| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 CrAccepted-AOC STREET NO 3 W NO 16 SUBHASH NAGAR GIDDERBAHA DISTT SRI MUKTSAR SAHIB 152101 PUNJAB | SRI MUKTSAR SAHIB | PUNJAB | 152101 | ₹4.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹5.3 Cr+₹76.0 L (16.6%)Rejected-AOC GURDASPUR CITY | ₹5.3 Cr+₹76.0 L (16.6%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | RAJ KUMAR CONTRACTOR L1 | MS GARGA ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00 | Jungle clearance on running canals and branches, and drains with discharge more than 9 Cum/s. (iii) Heavy type | 0.3 | km | 6,796.2 ₹6,796.2 Lowest | 6,796.2 ₹6,796.2 Lowest |
| 2.00 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. | 426.67 | cum | 17,493.47 ₹17,493.47 Lowest | 17,493.47 ₹17,493.47 Lowest |
| 3.00 | Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (X-Bundh and Cutting) | 12,584.29 | cum | 7,80,225.98 ₹7,80,225.98 Lowest | 8,55,731.72 ₹8,55,731.72 |
| 4.00 | Making dewatering arrangement by pumping set 4'' *4'' (Tractor driven) | 264 | hour | 2,18,856 ₹2,18,856 Lowest | 2,18,856 ₹2,18,856 Lowest |
| 5.00 | Sub Estimate:- Making dewatering arrangements inclusive of running,operation and maintenance of equipment to provide drycondition at working place for lining, longitudinal /transverse drain etc & provision of digging & filling of drains for disposal of water as per the instructions of the Engineer incharge. The rate shall be inclusive of filter material, if required, to be provided to prevent fine particles in the adjacent ground to be carried away by flowing water and to prevent clogging of the system. | 49,280 | per Hour per H.P | 1,97,120 ₹1,97,120 Lowest | 5,91,360 ₹5,91,360 |
| 6.00 | Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (Silt clearance and debris of channels) | 4,255.73 | cum | 2,63,855.26 ₹2,63,855.26 Lowest | 2,63,855.26 ₹2,63,855.26 Lowest |
| 7.00 | Dismantling of existing coping consisting of cement concrete 1:3:6 including loading & unloading, carriage and disposal of dismantled material with all leads & lifts. | 40.36 | cum | 41,490.08 ₹41,490.08 Lowest | 41,490.08 ₹41,490.08 Lowest |
| 8.00 | Dismantling existing tile lining on side slopes and bed including loading, unloading, carriage and disposal of dismantled materials with all leads and lifts | 2,604.95 | cum | 21,51,688.7 ₹21,51,688.7 Lowest | 21,51,688.7 ₹21,51,688.7 Lowest |
| 9.00 | Extra for laying earth as per specifications for compaction in
200 mm layers & compacted to about 150 mm, watering, rolling and compaction complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge. | 447.47 | cum | 44,299.53 ₹44,299.53 Lowest | 48,326.76 ₹48,326.76 |
| 10.00 | Earth work for lip cutting for lining of irrigation channels
inclusive of all allowances, lead and dressing complete in all respect, as per instruction of Engineer in charge (i) Depth 0 to 1.50 meters. | 175.45 | cum | 30,703.75 ₹30,703.75 Lowest | 32,107.35 ₹32,107.35 |
Tender Value
₹4.2 Cr
EMD Value
₹8.4 L
Closing Date
8 Oct 2025, 11:00 amClosed
XEN
Canal colony Gidderbaha
Estimate for relining of Ferozpur Feeder From RD 35000-36000
2025_WR_149945_5
Tendering Notice No. 7467
Open Tender
Civil Works
Item Wise
Zira
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
Yes
₹8.4 L
Yes
28 Jan 2026
16 Sept 2025
8 Oct 2025
16 Sept 2025
8 Oct 2025
16 Sept 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Jungle clearance on running canals and branches, and drains with discharge more than 9 Cum/s. (iii) Heavy type | 0.3 | km | - | - |
| 2 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. | 426.67 | cum | - | - |
| 3 | Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (X-Bundh and Cutting) | 12,584.29 | cum | - | - |
| 4 | Making dewatering arrangement by pumping set 4'' *4'' (Tractor driven) | 264 | hour | - | - |
| 5 | Sub Estimate:- Making dewatering arrangements inclusive of running,operation and maintenance of equipment to provide drycondition at working place for lining, longitudinal /transverse drain etc & provision of digging & filling of drains for disposal of water as per the instructions of the Engineer incharge. The rate shall be inclusive of filter material, if required, to be provided to prevent fine particles in the adjacent ground to be carried away by flowing water and to prevent clogging of the system. | 49,280 | per Hour per H.P | - | - |
| 6 | Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (Silt clearance and debris of channels) | 4,255.73 | cum | - | - |
| 7 | Dismantling of existing coping consisting of cement concrete 1:3:6 including loading & unloading, carriage and disposal of dismantled material with all leads & lifts. | 40.36 | cum | - | - |
| 8 | Dismantling existing tile lining on side slopes and bed including loading, unloading, carriage and disposal of dismantled materials with all leads and lifts | 2,604.95 | cum | - | - |
| 9 | Extra for laying earth as per specifications for compaction in
200 mm layers & compacted to about 150 mm, watering, rolling and compaction complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge. | 447.47 | cum | - | - |
| 10 | Earth work for lip cutting for lining of irrigation channels
inclusive of all allowances, lead and dressing complete in all respect, as per instruction of Engineer in charge (i) Depth 0 to 1.50 meters. | 175.45 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 1.82 MB
Tendernotice_1.pdf
PDF • 3.14 MB
Tendernotice_2.pdf
PDF • 1.85 MB
BOQ_303466.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .