Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.7 LAccepted-AOC PLOT NO D 2 COAL DEPOT FOSBERY ROAD SEWRI E MUMBAI 400 015 | MUMBAI | MUMBAI | MAHARASHTRA | 400015 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹31.7 L+₹6.0 L (23.4%)Rejected-AOC 1 16 70 SAI NAGAR COLONY ALWAL SECUNDERABAD 500 015 | SECUNDERABAD | HYDERABAD | TELANGANA | 500015 | L2 | Rejected-AOC Rejected | |
| 3 | L3₹35.7 L+₹10.0 L (39.1%)Rejected-AOC 67 A HAFIZALI BAHADUR KHAN MARG SURAJI COMPOUND BEHIND KHATAU MILL BYCULLA W MUMBAI 400011 BRITE INDUSTRIES 67 A HAFIZALI BAHADUR KHAN MARG SURYAJI COMPOUND BEHIND KHATAU MILL MUMBAI | MUMBAI | MAHARASHTRA | 400011 | L3 | Rejected-AOC Rejected |
Tender Value
Refer Docs
EMD Value
₹75,200
Closing Date
26 Apr 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE KARANJA
CWE KARANJA NAVAL STATION KARANJA URAN RAIGAD-400704
MANNING AND OPERATION OF 22 KV HT INSTALLATION AT NAD EXPLOSIVE AREA AND TUNIR AREA AT NAVAL STATION KARANJA
2021_MES_423446_2
84073-K/E8
Open Tender
Miscellaneous Works
Item Rate
334 days
NAVAL STATION KARANJA
Please refer tender documents
8 documents required · 8 mandatory
₹500
Yes
CWE KARANJA
₹75,200
Yes
29 Apr 2021
10 Apr 2021
28 Apr 2021
10 Apr 2021
26 Apr 2021
14 Apr 2021
60 days
Amount
Manning and operation of Sub stn L, DBM 3 and Kasthan Workshop (NAD Explosive area), HT 22 KV electric supply sub station including attending the complaints by employing One No Skilled electrician with uniform for shift of 08 Hours in Three shift in a day from 0600 hrs to 1400 Hrs, 1400 Hrs to 2200 and 2200 Hrs to 0600 Hrs including sunday and holidays for monitoring and recording of all parameters requried, including operating all the incoming and outgoing electrical control switchs of LT/ HT sides, replacing blown off fuses on HT sides and communicating with Engineer-in-Charge and also to concern JE E/M and including carraying out daily routine, periodical maintenance and attending breakdown etc., complete all as specified and as directed by Engr-in-charge. (a) List of equipment / Control gears installed at Marshaling yard/Control room as under: (i) HT 22 KV VCB / MOCB Panels - 03 Nos (ii) Step down transformer 315 KVA-02 Nos and 500 KVA -01 No. (iii) LT control panel -03 Nos (iv) APFC panel -03 Nos
Manning and operation of Sub Stn "Sut Torpedo", "SUT", "PCB Repair Bay", "Uran Workshop",' ATIME" and "EMR" (NAD Non Explosive Tech area .HT 22 KV electric supply sub station including attending the complaints by employing One No Skilled electrician with uniform for shift of 08 Hours in Three shift in a day from 0600 hrs to 1400 Hrs, 1400 Hrs to 2200 and 2200 Hrs to 0600 Hrs including sunday and holidays for monitoring and recording of all parameters requried, including operating all the incoming and outgoing electrical control switchs of LT/HT sides, replacing blown off fuses on HT sides and communicating with Engineer-in-Charge and also to concern JE E/M and including carraying out daily routine, periodical maintenance and attending breakdown etc., complete all as specified and as directed by Engr-in-charge. (a) List of equipment / Control gears installed at Marshaling yard/Control room as under: (i) HT 22 Kv VCB / MOCB Panels - 03 Nos (ii) Step down transformer 315 KVA-02 Nos, 500 KVA -01 No and 1000 KVA -01 No (iii) LT control panel - 03 Nos (iv) APFC panel -03 Nos
Manning and operation of Sub stn 'B', Sub Stn 'E', Sub Stn 'FODC', Sub Stn 'Proof House', Sub Stn 'H', Sub Stn N, Sub Stn C, Sub Stn Karanja Lagoon, Sub Stn NNN, 84 Leading, 36 Lt Cdr, NAD Pump House and Sub Stn Community Hall for NAD and Tunir Residential area HT 22 KV electric supply sub station including attending the complaints by employing One No Skilled electrician with uniform for shift of 08 Hours in Three shift in a day from 0600 hrs to 1400 Hrs, 1400 Hrs to 2200 Hrs and 2200 hrs to 0600 Hrs including sunday and holidays for monitoring and recording of all parameters requried, including operating all the incoming and outgoing electrical control switchs of LT /HT sides, replacing blown off fuses on HT sides and communicating with Engineer-in-Charge and also to concern JE E/M and including carraying out daily routine, periodical maintenance and attending breakdown etc., complete all as specified and as directed by Engr-in-charge. (a) List of equipment / Control gears installed at Marshaling yard/Control room as under: (i) Step down transformer 315 KVA-06 No , 500 KVA -03 No, 400 KVA -03 No, 200 KVA -04 No & 100 KVA -04 Nos (ii) LT control panel -09 Nos (iii) APFC panel -07 Nos (iv) 6 pole HT struture-02 Nos (v) 4 pole HT struture-09 Nos (vi) 2 pole struture-08 Nos (vii) HT 22 Kv SF-6 Breaker -02 Nos (viii) HT 22 KV Gang opreated device -56 Nos
Manning and operation of sub stn GG1 ,MRF Sub stn, J sub stn, Sub Stn P-20, Sub Stn 'A' and Sub Stn "K'' for Tunir area HT 22 KV electric supply sub station including attending the complaints by employing One No Skilled electrician with uniform for shift of 08 Hours in Three shift in a day from 0600 hrs to 1400 Hrs, 1400 Hrs to 2200 Hrs and 2200 hrs to 0600 Hrs including sunday and holidays for monitoring and recording of all parameters requried, including operating all the incoming and outgoing electrical control switchs of LT /HT sides, replacing blown off fuses on HT sides and communicating with Engineer-in-Charge and also to concern JE E/M and including carraying out daily routine, periodical maintenance and attending breakdown etc., complete all as specified and as directed by Engr-in-charge. (a) List of equipment / Control gears installed at Marshaling yard/Control room as under: (i) Step down transformer 315 KVA-01 No,250 KVA -01 No, 200 KVA -01 No ,1000 KVA -01 Nos & 500 KVA -02 Nos. (ii) LT control panel - 07 Nos (iii) APFC panel - 05 Nos (iv) 6 pole HT struture - 03 Nos (v) HT 22 Kv SF-6 Breaker - 02 Nos (vi) HT 22 KV Gang opreated device -18 Nos
Notes for item No 1 to 4: (i) Rate quoted above including relief staff to the person employed in shifts. (iI) The persons employed shall possess suitable T & P required and No T & P will be issued from the department. (iii) Quoted rate by contractor is inclusive of all necessary transports for staff employed and no transport will be provided by the department. (iv) Weeekly off shall be given to the employed staff and alternate arrangment shall be made by the contractor. (v) The items required to replace will be issued by the department.The contractor shall collect the stores from AGE E/M stores safely carry and incorporate in the work in the above areas. (vi) Cutting of bushes/ small plants a around E/M installations and surrounding area including surface dressing and removing debris to a distance not exceeding 50 mtr including daily cleaning of installaion complete.
(vii) Inform the JE/ AGE EM for any break down or any mishappening. (viii) All relvent norms and IE rules provison shall be adhered whole workman on electric switch gears HT/LT OH/UG lines all type of panels and Electrical circuits and T&P like electrical instruments safety equipment shall be provided by the contractor and the cost is deemed to be included in the rates Ouoted. (ix) Proper uniform wth name plate displaying all the details shall be provided to the duty personel by the contractor as directed by Engr-in-Charge. (x) The contractor/ service providing agency shall be wholly and exclusively responsible for payment of wages of persons engaged by it in compliance with all the statutory obligations under all related legislations as applicable to it from time to time including Minimum Wages Act, Employees Provident Fund Act, ESI Act, etc and the Deptt. MES shall not incur any liability for any expenditure whatsoever on the persons employed by the contractor/ Agency on account of any obligation. The contractor/ service providing agency will be required to provide particulars of PF, Group Insurance of its Employees engaged by him to the GE before processing of RAR payment. (xi) Daily log sheet for erecording all the perameters of electric supply, meter reading etc. including MSEB shutdown details shall be maintained by Contractor as directed by Engineer-in-charge. Any defect/Short coming notice shall be intimated immediately to the JE & Engineer-in-Charge. (xii) Contractor should not retain the old employees of previous contract. (xiii) The Electrician shall be ITI qualified with sufficient experience to rectify electrical fault and attend electric breakdown. (xiv) Man power list with aadhar linked bank account number, qualification certificate and EPF documents will be submitted prior to commencement of manning and operation for necessary sanction from GE.
Atul Enterprises
BRITE INDUSTRIES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .