Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.9 LAccepted-Finance | ₹27.9 L | L1 | Accepted-Finance responsive. |
| 2 | L2₹32.7 L+₹4.8 L (17.3%)Accepted-Finance | ₹32.7 L+₹4.8 L (17.3%) | L2 | Accepted-Finance responsive. |
| 3 | L3₹45.0 L+₹17.1 L (61.1%)Accepted-Finance C 9 53 IIND FLOOR SECTOR 08 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | ₹45.0 L+₹17.1 L (61.1%) | L3 | Accepted-Finance responsive. |
| 4 | L4₹56.7 L+₹28.8 L (103.0%)Accepted-Finance | ₹56.7 L+₹28.8 L (103.0%) | L4 | Accepted-Finance responsive. |
Tender Value
₹5 Cr
EMD Value
₹5.8 L
Closing Date
21 May 2026, 1:00 pmClosed
Chief Executive Officer
Chief Executive Officer, Sushma Swaraj Marg, Sadar Bazar, Delhi Cantt.
Term contract for improvement, repair, construction of footpath/ walking plaza, jogging tracks in Delhi Cantonment.
2026_DGDE_759582_1
DCB/8/C-8/2026-27
Open Tender
Civil Works
Percentage
365 days
Delhi Cantonment Board
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Chief Executive Officer, Delhi Cantonment Board
₹5.8 L
27 May 2026
8 Apr 2026
22 May 2026
8 Apr 2026
21 May 2026
8 Apr 2026
8 Apr 2026 - 21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | To execute all the Civil works under term contract for improvement, repair, construction of footpath/ walking plaza, jogging tracks in Delhi Cantonment using fresh kerb stones, fresh interlocking paver blocks, concrete tiles, sand stone pavements, pavement works of any kind & like and as specified under scope of work on Page No.23 in the technical bid and as per specifications contained in CPWD specifications Vol. I & II of 2019 with upto date correction slips and as directed. The work shall be priced at par with DSR-2023 CPWD subject to quoted percentage by the tenderer. The work shall be carried out as per work order (s) placed under the contract from time to time during entire period of contract and as directed by Engineer-in-charge.
Note: Tenderer shall insert the percentage here in below by selecting the option excess (+) or less (-) to quote the percentage above/ below the DSR- 2023 CPWD respectively. The amount inserted by the Deptt is an estimated cost but tender shall be accepted only on the percentage inserted/ quoted by tenderer. Further it shall be deemed that the contractor has read & understood scope of work on Page No.23 and clause 21 on page No.111-112 of the Technical bid (RFP) & the quoted rates shall be inclusive of adhering to these provisions fully.
The amount provisioned under the contract is provisional and the execution of works shall depend upon the requirement for improvement, repair, construction of footpath/ walking plaza, jogging tracks etc. generated from time to time during the year. Therefore the amount may vary on negative side in the event of less or no requirement for improvement, repair, construction of footpath/ walking plaza, jogging tracks etc. generated during the year. In that event no compensation/ damages on account of deemed profit shall be applicable/payable for whatsoever reason. | - | As per DSR - 2023 CPWD with upto date correction slips issued upto last date of issue of tender | 6,00,00,000 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
C-8.pdf
Tender Documents • 2.00 MB
BOQ_850797.xls
BOQ • 0.34 MB
8c.pdf
PDF • 0.55 MB
c8.pdf
PDF • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .