| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹70.8 LAccepted-AOC | 1 | Accepted-AOC lowest rates | |
| 2 | 2₹82.8 L+₹12.0 L (16.9%)Rejected-AOC | 2 | Rejected-AOC higher rates | |
| 3 | 3₹1.7 Cr+₹99.7 L (140.8%)Rejected-AOC A 45 NTPC VIDYUT NAGAR DADRI GB NAGAR 201008 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201008 | 3 | Rejected-AOC higher rates | |
| 4 | 4₹2.5 Cr+₹1.8 Cr (257.6%)Rejected-AOC B 1 1ST FLOOR AL SHAMS RESIDENCY KANKE ROAD NEAR CHANDANI CHOWK BHITHA RANCHI JHARKHAND 834008 | RANCHI | JHARKHAND | 834008 | 4 | Rejected-AOC higher rates |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
3 Oct 2023, 11:00 amClosed
XEN M and P
RGTPP Khedar Hisar
Overhauling of fans, RAHs and associated ducting installed in Unit-II, RGTPP during forthcoming overhauling of 600 MW Unit-II, RGTPP, HPGCL, Khedar, Hisar.
2023_HBC_286021_1
07/MP-633/RGTPP/2023-24
Open Tender
Power/Energy Projects/Products
Works
60 days
RGTPP Hisar
as per attached tender document
2 documents required · 2 mandatory
₹1,180
₹1.4 L
Yes
12 Dec 2023
29 May 2023
4 Oct 2023
29 May 2023
3 Oct 2023
29 May 2023
Part-A (as per main scope of work)
Lumsum Rate for Overhauling of fans, RAHs and associated ducting installed in Unit-II, RGTPP during forthcoming overhauling of 600 MW Unit-II, RGTPP, HPGCL, Khedar, Hisar
Part-B (Unit rates for purpose of variation in scope of work ) :
Replacement/Re-fitting/ reversal of RAH Hot end baskets after jet washing
Replacement/Re-fitting/ reversal of RAH intermediate hot end baskets after jet washing
Replacement/Re-fitting/ reversal of RAH cold end baskets after jet washing
Repairing of Hot End/ Intermediate End/Cold End Basket
Replacement of bypass seal fixing angle
Replacement of support bearing of RAH (scope of work will be as per Annexure-V/I)
Replacement of guide bearing of RAH (scope of work will be as per Annexure-V/II)
Replacement of overrun clutch assembly of gear box of RAH
Servicing of seal air blower
Repairing of duct by patch work of size above1'X1'
Repairing of duct by running meter welding
Repairing of duct by patch work of size upto 1'X1'
Replacement of fabric expansion joint (ir-respective of width) (scope of work will be as per Annexure-V/III)
Replacement of metallic expansion joint (ir-respective of width) (scope of work will be as per Annexure-V/III)
Complete Servicing of gates / dampers (scope of work will be as per Annexure-V/IV)
Laying of cooling water lines/ lub oil line upto 75 NB dia
Replacement of DE/NDE bearing of motor of ID/ PA Fans
Replacement of blades of ID Fan
Replacement of blades of FD Fan
Replacement of blades of PA Fan
Replacement of complete bearing assembly along with impeller of ID/FD/PA Fan including removal & re-fixing of the blades. (scope of work will be as per Annexure-V/V)
Servicing/overhauling & bearing replacement of complete bearing assembly along with impeller of ID/FD/PA Fan. (scope of work will be as per Annexure-V/VI)
Painting of hand railing,gate,beam,structure duct etc. Note:Paint is in scope of HPGCL.
Replacement of bearings of Seal Air Fan
Replacement of impeller of Seal Air Fan
Man hour rate ( including T&P, gas, consumables etc.) : Skilled labour/ welder
Man hour rate ( including T&P, gas, consumables etc.) : Semi-Skilled labour
Man hour rate ( including T&P, gas, consumables etc.) : Un skilled labour
POWERTECH ENGINEERING CO
UNITED ENGINEERING
APEX PROJECTS
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .