| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.2 CrAccepted-AOC | ₹3.2 Cr | 1 | Accepted-AOC L-1 |
| 2 | 2₹3.5 Cr+₹26.7 L (8.26%)Rejected-Finance JANAKPURI C 3 146 JANAKPURI 110058 | JANAKPURI | DELHI | DELHI | 110058 | ₹3.5 Cr+₹26.7 L (8.26%) | 2 | Rejected-Finance 2 |
| 3 | 3₹3.8 Cr+₹59.8 L (18.5%)Rejected-Finance N A | ₹3.8 Cr+₹59.8 L (18.5%) | 3 | Rejected-Finance 3 |
| 4 | 4₹3.8 Cr+₹60.7 L (18.8%)Rejected-Finance H NO 199 SECTOR 56 GURUGRAM HARYANA 122011 | GURUGRAM | HARYANA | 122011 | ₹3.8 Cr+₹60.7 L (18.8%) | 4 | Rejected-Finance 4 |
| 5 | 5₹4.1 Cr+₹84.0 L (26.0%)Rejected-Finance 1391 SECTOR 57 PART II 122003 | GURUGRAM | HARYANA | 122003 | ₹4.1 Cr+₹84.0 L (26.0%) | 5 | Rejected-Finance 5 |
| Sl No | Description | Qty | Unit | P C Gupta and Co L3 | M/s Kunal Construction L3 | JS SYNERGIES PRIVATE LIMITED L4 | VIKASH PROBUILD PRIVATE LIMITED L1 | Tomar Construction Company L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | 1. Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORTandH specifications | 618 | Sqm | 15 ₹9,270 | 60 ₹37,080 | 20 ₹12,360 | 14.68 ₹9,072.24 | 11 ₹6,798 Lowest |
| 2.00 | 1. Providing and laying 30mm - 45 mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG - 30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications | 25 | cum | 12,000 ₹3,00,000 | 11,000 ₹2,75,000 | 9,000 ₹2,25,000 | 7,314.29 ₹1,82,857.25 Lowest | 8,100 ₹2,02,500 |
| 3.00 | Providing and laying 75mm - 100 mm dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG 30 @ 4.5% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete, as per technical clause No. 505 of MORTandH specifications | 56 | Per Cum | 10,000 ₹5,60,000 | 10,500 ₹5,88,000 | 7,200 ₹4,03,200 | 5,628.12 ₹3,15,174.72 Lowest | 6,200 ₹3,47,200 |
| 4.00 | Hiring of 50 HP high capacity sewerage submersible pump set with DG set 125 KVA including making connection with motors and panel commissioning with hydra complete in all respect including HSD including loading, unloading and transportation as directed by Engineer –in charge. | 7 | Per day | 24,000 ₹1,68,000 | 1,10,000 ₹7,70,000 | 30,000 ₹2,10,000 | 17,857.87 ₹1,25,005.09 | 15,000 ₹1,05,000 Lowest |
| 5.00 | Plugging of 4.25 x 2.05 Mtr Open Storm Water Drain at upstream and downstream as per Direction by Engineer-In- Charge complete in all respect | 1 | Complete Job | 24,000 ₹24,000 | 4,70,000 ₹4,70,000 | 30,000 ₹30,000 | 19,750.18 ₹19,750.18 Lowest | 3,00,000 ₹3,00,000 |
| 6.00 | Providing and fixing factory-made wet cast high strength precast reinforced cement concrete box culverts of Width X Height as per BOQ. Box culverts shall be steam cured in a controlled environment and manufactured by using high performance self-compacting concrete of M- 50 grade using Fe 500 D grade TMT steel reinforcement bar. The precast box culvert shall consist of special in-built inserts at appropriate location for safer and faster installation. Design should confirm to IRC/BIS standards/ Guidelines/Codes furthermore taking into consideration expected handling and erection stresses etc. Rubber gasket required to ensure water-tight character and for jointing of each segment flange bolts with zinc coating and round washer or equivalent nut-bolt connection will be supplied as part of the box culvert. Any international guideline such as Japan and EURO codes may be followed in case of any gap in IRC/BIS standard and guideline. The design of the box culvert dully vetted from Institute of IIT/NIT or any reputed recognized University as per Directed by Engineer-In-Charge. The precast culvert should be designed considering super imposed dead load, live load including dynamic impact, tractive and braking forces and earth pressure as per IRC:6-2017. Class AA loading or Class 70R Load live load should be considered (whichever is higher) for design. Box culvert shall have inter-locking plug-socket arrangement. Precast manufacturer shall be certified for ISO 9001, ISO 14001 and ISO 45001. The precast factory should have its own NABL approved QA-QC laboratory within plant premises to ensure daily testing of precast products. Product shall be manufactured using RO water for durability criteria. Reinforcement cage shall be fabricated with automated cage making unit within plant premises having necessary machines like cutting and bending for getting consistent rebar production. Final product testing laboratory to test load carrying capacity. 2.60 x 2.60 Mtr | 220 | Per Mtr. | 1,61,500 ₹3,55,30,000 | 1,57,000 ₹3,45,40,000 | 1,73,000 ₹3,80,60,000 | 1,37,387.16 ₹3,02,25,175.2 Lowest | 1,47,500 ₹3,24,50,000 |
Tender Value
₹3.8 Cr
EMD Value
₹7.7 L
Closing Date
14 Jan 2026, 5:00 pmClosed
VIKRAM SINGH
Storm Water Drainage
Providing and fixing precast culvert
2025_HRY_493267_1
20254529D0F8 DFC1 467B 9E75 7D9F4CA2F817717001
Open Tender
Civil Works
Works
120 days
Gurugram
2 documents required · 2 mandatory
₹1,180
₹7.7 L
Yes
19 Mar 2026
26 Dec 2025
15 Jan 2026
26 Dec 2025
14 Jan 2026
26 Dec 2025
1. Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORTandH specifications
1. Providing and laying 30mm - 45 mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG - 30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications
Providing and laying 75mm - 100 mm dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG 30 @ 4.5% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete, as per technical clause No. 505 of MORTandH specifications
Hiring of 50 HP high capacity sewerage submersible pump set with DG set 125 KVA including making connection with motors and panel commissioning with hydra complete in all respect including HSD including loading, unloading and transportation as directed by Engineer –in charge.
Plugging of 4.25 x 2.05 Mtr Open Storm Water Drain at upstream and downstream as per Direction by Engineer-In- Charge complete in all respect
Providing and fixing factory-made wet cast high strength precast reinforced cement concrete box culverts of Width X Height as per BOQ. Box culverts shall be steam cured in a controlled environment and manufactured by using high performance self-compacting concrete of M- 50 grade using Fe 500 D grade TMT steel reinforcement bar. The precast box culvert shall consist of special in-built inserts at appropriate location for safer and faster installation. Design should confirm to IRC/BIS standards/ Guidelines/Codes furthermore taking into consideration expected handling and erection stresses etc. Rubber gasket required to ensure water-tight character and for jointing of each segment flange bolts with zinc coating and round washer or equivalent nut-bolt connection will be supplied as part of the box culvert. Any international guideline such as Japan and EURO codes may be followed in case of any gap in IRC/BIS standard and guideline. The design of the box culvert dully vetted from Institute of IIT/NIT or any reputed recognized University as per Directed by Engineer-In-Charge. The precast culvert should be designed considering super imposed dead load, live load including dynamic impact, tractive and braking forces and earth pressure as per IRC:6-2017. Class AA loading or Class 70R Load live load should be considered (whichever is higher) for design. Box culvert shall have inter-locking plug-socket arrangement. Precast manufacturer shall be certified for ISO 9001, ISO 14001 and ISO 45001. The precast factory should have its own NABL approved QA-QC laboratory within plant premises to ensure daily testing of precast products. Product shall be manufactured using RO water for durability criteria. Reinforcement cage shall be fabricated with automated cage making unit within plant premises having necessary machines like cutting and bending for getting consistent rebar production. Final product testing laboratory to test load carrying capacity. 2.60 x 2.60 Mtr
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
[12.50.1]Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. 1. Fixed to steel windows by welding [Through Rate]
[17.14.3]Granular Sub-Base with Close Graded Material - (Table:- 400-1) Plant mix method Construction of granular sub-base by providing Material as per Grading III (Table 400-I of MORTandH 5th revision) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per technical clause 401 of MORTandH specifications 3. Grading III material [Through Rate]
[17.24]Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per technical clause 406 of MORT&H specifications [Through Rate]
[17.4]Scarifying Existing Bituminous Surface to a depth of 50 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead up to 1000 metres, as per technical clause 202 of MORT&H specifications [Through Rate]
[17.5.3]Compacting Original Ground 3. Compaction of Earthwork Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate]
[3.1.18]By Mechanical Transport including loading, unloading and stacking 18. Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead up to 10 km for all lifts, complete as per directions of Engineer-in-charge. [Rate]
[34.31]Reinforced Cement Concrete Crash Barrier Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified. i) Excavation and backfilling are incidental to work and not to be measured separately. ii) Rate for RCC M 20 may be taken from chapter on super structure. [Through Rate]
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate]
[4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. [Through Rate]
[5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate]
[5.25]Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. [Through Rate]
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate]
[6.1.4]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.30.2]Centering and shuttering including strutting, propping etc. and removal of form for 2. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. [Through Rate]
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_571608.xls
BOQ • 0.30 MB
777806Z146384.pdf
Additional Documents • 4.70 MB
OT0146384.pdf
Other Document • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .