| 1 | L1₹15.4 LAccepted-AOC | L1 | Accepted-AOC L1 ios Less ER | |
| 2 | L2₹15.9 L+₹48,840.05 (3.17%)Rejected-AOC | L2 | Rejected-AOC L2 is Above ER |
Tender Value
₹15.4 L
EMD Value
₹15,500
Closing Date
24 Jun 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BLOCK DEVELOPMENT OFFICER (B.P)
Panchayat Union Vallam -604206 Villupuram Distrrict
TN/VPM/Vlm/GF 25-26/AGAMT Library Repair Work/25-26/P2
2025_RDTN_570602_1
TN/VPM/Vlm/GF 25-26/AGAMT Library Repair Work/25-26/P2
Open Tender
Civil Works
Works
30 days
VALLAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,500
Yes
25 Jul 2025
18 Jun 2025
24 Jun 2025
18 Jun 2025
24 Jun 2025
18 Jun 2025
Amount
1)Repairs to Library building at Thalavanur Panchayat.
Ceiling Cracks
Special Ceiling Plastering in Cement Mortor 1 : 3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 Sqm.
Weathering Course & Pressed tiles
Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works)
Doors Repair / Replacement
Windows Repair / Replacement
White washing two coats using shell lime including cost and conveyance ofall materials to site and all labour charges etc comoplete
Distembering Two Coats with Primer coat and Two Coat with OIL BOUND DISTEMBER over cement plastered surface including all charges etc complete
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of cement paint including cost of all materials and labour charges etc complete
Painting Two Coats with Enamel Paint over the old Iron Work over one coat of Primer including cost of all materials and labour charges etc complete
Construction of RWH
Provision for electrification works
Construction of Plinth Protection
Labour welfare fund @ 1.0%
Provision for Thirukkural Painting
Name board and Photo charges
2)Repairs to Library building at Thudupakkam Panchayat.
Weathering Course & Pressed tiles
Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works)
Windows (0.90 X 1.20)
White washing two coats using shell lime including cost and conveyance ofall materials to site and all labour charges etc comoplete
Distembering Two Coats with Primer coat and Two Coat with OIL BOUND DISTEMBER over cement plastered surface including all charges etc complete
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of cement paint including cost of all materials and labour charges etc complete
Painting Two Coats with Enamel Paint over the old Iron Work over one coat of Primer including cost of all materials and labour charges etc complete
Construction of RWH
Provision for electrification works
Construction of Plinth Protection
Labour welfare fund @ 1.0%
Provision for Thirukkural Painting
Name board and Photo charges
3)Repairs to Library building at Vadaputhur Panchayat.
Weathering Course & Pressed tiles
Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works)
Doors Repair / Replacement
Windows (0.90 X 1.20)
White washing two coats using shell lime including cost and conveyance ofall materials to site and all labour charges etc comoplete
Distembering Two Coats with Primer coat and Two Coat with OIL BOUND DISTEMBER over cement plastered surface including all charges etc complete
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of cement paint including cost of all materials and labour charges etc complete
Painting Two Coats with Enamel Paint over the old Iron Work over one coat of Primer including cost of all materials and labour charges etc complete
Construction of RWH
Construction of Plinth Protection
Labour welfare fund @ 1.0%
Provision for Thirukkural Painting
Name board and Photo charges
4)Repairs to Library building at ANANGUR Panchayat.
White washing two coats using shell lime including cost and conveyance ofall materials to site and all labour charges etc comoplete
Distembering Two Coats with Primer coat and Two Coat with OIL BOUND DISTEMBER over cement plastered surface including all charges etc complete
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of cement paint including cost of all materials and labour charges etc complete
Painting Two Coats with Enamel Paint over the old Iron Work over one coat of Primer including cost of all materials and labour charges etc complete
Construction of RWH
Provision for electrification works
Construction of Plinth Protection
Labour welfare fund @ 1.0%
Provision for Thirukkural Painting
Name board and Photo charges
5)Repairs to Library building at Kalladikuppam Panchayat.
Wall Cracks
Special Ceiling Plastering in Cement Mortor 1 : 3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 Sqm.
Weathering Course & Pressed tiles
Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works)
Doors Repair / Replacement
Windows Repair / Replacement
Windows (0.90 X 1.20)
White washing two coats using shell lime including cost and conveyance ofall materials to site and all labour charges etc comoplete
Distembering Two Coats with Primer coat and Two Coat with OIL BOUND DISTEMBER over cement plastered surface including all charges etc complete
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of cement paint including cost of all materials and labour charges etc complete
Painting Two Coats with Enamel Paint over the old Iron Work over one coat of Primer including cost of all materials and labour charges etc complete
Construction of RWH
Provision for electrification works
Construction of Plinth Protection
Labour welfare fund @ 1.0%
Provision for Thirukkural Painting
Name board and Photo charges
6)Repairs to Library building at Mahadevi Mangalm Panchayat.
Ceiling Cracks
Special Ceiling Plastering in Cement Mortor 1 : 3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 Sqm.
Weathering Course & Pressed tiles
Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works)
Doors Repair / Replacement
Windows (0.90 X 1.20)
White washing two coats using shell lime including cost and conveyance ofall materials to site and all labour charges etc comoplete
Distembering Two Coats with Primer coat and Two Coat with OIL BOUND DISTEMBER over cement plastered surface including all charges etc complete
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of cement paint including cost of all materials and labour charges etc complete
Painting Two Coats with Enamel Paint over the old Iron Work over one coat of Primer including cost of all materials and labour charges etc complete
Construction of RWH
Provision for electrification works
Repair to toilet
Construction of Plinth Protection
Labour welfare fund @ 1.0%
Provision for Thirukkural Painting
Name board and Photo charges
7)Repairs to Library building at Melolakkuar Panchayat.
Weathering Course & Pressed tiles
Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works)
Doors Repair / Replacement
Windows (0.90 X 1.20)
White washing two coats using shell lime including cost and conveyance ofall materials to site and all labour charges etc comoplete
Distembering Two Coats with Primer coat and Two Coat with OIL BOUND DISTEMBER over cement plastered surface including all charges etc complete
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of cement paint including cost of all materials and labour charges etc complete
Painting Two Coats with Enamel Paint over the old Iron Work over one coat of Primer including cost of all materials and labour charges etc complete
Construction of RWH
Provision for electrification works
Labour welfare fund @ 1.0%
Provision for Thirukkural Painting
Name board and Photo charges
8)Repairs to Library building at Mukkunam Panchayat.
Ceiling Cracks
Special Ceiling Plastering in Cement Mortor 1 : 3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 Sqm.
Weathering Course & Pressed tiles
Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works)
Doors Repair / Replacement
Windows Repair / Replacement
Windows (0.90 X 1.20)
White washing two coats using shell lime including cost and conveyance ofall materials to site and all labour charges etc comoplete
Distembering Two Coats with Primer coat and Two Coat with OIL BOUND DISTEMBER over cement plastered surface including all charges etc complete
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of cement paint including cost of all materials and labour charges etc complete
Painting Two Coats with Enamel Paint over the old Iron Work over one coat of Primer including cost of all materials and labour charges etc complete
Construction of RWH
Provision for electrification works
Construction of Plinth Protection
Labour welfare fund @ 1.0%
Provision for Thirukkural Painting
Name board and Photo charges
9)Repairs to Library building at NEER PERUTHAGARAM Panchayat.
Floor Finishing
Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M.Sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
White washing two coats using shell lime including cost and conveyance ofall materials to site and all labour charges etc comoplete
Distembering Two Coats with Primer coat and Two Coat with OIL BOUND DISTEMBER over cement plastered surface including all charges etc complete
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of cement paint including cost of all materials and labour charges etc complete
Painting Two Coats with Enamel Paint over the old Iron Work over one coat of Primer including cost of all materials and labour charges etc complete
Labour welfare fund @ 1.0%
Name board and Photo charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Malaiarasan.V (BID ID -1374439)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_681675.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .