Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.8 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹44.9 L+₹9,440 (0.21%)Accepted-Finance | L2 | Accepted-Finance ok |
| Sl No | Description | Qty | Unit | AQUA GASEOUS CONTROLS (INDIA) L1 | defence engineers (india) L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of flocculator Assembly spares with the help for required tool & tackles and safety arrangement. Disconnection of all incoming, cutgoing electric connection of clarifier as per Plant In charge. | 4 | Job | 0 ₹3,68,160 Lowest | 0 ₹3,87,040 |
| 2.00 | Supply of flocculators assembly Unit as per GM Design.
a) Bottom Bearing
b) Bevel Gear Teeth 46 (With Slewing Ring Block)
c) Coupling Set
d) Gear Box Spares & Bearing as per sample
e) V Belt Q 667
f) Oil Seal
g) Bearing for Gear | 4 | Set | 0 ₹32,80,400 Lowest | 0 ₹32,94,560 |
| 3.00 | Installation of above said supplied items as per GM drawing and instruction of pant incharge with the help of skilled staff / technical, along with required tools & tackles complete in all respect. | 4 | Job | 0 ₹4,62,560 | 0 ₹4,53,120 Lowest |
| 4.00 | Testing and commissioning of complete job No load and on full load as per site requirement including all T&P charges. | 4 | Job | 0 ₹3,68,160 | 0 ₹3,54,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹91,000
Closing Date
26 Sept 2026, 3:00 pmClosed
Nikhil Kumar
Chandrawal Water Works-I, Civil Lines, Delhi-110054
Repair of 4 nos. flocculators of Geo-Miller make Clariflocculators at Chandrawal Water Works-I
2026_DJB_298623_1
NIT no. 9 (2026-27)
Open Tender
Electrical Works
Item Rate
30 days
Chandrawal WW-II
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Delhi Jal Board
₹91,000
30 Sept 2026
19 Sept 2026
26 Sept 2026
19 Sept 2026
26 Sept 2026
19 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of flocculator Assembly spares with the help for required tool & tackles and safety arrangement. Disconnection of all incoming, cutgoing electric connection of clarifier as per Plant In charge. | 4 | Job | 80 | ₹320 |
| 2 | Supply of flocculators assembly Unit as per GM Design.
a) Bottom Bearing
b) Bevel Gear Teeth 46 (With Slewing Ring Block)
c) Coupling Set
d) Gear Box Spares & Bearing as per sample
e) V Belt Q 667
f) Oil Seal
g) Bearing for Gear | 4 | Set | 80 | ₹320 |
| 3 | Installation of above said supplied items as per GM drawing and instruction of pant incharge with the help of skilled staff / technical, along with required tools & tackles complete in all respect. | 4 | Job | 80 | ₹320 |
| 4 | Testing and commissioning of complete job No load and on full load as per site requirement including all T&P charges. | 4 | Job | 80 | ₹320 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_398309.xls
BOQ • 15.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .