Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹5,800
Closing Date
27 Nov 2021, 5:00 pmClosed
Executive Engineer R B M C Shimla
Executive Engineer R B M C Shimla
Construction of Garrage at Green Gate ward No 1 (SH Construction of Retaining wall and R C C work etc)
2021_MC_53634_2
3144Dated03112021
Open Tender
Civil Works
Item Rate
60 days
Shimla
Please refer Tender Documents
7 documents required · 7 mandatory
₹350
Executive Engineer R B M C Shimla
₹5,800
6 Dec 2021
16 Nov 2021
29 Nov 2021
16 Nov 2021
27 Nov 2021
16 Nov 2021
Amount
Excavation in earth work in all kinds of earth work including spade work, pick work, jumper work, B/work chiseling wedging out of rock etc. up to all lifts in earth work including dressing of sides and bed and disposing of excavated earth to be leveled and neatly dressed as directed by the Engineer-in-charge. (Disposal of earth/muck in MC dumping site at Bharyal free of cost, transportation charges will be paid extra)
Providing from work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling upto all heights and removal of the same for insitu-reinforced concrete & plain concrete work in flat surfaces such as soffits of suspended floors, roofs, landings and the like Floors etc. upto all thickness
Columns, pillars, posts and struts, square, rectangular or polygonal in plan
Edges of slabs and breaks in floors and walls under all cm. wide
Providing and laying cement concrete work 1:1.5:3 (1 cement : 1.5 sand :3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in :Column, pillars, posts and struts upto floor two level :
Providing and laying cement concrete work 1:1 ½ :3 (1 cement: 1 ½ sand: 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in lintels, beams girders bressumers and cantilevers upto floor two level
Providing mild steel/ Tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor all level-tor steel
Random rubble masonry/polygonal rubble masonry (Uncoursed/brought to courses) with hard stone of approved quality in foundation and plinth including leveling up with cement concrete 1:6:12 (1 cement: 6 sand; 12 graded stone aggregate 20mm nominal size) in cement mortar 1:6 (1 cement: 6 sand) in breast walls and retaining walls
KHOOB CHAND
ABDUL RAZAK BUTT
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .