0.00 0.00 0.00 INPUT INPUT INPUT #VALUE! #VALUE!
250 mm dia Mtr 36.23 1 36.23 651.20 17.80 22.20 27.70 0.00 0.00 0.00 INPUT INPUT INPUT #VALUE! #VALUE!
300 mm dia Mtr 28.00 1 28.00 651.20 17.80 22.20 27.70 0.00 0.00 0.00 INPUT INPUT INPUT #VALUE! #VALUE!
350 mm dia Mtr 19.76 1 19.76 651.20 17.80 22.20 27.70 0.00 0.00 0.00 INPUT INPUT INPUT #VALUE! #VALUE!
400 mm dia Mtr 14.82 1 14.82 651.20 17.80 22.20 27.70 0.00 0.00 0.00 INPUT INPUT INPUT #VALUE! #VALUE!
500 mm dia Mtr 11.53 1 11.53 651.20 17.80 22.20 27.70 0.00 0.00 0.00 INPUT INPUT INPUT #VALUE! #VALUE!
600 mm dia Mtr 8.24 1 8.24 651.20 17.80 22.20 27.70 0.00 0.00 0.00 INPUT INPUT INPUT #VALUE! #VALUE!
700 mm & 800 mm dia Mtr 6.75 1 6.75 651.20 17.80 22.20 27.70 0.00 0.00 0.00 INPUT INPUT INPUT #VALUE! #VALUE!
900mm & 1000 mm dia Mtr 4.50 1 4.50 651.20 17.80 22.20 27.70 0.00 0.00 0.00 INPUT INPUT INPUT #VALUE! #VALUE!
1100mm & 1200mm dia Mtr 3.38 1 3.38 651.20 17.80 22.20 27.70 0.00 0.00 0.00 INPUT INPUT INPUT #VALUE! #VALUE!
Dewatering 91700.25
1 5.1.1 Preparation of seat of embankment or canals by 75 mm ploughing and removing the grass roots etc.as per specifications and direction of E/I.
Unit :- Per Sqm.
Taking Out put:- 92.94 Sqm
Unskilled mazdoor for leveling and ploughing 0.50 nos 436.00 218.00
Unskilled mazdoor for removing grass roots and leveling 0.75 nos 436.00 327.00
Add Overhead charge & C.P @ 15% 81.75
Add cess @ 1% 0.00
Rate per Sqm. 6.74
2 5.7.41 Labour Charge for taking out disturbed boulder from boulder pitching or riprap or rock toe etcand cleaning the surface and stacking the same within a lead of 100 m.as per specifications and direction of E/I.
Unit :- Per cum.
Taking Out put:- 2.832 cum
Unskilled mazdoor for packing and carrying 2.50 nos 436.00 1090.00
Unskilled mazdoor for making stacking 0.5 nos 436.00 218.00
Add Overhead charge & C.P @ 15% 196.20
Add cess @ 1% 0.00
Rate per cumm. 531.14
3 7.6.8 Supplying and Laying ( properly as per design and drawing ) riprap with good quality of boulder duly packedfincluding the cost of materials, royality and all taxes all complete job as per specifications and direction of E/I.
Unit :- Per cum.
Taking Out put:- 2.832 cum
Stone Boulder 2.832 cum 1150.00 3256.80
Mason Gr-II 0.25 nos 551.00 137.75
Unskilled mazdoor 7 nos 436.00 3052.00
Add Overhead charge & C.P @ 15% 983.93
Add cess @ 1% 0.00
Rate per cumm. 2663.66
Say Rs. 2561.90
4 7.6.8 Supplying and Laying ( properly as per design and drawing ) riprap with good quality of boulder duly packedfincluding the cost of materials, royality and all taxes all complete job as per specifications and direction of E/I.( Only Labour Charge)
Unit :- Per cum.
Taking Out put:- 2.832 cum
Stone Boulder 0 cum 1150.00 0.00
Mason Gr-II 0.25 nos 551.00 137.75
Unskilled mazdoor 7 nos 436.00 3052.00
Add Overhead charge & C.P @ 15% 495.41
Add cess @ 1% 0.00
Say Rs. 1341.20
5 7.1.30 Labour for Rolling and compacting the earth in layers of 225 mm thicl at O.M.C. by road roller to achieve minimum 90 % of maximum dry density including sprinking the required quanting of water by tanker within 1 km. lead and all lifts including cost of water, finishing the surface with proper grade, camber or superelevation including, hire charges of compaction machine tanker and other tools and plants etc. all complete as per specifications and direction of E/1. .( Mode of measurement - Sectional measurement of compacted earth )
Assuming out put=100 Cum fill
(A).Watering for compaction
Assuming additional moisture required 7 % including 1 % loss. Quantity of water 1544.38 reqwired = 100 x 62.5x 35.3x7/10x100 =1544.38 gal for 100 cum fill 1544.38 for 100 eum fill
One Irnp gait = 10 lbs
capacity of tanker 8000 gallon
Bound trip time for 8000 gal tanker =
Filling time 16 mts
Hauling (1 km ) 16 km / hr 3.75 mts
Returning Time @ 24 krnh 2.5 mts
Sprinkling Timeat 500 gprn 16 mts
lost time 6 mts
Total time 44.25 mts
Quantity hauled per hour ( 50 mts )= 50 x 8000/4425=9040 gallon 9039.55 gallon
Use Rate of tanker (vide item 3.29b ) 767.00 789.00 PM11003
Cost of water = Rs 500 1 gallon 0.28 Per .gallon M-191
Rate per 100 cum fill=1544.38x Use rate of tanker/9040 gallom+cost of water per gallon x1544.38 567.22
(B).Hire charge of Road roller for 100 cum
Assuming 623 cum to be rolled in 8 hrs 1.28 hrs 1650.00 2112.00 PM8001
Add Overhead charge & C.P@15% 401.88
Rate per cum Say Rs 30.80 Per M3
6 5.1.46 Earth work by Mechanical means with help of Excavator, Tipper and Spreader in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead of ............... metre (lead will be considered as track path i.e. half of distance travelled in one cycle i.e. half of haulage path from pit to bank or embankment. Pit will be beyond 150 meter from centre of bank i.e. perpendicular distance from centre of bank to nearest boundary of pit will be more than 150 meter) and with all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth )
Lead in K.M ( L ) Cost of cutting & Loading by Excavator one M3 capacity= Use rate of Excavator / Capacity of Excavator ( 60M3) PM3005/60 Average Speed on Kucha track Km / hr = (V) Average haulage path ( Distance ) in one cycle ( D) in Km Haulage Time in minute ( Time taken in one cycle of run ) = 60D/V Loading Time one minute Per M3 For 5.5 M3 Unloading & Turning Time in minute Total Time Per trip in minute Col (5+6+7) =( T) No. of Trip per hour taken as 50 minute N =50/T Output per hour with 80 % efficiency Q = 0.8 X N X 5.5 Use Rate per hour of Tipper 5.5 M3 capacity = (Tr ) Carriage Cost per M3 = Tr/ Q Add for spreading cost =( Use rate of D-80 Dozer Per hr / Capacity of D-80 Dozer per hr 300 cum) =2930/300 Add 5 % for haul road maintenance, 5 % for processing and 2 % for extra labour for finishing = 12 % of column ( 2+12+13) Total Cost per M3 col (2+12+13+14 ) Add Overhead charge & C.P 15% (col 15) Rate Per Cum (15+16) Add Royality
NOTE:- Add royalty of Earth Rs 75.00 where needed without overhead charge & C.P
ABSTRACT OF COST 4
Name of Work :- Restoration of Left Bundh of Uderasthan Barrage
Sl. No. Itme of Works Quantity Unit Rate (In Rs.) Amount (In Rs.)
1 Preparation of seat of embankment or canals by 75 mm ploughing and removing the grass roots etc.as per specifications and direction of E/I. 31020.00 Per M2 6.70 207834.00
2 Earth work by Mechanical means with help of Excavator, Tipper and Spreader in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead of ............... metre (lead will be considered as track path i.e. half of distance travelled in one cycle i.e. half of haulage path from pit to bank or embankment. Pit will be beyond 150 meter from centre of bank i.e. perpendicular distance from centre of bank to nearest boundary of pit will be more than 150 meter) and with all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ).
3 Labour for Rolling and compacting the earth in layers of 225 mm thicl at O.M.C. by road roller to achieve minimum 90 % of maximum dry density including sprinking the required quanting of water by tanker within 1 km. lead and all lifts including cost of water, finishing the surface with proper grade, camber or superelevation including, hire charges of compaction machine tanker and other tools and plants etc. all complete as per specifications and direction of E/1. .( Mode of measurement - Sectional measurement of compacted earth ) 7.1.30 52855.00 Per M3 30.80 1627934.00
4 Labour Charge for taking out disturbed boulder from boulder pitching or riprap or rock toe etcand cleaning the surface and stacking the same within a lead of 100 m.as per specifications and direction of E/I.(5.7.41) 4822.50 Per M3 531.10 2561229.75
5 Supplying and Laying ( properly as per design and drawing ) riprap with good quality of boulder duly packedfincluding the cost of materials, royality and all taxes all complete job as per specifications and direction of E/I.( Only Labour Charge of 7.6.8) 4822.50 Per M3 1341.20 6467937.00
Total Rs. 32054504.25
ADD 1% of labour cess. 320545.04
Total Rs. 32772924.29
Add 12% of GST 3932750.92
G. Total Rs. 36705675.21
J.E. A.E. Executive Engineer
Irrigation Division Uderasthan
Calculation of S.Fee of Left Bundh
Item Quntity Unit Rate Amount(Rs)
S.Fee @10% of Total Amount Rs. 396412.50
J.E. A.E. Executive Engineer
Irrigation Division Uderasthan
GENERAL ABSTRACT OF COST
Name of Work:- Restoration of Left Bundh of Uderasthan Barrage ,Painting of Uderasthan Barrage and Renovatuion of Uderasthan Barrage Control Room under Irrigation Division Uderasthan
SL. No. Items of Work Amount
1 Restoration of Left Bundh of Uderasthan Barrage 32,054,504.25
2 Painting of Uderasthan Barrage 5,280,655.84
3 Renovatuion of Uderasthan Barrage Control Room 597,886.34
Total Rs. 37933046.42
Add 1% Labour Cess 379330.46
Add Seignorage Fee #REF!
Total Rs. #REF!
Add 18% G.S.T. #REF!
Grand Total Rs. #REF!
J.E. A.E. Executive Engineer
Irrigation Divisin Uderasthan
Superintending Engineer Chief Engineer
Irrigation Circle, Nalanda, Biharsharif Irrigation Creation, WRD,
Nalanda Biharsharif
Detail Estimate
For:- Restoration of Left Bundh of Uderasthan Barrage
1 Preparation of seat of embankment or canals by 75 mm ploughing and removing the grass roots etc.as per specifications and direction of E/I. (5.1.1)
Chainage Length Linear Width (M) Mean Linear Width(M) Quantity(M2)
Total Qnty 31020.00 M2
2 Earth work by Mechanical means with help of Excavator, Tipper and Spreader in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead of ............... metre (lead will be considered as track path i.e. half of distance travelled in one cycle i.e. half of haulage path from pit to bank or embankment. Pit will be beyond 150 meter from centre of bank i.e. perpendicular distance from centre of bank to nearest boundary of pit will be more than 150 meter) and with all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ).(5.1.46.4)
Chainage Length C/S Area (M2) Mean c/s Area(M2) Quantity(M3)
Total Qnty 52855.00 M3
3 Labour for Rolling and compacting the earth in layers of 225 mm thicl at O.M.C. by road roller to achieve minimum 90 % of maximum dry density including sprinking the required quanting of water by tanker within 1 km. lead and all lifts including cost of water, finishing the surface with proper grade, camber or superelevation including, hire charges of compaction machine tanker and other tools and plants etc. all complete as per specifications and direction of E/1. .( Mode of measurement - Sectional measurement of compacted earth ) 7.1.30
Qnty Same As Item No.-2 = 52855.00 M3
4 Labour Charge for taking out disturbed boulder from boulder pitching or riprap or rock toe etcand cleaning the surface and stacking the same within a lead of 100 m.as per specifications and direction of E/I.(5.7.41)
Total Length = 5000 m, Av Slope Length Disturbed = (3.20 + 3.23 )/2 = 3.215 m
5 Supplying and Laying ( properly as per design and drawing ) riprap with good quality of boulder duly packedfincluding the cost of materials, royality and all taxes all complete job as per specifications and direction of E/I.( Only Labour Charge of 7.6.8)
Qnty Same As Item No. (4) = 4822.50 M3
J.E. A.E. Executive Engineer
Irrigation Division Uderasthan
Detail Estimate
For:- Restoration of Right Guide Bundh on Down strem of Uderasthan Barrage
1 Earth work by Mechanical means with help of Excavator, Tipper and Spreader in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead of ............... metre (lead will be considered as track path i.e. half of distance travelled in one cycle i.e. half of haulage path from pit to bank or embankment. Pit will be beyond 150 meter from centre of bank i.e. perpendicular distance from centre of bank to nearest boundary of pit will be more than 150 meter) and with all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ).(5.1.46.1)
Chainage Length C/S Area (M2) Mean c/s Area(M2) Quantity(M3)
Total Qnty 311.25 M3
2 Labour for Rolling and compacting the earth in layers of 225 mm thicl at O.M.C. by road roller to achieve minimum 90 % of maximum dry density including sprinking the required quanting of water by tanker within 1 km. lead and all lifts including cost of water, finishing the surface with proper grade, camber or superelevation including, hire charges of compaction machine tanker and other tools and plants etc. all complete as per specifications and direction of E/1. .( Mode of measurement - Sectional measurement of compacted earth ) 7.1.30
Qnty Same As Item No.-2 = 311.25 M3
3 Supplying and Laying ( properly as per design and drawing ) riprap with good quality of boulder duly packedfincluding the cost of materials, royality and all taxes all complete job as per specifications and direction of E/I.( Only Labour Charge of 7.6.8)
Nos Length Breadth Height
Calculation of S.Fee of Left Bundh
Item Quntity Unit Rate Amount(Rs)
S.Fee @10% of Total Amount Rs. 2334.38 (A)
J.E. A.E. Executive Engineer
Irrigation Division Uderasthan
GENRAL ABSTRACT OF COST
Name of Work :- Restoration of Left Bundh of Uderasthan Barrage and other Important Work.
Sl. No. Itme of Works Quantity Unit Rate (In Rs.) Amount (In Rs.)
1 Preparation of seat of embankment or canals by 75 mm ploughing and removing the grass roots etc.as per specifications and direction of E/I. (SOR WRD 5.1.1) 31020.00 Per M2 6.70 207834.00
2 Earth work by Mechanical means with help of Excavator, Tipper and Spreader in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead of ............... metre (lead will be considered as track path i.e. half of distance travelled in one cycle i.e. half of haulage path from pit to bank or embankment. Pit will be beyond 150 meter from centre of bank i.e. perpendicular distance from centre of bank to nearest boundary of pit will be more than 150 meter) and with all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ).
3 Labour for Rolling and compacting the earth in layers of 225 mm thick at O.M.C. by road roller to achieve minimum 90 % of maximum dry density including sprinking the required quanting of water by tanker within 1 km. lead and all lifts including cost of water, finishing the surface with proper grade, camber or superelevation including, hire charges of compaction machine tanker and other tools and plants etc. all complete as per specifications and direction of E/1. .( Mode of measurement - Sectional measurement of compacted earth ) ( SOR WRD 7.1.30 ) 53166.25 Per M3 30.80 1637520.50
4 Labour Charge for taking out disturbed boulder from boulder pitching or riprap or rock toe etcand cleaning the surface and stacking the same within a lead of 100 m.as per specifications and direction of E/I.(SOR WRD 5.7.41) 4822.50 Per M3 531.10 2561229.75
5 Supplying and Laying ( properly as per design and drawing ) riprap with good quality of boulder duly packedfincluding the cost of materials, royality and all taxes all complete job as per specifications and direction of E/I.( Only Labour Charge of SOR WRD 7.6.8) 4917.50 Per M3 1341.20 6595351.00
6 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5:3 ) in superstructure of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing. royalty etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. (SOR WRD 5.3.10) 11.99 Cum 7565.20 90706.75
7 Providing shuttering including strutting, propping etc. and its removal after use in various components of canal structure or embankment structure as per specifications and direction of E/I. (SOR WRD 5.3.19) 1251.10 m2 590.30 738524.33
8 Providing M.S reinforcement ( Tor steel ) as per approved design , drawing, removal of rust, cutting, bending, binding, including supplying annealed wire, placing M.S rods in position complete job as per specifications and direction of E/I. ( SOR WRD 5.3.22)
9 Removing white or colour wash by scrapping and sand paper in and preparing the surface smooth including necessary repair scratches etc. complete (SOR BCD 13.74) 44989.78 m2 9.10 409407.00
10 Finishing walls with water proofing cement paint of required shade Old work (one or more coats applied @ 2.20 kg/10 sqm ) over priming coat of primer applied @ 0.80 litrs/10 sqm complete including cost of priming coat (SOR BCD 14.64.1) 44266.50 m2 66.20 2930442.30
11 Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: One or more coats on old work (SOR BCD 13.92.2) 676.18 m2 60.90 41179.36
12 Applying priming coat with ready mixed pink or grey primer of approved brand and manufacture : On Wood work (hard and soft wood) (SOR BCD 13.81.1) 40.95 m2 43.00 1760.85
13 Painting with ready mixed paint of approved brand and manufacture in all shades to give an even shade: Old wood work (one more coats) (SOR BCD 13.82.4) 40.95 m2 59.30 2428.34
14 Applying priming coat: With ready mixed zinc chromate yellow primer of approved brand and manufacture on steel galvanized iron/steel works (SOR BCD 13.81.3) 146.04 m2 38.30 5593.33
15 Painting with ready mixed paint of approved brand and manufacture in all shades to give an even shade: Old steel work (one or more coats)(SOR BCD 13.82.3) 146.04 m2 59.30 8660.17
16 Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) decorative type, core of block board construction with frame of 1 st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters. 35 mm thick including ISI Marked stainless steel butt hinges with necessary screws (SOR BCD 9.20.1) 9.70 m2 2560.90 24840.73
17 Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.l.brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required. (SOR BCD 17.3.1) 1.00 Each 5523.00 5523.00
18 Providing and supplying Spandrel Glass Panels comprising of 6 mm thick heat strengthened monolithic Providing and supplying Spandrel Glass Panels comprising of 6 mm thick heat strengthened monolithic float glass of approved colour and shade with reflective soft coating on surface # 2 of approved colour and shade so as to match the colour and shade of the IGUs in the vision panels etc. ,all complete for the required performances as specified, as per the Architectural drawings, as per the approved shop drawings, as specified, and as directed by the Engineer- in- Charge for payment only the actual area of glass on face #1 of the glass panels. ( but excluding the area of grooves and whether silicon sealant ) provided and fixed in position, shall be measured in sqm( payment for fixing of spandrel glass panels in the curtain glazing is included in cost of relevent item *).(i) coloured tinted float glass 6mm thick substrate with reflective soft coating on face #2, +12 mm alrgap +6 mm heat strengthend clear glass of approved make having properties as visual light transmitance (VLT) 25 to 35% , light reflection internal 10 to 15 % , light relection external 10 to 20 % , shading coefficient (0.25-0.28) and U value of 3.0 to 3.3W/m2 degree K etc. the properties of performance glass shall be decided by technical sanctioning authority as per site requirement. (SOR BCD 26A.6) 3.15 Each 1921.60 6053.04
19 Brick work in designation 100 A Brick with cement mortar (1 : 4 ) in superstructure with approved quality of coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curing, scaffolding and its removal wherever required including royalty etc. complete job as per specification and direction of E / I. (5.4.6) 742.93 m3 5355.10 3978464.44
20 Providing 12 mm thick cement plaster (1: 4) with approved quality sand of requisite F.M . washed and screened including curing, scaffolding wherever required and its removal, royalty etc. complete job as per specification and direction of E / I. (SOR WRD 5.5.2) 7087.50 m² 221.90 1572716.25
21 Providing shuttering including strutting, propping etc. and its removal after use in various components of canal structure or embankment structure as per specifications and direction of E/I. (SOR WRD 5.3.19) 1233.26 m2 590.30 727993.38
22 Providing and laying P.C.C. M-150 with nominal mix of (1:2:4 ) in superstructure of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing. royalty etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. (SOR WRD 5.3.9) 143.01 m3 7036.00 1006218.36
23 Supplying, fitting and fixing curtain at doors and window 68.58 m² LS 20000.00
24 Crockery set 1.00 set LS 10000.00
25 Provision CCTV Camera 1.00 set LS 150000.00
26 Display Board 1.00 No LS 15000.00
27 cyarn 1.00 No LS 200000.00
27 Carriage of Materials
i Coarse Sand (10 KM P) From Khijarsaray 363.18 m3 387.00 140550.66
ii Stone Chips (98 km P) From Govindpur 139.02 m3 2443.20 339653.66
iii Cement (5 KM P) From Local Market 160.22 MT 501.90 80414.42
iv Steel (5 KM P) From Local Market 1.06 MT 501.90 532.01
v Bricks (5KMP + 1KM K) From Local Area 301682 ‰ 2120.80 639807.44
Sub Total 40021151.97
Add 1% Labour Cess 400211.52
Add Seignorage fee 601297.48
Grand Total 48406739.93
ADD 1% of labour cess. 484067.40
Total Rs. 49288682.40
Add 12% of GST 5914641.89
G. Total Rs. 55203324.29
J.E. A.E. Executive Engineer
Irrigation Division Uderasthan
GENRAL ABSTRACT OF QUANTITY
Name of Work :- Restoration of Left Bundh of Uderasthan Barrage and other Important Work.
Sl. No. Itme of Works Unit Quantity
Left Bundh Barrage Painting Control Room & Kerb Slab Dowel Guide Bundh Total
1 Preparation of seat of embankment or canals by 75 mm ploughing and removing the grass roots etc.as per specifications and direction of E/I. (SOR WRD 5.1.1) M2 31020.00 0.00 0.00 0.00 0.00 31020.00
2 Earth work by Mechanical means with help of Excavator, Tipper and Spreader in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead of ............... metre (lead will be considered as track path i.e. half of distance travelled in one cycle i.e. half of haulage path from pit to bank or embankment. Pit will be beyond 150 meter from centre of bank i.e. perpendicular distance from centre of bank to nearest boundary of pit will be more than 150 meter) and with all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ).
3 Labour for Rolling and compacting the earth in layers of 225 mm thick at O.M.C. by road roller to achieve minimum 90 % of maximum dry density including sprinking the required quanting of water by tanker within 1 km. lead and all lifts including cost of water, finishing the surface with proper grade, camber or superelevation including, hire charges of compaction machine tanker and other tools and plants etc. all complete as per specifications and direction of E/1. .( Mode of measurement - Sectional measurement of compacted earth ) ( SOR WRD 7.1.30 ) M3 52855.00 0.00 0.00 0.00 311.25 53166.25
4 Labour Charge for taking out disturbed boulder from boulder pitching or riprap or rock toe etcand cleaning the surface and stacking the same within a lead of 100 m.as per specifications and direction of E/I.(SOR WRD 5.7.41) M3 4822.50 0.00 0.00 0.00 0.00 4822.50
5 Supplying and Laying ( properly as per design and drawing ) riprap with good quality of boulder duly packedfincluding the cost of materials, royality and all taxes all complete job as per specifications and direction of E/I.( Only Labour Charge of SOR WRD 7.6.8) M3 4822.50 0.00 0.00 0.00 95.00 4917.50
6 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5:3 ) in superstructure of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing. royalty etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. (SOR WRD 5.3.10) M3 0.00 0.00 11.99 0.00 0.00 11.99
7 Providing shuttering including strutting, propping etc. and its removal after use in various components of canal structure or embankment structure as per specifications and direction of E/I. (SOR WRD 5.3.19) M2 0.00 0.00 17.84 1233.26 0.00 1251.10
8 Providing M.S reinforcement ( Tor steel ) as per approved design , drawing, removal of rust, cutting, bending, binding, including supplying annealed wire, placing M.S rods in position complete job as per specifications and direction of E/I. ( SOR WRD 5.3.22)
9 Removing white or colour wash by scrapping and sand paper in and preparing the surface smooth including necessary repair scratches etc. complete (SOR BCD 13.74) M2 0.00 43822.87 1166.91 0.00 0.00 44989.78
10 Finishing walls with water proofing cement paint of required shade Old work (one or more coats applied @ 2.20 kg/10 sqm ) over priming coat of primer applied @ 0.80 litrs/10 sqm complete including cost of priming coat (SOR BCD 14.64.1) M2 0.00 43822.87 443.63 0.00 0.00 44266.50
11 Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: One or more coats on old work (SOR BCD 13.92.2) M2 0.00 0.00 676.18 0.00 0.00 676.18
12 Applying priming coat with ready mixed pink or grey primer of approved brand and manufacture : On Wood work (hard and soft wood) (SOR BCD 13.81.1) M2 0.00 0.00 40.95 0.00 0.00 40.95
13 Painting with ready mixed paint of approved brand and manufacture in all shades to give an even shade: Old wood work (one more coats) (SOR BCD 13.82.4) M2 0.00 0.00 40.95 0.00 0.00 40.95
14 Applying priming coat: With ready mixed zinc chromate yellow primer of approved brand and manufacture on steel galvanized iron/steel works (SOR BCD 13.81.3) M2 0.00 0.00 146.04 0.00 0.00 146.04
15 Painting with ready mixed paint of approved brand and manufacture in all shades to give an even shade: Old steel work (one or more coats)(SOR BCD 13.82.3) M2 0.00 0.00 146.04 0.00 0.00 146.04
16 Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) decorative type, core of block board construction with frame of 1 st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters. 35 mm thick including ISI Marked stainless steel butt hinges with necessary screws (SOR BCD 9.20.1) M2 0.00 0.00 9.70 0.00 0.00 9.70
17 Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.l.brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required. (SOR BCD 17.3.1) Each 0.00 0.00 1.00 0.00 0.00 1.00
18 Providing and supplying Spandrel Glass Panels comprising of 6 mm thick heat strengthened monolithic Providing and supplying Spandrel Glass Panels comprising of 6 mm thick heat strengthened monolithic float glass of approved colour and shade with reflective soft coating on surface # 2 of approved colour and shade so as to match the colour and shade of the IGUs in the vision panels etc. ,all complete for the required performances as specified, as per the Architectural drawings, as per the approved shop drawings, as specified, and as directed by the Engineer- in- Charge for payment only the actual area of glass on face #1 of the glass panels. ( but excluding the area of grooves and whether silicon sealant ) provided and fixed in position, shall be measured in sqm( payment for fixing of spandrel glass panels in the curtain glazing is included in cost of relevent item *).(i) coloured tinted float glass 6mm thick substrate with reflective soft coating on face #2, +12 mm alrgap +6 mm heat strengthend clear glass of approved make having properties as visual light transmitance (VLT) 25 to 35% , light reflection internal 10 to 15 % , light relection external 10 to 20 % , shading coefficient (0.25-0.28) and U value of 3.0 to 3.3W/m2 degree K etc. the properties of performance glass shall be decided by technical sanctioning authority as per site requirement. (SOR BCD 26A.6) Each 0.00 0.00 3.15 0.00 0.00 3.15
19 Brick work in designation 100 A Brick with cement mortar (1 : 4 ) in superstructure with approved quality of coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curing, scaffolding and its removal wherever required including royalty etc. complete job as per specification and direction of E / I. (5.4.6) M3 0.00 0.00 0.00 742.93 0.00 742.93
20 Providing 12 mm thick cement plaster (1: 4) with approved quality sand of requisite F.M . washed and screened including curing, scaffolding wherever required and its removal, royalty etc. complete job as per specification and direction of E / I. (SOR WRD 5.5.2) m² 0.00 0.00 0.00 7087.50 0.00 7087.50
21 Providing shuttering including strutting, propping etc. and its removal after use in various components of canal structure or embankment structure as per specifications and direction of E/I. (SOR WRD 5.3.19) M3 0.00 0.00 0.00 1233.26 0.00 1233.26
22 Providing and laying P.C.C. M-150 with nominal mix of (1:2:4 ) in superstructure of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing. royalty etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. (SOR WRD 5.3.9) M3 0.00 0.00 0.00 143.01 0.00 143.01
23 Supplying, fitting and fixing curtain at doors and window m² 0.00 0.00 68.58 0.00 0.00 68.58
25 Provision CCTV Camera Set 0.00 0.00 1.00 0.00 0.00 1.00
28 Carriage of Materials
i Coarse Sand (10 KM P) From Khijarsaray Cum 0.00 0.00 5.16 358.02 0.00 363.18
ii Stone Chips (98 km P) From Govindpur Cum 0.00 0.00 10.31 128.71 0.00 139.02
iii Cement (5 KM P) From Local Market MT 0.00 0.00 5.02 155.2 0.00 160.22
iv Steel (5 KM P) From Local Market MT 0.00 0.00 1.060 0.00 0.00 1.06
v Bricks (5KMP + 1KM K) From Local Area ‰ 0.00 0.00 0.00 301682 0.00 301682
J.E. A.E. Executive Engineer
Irrigation Division Uderasthan
LINE PLAN OF DOWEL
0.6 M BRICK WORK
J.E. A.E. Executive Engineer
Irrigation Division Uderasthan
Kerb Slab of Bridge
₀ Bottom Main Bar---- 12 mm Ø @125 mm c/c
₀ Top Dist. Bar ------ 10 mm Ø @ 150 mm c/c
Bottom Main Bar---- 12 mm Ø @125 mm c/c
J.E. A.E. Executive Engineer
Irrigation Division, Uderasthan
BILL OF QUANTITY
Name of Work :- Restoration of Left Bundh of Uderasthan Barrage and other Important Work.
Sl. No. Itme of Works Quantity Unit Rate (In Rs.) Amount (In Rs.)
1 Preparation of seat of embankment or canals by 75 mm ploughing and removing the grass roots etc.as per specifications and direction of E/I. (5.1.1) 31020.00 Per M2 6.70 207834.00
2 Earth work by Mechanical means with help of Excavator, Tipper and Spreader in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead of ............... metre (lead will be considered as track path i.e. half of distance travelled in one cycle i.e. half of haulage path from pit to bank or embankment. Pit will be beyond 150 meter from centre of bank i.e. perpendicular distance from centre of bank to nearest boundary of pit will be more than 150 meter) and with all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ).
3 Labour for Rolling and compacting the earth in layers of 225 mm thicl at O.M.C. by road roller to achieve minimum 90 % of maximum dry density including sprinking the required quanting of water by tanker within 1 km. lead and all lifts including cost of water, finishing the surface with proper grade, camber or superelevation including, hire charges of compaction machine tanker and other tools and plants etc. all complete as per specifications and direction of E/1. .( Mode of measurement - Sectional measurement of compacted earth ) ( SOR 7.1.30 ) 53166.25 Per M3 30.80 1637520.50
4 Labour Charge for taking out disturbed boulder from boulder pitching or riprap or rock toe etcand cleaning the surface and stacking the same within a lead of 100 m.as per specifications and direction of E/I.(5.7.41) 4822.50 Per M3 531.10 2561229.75
5 Supplying and Laying ( properly as per design and drawing ) riprap with good quality of boulder duly packedfincluding the cost of materials, royality and all taxes all complete job as per specifications and direction of E/I.( Only Labour Charge of 7.6.8) 4917.50 Per M3 1341.20 6595351.00
6 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5:3 ) in superstructure of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing. royalty etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. (5.3.10) 11.99 Cum 7565.20 90687.84
7 Centering and shuttering including struting, proping etc and removal of form for (5.9.5) 1251.10 m2 446.60 558739.03
8 Prov. M.S. rainforcement rods as per approved…. as complete job ./ as per specification and direction E/I.
9 Removing white or colour wash by scrapping and sand paper in and preparing the surface smooth including necessary repair scratches etc. complete (13.74) 44989.78 m2 9.10 409407.00
10 Finishing walls with water proofing cement paint of required shade Old work (one or more coats applied @ 2.20 kg/10 sqm ) over priming coat of primer applied @ 0.80 litrs/10 sqm complete including cost of priming coat (14.64.1) 44266.50 m2 66.20 2930442.30
11 Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: One or more coats on old work (13.92.2) 676.18 m2 60.90 41179.36
12 Painting with ready mixed paint or grey primer of approved brand and manufacture in all shades to give an even shade: On Wood work (hard and soft wood) (13.81.1) 40.95 m2 60.20 2465.19
13 Painting with ready mixed paint of approved brand and manufacture in all shades to give an even shade: Old wood work (one more coats) (13.82.4) 40.95 m2 59.30 2428.34
14 Applying priming coat: With ready mixed zinc chromate yellow primer of approved brand and manufacture on steel galvanized iron/steel works (13.81.3) 146.04 m2 38.30 5593.33
15 Painting with ready mixed paint of approved brand and manufacture in all shades to give an even shade: Old steel work (one or more coats)(13.82.3) 146.04 m2 59.30 8660.17
16 Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) decorative type, core of block board construction with frame of 1 st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters. 35 mm thick including stainless steel butt hinges with necessary screws (9.20.1) 9.70 m2 2560.90 24840.73
17 Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.l.brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required. (17.3.1) 1.00 Each 5523.00 5523.00
18 Providing and supplying Spandrel Glass Panels comprising of 6 mm thick heat strengthened monolithic Providing and supplying Spandrel Glass Panels comprising of 6 mm thick heat strengthened monolithic float glass of approved colour and shade with reflective soft coating on surface # 2 of approved colour and shade so as to match the colour and shade of the IGUs in the vision panels etc. ,all complete for the required performances as specified, as per the Architectural drawings, as per the approved shop drawings, as specified, and as directed by the Engineer- in- Charge.(26A.6) 3.15 Each 1921.60 6053.04
19 Brick work in designation 100 A Brick with cement mortar (1 : 4 ) in superstructure with approved quality of coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curing, scaffolding and its removal wherever required including royalty etc. complete job as per specification and direction of E / I. (5.4.6) 742.93 m3 5355.10 3978437.67
20 Providing 12 mm thick cement plaster (1: 4) with approved quality sand of requisite F.M . washed and screened including curing, scaffolding wherever required and its removal, royalty etc. complete job as per specification and direction of E / I. (5.5.2) 7087.50 221.9 221.90 1572716.25
21 Providing shuttering including strutting, propping etc. and its removal after use in various components of canal structure or embankment structure as per specifications and direction of E/I. (5.3.19) #REF! 590.3 590.30 #REF!
22 Providing and laying P.C.C. M-150 with nominal mix of (1:2:4 ) in superstructure of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing. royalty etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. 143.01 m3 7036.00 1006239.47
23 Carriage of Materials
i Coarse Sand (10 KM P) From Khijarsaray 363.18 m3 387.00 140550.66
ii Stone Chips (98 km P) From Govindpur 139.02 m3 2443.20 339653.66
iii Cement (5 KM P) From Local Market 160.22 MT 501.90 80414.42
iv Steel (5 KM P) From Local Market 1.06 MT 501.90 532.01
v Bricks (7KMP + 1KM K) From Local Area 301682.12 ‰ 2220.80 669975.65
Sub Total #REF!
Add 1% Labour Cess #REF!
Add Seignorage 601297.48
Add 18% G.S.T. #REF!
Grand Total #REF!
ADD 1% of labour cess. #REF!
Total Rs. #REF!
Add 12% of GST #REF!
G. Total Rs. #REF!
J.E. A.E. Executive Engineer
Irrigation Division Uderasthan
5.4.6 Brick work in designation 100 A Brick with cement mortar (1 : 4 ) in superstructure with approved quality of coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curing, scaffolding and its removal wherever required including royalty etc. complete job as per specification and direction of E / I.
Taking Out put =2.832 Cum
Head mason 0.125 nos 672.00 84.00 {S II -3}
Mason Gr II 2.5 nos 551.00 1377.50 {S II- 4}
Unskilled mazdoor 6 nos 436.00 2616.00 {SI-1}
Bhisti 1 nos 428.00 428.00 S II-13
Add Overhead charge & C.P@15% 1978.12
Rate per cum Say Rs 5355.10 Per M3
5.5.2 Providing 12 mm thick cement plaster (1: 4) with approved quality sand of requisite F.M . washed and screened including curing, scaffolding wherever required and its removal, royalty etc. complete job as per specification and direction of E / I.
Taking Out put =9.30 Sqm
Mason Gr II 1 nos 551.00 551.00 {S II- 4}
Unskilled mazdoor 1.5 nos 436.00 654.00 {SI-1}
Bhisti 0.5 nos 428.00 214.00 S II-13
Add Overhead charge & C.P@15% 269.17
Rate per sqm Say Rs 221.90 Per M2
5.3.19 Providing shuttering including strutting, propping etc. and its removal after use in various components of canal structure or embankment structure as per specifications and direction of E/I.
Taking Out put=9.30 Sqm
Local wood planks 38 mm thick 9.3 x 38 / 1000 =0.353 cum 0.353 cum
Add 5 % wastage 0.017 cum
Cost of 0.37 cum local wood planks 0.37 cum 26000.00 9620.00 {1198}
Add cost for strutting and propping @ 10 % of above 962.00
Total cost of wood 10582.00
Assuming 4 uses to calculate 4 use
Cost of shuttering for 2.832 cum total cost/4 2645.50
Add 1 % for cost of nails and spikes on total cost of wood 105.82
Carpenter Gr II 1.5 nos 551.00 826.50 {S I -17}
Unskilled mazdoor 2.5 nos 436.00 1090.00 {SI-1}
C Carriage of materials
Cost of the carriage of materials from Godown and back to godown after use including loading unloading and stacking @ 1 % of Total cost of wooden materals 105.82 C
TOTAL cost per 9.3 sqm =A+B+C 4773.64
Add Overhead charge & C.P@15% 716.05
Rate per sqm Say Rs 590.30 Per M2
5.3.9 Providing and laying P.C.C. M-150 with nominal mix of (1:2:4 ) in superstructure of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing. royalty etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I.
Unit :- Per Cum
Taking Out put= 2.832 Cum
Coarse aggregates (20 mm To 10 mm) (Taking Rate of approved quality of aggregate as per Design) 2.548 M3 1313.12 3345.83 M-044
Head mason 0.5 nos 672.00 336.00 {S II -3}
Mason Gr II 1 nos 551.00 551.00 {S II- 4}
Unskilled mazdoor 12 nos 436.00 5232.00 {SI-1}
Bhisti 1 nos 428.00 428.00 S II-13
C. HIRE CHARGES OF MACHINE
(i)Concrete mixer (10 H.P ) for 2.832 cum consists 1.43 hr 392.00 560.56 {P M -21001}
on the basic of mixer production capacity 1.98 m3
per hour. Used rate per hourx2.832/1.98
(ii) Vibrator 1no. To vibrate 2.832 cum on the 1.43 hr 456.00 652.08 {P M -44001}
basic of vibrator capacity 1.98 cum per hour.
Used rate per hourx2.832/1.98
Add Overhead charge & C.P@15% 2599.05
Rate per cum Say Rs 7036.00 Per M3
14.64 Finishing walls with water proofing cement paint of required shade
14.64.1 Old work (one or more coats applied @2.20 kg/10 sqm) over priming coat of primer applied @2 0.80 litrs/10 sqm complete including cost of Priming coat.
Detail of cost for 10 sqm
851 water proofing cement paint kilogram 2.20 38.00 83.60
8508 primer of cement paint litre 0.80 90.00 72.00
9977 carraiage of material L.S 1.56 2.12 3.31
9999 brushes,sand paper etc LS 7.15 2.12 15.16
9999 sundries LS 8.06 2.12 17.09
Add 1 % water charges 5.70
Add 15 % CP and overheads charges 86.35
Cost of 10.00 sqm 662.02
Cost of 1.00 sqm 66.20
J.E. A.E. Executive Engineer
Irrigation Division Uderasthan
14.64 Finishing walls with water proofing cement paint of required shade
14.64.1 Old work (one or more coats applied @2.20 kg/10 sqm) over priming coat of primer applied @2 0.80 litrs/10 sqm complete including cost of Priming coat.
Detail of cost for 10 sqm
851 water proofing cement paint kilogram 2.20 38.00 83.60
8508 primer of cement paint litre 0.80 90.00 72.00
9977 carraiage of material L.S 1.56 2.12 3.31
9999 brushes,sand paper etc LS 7.15 2.12 15.16
9999 sundries LS 8.06 2.12 17.09
Add 1 % water charges 5.70
Add 15 % CP and overheads charges 86.35
Cost of 10.00 sqm 662.02
Cost of 1.00 sqm 66.20
Construction of dowel in RLC, RMC , MAHMUDA BRANCH & BHARTHU BRANCH CANAL 2625 99.0566037735849
Sl. No. Description Nos. Length Width Height Quantity Unit 26.5 = 0.25 25 1 0.25 26.5
1 Brick work in designation 100 A Brick with cement mortar (1 : 4 ) in superstructure with approved quality of coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curing, scaffolding and its removal wherever required including royalty etc. complete job as per specification and direction of E / I. (5.4.6) Nos Length In one set TOTAL
2 Providing 12 mm thick cement plaster (1: 4) with approved quality sand of requisite F.M . washed and screened including curing, scaffolding wherever required and its removal, royalty etc. complete job as per specification and direction of E / I. (5.5.2)
Dowel wall 4 2625.00 0.60 6300.000 sqm
3 Providing shuttering including strutting, propping etc. and its removal after use in various components of canal structure or embankment structure as per specifications and direction of E/I. (5.3.19)
4 Providing and laying P.C.C. M-150 with nominal mix of (1:2:4 ) in superstructure of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing. royalty etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. (5.3.9)
Copping 2 2625.00 0.25 0.075 98.438 cum TOTAL LENGTH 2625
J.E. A.E. Executive Engineer
Irrigation Division Uderasthan
MATERIAL STATEMENT OF DOWEL
S.l NO ITOM NO. Quantity Cement L. Sand C.Sand S.Chips Brick Steel
CUM CUM CUM CUM Nos MT
SEIGNIORAGE FEE of Dowel
SL NO ITEM QUANTITY UNIT RATE AMOUNT
TOTAL 2008676.20
SF = 10% Of total 200867.62
J.E A.E Executive Engineer
Irrigation Division Uderasthan
5.1.46 Earth work by Mechanical means with help of Excavator, Tipper and Spreader in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead of ............... metre (lead will be considered as track path i.e. half of distance travelled in one cycle i.e. half of haulage path from pit to bank or embankment. Pit will be beyond 150 meter from centre of bank i.e. perpendicular distance from centre of bank to nearest boundary of pit will be more than 150 meter) and with all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth )
Lead in K.M ( L ) Cost of cutting & Loading by Excavator one M3 capacity= Use rate of Excavator / Capacity of Excavator ( 60M3) PM3005/60 Average Speed on Kucha track Km / hr = (V) Average haulage path ( Distance ) in one cycle ( D) in Km Haulage Time in minute ( Time taken in one cycle of run ) = 60D/V Loading Time one minute Per M3 For 5.5 M3 Unloading & Turning Time in minute Total Time Per trip in minute Col (5+6+7) =( T) No. of Trip per hour taken as 50 minute N =50/T Output per hour with 80 % efficiency Q = 0.8 X N X 5.5 Use Rate per hour of Tipper 5.5 M3 capacity = (Tr ) Carriage Cost per M3 = Tr/ Q Add for spreading cost =( Use rate of D-80 Dozer Per hr / Capacity of D-80 Dozer per hr 300 cum) =2930/300 Add 5 % for haul road maintenance, 5 % for processing and 2 % for extra labour for finishing = 12 % of column ( 2+12+13) Total Cost per M3 col (2+12+13+14 ) Add Overhead charge & C.P 15% (col 15) Rate Per Cum (15+16)
5.1.46.1 Beyond 150m but upto 1/2 K.M #REF! 10.00 0.65 3.90 5.50 3.30 12.70 3.937 17.323 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5.1.46.2 Beyond 1/2 K.M but upto 1.00 K.M #REF! 10.00 1.50 9.00 5.50 3.30 17.80 2.809 12.360 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5.1.46.3 Beyond 1.00 K.M but upto 1.50 K.M #REF! 10.00 2.50 15.00 5.50 3.30 23.80 2.101 9.244 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5.1.46.4 Beyond 1.50 K.M but upto 2.00 K.M #REF! 10.00 3.50 21.00 5.50 3.30 29.80 1.678 7.383 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5.1.46.5 Beyond 2.00 K.M but upto 2.50 K.M #REF! 10.00 4.50 27.00 5.50 3.30 35.80 1.397 6.145 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5.1.46.6 Beyond 2.50 K.M but upto 3.00 K.M #REF! 10.00 5.50 33.00 5.50 3.30 41.80 1.196 5.263 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
NOTE:- Add royalty of Earth Rs 75.00 where needed without overhead charge & C.P
5.3.19 Providing shuttering including strutting, propping etc. and its removal after use in various components of canal structure or embankment structure as per specifications and direction of E/I.
Taking Out put=9.30 Sqm
Local wood planks 38 mm thick 9.3 x 38 / 1000 =0.353 cum 0.353 cum
Add 5 % wastage 0.017 cum
Cost of 0.37 cum local wood planks 0.37 cum 26000.00 9620.00 {1198}
Add cost for strutting and propping @ 10 % of above 962.00
Total cost of wood 10582.00
Assuming 4 uses to calculate 4 use
Cost of shuttering for 2.832 cum total cost/4 2645.50
Add 1 % for cost of nails and spikes on total cost of wood 105.82
Carpenter Gr II 1.5 nos 551.00 826.50 {S I -17}
Unskilled mazdoor 2.5 nos 436.00 1090.00 {SI-1}
C Carriage of materials
Cost of the carriage of materials from Godown and back to godown after use including loading unloading and stacking @ 1 % of Total cost of wooden materals 105.82 C
TOTAL cost per 9.3 sqm =A+B+C 4773.64
Add Overhead charge & C.P@15% 716.05
Rate per sqm Say Rs 590.30 Per M2
5.3.22 Providing M.S reinforcement ( Tor steel ) as per approved design , drawing, removal of rust, cutting, bending, binding, including supplying annealed wire, placing M.S rods in position complete job as per specifications and direction of E/I.
Assuming 1.00 M.T
(b). T.M.T Fe- 500 10 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 56100.00 58905.00
(B). i. Annealed wire 14 Kg 49.41 691.74 M 072
ii Black smith Gr II 9 nos 551.00 4959.00 S II-10
iii. Head black smith 1 nos 672.00 672.00 S II-9
iv. Skilled mazdoor 8 nos 551.00 4408.00 S I-71
v Unskilled mazdoor 2 nos 436.00 872.00
Add Overhead charge & C.P@15% 10576.16
Say Rs 81083.90 Per M.T
(c). T.M.T Fe-500 12 mm
(A). Providing M.S reinforcement Plain
(including 5 % wastage ) 1.05 M.T 55500.00 58275.00
(B). i. Annealed wire 14 Kg 49.41 691.74 M 072
ii Black smith Gr II 9 nos 551.00 4959.00 S II-10
iii. Head black smith 1 nos 672.00 672.00 S II-9
iv. Skilled mazdoor 8 nos 551.00 4408.00 S I-71
v Unskilled mazdoor 2 nos 436.00 872.00
Add Overhead charge & C.P@15% 10481.66
Say Rs 80359.40 Per M.T
J.E. A.E. Executive Engineer
Irrigation Division Uderasthan
GENRAL ABSTRACT OF COST
Name of Work :- Restoration of Left Bundh of Uderasthan Barrage and other Important Work.
Sl. No. Itme of Works Quantity Unit Rate (In Rs.) Amount (In Rs.)
1 Preparation of seat of embankment or canals by 75 mm ploughing and removing the grass roots etc.as per specifications and direction of E/I. (SOR WRD 5.1.1) 31020.00 Per M2 6.70 207834.00
2 Earth work by Mechanical means with help of Excavator, Tipper and Spreader in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead of ............... metre (lead will be considered as track path i.e. half of distance travelled in one cycle i.e. half of haulage path from pit to bank or embankment. Pit will be beyond 150 meter from centre of bank i.e. perpendicular distance from centre of bank to nearest boundary of pit will be more than 150 meter) and with all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ).
3 Labour for Rolling and compacting the earth in layers of 225 mm thick at O.M.C. by road roller to achieve minimum 90 % of maximum dry density including sprinking the required quanting of water by tanker within 1 km. lead and all lifts including cost of water, finishing the surface with proper grade, camber or superelevation including, hire charges of compaction machine tanker and other tools and plants etc. all complete as per specifications and direction of E/1. .( Mode of measurement - Sectional measurement of compacted earth ) ( SOR WRD 7.1.30 ) 53166.25 Per M3 30.80 1637520.50
4 Labour Charge for taking out disturbed boulder from boulder pitching or riprap or rock toe etcand cleaning the surface and stacking the same within a lead of 100 m.as per specifications and direction of E/I.(SOR WRD 5.7.41) 4822.50 Per M3 531.10 2561229.75
5 Supplying and Laying ( properly as per design and drawing ) riprap with good quality of boulder duly packedfincluding the cost of materials, royality and all taxes all complete job as per specifications and direction of E/I.( Only Labour Charge of SOR WRD 7.6.8) 4917.50 Per M3 1341.20 6595351.00
6 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5:3 ) in superstructure of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing. royalty etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. (SOR WRD 5.3.10) 11.99 Cum 7565.20 90706.75
7 Providing shuttering including strutting, propping etc. and its removal after use in various components of canal structure or embankment structure as per specifications and direction of E/I. (SOR WRD 5.3.19) 1251.10 m2 590.30 337781.47
8 Providing M.S reinforcement ( Tor steel ) as per approved design , drawing, removal of rust, cutting, bending, binding, including supplying annealed wire, placing M.S rods in position complete job as per specifications and direction of E/I. ( SOR WRD 5.3.22)
9 Removing white or colour wash by scrapping and sand paper in and preparing the surface smooth including necessary repair scratches etc. complete (SOR BCD 13.74) 44989.78 m2 9.10 409407.00
10 Finishing walls with water proofing cement paint of required shade Old work (one or more coats applied @ 2.20 kg/10 sqm ) over priming coat of primer applied @ 0.80 litrs/10 sqm complete including cost of priming coat (SOR BCD 14.64.1) 44266.50 m2 66.20 2930442.30
11 Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: One or more coats on old work (SOR BCD 13.92.2) 676.18 m2 60.90 41179.36
12 Applying priming coat with ready mixed pink or grey primer of approved brand and manufacture : On Wood work (hard and soft wood) (SOR BCD 13.81.1) 40.95 m2 43.00 1760.85
13 Painting with ready mixed paint of approved brand and manufacture in all shades to give an even shade: Old wood work (one more coats) (SOR BCD 13.82.4) 40.95 m2 59.30 2428.34
14 Applying priming coat: With ready mixed zinc chromate yellow primer of approved brand and manufacture on steel galvanized iron/steel works (SOR BCD 13.81.3) 146.04 m2 38.30 5593.33
15 Painting with ready mixed paint of approved brand and manufacture in all shades to give an even shade: Old steel work (one or more coats)(SOR BCD 13.82.3) 146.04 m2 59.30 8660.17
16 Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) decorative type, core of block board construction with frame of 1 st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters. 35 mm thick including ISI Marked stainless steel butt hinges with necessary screws (SOR BCD 9.20.1) 9.70 m2 2560.90 24840.73
17 Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.l.brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required. (SOR BCD 17.3.1) 1.00 Each 5523.00 5523.00
18 Providing and supplying Spandrel Glass Panels comprising of 6 mm thick heat strengthened monolithic Providing and supplying Spandrel Glass Panels comprising of 6 mm thick heat strengthened monolithic float glass of approved colour and shade with reflective soft coating on surface # 2 of approved colour and shade so as to match the colour and shade of the IGUs in the vision panels etc. ,all complete for the required performances as specified, as per the Architectural drawings, as per the approved shop drawings, as specified, and as directed by the Engineer- in- Charge for payment only the actual area of glass on face #1 of the glass panels. ( but excluding the area of grooves and whether silicon sealant ) provided and fixed in position, shall be measured in sqm( payment for fixing of spandrel glass panels in the curtain glazing is included in cost of relevent item *).(i) coloured tinted float glass 6mm thick substrate with reflective soft coating on face #2, +12 mm alrgap +6 mm heat strengthend clear glass of approved make having properties as visual light transmitance (VLT) 25 to 35% , light reflection internal 10 to 15 % , light relection external 10 to 20 % , shading coefficient (0.25-0.28) and U value of 3.0 to 3.3W/m2 degree K etc. the properties of performance glass shall be decided by technical sanctioning authority as per site requirement. (SOR BCD 26A.6) 3.15 Each 1921.60 6053.04
19 Brick work in designation 100 A Brick with cement mortar (1 : 4 ) in superstructure with approved quality of coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curing, scaffolding and its removal wherever required including royalty etc. complete job as per specification and direction of E / I. (5.4.6) 742.93 m3 5355.10 3978437.67
20 Providing 12 mm thick cement plaster (1: 4) with approved quality sand of requisite F.M . washed and screened including curing, scaffolding wherever required and its removal, royalty etc. complete job as per specification and direction of E / I. (SOR WRD 5.5.2) 7087.50 m² 221.90 1572716.25
21 Providing shuttering including strutting, propping etc. and its removal after use in various components of canal structure or embankment structure as per specifications and direction of E/I. (SOR WRD 5.3.19) 1233.26 m2 590.30 727990.43
22 Providing and laying P.C.C. M-150 with nominal mix of (1:2:4 ) in superstructure of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing. royalty etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. (SOR WRD 5.3.9) 143.01 m3 7036.00 452344.44
23 Supplying, fitting and fixing curtain at doors and window 68.58 m² LS 20000.00
24 Crockery set 1.00 set LS 10000.00
25 Provision CCTV Camera 1.00 set LS 150000.00
26 Display Board 1.00 No LS 15000.00
27 cyarn 1.00 No LS 200000.00
27 Carriage of Materials
i Coarse Sand (10 KM P) From Khijarsaray 363.18 m3 387.00 140550.66
ii Stone Chips (98 km P) From Govindpur 139.02 m3 2443.20 339653.66
iii Cement (5 KM P) From Local Market 160.22 MT 501.90 80414.42
iv Steel (5 KM P) From Local Market 1.06 MT 501.90 532.01
v Bricks (5KMP + 1KM K) From Local Area 301682 ‰ 2120.80 639807.44
Sub Total 39066505.46
Add 1% Labour Cess 390665.05
Add Seignorage fee 601297.48
Grand Total 47268992.23
ADD 1% of labour cess. 483927.35
Total Rs. 49274537.35
Add 12% of GST 5912944.48
G. Total Rs. 55187481.83
J.E. A.E. Executive Engineer
Irrigation Division Uderasthan
BILL OF QUANTITY
Name of Work :- Restoration of Left Bundh of Uderasthan Barrage and other Important Work.
Sl. No. Itme of Works Quantity Unit Rate (In Rs.) Amount (In Rs.)
1 Preparation of seat of embankment or canals by 75 mm ploughing and removing the grass roots etc.as per specifications and direction of E/I. (SOR WRD 5.1.1) 31020.00 Per M2 6.70 207834.00
2 Earth work by Mechanical means with help of Excavator, Tipper and Spreader in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead of ............... metre (lead will be considered as track path i.e. half of distance travelled in one cycle i.e. half of haulage path from pit to bank or embankment. Pit will be beyond 150 meter from centre of bank i.e. perpendicular distance from centre of bank to nearest boundary of pit will be more than 150 meter) and with all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ).
3 Labour for Rolling and compacting the earth in layers of 225 mm thick at O.M.C. by road roller to achieve minimum 90 % of maximum dry density including sprinking the required quanting of water by tanker within 1 km. lead and all lifts including cost of water, finishing the surface with proper grade, camber or superelevation including, hire charges of compaction machine tanker and other tools and plants etc. all complete as per specifications and direction of E/1. .( Mode of measurement - Sectional measurement of compacted earth ) ( SOR WRD 7.1.30 ) 53166.25 Per M3 30.80 1637520.50
4 Labour Charge for taking out disturbed boulder from boulder pitching or riprap or rock toe etcand cleaning the surface and stacking the same within a lead of 100 m.as per specifications and direction of E/I.(SOR WRD 5.7.41) 4822.50 Per M3 531.10 2561229.75
5 Supplying and Laying ( properly as per design and drawing ) riprap with good quality of boulder duly packedfincluding the cost of materials, royality and all taxes all complete job as per specifications and direction of E/I.( Only Labour Charge of SOR WRD 7.6.8) 4917.50 Per M3 1341.20 6595351.00
6 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5:3 ) in superstructure of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing. royalty etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. (SOR WRD 5.3.10) 11.99 Cum 7565.20 90706.75
7 Providing shuttering including strutting, propping etc. and its removal after use in various components of canal structure or embankment structure as per specifications and direction of E/I. (SOR WRD 5.3.19) 1251.10 m2 590.30 738524.33
8 Providing M.S reinforcement ( Tor steel ) as per approved design , drawing, removal of rust, cutting, bending, binding, including supplying annealed wire, placing M.S rods in position complete job as per specifications and direction of E/I. ( SOR WRD 5.3.22)
9 Removing white or colour wash by scrapping and sand paper in and preparing the surface smooth including necessary repair scratches etc. complete (SOR BCD 13.74) 44989.78 m2 9.10 409407.00
10 Finishing walls with water proofing cement paint of required shade Old work (one or more coats applied @ 2.20 kg/10 sqm ) over priming coat of primer applied @ 0.80 litrs/10 sqm complete including cost of priming coat (SOR BCD 14.64.1) 44266.50 m2 66.20 2930442.30
11 Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: One or more coats on old work (SOR BCD 13.92.2) 676.18 m2 60.90 41179.36
12 Applying priming coat with ready mixed pink or grey primer of approved brand and manufacture : On Wood work (hard and soft wood) (SOR BCD 13.81.1) 40.95 m2 43.00 1760.85
13 Painting with ready mixed paint of approved brand and manufacture in all shades to give an even shade: Old wood work (one more coats) (SOR BCD 13.82.4) 40.95 m2 59.30 2428.34
14 Applying priming coat: With ready mixed zinc chromate yellow primer of approved brand and manufacture on steel galvanized iron/steel works (SOR BCD 13.81.3) 146.04 m2 38.30 5593.33
15 Painting with ready mixed paint of approved brand and manufacture in all shades to give an even shade: Old steel work (one or more coats)(SOR BCD 13.82.3) 146.04 m2 59.30 8660.17
16 Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) decorative type, core of block board construction with frame of 1 st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters. 35 mm thick including ISI Marked stainless steel butt hinges with necessary screws (SOR BCD 9.20.1) 9.70 m2 2560.90 24840.73
17 Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.l.brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required. (SOR BCD 17.3.1) 1.00 Each 5523.00 5523.00
18 Providing and supplying Spandrel Glass Panels comprising of 6 mm thick heat strengthened monolithic Providing and supplying Spandrel Glass Panels comprising of 6 mm thick heat strengthened monolithic float glass of approved colour and shade with reflective soft coating on surface # 2 of approved colour and shade so as to match the colour and shade of the IGUs in the vision panels etc. ,all complete for the required performances as specified, as per the Architectural drawings, as per the approved shop drawings, as specified, and as directed by the Engineer- in- Charge for payment only the actual area of glass on face #1 of the glass panels. ( but excluding the area of grooves and whether silicon sealant ) provided and fixed in position, shall be measured in sqm( payment for fixing of spandrel glass panels in the curtain glazing is included in cost of relevent item *).(i) coloured tinted float glass 6mm thick substrate with reflective soft coating on face #2, +12 mm alrgap +6 mm heat strengthend clear glass of approved make having properties as visual light transmitance (VLT) 25 to 35% , light reflection internal 10 to 15 % , light relection external 10 to 20 % , shading coefficient (0.25-0.28) and U value of 3.0 to 3.3W/m2 degree K etc. the properties of performance glass shall be decided by technical sanctioning authority as per site requirement. (SOR BCD 26A.6) 3.15 Each 1921.60 6053.04
19 Brick work in designation 100 A Brick with cement mortar (1 : 4 ) in superstructure with approved quality of coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curing, scaffolding and its removal wherever required including royalty etc. complete job as per specification and direction of E / I. (5.4.6) 742.93 m3 5355.10 3978464.44
20 Providing 12 mm thick cement plaster (1: 4) with approved quality sand of requisite F.M . washed and screened including curing, scaffolding wherever required and its removal, royalty etc. complete job as per specification and direction of E / I. (SOR WRD 5.5.2) 7087.50 m2 221.90 1572716.25
21 Providing shuttering including strutting, propping etc. and its removal after use in various components of canal structure or embankment structure as per specifications and direction of E/I. (SOR WRD 5.3.19) 1233.26 m2 590.30 727993.38
22 Providing and laying P.C.C. M-150 with nominal mix of (1:2:4 ) in superstructure of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing. royalty etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. (SOR WRD 5.3.9) 143.01 m3 7036.00 1006218.36
23 Carriage of Materials
i Coarse Sand (10 KM P) From Khijarsaray 363.18 m3 387.00 140550.66
ii Stone Chips (98 km P) From Govindpur 139.02 m3 2443.20 339653.66
iii Cement (5 KM P) From Local Market 160.22 MT 501.90 80414.42
iv Steel (5 KM P) From Local Market 1.06 MT 501.90 532.01
v Bricks (5KMP + 1KM K) From Local Area 301682 ‰ 2120.80 639807.44
Sub Total 39626151.97
Add 1% Labour Cess 396261.52
Add Seignorage fee 601297.48
Grand Total 47935978.93
J.E. A.E. Executive Engineer
Irrigation Division Uderasthan
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Corrigendum 1.pdf
NIT • 0.52 MB
Refrance Circulars 1.pdf
NIT • 22.58 MB
Refrance Circular 2.pdf
NIT • 0.22 MB
Refrance Circular 3.pdf
NIT • 4.30 MB
Refrance Circular 4.pdf
NIT • 1.69 MB
Refrance Circular 5.pdf
NIT • 1.06 MB
Technical Sheet.xls
NIT • 0.14 MB
Technical Bid Docs.doc
NIT • 1.12 MB
NIT 01SBD 2026-27.pdf
NIT • 1.73 MB
BOQfinancial Bid.xlsx
NIT • 2.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .