Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 302 4TH FLOOR SAI NILAYAM APARTMENT BESIDES JAGAN S COLLEGE GOMATHY NAGAR MAGUNTA LAYOUT NELLORE ANDHRA PRADESH 524003 | SPSR NELLORE | ANDHRA PRADESH | 524003 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 70 1784 POTTAKUZHI ROAD PACHALAM ERNAKULAM KERALA 682012 | ERNAKULAM | KERALA | 682012 | Admitted-Finance |
Tender Value
₹84.4 L
EMD Value
₹1.7 L
Closing Date
20 Jul 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Mechanical Engineer
V.O.Chidambaranar Port Authority, Tuticorin 628004
Dry docking and survey repair work of Pilot Launch M.L. Nalathanni
2023_VOCPT_159249_1
MEE/SE1MN/MAR/NALLA.DD/2023
Open Tender
Marine Works
Works
90 days
V.O.Chidambaranar Port Authority
Refer Tender Document
15 documents required · 15 mandatory
₹0
₹1.7 L
Yes
18 Aug 2023
29 Jun 2023
21 Jul 2023
29 Jun 2023
20 Jul 2023
29 Jun 2023
Amount
SCHEDULE - I a. Beaching the Pilot Launch M.L. Nallathani in a safe manner – 1time (Beaching Includes Providing chocks, arrangements of chocks, positioning the vessel, engaging labours& Providing necessary tools & tackles, ropes, boats, Backhoe Loaders and all other materials required for SAFE Beaching.)
b. Un-beaching the PilotLaunch M.L.Nallathani in a safe manner – 1time.(Un- beaching Includes positioning the vessel for un-beaching, engaging labours, Providing necessary tools and tackles, ropes, boats, Backhoe Loaders and all other material required for SAFE un-beaching.)
NOTE: (i) Materials, Machineries, boats, excavator/winches, wooden blanks, jack, ropes, rigging equipments and Man power required for the beaching and securing the vessel in position and also after un-beaching, shifting the vessel from un-beaching area to zone –B VOCPA or a suitable location within the Port limit are contractors scope. (ii) At least one mtr height to be maintained from bottom hull to ground to inspect /carry out the underwater repair works. (iii) It is the responsibility of the contractor to arrange suitable boats to shift the vessel from Zone - B or to receive the vessel from the place, where the Port is handing over the vessel for taking to Beaching site and back. Port may provide Master & full crew (as per harbor operation) depends upon the availability. Contractor has to arrange their own manning and risk for taking the launch for beaching and also handing over the vessel from beaching site to the place informed by the Port. Since the beaching site may be shallow draft / muddy, we/you can’t utilize the Pilot launch propellers for movement of the vessel to save the coolers / propellers from choking/ damage. Hence capable boats may be arranged to pull / tow the vessel to beach site/hand over to Port officials in deeper area or the place intimated by the Port.
SCHEDULE-II SURFACE PREPARATION AND PAINTING CHIPPING, BLASTING & PAINTING: Work description: Rate to be quoted for carrying out all the following works: *On completion of beaching / docking the vessel, immediately the sea growth on hull area / under water portions including propellers/rudders etc to be scrapped, cleaned safely and fresh water washed as per instruction of Port officials. After removal of sea growth, scrapping, chipping, sand blasting/grit blasting, painting works to be carried out on the entire vessel, viz. hull plate, main deck and its all accessories by using International (akzonobel) or sigma PPMG or Jotun marine grade paints. *All paintings to be carried out under the supervision of representative of paint manufacturer after making satisfactory surface preparation. Painting scheme including anti-fouling shall be guaranteed for 60 months from the date of application of paint. Certificate shall be furnished by the Paint Manufacture to furnish the same to VOCPA. DFT shall be maintained as per Paint manufacturer’s recommendation and the thickness shall be measured with suitable instrument and recorded and furnished. Painting thickness has been given approximately. However, paint maker rep’s or IRS recommendation may also be considered for paint application. *Prior painting all areas of the vessel to be properly grit/sand blasted, chipped, scrapped, thoroughly cleaned and fresh water washed as per the satisfaction of VOCPA/Paint manufacturer rep. *In engine room, cleaning may be done by using degreaser/chemical wash to ensure proper removal of oily/grease. On completion of said work, the surface preparation to be shown to representative of paint manufacturers/VOCPA officials. *Cost of copper slag/sand, marine paint, tools, crane, equipments, rigging stages, scaffolding, fresh water, covering of anodes, scuttles, equipments, laboursetc and electric power supply, removal & refitting of wooden &tyre fenders, wooden grating on main deck, electrical accessories like cables, light fittings, switch, & junction boxes etc.& any other obstructions, are to be included. *Damaged/corroded deck mountings such as air vent, filling pipe, sounding pipe, port hole lips, monkey deck, Navigation mast, WT door, bed plates of deck & engine room machineries, life raft, ladders, name & draft markings and flaps, sky light, all booby hatches (forepeak, compartment at middle, engine room entrance & rudder compartment entrance), air vent, foundation of deck fittings/machineries, structural supporting and all parts of the tug etc, are to be repaired or renewed as per steel renewal rate and painted as per given schedule. *After completion of finishing paint on deck fittings and mountings the names of the fittings and mountings shall be stenciled with its dedicated names. Paint shall be arranged by the contractor as per requirements.
A) Hull Plate under water work (Incl aft transom plate) Rate to be quoted for carrying out all the following works:
Sea growth scrapping and cleaning work
Sand/copper Slag blasting work – SA 2.5
High pressure fresh water washing 2 time (as per instruction)
Application of paintings
Marine epoxy Primer 1 coat (50 micron)
EpoxyMarine gradeAnticorrosion paint 2 coat (each 130 micron)
Tie coat (100 micron)
Antifouling 2 coat(120 micron each 1 coat brown & 1 coat red)
B) Hull Plate above water (Including aft transom plate) Rate to be quoted for carrying out all the following works:
Sand/copper Slag blasting work – SA 2.5
High pressure water washing 1 time
Painting 4 coats
Marine epoxy Primer 1 coat (50 micron)
EpoxyMarine grade Anticorrosion paint 2 coat (each 130 micron)
Polyurethane Marine Paint- 1 coat (Existing colour)
On completion of painting, Draft marks, Name in Tamil, English, Hindi to be painted on fwd (P&S sides) hull plate and aft side in transom plate as per the existing manner as per Port instruction. Also in super structure three sides, write “PILOT” in red colourreflective paint. Port emblem shall be printed and pasted on Port &stbs sides.
C) Main Deck Plate and accessories Rate to be quoted for carrying out all the following works:
Sand/copper Slag blasting work- SA 2.5
High pressure water washing 1 time
Painting 5 coats (As per schedule)
Marine epoxy Primer 1 coat (50 micron)
EpoxyMarine grade Anticorrosion paint 2 coat (each 130 micron)
Polyurethane Marine Paint- 1 coat (Existing colour)
D) Wheelhouse (Complete Super Structure including Mast) and Engine Room Casing Repair work has been given separately Rate to be quoted for carrying out all the following works:
Rate to be quoted for carrying out all the following works: FRP Work: Super structure top roof (monkey deck)/all sides (FRP) found damaged in some areas & leaky in various places. Top roof, area joining in main deck plating - all sides and defective parts to be repaired properly and FRP coating (in three coats) to be done on entire top roof side and ensure leak proof. (Especially in cable entry/fitting frame area). Provision for routing pipe, cable and search light operating rod to be removed &properly made in new and sealing to be done to prevent leaking of rain water/ while meeting waves at open sea. On completion of laying work, finally paint to be done.On completion of repairs, hose test to be shown. Work to be carried out as per VOCPA direction & satisfaction.
Buffing (removal) on existing paint surface
Washing and cleaning work.
Marine epoxy Primer (1 coat)
Top coat - white colour (Marine Polyurethane) 2 coat
E) Forepeak Compartment
Repair works: Rate to be quoted for carrying out all the following works: * Forepeak tank to be opened, remove the wastes/ropes/water from the tank, * FRP floor plate (approx 5 sq mtr) to be removed and after completion of work new FRP plate to be fitted in place as per instruction and satisfaction of VOCPA. (rate material + labour) * Entire tank including bilge area to be scrapped, chipped and cleaned with fresh water and to place for survey. * Gauging to be done. * Tanks are to be pressure tested and shown to the Surveyor. * Thin down & wasted areas inside the tank, bulkhead plates, supporting angles, stiffeners, supporting longitudinal frameetc to be renewed as per steel renewal rate. * Existing Vent pipe to be removed and renewed. * Provision to be made by fitting a 4-5 inches pipe for Water flowing from FP Tank to Fwd crew compartment a good marine quality new brass valve also to be provided. * Existing Ladder removed, replaced with new ladder as per steel renewal rate. * All vent pipe, bilge suction line to be checked and renewed and painted. Rate may be quoted by including consumables, paints, etc the above said act of works.
Painting 2 coats (Including bilges and entire area) Completion of entire repair work, the tank to be thorough cleaned, Internal surface area in Port, Stbd, FWD & AFT sides including ceiling, bilge area to be painted with marine epoxy primer and two coats of suitable marine grade paint.
Marine Epoxy primer 1 coat
EpoxyMarine grade Anticorrosion paint 2 coat (each 130 micron)
F) Forward crew compartment
Repair works: Rate to be quoted for carrying out all the following works: * Forward crew compartment to be opened, remove the waste materials, table, chairs and all other items, Entire area to be cleaned, scrapped, chipped andcleaned with fresh water and to place for survey. Gauging to be done. * FRP floor plate (approx 9 sq mtr) to be removed and after completion of work new FRP floor plate to be fitted in place as per instruction and satisfaction of VOCPA. (rate material + labour) Supporting frames also to be checked and repaired / renewed as necessary. * Thin down & wasted areas inside the Compartment, bulkhead plates, supporting angles, stiffeners, supporting longitudinal frameetc to be renewed as per steel renewal rate. * Storage tanks (Fuel oil & Fresh water tanks) available inside compartment to be shifted, cleaned and painted externally and also the bulkhead & side plating to be painted as per paint schedule. *On completion of work, tanks to be positioned and secured. * Repairs to be made if any corroded spot identified. Outer side of the tanks also to be painted and chipping & cleaning. *Before completing the FRP work, bottom bilge area to be chipped, scrapped and painted with 01 coat of marine epoxy primer and two coats of top coat. * Ladder to be checked and repaired/renewed as per steel renewal rate. * All vent pipe, bilge suction line to be checked and renewed and painted. * Rate may be quoted for all above activities including consumables, electrical accessories paints, etc the above said act of works.
Existing light fittings to be removed and fitted with new 02 nos. marine type LED light fittings with lights and 01 no. new Emergency (24 v) light fittings to be fitted. Defective switches to be renewed. All electrical defects for lighting to be rectified.
Painting 2 coats(Including bilges and entire area) Completion of entire repair work, the tank to be thorough cleaned, Internal surface area in Port, Stbd, FWD & AFT sides, Ceiling (transom plate) to be painted with marine epoxy primer and two coats of suitable marine grade paint.
Marine Epoxy primer 1 coat
EpoxyMarine grade Anticorrosion paint 2 coat (each 130 micron)
G) Aft Rudder Compartment& cofferdam tank
Repair works: Rate to be quoted for carrying out all the following works: * AFT Rudder compartment to be opened, remove the wastes, bail out the water, thoroughly cleaned, scrapped, chipped andcleaned with fresh water and to place for survey. Gauging to be done. * Thin down & wasted areas inside the tank, bulkhead/transom plates, supporting angles, stiffeners, supporting longitudinal frameetc to be renewed as per steel renewal rate. At present all the supporting angles and top plate etc found badly corroded. Same to be renewed as per steel renewal rate. * Ladder to be renewed as per steel renewal rate. New ladder fabrication and fitting as per existing type. * All vent pipe, bilge suction line to be checked and renewed and painted. * Existing light fittings to be removed and fitted with new 02 nos. marine type light fittings with tube lights and 01 no. Emergency (24 v) light fittings to be fitted. *Cofferdam manhole plate to be removed and new manhole plate to be fabricated and fitted with new joint as per steel renewal rate. (Enclosed space between engine room and rudder compartment). Inside area to be cleaned, inspected and facilitate for Class inspection. Repair if any to be attended as per Surveyor satisfaction. *Rate may be quoted by including consumables, paints, electrical accessories etc the above said act of works.
Painting 2 coats (Including bilges entire area & cofferdam: Completion of entire repair work, the tank to be thorough cleaned, Internal surface area in Port, Stbd, FWD & AFT sides, ceding, transom, bottom plate to be painted with marine epoxy primer and two coats of suitable marine grade paint.
Marine Epoxy Primer 2 coat (since sea water always enter inside the compartment, epoxy coat to be applied to prevent rusting of steel plates) each coat 50 micron
Anticorrosion 1 coat (each 130 micron)
H) Engine Room Compartment
Rate to be quoted for carrying out all the following works: Engine room areas upto floor plate level, Port, stbd side shell plating, fwd& aft bulk head plates, supporting angles, foundation of all machineries, engine room ceiling,floor plates, various sizes of Pipe lines, starter panel, Main & Aux Engines control panels, junction boxes, air duct, Battery charger, battery boxes, complete air trunking, valves, cable tray, ladders, emergency escape route with ladder, inside of sky light doors and area, blower inside part, hand rail, all sides of fuel oil service tanks (both DO Service tank to be shifted and cleaned, painted properly and position back after paining). Above said all areas to be thoroughly cleaned with degreaser or suitable medium. Damaged or missing supporting angles to be renewed as per steel renewal rate. After thorough cleaning with degreaser and soap water one coat of epoxy marine primer and three top coats of suitable marine paint (white color or as per instruction). Rate inclusive of cleaning agent, consumables, paints, labor etc.
Rate for cleaning with chemical/degreaser or suitable medium plus fresh water washing and all other surface preparation works.
Marine Epoxy Primer 2 coat (since sea water always enter inside the compartment, epoxy coat to be applied to prevent rusting of steel plates) each coat 50 micron
Anticorrosion 1 coat (each 130 micron)
Rate to be quoted for carrying out all the following works: Bilge water to be completely bail out/transferred from the engine room safely as per instruction of Port officials. Engine room Bilge bottom plating (from floor plate level to bottom) including various pipe line available under the floor pate level, various valves, fittings, all main engine bottom sides & foundation, aux machineries’ foundation base, Pump foundation, bilge keel, frames, angles, to be scrapped, chipped, wire brushed, chemical/ degreaser Washing, mobbed, cleaned and painted with primer and suitable marine paint for bilge application. On completion of work, floor plating to be properly placed in its respective place and secured with screws. Supportingangle found damaged / missing, same to be renewed as per steel renewal rate. After thorough cleaning with degreaser and soap water one coat of epoxy primer and three anticorrosive coats of suitable marine paint with suitable color to be applied. Rate inclusive of cleaning agent, consumables, paints, labor etc.
Rate for cleaning with chemical/degreaser or suitable medium plus fresh water washing and all other surface preparation works.
Marine Epoxy Primer 2 coat (since sea water always enter inside the compartment, epoxy coat to be applied to prevent rusting of steel plates) each coat 50 micron
Anticorrosion 1 coat (each 130 micron)
Supply & installation of new aluminum chequered floor plates upto 6 mm thick. Damaged / missing floor plate in engine room to be replaced by new Alu plate. Rate inclusive of removal of existing plattes, angles, supply, providing new plates, supporting angles, screw and consumables etc..
NOTE: Fresh Water (only to be used for washing purpose), Sand, copper slug, Scrapping tools, Compressors & accessories required for blasting, Marine Paints, painting sprayers, brushes etc and necessary equipment, labors, scaffolding, stages, ladder and machineries are contractors scope. Rate has to be quoted by considering all requirements.
SCHEDULE-III STEEL PLATE FABRICATION RENEWAL WORK
A) Hull & Deck Plate Renewal work: Work description -Rate to be quoted for carrying out all the following works:
Crop and Renewal of Steel Plate as per Surveyor/VOCPA recommendation. Renewal of finished steel structure includes hull plates, main deck plating, various size angles, stiffeners, beams, various size flat bars, mooring eyes, corroded base of pumps and other machineries in Engine room, deck and Goosenecks, air vent, engine room air vent port &stbd side with closing arrangement, angle of curvature, deck plating, Fender structure, fender securing flat bars, beams, brackets, girders, hatch covers, water tight doors in fuel tanks and fresh water tanks, other tanks, bilges etc. and where ever it is necessary and as instructed by Port officials with M.S plates and sections at all heights and locations of the vessel (required surface preparation). Plate thickness – 6 mm. After welding a hose down test (or any sort of test as instructed by the Class Surveyor/VOCPA) should be conducted in presence of Port Authority & Class Surveyor. Steel to be supplied by contractor: Ship Build quality steel acceptable by IRS Class to be used. Necessary Test Certificate issued by IRS for steel plates (various required sizes as per requirement/available in the vessel) to be furnished to Port Authority& IRS. Apart from deck/hull plating renewal, fabrication work also involved in steel renewal. Some of the works mainly involved in fabrication, where the labour part is higher than the steel cost. Considering the above, contractor is required to quote the rate accordingly. Contractors may visit the vessel prior quote the rate. Contractor may be quoted the steel rate by considering cost of fabrication, approved steel plates (new), angles in various sizes, stiffeners, channels, any steel items, labour cost, consumables, Removal & refitting of any parts of the vessel, paneling, any equipments/items, electrical items viz. cables, cable tray, switches, light fittings, junction boxes, control boxes, and any sort of electrical or mechanical appliances also pipes, valves, wash basin or any sort of obstruction etc. RE-GUTTING& DE-GUTTING CHARGES WILL NOT BE PAID SEPARATELY. Note: Steel materials, consumable, labours and all allied materials and staging if any are contractors scope
The entire hull area, main deck or any other area, Underneath of Bilge suction pipe area, bottom shell, skeg, collision bulkhead, cofferdam, E/R, transom, bulkhead, all tanks & compartments, suspected area identified by the IRS/VOCPA to be checked for thickness with Ultrasoinc Thickness gauging. Gauging shall be conducted by the IRS approved firm as per the IRS Surveyors requirement. Report shall be furnished to Class Surveyor & VOCPA as per statutory requirements. Payment will be made at actual.
*Crop and Renewal of Steel Plate as per IRS Surveyor/VOCPArecommendation. Renewal of finished steel structure includes hull plates, main deck plating, bollards, all tanks, mooring eyes, corroded base of pumps and other machineries in Engine room and Anchor stand, life raft stand, corroded base, Goosenecks, air vents, fabrication and fitting of 04 nos. engine room air vent with closing mechanism, angle of curvature, thinned down hatch covers/its coaming, air vents, sounding pipes, wasted structural members of foundation and part of various machineries on deck / engine room, Fender structure in fwd area, air blower parts, wooden fender securing flat bars around the vessel, tyre fender securing rings, ladders, Mast, Navigation light stand bottom plate, Nav. Mast, Deck light stand, beams, brackets, girders, booby hatches, hatch covers, water tight (man hole) doors in fuel tanks and fresh water tanks, other tanks, bilges, blower drum plate etc. and other areas recommended by the IRS Surveyor/VOCPA with M.S plates and sections thickness 6 mm. Steel rate inclusive of steel plate, stiffeners, flat bar, angles, channels or all sort of steel requirements. * After welding, necessary test should be conducted as per the instruction of surveyor and in presence of Port Authority. * Steel to be supplied by contractor: Ship Build quality, IRS Class approved steel plate Grade “A”. The necessary test Certificate (IRS approved) to be produced to Port Authority/IRS. * Steel renewal to be done as per Surveyor &VOCPA satisfaction.Payment will be made as per actual quantity renewed. Note: Steel materials, consumable, labours and all allied materials, staging and removal & refitting of removal & refitting of various paneling, electrical items, cable tray, junction /switches/panel boards and all associated fittings and or any obstructions while carrying out the plate renewal works, if any are contractor’s scope. Considering all said activities &visit the vessel at VOC Port and rate to be quoted for carrying out the said works.
B) Other Deck Work
E/R Goose neck vents (located in main deck) to be completely renewed with closing arrangements and painted.(Partly insert to be placed). Locking/closing arrangement to be made by using SS stud and ss butterfly nuts or suitable one. (4 Nos.)
Goose neck Vents pipes located in main deck to be removed and renewed. All vents to be painted as per main deck scheme. (8 nos.)
Defective/wasted Engine room Blower casing to be renewed, and painted -1 primer coat + 2 top coats Rate inclusive of removal of blower casings and refitting after repair & renewal consumables and all required materials etc.
Fabrication & installation of new Nav mast: Existing Mast (complete) from bottom along with foundation and foundation base welded in Main deck (entire) to top end to be renewed and painted. Rate inclusive of removal of existing mast, electrical cables, Nav lights, connections etc consumables and all reqd materials etc..Steel& pipe as per steel renewal rate. Rate includes regutting& degutting charges. After completion of entire renewal work, mast to be erected p[properly and all installation like lights, cables etc to be fitted properly as per satisfaction of VOCPA.
Al existing Bulkhead light fitting frame, deck light & flood light renewal work.- 16 Nos. Rate inclusive of removal of existing light sets, re-fitting of new units, providing electrical connections, renewal of base plates etc (as per steel renewal rate) consumables and all reqd materials etc..
Tyre fender holding ring to be fabricated and fitted around the vessel to tie up the tyre fenders. - 40 Nos Rate inclusive of removal of all existing rings, re-fitting of new units consumables and all required materials etc.
18 nos. Good quality 407/equivalent vehicle’s old tyres (size may be confirmed from master before supply) to be supplied and secured with new PP rope in suitable size in the rings as per instruction of Master.(Port, Stbd and aft)
Existing fender box fitted on fwd area to be removed and new box with adequate supporting angle to be fabricated and welded in fwd area and 01 No. good quality radial tyre (if 3-4 ft dia air craft old tyre or equivalent new box type rubber fender) to be fitted on FWD fender box in a space provided and secured properly as per existing manner.Steel renewal as per steel rate. Rate inclusive of tyre, consumables steel etc..
Existing Air conditioner outdoor unit fitting foundation frame to be removed and new frame to be fabricated and and fitted as per direction of VOCPA.. To be painted after fabrication. Rate includes removal of existing outdoor unit, electrical connections, frames and fitting of new one with 03 coats of painting. Position of new outdoor unit as per instruction. Steel renewal as per steel rate. Rate inclusive of necessary consumables and all reqd materials etc..
Aluminum anode renewal work. (To be renewed as per the requirement after inspection). Rate includes removal of existing anodes, repairing /renewal of holding frames and supply and fitting of new anodes etc. Rate inclusive of necessary consumables and all reqd materials etc. New anode composition certificate to be furnished and should comply with statutory requirements.
Round Aluminum anode renewal work. (To be renewed as per the requirement after inspection) Rate includes removal of existing anodes, repairing /renewal of holding frames and supply and fitting of new anodes etc. Rate inclusive of necessary consumables and allreqd materials etc.
Life raft bed (holding frame) to be renewed. Rate includes removal of existing stand and fitting of new one etc and painting as per paint schedule.
8 Nos. Life buoy stand renewal works Rate includes removal of existing stand and fitting of new one etc and painting as per paint schedule.
Standard skylight glass window material (Aluminium frames) 4 nos. both Port &stbd side to be renewed. Glass size:- Dia- 200 mm, Thickness – 8mm Frame size :- Flange Outer Dia – 300mm Flange Inner Dia – 250mm, Flange Thickness – 10mm with glass lock ring Rate includes removal of existing windows and fitting of new windows, toughened glass, fasteners and all consumables etc.
After beaching the all hand rails to be removed from the boat and safely kept. Rusted part of hand rail on Fwd (both port and stbd side) to be thoroughly buffed, cleaned and painted as per instruction. On completion of entire repair works on main deck and buffing & cleaning, the hand rail to be welded on pad provided on main deck. Bottom pad to be newly fabricated and welded on main deck. Finally, hand rail to be placed on the pad and welded. Pipe length approx. 50 mtrs, No. of pads to be fabricated and welded is 40 nos.(approx) Also hand rail fitted on both side accommodation (FRP) shall be checked thoroughly and repaired and fitted back. Rate inclusive of necessary consumables and all reqd materials etc. Payment will be made actual.
Damaged and rusted part of hand rail on Aft side to be completely renewed withnew SS pipes as per instruction. Approx. renewal of Hand rails (Dia-2.5”, support SS pipe dia may be 1.5 inch) Total length approximately estimated to 50 mtr. Finally, hand rail to be placed on the pad and welded. Rate inclusive of necessary consumables and all reqd materials etc. Payment will be made actual.
Ballast tank vent pipe to be renewed. (length-0.5 mtr, Dia-2.5 inches) as per steel renewal / pipe renewal rate
Existing Sounding pipeline (length-0.5 mtr, Dia-2.5 inches) in various tanks to be renewed and caps to be newly fitted. (SS caps with thread) as per steel renewal / pipe renewal rate
Search light frame to be fabricated to suit new fitting and painted with primer. Search light rotating mechanism to be checked and shown to the satisfactory operation. Rate inclusive of all materials, consumables etc.
Fuel oil storage tank to be cleaned. - 1 NO. F.O Storage tank provided in the fwd compartment shall be opened,, HSD to be transferred, removal of sediments, cleaning etc. Rate inclusive of necessary consumables, bolt & nut, joints and all reqd materials etc. Vent, filling line and out let line, drain valve to be checked and repaired. Tank air vent and filling pipe line to be checked& renewed as per steel renewal / pipe renewal rate with its cap etc. any defect noticed, same to be renewed. Drain valve and discharge valve to be opened, thoroughly overhauled and fitted back. (irf requires renewal, same to be done as per renewal rate given) Rate may be quoted for all needed items, consumables, machining , lapping etc. Work to be carried out with satisfaction of VOC.
Fuel oil service tanks (P&S) to be cleaned. Rate inclusive of opening of manhole, transferring of diesel oil to barrels, removal of sludge, cleaning etc. Barrel will be supplied by the Port. HSD will be taken by the Port. Prior undocking the vessel, HSD to be transferred to service tank by the contractor as per instruction of port officials. Rate inclusive of necessary consumables, bolt & nut, joints and all required materials etc. Vent, filling line and out let line, and valves, drain valve to be checked and repaired. (Vehicle will be provided by Port but loading & unloading is contractor scope both time i.e., after beaching and before un-beaching) ) Tank air vent and filling pipe line to be checked with its cap etc. any defect noticed, same to be renewed. Drain valve, Filling valve and discharge valve to be opened, thoroughly overhauled and fitted back. Rate may be quoted for all needed items, consumables, machining, lapping etc. Work to be carried out with satisfaction of VOC.
Fabrication & installation of new Booby Hatch - 03 nos.
Complete Booby hatches (03 nos.) for entering the FP Tank, engine room & rudder compartment) to be removed and newly fabricated including locking arrangement, rubber beadings etc and welded.Rate inclusive of fabrication cost, removal of existing one, rubber beading, SS Locking butterfly nuts, studs, consumables etc.Steel rate as per steel renewal cost.Open& closing marking to be done after completion of painting as per man deck paint scheme.Satisfactory opening & closing and water tightness (hose testing) to be shown to IRS/VOCPA. Finally WT shall be shown to IRS/VOCPA.
* 01 no. Booby hatch for entering the under deck compartmentto be checked & repaired completely. * Complete repairs/renewal on entire/partly of booby hatch plating including, side plates, top plate, retainer channel, door, door locking support, handle, coaming, door hinges, Door locking arrangements (Stainless steel wing nut lock) etc. to be done as per steel renewal rate. * Inside and outside of entire booby hatches to be chipped and painted as per deck painting schedule. * Water tight rubber beading / packing to be renewed with good quality suitable marine use new rubber beadings. * open & close Marking to be done after completion of painting as per man deck paint scheme * Satisfactory opening & closing and water tightness (hose testing) to be shown to IRS/VOCPA. Rate inclusive of necessary consumables, bolts, nuts, rubber beading, painting, steel plates, supporting angles etc and all required materials etc.
Complete Engine room Blower& driving motor: * The engine room mushroom blower to be removed from the fibre made engine room canister. * complete overhauling to be done on Engine room blower unit and both forward and reverse directions of rotation to be provided. Charges for any repairs/renewal on blower parts/body, (partly or completely as per direction of IRS/Port) steel renewal, both elect & mech works on motor, fan, casing etc, FRP work etc may be included. * The mushroom head to be made free to rotate in order to close and open and the function of rotation have to shown to IRS surveyor / Port official. If any defect noticed, same to be rectified/renewed. If required, opening & closing mechanism including long threaded stud, nut and all to be renewed. Rate shall be included repair, renewal, machining, fabrication, FRP works etc.. *Impeller balancing to be done. Any repairs on impeller, shaft same to be attended and renew the impeller or shaft if necessary. Should not be any vibration/noise while running.* *If impeller/blade found beyond repairable, same to be renewed. The blower trunk thickness and supporting & holding plates thickness of blower motor to be checked and renewed if thickness is reduced less than 2 mm. * The blower meshes to be renewed along with mesh holding ring. After the repair work of mushroom blower, the same to be fitted back in position and bolted with engine room fibre canister and the bolted portion have to be sheathed with fibre coating. * Suitable capacity Blower motor (existing motor capacity - 2.2 KW, 3 HP 3phase Ind Motor) along with Motor starter to be renewed with new one and installed. All cables to be renewed with new approved cable from main board to motor. ON/OFF panel to be checked any defect may be rectified including renewal of ON/OFF switch etcand painted. Rate shall be quoted for all the above work including spares and consumables. Cost may be included winding or any electrical defect etc Impeller balancing, machining to be done. * Rate inclusive of consumables, spares, supporting angles, fabrication cost, machining, new motor, starter, welding, crane facility, shifting, fabrication and all sorts of all mech & elect, machining, re-conditioning, including FRP - fibre repair works. Completion of repairs, entire blower area to be cleaned and painted inside & outside as per deck paint schedule. Steel renewal as per steel rate. Any machining or reconditioning or renewal of any part required to be done to complete the scope of work and to satisfy the VOCPA, same has to be done by the contractor without extra cost. Satisfactory operation of the blower including motor to be shown to IRS/VOCPA officials.
Note: Steel work, machining work if any and allied Fibre work and fibre are contractor scope. Material and fasteners are contractor’s scope.
SCHEDULE-IV WOODEN REPAIR WORKS
Wooden fenders, holding Bolts and Nuts renewal works. (good marine quality suitable wood)Approx renewal may be 45mtrs. (approx size 120 mm x 200 mm) Existing wooden fenders (Port, Stbd& Aft side) to be removed from its position for gauging, steel renewal and painting of plating. After completion of gauging, steel renewal and painting, apart from damaged wooden blank, new wooden fender (in good quality - marine use - dimension as per existing size) to be supplied made suitable size and fitted around the vessel as per existing manner. Before that, the fender holding plates (bar) to be repaired& renewed and painted. Wooden fenders are also to be properly painted as per suitable paint coats to prevent affect by termite/ salty water on all surfaces. Wood primer termite proof coat to be applied before fitting. Rate inclusive of supply of good marine quality wood, carpentry, steel fabrication, holding down long bolts & nuts, painting etc. Payment will be made actual.
Wooden paneling, ceilings renewal works. (side and top ceilings in pilot cabin at aft portside)approx area (50 sq mtr) Existing wooden panelingalongwith insulation to be removed. Good marine quality 12 to 18 mm approx thickness (marine type) panel material suitable for ship accommodation as per class requirement,inside supporting wooden frames with insulation materials to be supplied and fitted as per existing manner. Adequate supporting wooden frames to be ensured. Works carry out as per instruction of Port. Aft side Corner side cup board to be fabricated as per existing Rate inclusive of carpentry, supply of new wooden panel, mica, plywood, insulation materials, fasteners, removal & refitting of light fitting, electrical items, boxes, navequipments, wheel handle etc. Colour to be chosen with consultation of Master.
Wheel house partition to be removed above air conditioner (Including door and cupboard). Explore the possibility of removing entire patrician to facilitate the Pilot to see the vessel movement by sitting in his seat. Cabin alteration to be made as per instruction of vessel staff. A/C indoor unit to be removed, secured and new indoor unit to be fitted as per direction of VOCPA.Rate inclusive of necessary consumables, carpentry, electrician work, shifting of equipments and all required materials etc..
Wheel house forward view glass to be removed and fitted with new toughened marine quality suitable glass with same size and manners with new rubber packing. Rate inclusive of necessary consumables side rubber sealings and all reqd materials etc. FWD view glass top portion cooling paper to be pasted for 6 inches and name of the vessel to be written.
Both side small glass windows with aluminium beading (existing open & close type) just adjacent to view glass may be renewed with new glass permanent closing type. Rate inclusive of toughen glass, alu frame, consumables etc.
Existing 02 nos. window (open & close type) with aluminium channel provided on Port &Stbd shall be removed and renewed with new one. Good quality aluminium frame and good quality toughened glass with opening & closing mechanism as per existing type shall be procured and fitted as per satisfaction of Port. Finally Cooling paper to be fixed on all window glasses. In side area paneling to be done.Rate inclusive of necessary consumables, new Porthole (window set) carpentry and all required materials etc.
All other cabin windows (on all sides) rubber packings to be renewed. Windows to be dismantled and serviced. Cooling paper to be fixed on all window glasses and door glass. Fixed glass rubber packing to be renewed. Frames to be painted suitably. In side area shall be covered with paneling material. Rate inclusive of necessary consumables, carpentry, electrician and all required materials etc. Cooling paper also to be pasted on fixed window glasses - 2 nos.
Wheel house cabin floor vinyl mat/polyurethane mat (min thickness 3mm) good marine quality (using for ship accommodation)to be supplied &renewed.Contractor shall remove the existing one and properly pasted after thorough surface preparation. Rate inclusive of removal of existing mat, surface preparation, necessary consumables, carpentry, Resin, adhesive solution, electrician work and all reqdmaterials etc. area approx 30 sq mtr.
All the following works to be carried out. Seating arrangement to be modified. (Present seating with table to be removed). *02 nos. (twin) PU Foam bus seat (executive) with reclining facility, arm rest preferable SS for Pilots to be supplied and fitted. Adequate height to be made in base and to fix the chairs in consultation with Master. *Stbd side, new wooden sofa length of 7’ L x 2.5’ B (approx) with foam cushioning with foam back rest (detachable) to be fabricated and fitted. *Under sofa, cupboard provision to be provided with SS locks and SS handle for keeping life jackets etc. Model to be shown before commencement of work. *In front of sofa, writing tables also to be fabricated with SS handleand fitted as per instruction. *Corner place to be facilitated with good mica plywood box type table. *10 nos. SS Handles to be fitted in various places to hold by master/staff as per direction of Port staff to prevent falling during rolling of the vessel. *1 no. Master seat &1 no. co-pilot seat in suitable size, height to be newly supplied and installed (ss post) in respective location as per Master instruction. Seat should be ergonomically and separately fixed. *Operator stand, area to be cleaned, covered with paneling material for good looking as per instruction of Port. Rate inclusive of all materials, SS Post, seat cost, necessary consumables, carpentry work, and all reqd materials etc.
SCHEDULE-V MECHANICAL WORK (Contractor has to take utmost care for carrying out repair works on rudder, propeller and under water works. If any defect noticed after undocking or during guarantee period, the contractor has to rectify the defect and if required, the contractor has to beach / dock the vessel for repairs during the guarantee period at their cost. Hence quality of spares, bearings, cutlass bushes, all sort of works including machining/reconditioning works etc and workmanship to be ensured as per marine standard/requirement to ensure trouble free running of the vessel) Following works to be carried out as per satisfaction of IRS.
Propeller system: 2 sets (PORT & STBD) Rate to be quoted for following all works: *Complete Propeller system (Port &Stbd) to be overhauled as per instruction. Propeller to be removed, propeller shaft to be withdrawn and cleaned thoroughly for Surveyor’s inspection. * Deteriorated shaft bearings to be renewed. * All cutlass bushes (Inside engine room, intermediate and A-bracket) are to be removed and renewed with new cutlass bushes (good marine quality) in both side propeller systems. Maker certificate/required documents to be furnished to IRS * Both Propellers to be checked for its pitch and balanced. * Propeller to be polished. Dynamic balancing of propellers and trueness of the shafts to be shown to IRS/VOCPA. * Dye Penetrant test or any test informed by the IRS Surveyor onpropeller shafts and propellersor any other parts to be done and assembled back. * Suppose the shaft /other parts became worn out in some places, as per instruction of VOCPA/IRS, metal build up, welding machining and reconditioning and all sort of works to be carried out and the charges may include. * Rate to be included all sort of repairing, machining, buildup material,reconditioning of shaft all sorts of work to complete the scope of work as per satisfaction of IRS /Port officials. * Post renewal bearings, shafting clearances, rudder neck clearances to be checked, noted and furnished to IRS /VOCPA. Since the underwater equipments repairs can only be carried out at the time of docking/beaching, contractor should carry out all sorts of repairs in perfect manner and rate shall be quoted accordingl
Rudder system: 2 sets (PORT & STBD) Rate to be quoted for following all works: * Complete Rudder system (Port &Stbd) to be overhauled as per instruction. Both Rudder and rudder shaft to be lowered. * Trueness of rudder shaft to be checked. * Dye Penetrant test or any test informed by the IRS Surveyor onrudder shafts to be done. Suppose both / any one of rudder shaft / other parts became worn out excessively in some places, as per instruction of VOCPA/IRS, metal build up, welding machining and reconditioning work to be carried out and the charges may include. * Rudder shaft holding collars to be checked for wearness, if the clearness is beyond the limit the same to be renewed. * Thrust bearing to be checked and also renewed with new good quality bearing. * Complete overhauling to be done on Hydraulic ram. (defective spares to be renewed as necessary) Deteriorated rudder bearings to be renewed. * Rubber hoses – 6 Nos to be renewed & new rudder shaft bush – 2 Nos and glands along with gland bolts and nuts to be renewed and assembled back. * Post renewal bearings, shafting clearances, rudder neck clearances to be furnished. * On completion of entire work, satisfactory steering operation to be shown to Port /IR Class Surveyor. * Any steel renewal including fabrication of any parts as per steel renewal rate. * Emergency steering to be made operational. Handle to be supplied. Opening provision to be made for operating the emergency steering * Rate to be included supply of new bearing, fabrication of any parts and all sorts of worksto complete the scope of work as per satisfaction of IRS /Port officials.* Since the underwater equipments repairs can only be carried out at the time of docking/beaching, contractor should carry out all sorts of repairs in perfect manner and rate shall be quoted accordingly. * On completion of work, emergency steering ramp, handle to be provided and operation to be shown to IRS/VOCPA. * All sorts of work to complete the scope of work as per satisfaction of IRS /Port officials Since the underwater equipments repairs can only be carried out at the time of docking/beaching, contractor should carry out all sort of repairs in perfect manner and rate shall be quoted accordingly.
Attached sea water pump provided on both port and stbd Aux. engines to be renewed with new suitable capacity pumpsalongwith new belt and suitable pulleys. Any alteration required for (foundation) placing new pump also to be made properly. Rate inclusive of all materials, new pump, aligning, installation, new belts, rubber hoses, clips, necessary consumables and all required materials etc. Base plate repaired/renewed to suit new pump.
Both main switch board (in E/room) to be completely checked, serviced. If any defect noticed, same to be attended. # Defective, electrical parts, all type of switches, indication lamps, volt meter, ammeter etc to be renewed with new one. (mainly 32 amps, 3 phase 415 v change over rotary switch , Power supply indicators, 3 ph 3 pole 32 amps MCB, Volt meter, Ammeter, frequency meter in digital, Blower contacts 415 v, 3 phase multifunction energy meter to be renewed with good marine quality). If any items other than above requires to be renew for completing the scope of work may also to be renewed. # Finally, the MSB Box to be cleaned and painted with 1 coat of primer and 2 coat of top coat. Any mechanical repair work or damaged parts to be renewed. All required spares, consumables, elect works if required etc are contractor’s scope. Operation of main DB & Emergency DB to be shown as per satisfaction of IRS/VOCPA.
# Cladding work: Both main engines & Aux Engines exhaust pipes existing old glass wool/insulation/tin sheet to be removed. # Exhaust pipe lagging newly installed by putting new suitable insulation material and metal cladding in engine room. Any leakages to be rectified as per instruction. # Silencer also to be checked and repaired. # If exhaust pipe and silencer found damage, or badly corroded, same to be renewed. Also care to be given on the exhaust pipe welded on hull part on both side to ensure no leakage. # Painting to be done on exhaust pipes after fitting of new metal sheet. Work to be carried out as per satisfaction of IRS/VOCPA. All bolts & nuts (HT) in the exhaust pipe connections exists in all connections to be renewed with new one. Aluminium paint also be applied on completion of work. Note: Insulation material, new good quality, heat resistant metal sheet, pipes, fabrication, cladding sheet, labour, spares and consumable are contractor supply.
Remote Accelerator cable (3 mm flexible cable) to be renewed. Rate inclusive removal of existing wires, necessary consumables, pulleys and all required materials etc. Satisfactoryoperation to be shown.
Gear box cable (3 mm flexible cable) to be renewed. Rate inclusive removal of existing wires, necessary consumables, pulleys and all required materials etc. Satisfactory operation to be shown.
Quick closing valve along with the entire mechanism provided on both D.O Service tanks (4 valves). Wire for easing gear arrangement of to be renewed. On deck, existing piping provision also to be renewed with new one.Satisfactory trials to be shown. Rate inclusive removal of new quick closing valves, wires, necessary consumables, pulleys, pipes, and all required materials etc
Sea chest and its gratings (P&S) to be de-rusted and painted as per under water hull paint scheme. Main sea connection strainer including entire sea chest in both sides to be scrapped, cleaned and to be painted. - 02 nos. strainers, primer 1 coat, anticorrosion 1 coat. If any damages identified or fabrication needed due to excessive corrosion, inside sea chest or it’s adjacent and recommended by IRS/VOCPA, same to be rectified as per steel renewal rate. Top coat green paint 1 coat (strainer body) (If required strainer plate to be renewed after inspection). Air vent valve on both sides to be renewed with approved new valve/cocks as per existing size. Since this is the underwater work and can be done only at the time of docking, contractor shall be carried out entire satisfaction of strainer works and quote the rate accordingly.
Suitable 02 nos. Semi rotary pump to be renewed with new pump in engine room & fwd. (For bilges & FF) rate inclusive of supply, fitting, piping works and consumables and satisfactory trials.Piping work to be done to suit the existing system. Damaged piping to be removed and new pipe with suitable size to be fitted.
New fuel oil transfer pump with motor (0.5 HP) to be procure and install at suitable place with piping & valve connections at engine room.Piping work to be done to suit the existing system. Rate inclusive of supply, fitting and consumables, valves, pipe lines, hoses and satisfactory trials.
New Bilge pump with motor (1.5 HP) to be procured and fit at suitable place at engine room or crew compartment so as to transfer the water if main bilge pump is under repair.Piping to be connected in suitable location, valves to be fitted accordingly. Piping work to be done to suit the existing system. Rate inclusive of new suitable capacity motor driven pump, starter box, pipes, piping work, new valves, electrical cables, electrical items, consumables etc. Location to be chose as per ship staff instruction. Rate inclusive of consumables and satisfactory trials also.
Supply of new pump drive mechanism & supply installation of new pump: The main engine belt driven bilge pump mechanism for driving the bilge pump is beyond repairable. New suitable drive mechanism to suit new pump and taken the main engine drive to be supplied and installed in respective place. After installing the unit, same to be coupled with new Bilge pump (as per existing cap) and provide new belts and satisfactory trials to be show. Modification work providing new piping, which will be connect with bilge line, sea water line and fire line to be made with required valves provision also to be done in consultation of VOC Port officials. Piping work to be done to suit the existing system. Rate inclusive necessary consumables, modification works, supply of pipe, pipe routing, required new valves, supply of new pump having suitable capacity, new connection mechanism, piping alteration, spares and all required materials etc. New pump having suitable capacity to be chosen to transfer the bilges from e/r to overboard.
PIPE RENEWAL:: (Removal, renewal & re-fitting work) Pipes in the dedicated systems viz. bilge system, sea water, Fire fighting, main & aux engine system etc in the engine room, deck, inside compartments, tanks are to be renewed with Schedule 80 if the existing pipe found holed/corroded badly. The charges for the removal & renewal of pipes (Rate Per Mtr) may kindly be quoted. The actuals will be paid as per the renewal quantity. Renewed pipes shall be painted one coat of primer and two coat of finish paint. Rate inclusive of Pipes (nipples, coupler, bends (short and long), new flanges, joints (different types), fasteners such as S.S bolt, SS nut, SS stud, washers, labor or any other consumables are Shipyard Supply. The rate for removing and refitting of paneling and obstructions while renewing the pipes shall also be included. Payment will be made actual renewal only. Given quantity is approx. Payment will be made on actual renewal.
Upto 20 NB
21 NB to 40 NB
Both engine room Hatch& door plate to be repaired properly / renewal work. - Door - 4 lock, -2 hinge, -1 handle for 4 door (E/R top) etc. While removal of Main Engines, Aux Engines, and the door to be removed and kept safely. All sorts of repair work in the casing body including repair of doors and all other parts to be done as per satisfaction of VOC Port. On completion of engine works and refitted in engine room, both the doors to be properly placed and secured with new fasteners. Rate inclusive of all FRP work, removal & refitting, painting as per main deck paint schedule and all sort of repairs and both small man entry doors, consumables etc
Providing fire hydrant on main deck. Rate may be quoted for supply of new hydrant, pipe line, routing from fire pump, valve (brass / SS) with handle. Rate inclusive necessary consumables, pipes, laying of new pipe connections, flanges, valves, hydrant new and all required materials etc
Providing Wooden gratings main deck area passage. Existing wooden gratings to be removed. Fabricate new wooden gratings as per existing size and shape with good quality wood and install on main deck with proper securing as per instruction of VOCPA. (Welded & locked). The gratings to be painted atleasttwo coats of wood primer properly to prevent salty weather and termite erosion.Rate inclusive of wood in good quality, carpenter, consumables, paints etc. length approx size in each side 7 m x 1.1 mtr. Work to be carried out in consultation with Port as per satisfaction.
Supply, installation and commissioning of new rudder angle indicator. Satisfactory trials to be shown on completion of work. Rate inclusive necessary consumables, providing suitable new indicator, connections, and all required materials etc.
Supply and Install of new navigational panel board - 24V. Since provision is available for ONLY AC system in the boat, new panel with DC system to be installed in suitable place for Navigation lighting panel in wheel house. Rate shall be included supply of new panel board, providing AC & DC connection, all electronic, electrical devices, indication lamps, IR Class approved cables, alarms, routing of cables and all mech & elect consumables to complete the work. Satisfactory operation including alarm to be shown to Surveyor. Work to be carried out as per Survey requirement.
Supply and installation of general Alarm with Push button (24V)
Supply, installation and assembling of Potentiometer and tiller arm. Rate inclusive of supply of complete unit and installation, cable laying, switches, connection from paneling and all allied works and consumables. Satisfactory operation to be shown on completion of installation.
01 no. Anchor to be removed from the vessel # Anchor to be completely chipped, scrapped painted as per hull paint scheme. Swivel, D shackle to be renewed. Necessary repairs to be attended. # Anchor rest with foundation found corroded. Same to be renewed and fitted in new on main deck as per existing manner. As per steel renewal rate. # Anchor windlass, hand operated in suitable type to be newly fabricated and installed. Windlass to be mounted on FWD side. Foundation to be renewed. # Further, Anchor to be secured with 50 mtrs of rope with windlass and satisfactory operation to be shown. Rate inclusive of consumables, D shackles, bolt, nuts, and material cost consumables etc. Finally 3 coats of paint to be applied on windlass, anchor, stand and all parts. Rate inclusive of fabrication cost, gears, handle, complete structures etc.
While the Aux Engine is not working, sea water enters thro’ exhaust opening provided on hull side just above the water line. Since free board of the boat is lesser and due to rolling, sea water enters into the engine thro’ exhaust opening and create damages. To overcome the issue exhaust pipe of both aux engine to be modified. Both Aux Engine exhaust pipe to be modified suitably to prevent sea water entering into the engine through exhaust pipe. Rate inclusive necessary consumables, pipes, laying of new pipe connections, rectification methodology, flanges, valves, and all required materials etc
FOLLOWING ENGINE ROOM VALVES TO BE OVERHAULED Work scope: All thevalves to be removed from the various piping system in the vessel, dismantled, completely overhauled, valve seat checked and skimmed if necessary, pressure tested and showed to the satisfaction of Port officials/IRS and fitted back in position after leak test proper painting. Note: Rate to be quoted for including all consumables, repair work, machining if required. Pr. testing equipment is contractor’s scope.
Port side and Starboard side Main Sea suction valves (main valve connected to sea chest / gallery) to be removed, dismantled, valve seat checked and skimmed if necessary, pressure tested and showed to the satisfaction of Port officials/IRS and fitted back in position. Valve Size: 75 NB Gate valve.
Both M/E attached sea water pump suction line valves.
Quick closing valves to be serviced, wire travelling pulleys to be renewed and ensure proper function from remote operation for proper closing and opening. Provision like pipes and drive to be fitted on main Deck to operate all QC Valves. QC Valve 25 NB – 2 No. QC Valve 40 NB – 2 No. Material and all consumables for the above works are contractor scope.
Both Aux Engine attached sea water pump suction line valves.
Sea waterline intermediate valves.
Overboard valves.
Main sea line connection valves.
Bilge suction line valves.
Bilge delivery line valves.
Diesel oil service tank inter connection valves.
Diesel oil storage tank inter connection valves.
Renewal of OBD and other valves stub pieces.
All the bilge strainer box (6 nos) in E/R, FP, Crew accmn, rudder compt to be opened & cleaned and boxed back with new joint and consumables. Any damages may be rectified.
If any existing above said valves found beyond repairable during testing/inspection, same to be renewed with good marine quality new brass/gun metal valves with accessories. (various sizes in any location) Cost includes supply of new brass valve, consumables, fitting etc. (optional) Cost may be claimed as per actual.
SCHEDULE-VI ELECTRICAL WORKS
Wheel house tube light (LED light - marine type) with fitting to be renewed. removal of existing damaged lights, supply of marine type suitable fittings with bulbs, installation , wiring, consumables etc
All electrical wiring (various type &capacity) inside and outside wheel house including engine room, mast wirings to be checked for value and submit the report. Defective cables to be renewed with suitable water proof IR class approved cable as per existing type and specification with suitable marine type IP ratings for various system. All electrical cables in engine room and mast to be secured properly with ties. Cost involves removal of existing cables, supply of approved marine type suitable cables, installation , wiring, consumables etc. (mainly cables are Class 5, 2 core round, water proof IP rating. Same may be confirmed during site visit)
Suitable new heavy duty complete wiper set suitable for Marine Crafts to be supplied (should not supply local set) and installed. (1 no. for keeping spares) Cost involves supply, consumables, providing switch, installation etc
Suitable good quality Electrical switches (damaged) in various locations, various capacity to be renewed.(As per requirement).
Suitable good quality Electrical sockets (damaged) various capacities to be renewed. (As per requirement).
All 7 nos. navigation lights (type approved) to be renewed with new fittings including bulbs. Order may be placed after verify the existing one andconfirm by the MASTER. (Partly exposed lights 4 nos and fully exposed lights 3 nos).Rate inclusive of removal of existing mast, cable, supply of new fittings, installing, cable laying, connections, switches, etc
02 nos. navigational light showing main engine running indication i.e. red & green light to be supplied & installed on top of the FRP super structure The steel part for placing the lamp has to be fabricated newly and installed on the both side of the FRP top of the wheel house super structure
01 no. 24 volt DC Distribution board and 01 no. 230 v Distribution Board located in Wheel House to be completely serviced. Defective MCBs to be renewed. Also any defect noticed shall be rectified. Board shall be properly cleaned and painted with 2 coats. Work carried out as per instruction of VOC Port officials.
Existing switch board in wheel house to be renewed with new one in suitable locations. Switch box, indication lamps, Switches for various instruments, lightings, Electric horn, wiper, AIS, AC, VHF, search lightetc (name to be mention) to be newly installed in wheel house as per Port instruction. Rate inclusive of box, switches, wiring connection etc. consumables.
New electric horn, (loudable) suitable for boats to be procured and to fit at suitable place. Rate includes supply & installation and consumables.
The existing search light with fitting alongwith rotating mechanism to be renewed with new search light. Lighting Type - Halogen, Body - Aluminium, all weather proof, IP 55 rate, 220- 240 volt, 50 hz. Range -600 mtrs< New search light to be installed in proper way, search light adjusting stem penetration path to wheel house (through fibre body) to be properly secured with fibre mat finish in order to avoid water leakage to wheel house from wheel house top. The height of the search light also to be increased/decreased as per requirement. Suitable Switches with electric connections to be provided. Spares, cable, elect switch, new light with bulb, fabrication of frame, installation and consumable are contractor scope.
Wheel house wooden door alongwith frame to be removed and new marine good quality wooden door with frame to be fabricated and fitted properly. New toughened glass with min 6 mm thick to be provided in the door (apprx size 2 x 2.5) Good quality stainless steel mortise lock, quick closer and handles to be supplied and installed. Marine quality Wooden door, door mountings, lock & keys and consumables are contractor supply.
Supply and Installation of 06 sets marine Deck Light Fitting set (U type fitting) - complete set with LED bulb. Payment wil be made at actual. Rate inclusive of fittings, bulbs, switch, installation, electrical & mech works)
Supply and Install of suitable Top Mounted Control Lever (Type: LM-V-4) in wheel house and new cable connections to be given with engines & gear boxes. Work is sensitive in nature as the control lever is vital for maneuver the launch (i.e for engine throttling, ahead /astern movements). Work to be carried out as per satisfaction of master. Satisfactory operation to be shown. Rate inclusive of supply of new control lever, installation, electrical & mech works)
Supply of two nos. suitable Digital Tachometer and install in Wheel House for monitoring both main engine speed (rpm). (lighting with switch to be provided to enable to see the rpm during night timings) Work also includes providing tachometer, proximitysensor, cables and all other accessories etc. Tachometer shall be fixed in a convenient place in wheel house as directed by the Port.
01 nOs of 100 watt LED fitting for marine service to be supplied & fitted on top of The monkey deck . Suitable fitting also to be fabricated and sitted on accomodation
SCHEDULE-VII - Wheel house & Communication equipments
Supply & installation of 01 no. new echo sounder. After docking/beaching the vessel, the existing probe may be checked. If it is found defective, same to be renewed. Rate inclusive of supply of newly class approved (acceptable by IRS Class) echo sounder unit complete and installation, cable laying, switches, connection from paneling and all allied works and consumables. Satisfactory operation to be shown on completion of installation.
HARKAMAL MARITIME INDUSTRIES PRIVATE LIMITED
UNOTECH Marine Engineering and Services Private Limited
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .