Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC | ₹2.2 Cr | L1 | Accepted-AOC Ok |
| 2 | L2₹2.2 Cr+₹5.0 L (2.30%)Rejected-Finance 858 SECTOR 23 127021 2021R109 | BHIWANI | HARYANA | 127021 | ₹2.2 Cr+₹5.0 L (2.30%) | L2 | Rejected-Finance ok |
| 3 | L3₹2.3 Cr+₹10.1 L (4.70%)Rejected-Finance 259 JAY RAM NAGAR KHAMBHAPUR ROAD FATEHPUR FATEHPUR UTTAR PRADESH 212601 | FATEHPUR | UTTAR PRADESH | 212601 | ₹2.3 Cr+₹10.1 L (4.70%) | L3 | Rejected-Finance ok |
| 4 | L4₹2.4 Cr+₹22.6 L (10.5%)Rejected-Finance 62 BALSAMAND ROAD HISAR 125001 | HISAR | HARYANA | 125001 | ₹2.4 Cr+₹22.6 L (10.5%) | L4 | Rejected-Finance ok |
| 5 | L5₹2.8 Cr+₹65.0 L (30.2%)Rejected-Finance 0 BARWALA HISAR HARYANA | HISAR | HARYANA | 125001 | ₹2.8 Cr+₹65.0 L (30.2%) | L5 | Rejected-Finance ok |
Tender Value
₹2.8 Cr
EMD Value
₹5.7 L
Closing Date
1 May 2023, 1:00 pmClosed
SARWAN KUMAR
Hisar W.S. Divn. Hisar
constructing Pump House for protecting Abadi area of village Ghirai and out falling at RD 133000-L Barwala Branch .
2023_HRY_273374_1
20232311639C 2879 4E1D A7C6 78BF618670C0109IRR
Open Tender
Civil Works
Works
560 days
GHIRAI
3 documents required · 3 mandatory
₹15,000
₹5.7 L
Yes
Hisar
30 May 2023
13 Apr 2023
3 May 2023
13 Apr 2023
1 May 2023
13 Apr 2023
13 Apr 2023 - 25 Apr 2023
25 Apr 2023
Amount
Providing and fixing of 400 mm HDPE single side flanged tie
providing and fixing of 200 mm 90` bend
Providing and fixing of MS flange 200 mm
Providing and fixing of Nuts and Bolts
Providing and fixing of Kit-Kat rewireable 200 amp
Providing and fixing of 12 mm alloy steel chain specifically for the use of lowering and lifting of sewerage submersible motor pump set
providing and fixing of sewerage submersible water level controller for safety of sewerage submersible motor pump set.
Supply, erection, testing and commissioning of submersible motor pumping set non clog for sewerage having head 24.0 mtr as per the indicated requirements of discharge in 8500 LPM and power capacity in 75 BHP Make KSB, CRI, Kirlosker, crompton greeve, Lubi Aqua, Kishore, matter and Platt, Beacon Wier
supply of full automatic electric control panel board for tubewell in pump chamber consisting of MS sheet of thickness 14 gauge duly painted box type floor mounted made angle frame containing 01 nos fully automatic air break starter suitable for motor of capacity for 75 bhp
Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths ISI marked HDPE pipe of PE-80 grade and PN- 4 for water supply as per IS 4984-2016 (amended up to date) in trenches in complete including cost of HDPE Specials, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer. Note: E/w to be measured and paid separately. Rate includes cost of all specials like bends, tees required during laying of pipe line along required alignment. 400 mm Outside Dia
Bidder Name
Amount
M/S LAXMI CONSTRUCTION CO.(GSTN-06AABFL8117G1ZI)
Krishan Kumar contractor(GSTN-06AXBPK5232G1ZT)
Rajkumar Malik Contractor(GSTN-NA)
meharchand(GSTN-NA)
M/S SHREE BALAJI BUILDERS(GSTN-NA)
M/S SHREE BALAJI BUILDERS
M/S LAXMI CONSTRUCTION CO.
Krishan Kumar contractor
meharchand
M/S SHREE BALAJI BUILDERS
Rajkumar Malik Contractor
Krishan Kumar contractor
meharchand
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .