DIVISIONAL SOIL CONSERVATION OFFICER, SAS NAGAR
Soil Conservation Complex, Sector 56, SAS Nagar
Construction of Crate wire structures at village choti jhakhian majri haripur purkhali kakot stone masonry structure village Bari
2026_DOA_172422_2
DSWC/MOH/2026-2027/05
Open Tender
Civil Works
Percentage
90 days
Ropar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
₹1.5 L
9 Sept 2026
7 Aug 2026
18 Aug 2026
7 Aug 2026
18 Aug 2026
7 Aug 2026
DEPARTMENT OF SOIL AND WATER CONSERVATION, PUNJAB
Tender No. DSWC/DSCO/MOHALI/2026-27/05
Construction of Crate Wire Structure/Retaining wall at Village Chhoti Jhakhian, Majri, Haripur, Purkhali, Kakot, Bhaowal and Stone Masonary WATER RECHARGING STRUCTURE Village Bari Under Sub Division Rupnagar Tehsil & Distt. Rupnagar.
RATES FOR CIVIL WORK( Approved by CCS PUNJAB Chandigarh)
Name & Address of Firm/ Bidder
Total Estimated Cost
Quoted by Contractor (as %age less of estimated Amount) Less (-%) Amount Quoted
1 For Construction of Crate Wire Structures Project Village Majri,Tehsil & District Rupnagar
Estimate San.No. 11068 Dated 03-07-2026 for Rs. 1783700.00/-
A. CRATE WIRE STRUCTURE 1
1.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.5 Per Cum 37
1.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 62.7 Per Sqm 187
1.03 Spreading of wire crates as per PWD specifications CSR 23.37 62.7 Per Sqm 70
1.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 18 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
B. CRATE WIRE STRUCTURE 2
1.05 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 9 Per Cum 37
1.06 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 73.8 Per Sqm 187
1.07 Spreading of wire crates as per PWD specifications CSR 23.37 73.8 Per Sqm 70
1.08 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 21.6 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
C. CRATE WIRE STRUCTURE 3
1.09 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.5 Per Cum 37
1.1 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 62.7 Per Sqm 187
1.11 Spreading of wire crates as per PWD specifications CSR 23.37 62.7 Per Sqm 70
1.12 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 18 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
D. CRATE WIRE STRUCTURE 4
1.13 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 9 Per Cum 37
1.14 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 73.8 Per Sqm 187
1.15 Spreading of wire crates as per PWD specifications CSR 23.37 73.8 Per Sqm 70
1.16 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 21.6 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
E. CRATE WIRE STRUCTURE 5
1.17 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 6 Per Cum 37
1.18 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 51.6 Per Sqm 187
1.19 Spreading of wire crates as per PWD specifications CSR 23.37 51.6 Per Sqm 70
1.2 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 14.4 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
F. CRATE WIRE STRUCTURE 6
1.21 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 12 Per Cum 37
1.22 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 99.6 Per Sqm 187
1.23 Spreading of wire crates as per PWD specifications CSR 23.37 99.6 Per Sqm 70
1.24 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 28.8 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
G. CRATE WIRE STRUCTURE 7
1.25 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 12 Per Cum 37
1.26 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 99.6 Per Sqm 187
1.27 Spreading of wire crates as per PWD specifications CSR 23.37 99.6 Per Sqm 70
1.28 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 28.8 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
H. CRATE WIRE STRUCTURE 8
1.29 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 9 Per Cum 37
1.3 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 66.75 Per Sqm 187
1.31 Spreading of wire crates as per PWD specifications CSR 23.37 66.75 Per Sqm 70
1.32 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 18.45 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
I. CRATE WIRE STRUCTURE 9
1.33 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 6 Per Cum 37
1.34 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 51.6 Per Sqm 187
1.35 Spreading of wire crates as per PWD specifications CSR 23.37 51.6 Per Sqm 70
1.36 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 14.4 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
J. CRATE WIRE STRUCTURE 10
1.37 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.5 Per Cum 37
1.38 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 62.7 Per Sqm 187
1.39 Spreading of wire crates as per PWD specifications CSR 23.37 62.7 Per Sqm 70
1.4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 18 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
K. CRATE WIRE STRUCTURE 11
1.41 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.5 Per Cum 37
1.42 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 62.7 Per Sqm 187
1.43 Spreading of wire crates as per PWD specifications CSR 23.37 62.7 Per Sqm 70
1.44 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 18 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
L. CRATE WIRE STRUCTURE 12
1.45 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 6 Per Cum 37
1.46 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 51.6 Per Sqm 187
1.47 Spreading of wire crates as per PWD specifications CSR 23.37 51.6 Per Sqm 70
1.48 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 14.4 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
M. CRATE WIRE STRUCTURE 13
1.49 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.5 Per Cum 37
1.5 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 62.7 Per Sqm 187
1.51 Spreading of wire crates as per PWD specifications CSR 23.37 62.7 Per Sqm 70
1.52 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 18 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
N. CRATE WIRE STRUCTURE 14
1.53 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.5 Per Cum 37
1.54 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 62.7 Per Sqm 187
1.55 Spreading of wire crates as per PWD specifications CSR 23.37 62.7 Per Sqm 70
1.56 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 18 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
O. CRATE WIRE STRUCTURE 15
1.57 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 15 Per Cum 37
1.58 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 110.23 Per Sqm 187
1.59 Spreading of wire crates as per PWD specifications CSR 23.37 110.23 Per Sqm 70
1.6 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 30.75 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
P. CRATE WIRE STRUCTURE 16
1.61 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.5 Per Cum 37
1.62 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 62.7 Per Sqm 187
1.63 Spreading of wire crates as per PWD specifications CSR 23.37 62.7 Per Sqm 70
1.64 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 18 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
Q. CRATE WIRE STRUCTURE 17
1.65 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.5 Per Cum 37
1.66 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 62.7 Per Sqm 187
1.67 Spreading of wire crates as per PWD specifications CSR 23.37 62.7 Per Sqm 70
1.68 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 18 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
TOTAL PROJECT COST
SAY ( as per estimate sanctioned) 816749
2 For Construction of Crate Wire Structures Project Village Haripur,Tehsil & District Rupnagar
Estimate San.No. 11072 Dated 03-07-2026 for Rs. 972700.00/-
A. CRATE WIRE STRUCTURE 4
2.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 37.5 Per Cum 37
2.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 297.9 Per Sqm 187
2.03 Spreading of wire crates as per PWD specifications CSR 23.37 297.9 Per Sqm 70
2.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 90 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
B CRATE WIRE STRUCTURE 5
2.05 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 15 Per Cum 37
2.06 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 121.8 Per Sqm 187
2.07 Spreading of wire crates as per PWD specifications CSR 23.37 121.8 Per Sqm 70
2.08 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 36 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
C. CRATE WIRE STRUCTURE 6
2.09 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 19.5 Per Cum 37
2.1 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 140.53 Per Sqm 187
2.11 Spreading of wire crates as per PWD specifications CSR 23.37 140.53 Per Sqm 70
2.12 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 39.98 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
D. CRATE WIRE STRUCTURE 7
2.13 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 18 Per Cum 37
2.14 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 130.43 Per Sqm 187
2.15 Spreading of wire crates as per PWD specifications CSR 23.37 130.43 Per Sqm 70
2.16 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 36.9 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
E. CRATE WIRE STRUCTURE 8
2.17 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 20.4 Per Cum 37
2.18 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 155.32 Per Sqm 187
2.19 Spreading of wire crates as per PWD specifications CSR 23.37 155.32 Per Sqm 70
2.2 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 38.76 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
F. CRATE WIRE STRUCTURE 9
2.21 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 15 Per Cum 37
2.22 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 110.23 Per Sqm 187
2.23 Spreading of wire crates as per PWD specifications CSR 23.37 110.23 Per Sqm 70
2.24 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 30.75 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
G. CRATE WIRE STRUCTURE 10
2.25 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 15 Per Cum 37
2.26 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 110.23 Per Sqm 187
2.27 Spreading of wire crates as per PWD specifications CSR 23.37 110.23 Per Sqm 70
2.28 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 30.75 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
H. CRATE WIRE STRUCTURE 11
2.29 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 15 Per Cum 37
2.3 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 110.23 Per Sqm 187
2.31 Spreading of wire crates as per PWD specifications CSR 23.37 110.23 Per Sqm 70
2.32 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 30.75 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
I. CRATE WIRE STRUCTURE 12
2.33 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 15 Per Cum 37
2.34 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 110.23 Per Sqm 187
2.35 Spreading of wire crates as per PWD specifications CSR 23.37 110.23 Per Sqm 70
2.36 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 30.75 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
J. CRATE WIRE STRUCTURE 13
2.37 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 15 Per Cum 37
2.38 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 121.8 Per Sqm 187
2.39 Spreading of wire crates as per PWD specifications CSR 23.37 121.8 Per Sqm 70
2.4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 36 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
TOTAL PROJECT COST
3 For Construction of Crate Wire Structures Project Village Purkhali,Tehsil & District Rupnagar
Estimate San.No. 1422 Dated 08-07-2026 for Rs.138800.00/-
A. CRATE WIRE STRUCTURE 2
3.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 12 Per Cum 37
3.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 99.6 Per Sqm 187
3.03 Spreading of wire crates as per PWD specifications CSR 23.37 99.6 Per Sqm 70
3.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 28.8 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
B. CRATE WIRE STRUCTURE 3
3.05 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 12 Per Cum 37
3.06 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 99.6 Per Sqm 187
3.07 Spreading of wire crates as per PWD specifications CSR 23.37 99.6 Per Sqm 70
3.08 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 28.8 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
TOTAL PROJECT COST
4 For Construction of Crate Wire Structures Project Village Kakot,Tehsil & District Rupnagar
Estimate San.No. 1426 Dated 08-07-2026 for Rs. 118700.00/-
A. CRATE WIRE STRUCTURE 7
4.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 15 Per Cum 37
4.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 110.23 Per Sqm 187
4.03 Spreading of wire crates as per PWD specifications CSR 23.37 110.23 Per Sqm 70
4.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 30.75 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
B. CRATE WIRE STRUCTURE 8
4.05 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.5 Per Cum 37
4.06 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 62.7 Per Sqm 187
4.06 Spreading of wire crates as per PWD specifications CSR 23.37 62.7 Per Sqm 70
4.08 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 18 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
TOTAL PROJECT COST
5 For Construction of Crate Wire Structures Project Village Kakot,Tehsil & District Rupnagar
Estimate San.No. 1424 Dated 08-07-2026 for Rs. 302600.00/-
A. CRATE WIRE STRUCTURE 11
5.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.5 Per Cum 37
5.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 62.7 Per Sqm 187
5.03 Spreading of wire crates as per PWD specifications CSR 23.37 62.7 Per Sqm 70
5.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 18 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
B. CRATE WIRE STRUCTURE 12
5.05 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.5 Per Cum 37
5.06 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 62.7 Per Sqm 187
5.07 Spreading of wire crates as per PWD specifications CSR 23.37 62.7 Per Sqm 70
5.08 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 18 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
C. CRATE WIRE STRUCTURE 13
5.09 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.5 Per Cum 37
5.1 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 62.7 Per Sqm 187
5.11 Spreading of wire crates as per PWD specifications CSR 23.37 62.7 Per Sqm 70
5.12 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 18 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
D. CRATE WIRE STRUCTURE 14
5.13 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.5 Per Cum 37
5.14 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 62.7 Per Sqm 187
5.15 Spreading of wire crates as per PWD specifications CSR 23.37 62.7 Per Sqm 70
5.16 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 18 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
E. CRATE WIRE STRUCTURE 15
5.17 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 22.5 Per Cum 37
5.18 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 180.9 Per Sqm 187
5.19 Spreading of wire crates as per PWD specifications CSR 23.37 180.9 Per Sqm 70
5.2 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 54 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
TOTAL PROJECT COST
6 For Construction of Crate Wire Structures Project Village Kakot,Tehsil & District Rupnagar
Estimate San.No. 1608 Dated 09-07-2026 for Rs. 87000.00/-
A. CRATE WIRE STRUCTURE 9
6.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.5 Per Cum 37
6.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 62.7 Per Sqm 187
6.03 Spreading of wire crates as per PWD specifications CSR 23.37 62.7 Per Sqm 70
6.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 18 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
B. CRATE WIRE STRUCTURE 10
6.05 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.5 Per Cum 37
6.06 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 62.7 Per Sqm 187
6.07 Spreading of wire crates as per PWD specifications CSR 23.37 62.7 Per Sqm 70
6.08 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 18 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
TOTAL PROJECT COST
1 For Construction of Stone Masonary Water recharging Structures Project Village Bari,Tehsil & District Rupnagar
Estimate San.No. 8037 Dated 25-05-2026 for Rs. 2523600.00/-
A. STONE MASONARY WATER RECARGING STRUCTURE
1.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 50.5 Per Cum 37
1.02 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6 b (i) as per PWD specifications. 7.8 Per Cum 3259
1.03 Squared Rubbled Masonary 1:5 Below Ground Level and Below Plinth Level CSR 12.17 51.83 Per Cum 5318
1.04 Square rubble boulder masonary 1:5 above plinth level CSR 12.17 as per PWD specifications. 44.13 Per Cum 5780
1.05 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a (ii) as per PWD specifications. 2.71 Per Cum 4802
1.06 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. CSR 15.9 77.8 Per Sqm 202.7
1.07 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 26 Per Sqm 187
1.08 Spreading of wire crates as per PWD specifications CSR 23.37 26 Per Sqm 70
1.09 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 6 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
B. STONE MASONARY WATER RECARGING STRUCTURE
1.1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 50.5 Per Cum 37
1.11 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6 b (i) as per PWD specifications. 7.8 Per Cum 3259
1.12 Squared Rubbled Masonary 1:5 Below Ground Level and Below Plinth Level CSR 12.17 51.83 Per Cum 5318
1.13 Square rubble boulder masonary 1:5 above plinth level CSR 12.17 as per PWD specifications. 45.41 Per Cum 5780
1.14 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a (ii) as per PWD specifications. 2.71 Per Cum 4802
1.15 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. CSR 15.9 66.55 Per Sqm 202.7
1.16 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 26 Per Sqm 187
1.17 Spreading of wire crates as per PWD specifications CSR 23.37 26 Per Sqm 70
1.18 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 6 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
C. STONE MASONARY WATER RECARGING STRUCTURE
1.19 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 50.5 Per Cum 37
1.2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6 b (i) as per PWD specifications. 7.8 Per Cum 3259
1.21 Squared Rubbled Masonary 1:5 Below Ground Level and Below Plinth Level CSR 12.17 53.37 Per Cum 5318
1.22 Square rubble boulder masonary 1:5 above plinth level CSR 12.17 as per PWD specifications. 51.32 Per Cum 5780
1.23 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a (ii) as per PWD specifications. 2.63 Per Cum 4802
1.24 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. CSR 15.9 86.05 Per Sqm 202.7
1.25 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 26 Per Sqm 187
1.26 Spreading of wire crates as per PWD specifications CSR 23.37 26 Per Sqm 70
1.27 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 6 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
D. STONE MASONARY WATER RECARGING STRUCTURE
1.28 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 46.46 Per Cum 37
1.29 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6 b (i) as per PWD specifications. 7.66 Per Cum 3259
1.3 Squared Rubbled Masonary 1:5 Below Ground Level and Below Plinth Level CSR 12.17 53.26 Per Cum 5318
1.31 Square rubble boulder masonary 1:5 above plinth level CSR 12.17 as per PWD specifications. 31.96 Per Cum 5780
1.32 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a (ii) as per PWD specifications. 2.38 Per Cum 4802
1.33 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. CSR 15.9 71.36 Per Sqm 202.7
1.34 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 26.8 Per Sqm 187
1.35 Spreading of wire crates as per PWD specifications CSR 23.37 26.8 Per Sqm 70
1.36 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 4.8 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
TOTAL Project Cost
1 For Extension of Crate Wire Structure/Retaining Wall Village Chhoti Jhakhian,Tehsil & District Rupnagar
Estimate San.No. 1443 Dated 09-07-2026 for Rs. 334500/-
Crate Wire Structure/Retaining Wall (Scheme - PMKSY WDC 2.0)
1.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 55 Per Cum 37
1.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 428 Per Cum 187
1.03 Spreading of wire crates as per PWD specifications CSR 23.37 428 Per Cum 70
1.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 148.5 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
Round Off 44.19
Final Sanctioned Amount
1 For Construction of Crate Wire Structures No.1,2,3 & 4 Project Village Bhaowal,Tehsil & District Rupnagar
Estimate San. No. 885 Dated 21-05-2026 for Rs. 636000/-
A. Crarte Wire Structure No. 1 (Scheme - PMKSY WDC 2.0)
1.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 32 Per Cum 37
1.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 195.6 Per Cum 187
1.03 Spreading of wire crates as per PWD specifications CSR 23.37 195.6 Per Cum 70
1.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 71.36 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
B. Crarte Wire Structure No. 2 (Scheme - PMKSY WDC 2.0)
1.05 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 32 Per Cum 37
1.06 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 195.6 Per Cum 187
1.07 Spreading of wire crates as per PWD specifications CSR 23.37 195.6 Per Cum 70
1.08 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 71.36 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
C. Crarte Wire Structure No. 3 (Scheme - PMKSY WDC 2.0)
1.09 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 32 Per Cum 37
1.1 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 195.6 Per Cum 187
1.11 Spreading of wire crates as per PWD specifications CSR 23.37 195.6 Per Cum 70
1.12 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 71.36 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
D. Crarte Wire Structure No. 4 (Scheme - PMKSY WDC 2.0)
1.09 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 32 Per Cum 37
1.1 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 195.6 Per Cum 187
1.11 Spreading of wire crates as per PWD specifications CSR 23.37 195.6 Per Cum 70
1.12 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 71.36 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
GRAND TOTAL OF CWS NO. 1,2,3 & 4
Sign Board (6' x 4') 3000
Final Sanctioned Amount
2 For Construction of Crate Wire Structure/Retaining Wall Project Village Manguwal Diwari,Tehsil & District Rupnagar
Estimate San.No. 870 Dated 21-05-2026 for Rs. 475700/-
Crate Wire Structure/Retaining Wall (Scheme - PMKSY WDC 2.0)
2.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 77 Per Cum 37
2.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 607.84 Per Cum 187
2.03 Spreading of wire crates as per PWD specifications CSR 23.37 607.84 Per Cum 70
2.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 209.3 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
Sign Board (6' x 4') 3000
Final Sanctioned Amount
3 For Construction of Crate Wire Structure/Retaining Wall Village Chhoti Jhakhian,Tehsil & District Rupnagar
Estimate San.No. 868 Dated 21-05-2026 for Rs. 598500/-
Crate Wire Structure/Retaining Wall (Scheme - PMKSY WDC 2.0)
3.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 94.5 Per Cum 37
3.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 710.14 Per Cum 187
3.03 Spreading of wire crates as per PWD specifications CSR 23.37 710.14 Per Cum 70
3.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 274.05 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
Sign Board (6' x 4') 3000
Final Sanctioned Amount
4 For Construction of Crate Wire Structures/Retaining Walls No.1 & 2 Project Village Bhaowal,Tehsil & District Rupnagar
Estimate San. No. 1026 Dated 03-06-2026 for Rs. 549800/-
A. Crarte Wire Structure/Retaining Wall No. 1 (Scheme - PMKSY WDC 2.0)
4.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 54 Per Cum 37
4.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 367.8 Per Cum 187
4.03 Spreading of wire crates as per PWD specifications CSR 23.37 367.8 Per Cum 70
4.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 118.8 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
B. Crarte Wire Structure/Retaining Wall No. 1 (Scheme - PMKSY WDC 2.0)
4.05 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 54 Per Cum 37
4.06 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 367.8 Per Cum 187
4.07 Spreading of wire crates as per PWD specifications CSR 23.37 367.8 Per Cum 70
4.08 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 118.8 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
GRAND TOTAL OF CWS/Rt. Wall NO. 1 & 2
Final Sanctioned Amount
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
DNIT.pdf
Tender Documents • 0.49 MB
finbid1.xls
Additional Documents • 0.10 MB
03Corrigendumdate.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .