Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAdmitted-Finance | ₹4.8 L | L1 | Admitted-Finance |
| 2 | L2₹5.3 L+₹55,545 (11.6%)Admitted-Finance | ₹5.3 L+₹55,545 (11.6%) | L2 | Admitted-Finance |
| 3 | L3₹5.4 L+₹58,807 (12.3%)Admitted-Finance | ₹5.4 L+₹58,807 (12.3%) | L3 | Admitted-Finance |
| 4 | L4₹5.4 L+₹61,445 (12.8%)Admitted-Finance | ₹5.4 L+₹61,445 (12.8%) | L4 | Admitted-Finance |
| 5 | L5₹5.4 L+₹62,890 (13.1%)Admitted-Finance | ₹5.4 L+₹62,890 (13.1%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Manzoor Ahmad Teeli L6 | M/S M D TRADERS L5 | MALIK POWER SOLUTION L9 | Reaching Rays Infra Electricals L1 | GENIUS ELECTRIC WORKS L8 | M/S SHEIKH ELECTRICALS L3 | SHARK CONSTRUCTIONS ELECTRICAL MECHANICAL ENGINEERS SUPPLIERS L7 | NAZEEM ELECTRICALS SUPPLIERS L2 | M/S SHEIKH ELECTRICALS DIALGAM ANANTNAG L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply, installation, testing, commissioning including Loading, Transportation , insurance, Unloading, Carriage and Delivery at Site of 100 kVA, 11/0.433 kV Distribution Transformer, Energy Efficiency Level-II, redesignated as Level 1 energy efficient, Aluminium wound, oil filled, with LT cable termination box with detachable Aluminium Gland Plate. | 1 | No | 1,90,000 ₹1,90,000 | 1,69,000 ₹1,69,000 | 2,30,000 ₹2,30,000 | 1,85,000 ₹1,85,000 | 1,99,000 ₹1,99,000 | 1,69,000 ₹1,69,000 | 1,93,811 ₹1,93,811 | 1,70,000 ₹1,70,000 | 1,60,000 ₹1,60,000 Lowest |
| 2.00 | Supply,installation,testing,commissioning of 11 kV, G.O AB Switch , 3-phase, 3-Pole, 200A | 1 | Set | 11,000 ₹11,000 | 8,000 ₹8,000 Lowest | 15,000 ₹15,000 | 11,000 ₹11,000 | 11,700 ₹11,700 | 9,000 ₹9,000 | 9,500 ₹9,500 | 10,000 ₹10,000 | 9,000 ₹9,000 |
| 3.00 | Supply,installation,testing,commissioning of 11 kV Horn Gap Fuse Set 3-Phase, 3-Pole, 200Amp. | 1 | Set | 3,000 ₹3,000 | 3,300 ₹3,300 | 7,000 ₹7,000 | 5,000 ₹5,000 | 4,300 ₹4,300 | 3,700 ₹3,700 | 4,500 ₹4,500 | 2,600 ₹2,600 Lowest | 4,000 ₹4,000 |
| 4.00 | Supply,installation,testing,commissioning of Gapless Surge Arrestor,9 kV,10 kA, LA with (polymer) housing, Station Type Heavy Type | 1 | Set | 4,500 ₹4,500 | 3,500 ₹3,500 Lowest | 7,000 ₹7,000 | 8,500 ₹8,500 | 3,500 ₹3,500 Lowest | 4,500 ₹4,500 | 5,500 ₹5,500 | 4,500 ₹4,500 | 5,000 ₹5,000 |
| 5.00 | Providing and Fixing of G.I.channel Iron ISMC100x50x6mm) with 50X8 mm back clamps without drilling/punching holes in the poles.. | 56 | Kg | 122 ₹6,832 | 119 ₹6,664 Lowest | 200 ₹11,200 | 160 ₹8,960 | 135 ₹7,560 | 135 ₹7,560 | 124 ₹6,944 | 125 ₹7,000 | 135 ₹7,560 |
| 6.00 | Providing and Fixing of GI channel Iron ISMC 75x40x6 mm) with 50X8 mm back clamps without drilling/punching holes in the poles including transformer belt | 144 | Kg | 122 ₹17,568 | 119 ₹17,136 Lowest | 200 ₹28,800 | 160 ₹23,040 | 135 ₹19,440 | 135 ₹19,440 | 124 ₹17,856 | 125 ₹18,000 | 135 ₹19,440 |
| 7.00 | Providing and fixing of Angle Iron 45x45x5 mm 10 ft long duly painted for Transformer Belt | 21 | Kg | 90 ₹1,890 Lowest | 120 ₹2,520 | 200 ₹4,200 | 150 ₹3,150 | 135 ₹2,835 | 130 ₹2,730 | 124 ₹2,604 | 125 ₹2,625 | 135 ₹2,835 |
| 8.00 | Supply, Laying Testing and commissioning of PVC Cable 185 mm sq. of standard make with ISI Insulation. | 40 | Mtr. | 350 ₹14,000 | 330 ₹13,200 | 500 ₹20,000 | 500 ₹20,000 | 390 ₹15,600 | 350 ₹14,000 | 440 ₹17,600 | 300 ₹12,000 Lowest | 400 ₹16,000 |
| 9.00 | Providing and fixing of Al thimbles of 185 sq mm | 4 | No | 100 ₹400 | 50 ₹200 | 155 ₹620 | 80 ₹320 | 60 ₹240 | 35 ₹140 Lowest | 50 ₹200 | 80 ₹320 | 200 ₹800 |
| 10.00 | Supplying and installation of sub station earthing by excavation of earth pit of dia 650mm and depth 3000mm, installation of earthing pipe of 40mm nominal bore and 4 mm wall thickness and length 2.5m long as per IS 1239. GI Strip for neutral earthing of size 25mm x 3 mm for connection of Transformer Body, GO Set and Lightning Arrestor as per IS 2629/85, GI Nuts and Bolts, refilled with earth enhancement materials and earth chamber made of brick messonary with RCC Slab cover | 3 | No | 2,200 ₹6,600 | 1,600 ₹4,800 | 11,000 ₹33,000 | 3,500 ₹10,500 | 2,500 ₹7,500 | 1,200 ₹3,600 Lowest | 3,100 ₹9,300 | 1,400 ₹4,200 | 1,500 ₹4,500 |
Tender Value
₹8.7 L
EMD Value
₹17,314
Closing Date
2 Jun 2026, 4:00 pmClosed
EXECUTIVE ENGINEER ED ANANTNAG
OFFICE OF THE EXECUTIVE ENGINEER ED ANANTNAG
Creation of 100kVA Sub Station SWM plant at kehripora MC Kokernag
2026_PDD_310004_1
11/EDA OF 2026-27
Open Tender
Electrical Works
Turn-key
20 days
ANANTNAG
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
EXECUTIVE ENGINEER ED ANANTNAG
₹17,314
3 Jun 2026
15 May 2026
3 Jun 2026
15 May 2026
2 Jun 2026
15 May 2026
15 May 2026 - 2 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, installation, testing, commissioning including Loading, Transportation , insurance, Unloading, Carriage and Delivery at Site of 100 kVA, 11/0.433 kV Distribution Transformer, Energy Efficiency Level-II, redesignated as Level 1 energy efficient, Aluminium wound, oil filled, with LT cable termination box with detachable Aluminium Gland Plate. | 1 | No | 1 | ₹1 |
| 2 | Supply,installation,testing,commissioning of 11 kV, G.O AB Switch , 3-phase, 3-Pole, 200A | 1 | Set | 1 | ₹1 |
| 3 | Supply,installation,testing,commissioning of 11 kV Horn Gap Fuse Set 3-Phase, 3-Pole, 200Amp. | 1 | Set | 1 | ₹1 |
| 4 | Supply,installation,testing,commissioning of Gapless Surge Arrestor,9 kV,10 kA, LA with (polymer) housing, Station Type Heavy Type | 1 | Set | 1 | ₹1 |
| 5 | Providing and Fixing of G.I.channel Iron ISMC100x50x6mm) with 50X8 mm back clamps without drilling/punching holes in the poles.. | 56 | Kg | 1 | ₹56 |
| 6 | Providing and Fixing of GI channel Iron ISMC 75x40x6 mm) with 50X8 mm back clamps without drilling/punching holes in the poles including transformer belt | 144 | Kg | 1 | ₹144 |
| 7 | Providing and fixing of Angle Iron 45x45x5 mm 10 ft long duly painted for Transformer Belt | 21 | Kg | 1 | ₹21 |
| 8 | Supply, Laying Testing and commissioning of PVC Cable 185 mm sq. of standard make with ISI Insulation. | 40 | Mtr. | 1 | ₹40 |
| 9 | Providing and fixing of Al thimbles of 185 sq mm | 4 | No | 1 | ₹4 |
| 10 | Supplying and installation of sub station earthing by excavation of earth pit of dia 650mm and depth 3000mm, installation of earthing pipe of 40mm nominal bore and 4 mm wall thickness and length 2.5m long as per IS 1239. GI Strip for neutral earthing of size 25mm x 3 mm for connection of Transformer Body, GO Set and Lightning Arrestor as per IS 2629/85, GI Nuts and Bolts, refilled with earth enhancement materials and earth chamber made of brick messonary with RCC Slab cover | 3 | No | 1 | ₹3 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Tendernotice_2.pdf
PDF • 1.00 MB
Tendernotice_3.pdf
PDF • 18.33 MB
BOQ_1003185.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .